Hydrant_0332_Marsh_Road.pdf

PDF 54 KB Posted

Attached to
Beaufort County Detention Center Gymnasium Conversion Project
Solicitation number
090126
Issued by
Barnwell County, South Carolina

About this file

This is a Hydrant Flow Test Results document for the Beaufort County Detention Center Gymnasium Conversion Project in South Carolina. The document presents technical specifications and performance data for hydrant PR0332 located on Marsh Road, which was tested on May 7, 2024. The hydrant, a Mueller Super Centurion model manufactured in 1988, was subjected to a five-minute flow test beginning at 12:10 PM. Testing parameters included static pressure measurements of 59 psi, residual pressure of 39 psi, and a pitot pressure of 20 psi. The hydrant demonstrated a discharge capacity of 750.65 gallons per minute with a total volume of 3,753.25 gallons released during the test period. The hydrant opens in a counterclockwise direction with a steamer nozzle height of 20 inches to grade.

This flow test data appears to serve as supporting documentation for infrastructure evaluation related to the Beaufort County Detention Center Gymnasium Conversion Project. The hydrant performance metrics establish baseline fire suppression capabilities in the facility vicinity, which is essential for verifying adequate water supply and pressure for emergency response systems required during the renovation and conversion of the gymnasium into a dormitory-style inmate housing unit. The test results confirm the hydrant's operational status and flow capacity necessary to support the security and safety infrastructure improvements planned as part of the detention center expansion project.

View the file

Other files

File Type Posted
Beaufort_County_Detention_Center_Gymnasium_Conversion_Project.pdf PDF
2026.07.23_-_PROJECT_MANUAL.pdf PDF
2026.07.23_-_DRAWINGS.pdf PDF
Hydrant_0321_parking_lot_magistrate_court_Ribaut_road.pdf PDF
Hydrant_0336_Duke_Street..pdf PDF
E2-1_-_FLOOR_PLAN_AND_DETAILS.dwg DWG drawing
M0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
P2-1_-_FLOOR_PLANS_-_PLUMBING.dwg DWG drawing
26-2574_-_Beaufort_County_-_106_Ribaut_Rd_Gymnasium_-_Lim_ACM.pdf PDF
P5-1_-_DETAILS.dwg DWG drawing
S1-1-1_-_SECOND_FLOOR_&_ROOF_FRAMING_PLAN_&_DETAILS.dwg DWG drawing
M2-1_-_MECHANICAL_CONSTRUCTION_PLANS.dwg DWG drawing
P0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
S0-0-1_-_GENERAL_NOTES_AND_LEGENDS.dwg DWG drawing
M0-2_-_SCHEDULES_AND_DETAILS.dwg DWG drawing
FP0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
M1-1_-_MECHANICAL_DEMOLITION_PLANS.dwg DWG drawing
FP1-0_-_FLOOR_PLAN.dwg DWG drawing
A1-3_-_MULTI-PURPOSE_TOILET_PLANS_&_DETAILS.dwg DWG drawing
A1-0_-_OVERALL_PLANS.dwg DWG drawing
COVER.dwg DWG drawing
A1-2_-_MULTI-PURPOSE_ELEVATIONS,_FRAME_TYPES_&_DETAILS.dwg DWG drawing
A1-1_-_MULTI-PURPOSE_PLANS.dwg DWG drawing
E0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
Detention_Center_Multi-Purpose_Renovation_Plans_Review.pdf PDF
A3-1_-_FINISH_SCHEDULE.dwg DWG drawing
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hydrant Flow Test Results

Hydrant ID: PR0332

Date of Flow Test: May 7, 2024 12:15 PM

Manufacture Year: 1988

Manufacturer: Mueller

Model: Super Centurion

Direction to Open: CCW (L)

Steamer Nozzle Height to Grade: 20

Time of Flow Test Start: 12:10

Time of Flow Test End: 12:15

Total Test Time: 5

Static Pressure (psi): 59

Residual Pressure (psi): 39

Pitot Pressure: 20

Flow at 20 psi: 1,076.6

Discharge (gpm): 750.65

Volume Released (gal): 3,753.25

File details come from the government source that posted it. Updated .