TASK ORDER 0002 QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_2_HTC711-18-R-D007_Ques_Ans.pdf | ||
| HTC711-18-R-D007_SDDC_TEA_Amendment_0002.pdf | ||
| Atch_1_HTC711_18_R_D007_Amendment_0002__6_Jul_18.pdf | ||
| HTC711-18-R-D007_SDDC_TEA_Amendment_0001_signed.pdf | ||
| Atch_1_Amendment_0001_HTC711-18-R-D007_TEA_Synp.pdf | ||
| Atch_2_PWS_TO_1_27_Mar_18.pdf | ||
| Atch_11_TO_2_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| Atch_14_TEA_PPQ.docx | DOCX document | |
| Atch_8_-_IDIQ_Labor_Categories_&_Rates.xls | XLS spreadsheet | |
| Atch_3_PWS_TO_2_27_Mar_18.pdf | ||
| Atch_7_Labor_Cat_Requirements.pdf | ||
| Atch_12_TO_3_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| Atch_10_TO_1_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| Atch_5_QASP_TO_1.pdf | ||
| Atch_9_TEA_RFP_Info_Sheet_22_May_18.docx | DOCX document | |
| HTC711_18_R_D007_TEA__Final.pdf | ||
| Atch_4_PWS_TO_3_27_Mar_18_(SAMPLE_ONLY).pdf | ||
| Atch_1_PWS_IDIQ_5_APR_18.pdf | ||
| Atch_13_TEA_PP_Ref_Sheet.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING OFFICER’S REPRESENTATIVE (COR)
MANUAL
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
USTRANSCOM
HTC711-18-R-D007
Task Order 0002 Traffic Engineering Publications, Training Materials, and Tools
APPROVED: ## Month 2018
JASON W. COWIN, PE Matthew J. Hellmann Branch Chief, Traffic Engineering Contracting Officer
SDDC/TEA USTRANSCOM/TCAQ-D
Acquisition: Proficient, Professional, & Proud
TABLE OF CONTENTS
1.0. INTRODUCTION Page 2
2.0. PURPOSE Page 2
3.0. ROLES AND RESPONSIBILITIES Page 2
4.0. METHODS OF SURVEILLANCE AND PERFORMANCE OBJECTIVES Page 3
5.0. DOCUMENTATION REQUIREMENTS Page 4
6.0. WIDE AREA WORK FLOW/CERTIFICATION OF SERVICES Page 7
7.0. CPARS Page 8
8.0. TRAINING Page 8
9.0. CONTRACTOR COMPLIANCE WITH COMBATING Page 8
TRAFFICKING IN PERSONS
ATTACHMENTS
1. QUARTERLY PERFORMANCE REPORT
2. CONTRACT DISCREPANCY REPORT
3. CONTRACT DISCREPANCY REPORT LOG
4. CPARS
5. WAWF
1.0. INTRODUCTION
1.1. This Quality Assurance Surveillance Plan (QASP) provides the Contracting Officer’s Representative (COR) effective and systematic surveillance procedures to be used in monitoring contractor performance in accordance with the requirements listed in the Performance Work Statement (PWS) entitled “Task Order 002, IDIQ Task 2. Traffic Engineering Publications, Training Materials, and Tools”. This plan sets forth the procedures and guidelines the COR shall use in evaluating the technical performance of the contractor.
2.0. PURPOSE
2.1. This plan describes the systematic methods used to measure performance and to identify reports required and resources to be employed. This plan provides a means for evaluating whether the contractor is meeting the objectives as identified in the PWS.
2.2. This plan is designed to define roles and responsibilities, identify performance objectives, define methodologies to be used in monitoring and evaluating contractor performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
3.0. ROLES AND RESPONSIBILITIES
3.1. The Contracting Officer (CO) and the Primary/Alternate Contracting Officer’s Representative (COR) shall monitor contractor performance on a continuing basis. Points of Contact are as follows:
CO: Mr. Matthew Hellmann matthew.j.hellmann.civ@mail.mil
DSN 770-7071
Primary COR: Mr. Jason W. Cowin jason.w.cowin.civ@mail.mil
DSN 770-5218
Alternate COR: Mr. Mickeal D. Carda mickeal.d.carda.civ@mail.mil
DSN 770-5450
Wide Area Work Flow (WAWF) POC: Mr. Andrew Renth andrew.j.renth.civ@mail.mil
DSN 770-7115
Contractor Performance Assessment Reporting System (CPARS) POC:
Mr. Michael Staley Michael.a.staley6.civ@mail.mil
DSN 770-6720
mailto:matthew.j.hellmann.civ@mail.mil mailto:andrew.j.renth.civ@mail.mil mailto:Michael.a.staley6.civ@mail.mil
3.2. Contracting Officer (CO) RESPONSIBILITIES. The CO performs pre-award functions and awards or executes a contract and performs post-award functions, has overall responsibility for contract administration, and is the primary focal point for formal Government-Contractor Interface. The CO is responsible for monitoring contractor compliance and resolving disagreements regarding the interpretation of contract terms and conditions. The CO may call upon the expertise of other Government individuals as required. Revisions to the contract shall be authorized by the CO. Additionally, the CO is responsible for approving the QASP and any changes thereto.
3.3. Contracting Officer’s Representative (COR) RESPONSIBILITIES (Applies to both the Primary and Alternate COR).
3.3.1. The COR is an individual designated in accordance with (IAW) subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions. The COR serves as a functional expert and is responsible for monitoring, assessing, recording, and reporting the technical performance of the contractor on a continuous basis. The COR schedules surveillance activities; evaluates and documents contractor performance; initiates requests for and evaluates adequacy of corrective actions; and reports contractor performance of contractor requirements. The COR shall be sufficiently trained to perform the required duties and shall ensure they are knowledgeable of the terms and conditions of the contract.
4.0. METHODS OF SURVEILLANCE AND PERFORMANCE OBJECTIVES
4.1. 100% Inspection
100% inspection is the type of surveillance selected for this Task Order.
The results of these inspections shall be documented and, if necessary, provided to the CO. The CO shall handle each documented discrepancy on a case-by-case basis.
The following Service Delivery Summary (SDS) is the most important deliverables that, when met, will ensure task order performance is satisfactory. While the contractor is fully expected to comply with all requirements in the Performance Work Statement (PWS), the Government’s assessment of contractor performance will focus mainly on the objective listed below.
Contract Deliverables PWS
Paragraph Performance Threshold
Draft, Draft-Final and Final Pamphlets completed in an accurate and timely manner
3 No more than one late delivery and no more than five days late. No more than two sets of corrections/edits with all corrections accomplished within five days of notice.
Events (e.g., In Process Reviews, Meetings, Briefings) planned and conducted with target audience
3 Events held within their scheduled timeframes with no more than one formal complaint received per event. Up to 95% of all existing program issues completed or closed. Exception noted for those issues to remain open based on prior approval by the COR.
Host SMART 4 Application has a 95% availability rate
This QASP comprehensively guides the surveillance team’s activities and has been developed in a format to ensure ease of understanding
5.0. DOCUMENTATION REQUIREMENTS
5.1. Official File. The primary COR must maintain an official file for each contract assigned. The official COR files must be kept in hard copy or electronic format. If kept in electronic format, the location of files must be secured from unauthorized access. This file must be available for review by the contracting officer, Inspector General, GAO or other authorized officials. The file must include, as a minimum –
• A complete, current copy of the contract and all contract modifications (the contracting officer will provide, via email, copies of every modification);
• Current copy of Quality Assurance Surveillance Plan;
• A copy of the contracting officer’s letter(s) of delegation and other documentation describing the COR’s duties and responsibilities;
• Copies of certificates/evidence of attendance for all COR related training (i.e., CLC 106, COR With a Mission Focus; Ethics Training, provided by local legal counsel or DAU CLM 003, Ethics Training for Acquisition Technology and Logistics Workforce; contract specific training; and refresher training);
• Documentation of actions taken in accordance with the delegation of authority;
• All correspondence initiated concerning performance of the contract;
• All correspondence to and from the contracting officer and the contractor;
• Names and social security numbers of all employees provided by the contractor for base passes;
• All memorandum for records (MFRs) or minutes of pre-performance conferences, meetings, or discussions with the contractor, or others, pertaining to the contract or contract performance;
• Records pertaining to Government-Furnished Property (GFP);
• Record of all inspections performed and the results;
• COR Performance Review by the contracting officer; and
• COR File Review by Contract Administrator
5.2. As a matter of practice when holding discussions or conducting business with contractors, the COR shall prepare Memoranda for Record (MFRs) of meetings, trips, and telephone conversations relating to the contract. The MFR should be prepared no later than one business day after a significant meeting or discussion with the contractor. Each MFR, or other similar records, and correspondence relating to the contract shall cite the contract number and list names and titles of all participants. A copy of all actions or correspondence shall be furnished to the contracting officer.
5.2.1. Some tips to remember:
• Do not rely on your memory - document events on the day or next working day after they occur.
• Keep a record of important telephone conversations.
• Take good meeting notes, even for informal meetings.
5.3. Since the COR is an authorized representative of the contracting officer, the COR’s records are a part of the official post-award contract files and shall be forwarded to the CO for retirement with the official contract file upon completion of the contract.
5.4. Performance Documentation. Documentation is required to record, evaluate, and report the contractor’s performance. CORs are required to maintain accurate and detailed records of the contractor’s performance and keep the CO informed. COR must document each surveillance as it is accomplished and maintain open lines of communication with the CO, discussing discrepancies that may warrant deficiency notices or CDRs. (Note: Observation of Performance Objective 1, Facilitate on-time aircraft departure, does not have to be documented unless there is a delay.)
5.4.1. Surveillance Activity Checklists. COR will use a Surveillance Activity Checklist (Attachment 1) to record observations and provide a complete picture of the contractor’s performance. Separate checklists will be used each time an evaluation is accomplished (checklists are tailored for specific performance objectives). As COR record their findings they must be aware of each situation and provide a narrative to identify performance that is satisfactory, above, or below the standard.
5.4.2. Customer Complaints. A customer complaint can be filed by anyone interacting with the contractor in any capacity. The burden of documenting the complaint rests predominantly with the COR. Once a complaint is received, the COR will assign the complaint a tracking number using the Customer Complaint Log (Attachment 2) and initiate a Customer Complaint Inquiry Form (Attachment 3) to document the actions taken during the investigation. Once the COR has completely investigated the complaint and documented the results, a recommendation will be made to the CO.
5.5. Quarterly Evaluations. The COR will complete a quarterly evaluation of the contractor’s performance using the format in Attachment 4. The letter will summarize all observations during the quarter to include performance that is above the standard, valid customer complaints and failed performance objectives. This letter will be forwarded to the FD not later than the 5th working day after the end of the quarter. The FD has two days to review and then forward to the CO. The quarterly evaluation is never given to the contractor by anyone other than the CO. The CO will prepare a letter to the contractor which includes the pertinent information from the COR. The CO will sign the letter, send to the contractor and provide a copy to the PCO and Program Management Office by the 10th working day after the end of the quarter.
5.6. Unacceptable Performance
5.6.1. The COR shall record circumstances (time, date, location, and defective element) surrounding an observed discrepancy. When unacceptable performance, which was not caused or contributed to by government actions, is documented, the COR shall take the following actions:
• If it is a critical discrepancy, immediately contact the CO.
• Inform the contract manager or alternate contract manager of the unacceptable performance and reasons why it is unacceptable.
• Afford them the opportunity to show the problem has already been identified and corrective action is being taken. A deficiency may not be recorded if evidence is shown where the contractor’s quality program has already documented the deficiency and timely corrective action was taken to remedy the problem.
• Evaluate the effectiveness of the contractor’s corrective action. Trends shall be tracked and repeated failures annotated.
• Ask the contract manager or alternate contract manager to sign the checklist acknowledging receipt; and provide them a copy of the signed checklist. If the contractor refuses to sign the inspection, the COR shall document the contractor’s refusal and advise the CO of the situation.
5.6.2. Contract Discrepancy Report (CDR). If at any time during the surveillance period, the results of surveillance show unacceptable observations during the period, and the COR determines that it is not government caused or the service cannot be re-performed, a Contract Discrepancy Report (CDR) may be issued. The COR shall follow the below steps for CDRs:
Step 1 - The COR shall call the CO and discuss the discrepancy to ascertain whether a CDR is warranted.
Step 2 - The COR shall complete Part 1, blocks 1 through 5, and the contract number and discrepancy report number blocks, Parts 2 and 3, of the CDR. A template has been provided in Attachment 2. Note: Block 5, discrepancy or problem, shall be completed in as much detail as possible. If additional space is required, the COR may continue on another page. The COR shall include the PWS paragraph reference and initiate a CDR log entry provided in Attachment 3.
Step 3 - The COR shall submit a copy of the CDR to the CO.
Step 4 - The CO shall sign and date blocks 6a and 6b of the CDR and forward Parts 1 and 2 to the contractor.
Step 5 - The contractor shall complete Part 2 of the report and return that page only to the CO.
The CO shall review the response and submit a recommendation (accept or reject) to the COR.
After discussion with the CO, the COR shall either accept or reject the contractor’s response by completing block 11 and signing and dating blocks 12a and 12b of the CDR. Note: An explanation is required if the COR rejects the contractor's response.
Step 6 - The COR shall return Part 3 only of the CDR to the CO. The CO shall complete block 13, government actions.
Step 7 - The CO shall send Part 3 of the CDR back to the contractor representative for closeout signature. Once the contractor has signed the close out portion of the form, the CO shall sign and provide a complete copy of the CDR to the contractor and the COR.
Step 8 - The COR shall complete the CDR log entry.
5.6.3. Discrepancy Notice. In cases where the discrepancy is not serious as to warrant a CDR, but still needs to be brought to the contractor’s attention, a Deficiency Notice may be issued by the CO to the contractor.
6.0. WIDE AREA WORK FLOW/CERTIFICATION OF SERVICES
6.1. Payment processing is an important aspect of the COR’s job. Just as the government expects the contractor to meet all contract requirements for quality, quantity and timeliness, the contractor expects no less of the government in meeting its obligation to timely, accurate payment for supplies and services received.
6.2. (Applies to FFP only) Is responsible for inspection and acceptance of services or contract deliverables and for reviewing and accepting invoices submitted. You must verify that services/items were received.
You should also ensure that this review and acceptance is documented in the COR file. You are responsible for reviewing and processing the receiving report within seven days after the invoice is received. An informational e-mail indicating the completion of the receiving report must be sent to the CO or Contract Specialist, as appropriate.
6.3. Labor Hour (LH)/Cost CLINS This contract contains Cost line items. Invoices for these items must be processed through the Defense Contract Audit Agency (DCAA). The COR will receive the monthly receiving report by using the Wide Area Work Flow – Admin By View Only (WAWF-RA) electronic form. The COR will be notified by email when the contractor has initiated a Cost Voucher document in the WAWF system. At that point the COR shall review the invoice within 2 work days of email notification. If there is a problem with the invoice, immediately contact the Contracting Officer. If everything is correct, document your file that you reviewed the invoice and found no discrepancies. No further action is required.
6.3.1. Registration – See Attachment 4 for instructions.
6.4. Unacceptable Services. The following statement shall be annotated in the "Comments Section" of the WAWF COMBO document when there are outstanding CDRs, "CDRs XXX have been issued. Payment may be made pending resolution of CDRs XXX. Any deductions caused by these CDRs will be taken against future invoices."
7.0. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
7.1. CPARS is a web-enabled application that collects and manages a library of automated contractor report cards. CPARS data may be used to effectively communicate contractor strengths and weaknesses on a given contract during a specific period of time. The CPARS assesses a contractor’s performance and provides a record, both positive and negative, on a given contract during a specific period of time. Each assessment shall be based on objective (or measurable subjective) data. Upon request, CPARS training will be given to the COR by the Contracting Officer or designee.
7.2. All CPARS information is treated as “For Official Use Only/Source Selection Information” in accordance with FAR 3.104 and the DoD Guide to Collection and Use of Past Performance Information.
Access to the CPARS Automated Information System (AIS) is restricted to those individuals with an official need to know.
7.3. Annual Assessment. An annual assessment of the contractor’s performance shall be completed. The COR shall use the Quarterly Evaluations (paragraph 7.5) as the basis for the annual assessment.
Generally, it is wise to first draft the assessment and send to the Assessing Official (AO) for review prior to finalizing in CPARS. This eliminates the need for any corrections in CPARS. See Attachment 5 for additional information. In addition, whenever the Primary COR changes, the outgoing Primary COR shall complete an interim assessment and forward the original to the contracting officer and retain a copy in the COR file.
8.0. TRAINING
8.1. Every COR must receive training prior to performing duties. Initial training consists of DAU Course CLC 106, COR With a Mission Focus, and can be accessed at the DAU site https://learn.dau.mil/html/login/login.jsp. We must have a proper delegation letter from
8.2. Contract Specific Training will be provided by the CO after CLC 106 is successfully completed. This will generally occur at the Post-Award Conference.
8.3. Refresher Training. CORs must retake CLC 106 every three years.
8.4. Ethics Training. Each COR must complete CLM 003, Ethics Training for Acquisition Technology and Logistics Workforce, or training provided by local legal counsel. CLM 003 can be found at https://learn.dau.mil/html/login/login.jsp.
9. CONTRACTOR COMPLIANCE WITH COMBATING TRAFFICKING IN PERSONS
9.1. The COR will monitor the contractor’s performance regarding trafficking in persons such that non-compliance with FAR clause 52.222-50, Combating Trafficking in Persons, is brought to the immediate attention of the Contracting Officer.
https://learn.dau.mil/html/login/login.jsp https://learn.dau.mil/html/login/login.jsp
ATTACHMENT 1
date
MEMORANDUM FOR Contracting Officer, TCAQ-X
FROM: (Insert office symbol and address for the COR)
SUBJECT: Monthly Evaluation Report for Contract HTC711-0X-D-XXXX, (Insert Name of Contract)
1. The following information is provided for your information/action regarding subject contract for the month of XXX XX.
Standard performance area categories a-f must be evaluated to correspond with CPARS. Performance areas that do not apply to an individual contract may be evaluated as N/A. Additional performance areas may be added to tailor to an individual contract.
a. Quality of Product/Service Rating: (Provide a rating of Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory)
• Contract Discrepancy Reports Issued: (Insert number of CDRs issued) o (Provide a brief description of each CDR)
• Other Observed Deficiencies: (Insert number of other deficiencies observed) o (Provide a brief description of each deficiencies observed)
• Over and Above Initiatives: (Insert number of initiatives) o (Provide a brief description of each initiative)
b. Schedule Rating: (Provide a rating of Exceptional,
c. Cost Control Rating: (Provide a rating of Exceptional,
d. Business Relations Rating: (Provide a rating of Exceptional,
e. Management of Key Personnel Rating: (Provide a rating of Exceptional,
f. Utilization of Small Business Rating: (Provide a rating of
Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory)
g. Overall Comments
(Add a short summary of the contractor’s overall performance for the month.)
2. Please direct any questions to the undersigned at DSN XXX-XXXX or commercial XXX-XXX-
XXXX.
(Insert name) (Insert duty title, e.g.PM or COR)
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. An Exceptional rating should identify multiple significant events & how they were of benefit to the Government or a singular benefit of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor was effective. To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. To justify Marginal performance, identify a significant event that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner.
The contractual performance contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
ATTACHMENT 2
Performance Objective 1: ____________________________________________________ Performance Threshold” _____________________________________________________ This is a high risk, critical operational requirement, and a CDR item. Contact the CO.
Date and Time of Observation:________________________________________
(Continue on Separate Sheet of Paper)
Contracting Officer’s Representative Contractor Representative
Signature of Contractor Representative Designates Notification - Not Agreement with Observation.
NOTE: CO shall complete one checklist for each Performance Objective and include them in this COR Handbook
CONTRACT DISCREPANCY REPORT
PART 1
1. CONTRACT NUMBER
Insert Contract Number Here
2. DISCREPANCY REPORT NUMBER
Insert Report Number Here
3. TO (Contractor Representative)
Insert Name Here
4. FROM (COR)
Insert Name Here
5. DISCREPANCY OR PROBLEM (Describe in detail. Include Statement of Work/Contract Reference.)
Insert Text Here
6a. SIGNATURE OF CONTRACTING OFFICER b. DATE
PART 1 OF 3
PART 2 OF 3
PART 2
CONTRACT NUMBER (Same as Part 1 No. 1)
DISCREPANCY REPORT NUMBER (Same as Part 1 No. 2) Insert Report Number Here
7. TO (Contracting Officer)
Insert Name Here
8. FROM (Contractor Representative)
Insert Name Here
9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION, AND ACTION TO
PREVENT RECURRENCE:
10a. SIGNATURE OF CONTRACTOR REPRESENTATIVE b. DATE
PART 3 OF 3
PART 3
CONTRACT NUMBER (Same as Part 1 No. 1)
DISCREPANCY REPORT NUMBER (Same as Part 1 No. 2) Insert Report Number Here
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection)
12a. SIGNATURE OF CONTRACTING OFFICER’S
REPRESENTATIVE
b. DATE
13. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, or other)
CLOSE OUT
NAME/TITLE
SIGNATURE
DATE
CONTRACTOR
REPRESENTATIVE
CONTRACTING
OFFICER
ATTACHMENT 3
(SAMPLE)
CONTRACT DISCREPANCY REPORT (CDR) LOG
CDR NUMBER REQUIRED SERVICE
(Ref PWS Para #)
DISCREPANCY DATE
PREPARED
DATE
CLOSED
ATTACHMENT 4
Contractor Performance Assessment Reporting System (CPARS)
1.0. Background
The Contractor Performance Assessment Reporting System (CPARS) is a paperless contracting initiative directed by SAF/AQC. Use of the CPARS Automated Information System is mandatory as it ensures that evaluations will be entered into the CPARS database to provide a centralized data repository of past performance information (PPI). Paper copies of the evaluations are to be used only for classified and special access programs. The automated CPARS must be used for all other evaluations.
2.0. Purpose
The primary purpose of the CPARS is to ensure that accurate data on contractor performance is current and available for use in source selections through the Past Performance Informational Retrieval System (PPIRS). Performance assessments will be used as a resource in awarding best value contracts and orders to contractors that consistently provide quality, on-time products and services that conform to contractual requirements. CPARS can be used to effectively communicate contractor strengths and weaknesses to source selection officials.
The CPAR assesses a contractor’s performance and provides a record, both positive and negative, on a given contract during a specified period of time. Each assessment must be based on objective data (or measurable, subjective data when objective data is not available) supportable by program and contract management data, such as cost performance reports, customer comments, quality reviews, technical interchange meetings, production management reviews, contractor operations reviews, functional performance evaluations, earned contract incentives, quality assurance evaluations, etc. Subjective assessments concerning the cause or ramifications of the contractor’s performance may be provided, however, speculation or conjecture must not be included. Attachment 1 contains the specific areas to be evaluated for the identified business sectors.
3.0. Responsibilities
3.1. MAJCOM/DRUs CPARS Focal Point
USTRANSCOM CPARS Focal Point: Andrew Renth, Andrew.renth@ustranscom.mil
3.2. AO Representative (AOR)
AORs for this contract are the CORs and the Contracting Officer. Each assigned AOR has the capability of inputting and reviewing information input by the other AORs. AORs are generally responsible for:
• Providing a timely and quality narrative
• Coordinating, off-line, to determine which AOR will select “finalize data and forward to AO” since any AOR has that capability (once that choice is selected, AORs are no longer able to input evaluation information) mailto:Andrew.renth@ustranscom.mil
• Assisting the AO or RO, as necessary
3.3. Assessing Official (AO)
The AO for this contract is the CO. The AO is responsible for overall program execution and is responsible for preparing, reviewing, signing, and processing the CPAR. AO responsibility includes:
• Registering the contract in CPARS within 30 days of award by completing the basic contract information in Blocks 1-17 (this function may be provided by contractor personnel providing assistance to Government program offices, however, their access to the CPARS database is limited to only this function)
• Ensuring performance input from program management, technical, functional, quality assurance, contracting and other end users of the product or service is included in the evaluation
• Reviewing evaluation information provided by the AORs
• Input of evaluation information
• Quality review of the entire evaluation
• Forwarding the Government evaluation information to the contractor
• Reviewing comments from the designated contractor representative once the evaluation has been returned by the contractor or after 30 days have lapsed
• Modifying the CPAR comments and/or ratings after review of contractor comments, as determined by the AO. After receiving and reviewing the contractor’s comments on the CPAR, the AO may revise the assessment, including the narrative. The AO will notify the contractor of any revisions made to a report as a result of the contractor’s comments. Such a revised report will not be sent to the contractor for further comment. The contractor will have access to both the original and revised reports in the CPARS AIS when the Government finalizes the evaluation.
• Forwarding evaluations to the RO which are in disagreement or when requested by the contractor or when the contractor fails to respond to the assessment, or, in the alternative, completing the evaluation if it does not require further RO review
3.4. Reviewing Official (RO)
The RO provides the check-and-balance when there is disagreement between the AO and the contractor. The RO must review and sign the assessment when there are significant differences between the AO and the contractor assessment. The RO has the authority to:
• Provide narrative comment (the RO’s comments supplement those provided by the AO; they do not replace the ratings/narratives provided by the AO)
• Sign the CPAR (at this point, it is considered final and is posted in the CPARS AIS and is available for source selection official use in the PPIRS)
4.0. Frequency of Reporting
Generally, reporting is done on an annual basis. When an out-of-cycle CPAR is required, however, it is acceptable to complete two CPARS in a given year for the contract. Out-of-cycle CPARs do not alter the annual reporting requirement. For example, if the regular CPAR period of performance ends on 30 September 2005 and an out-of-cycle CPAR is completed which covers a performance period that ends on 1 May 2005, the next intermediate CPAR report is still required to cover the period of performance from 1
October 2004 to 30 September 2005. A period of performance overlap is only permitted when an out-of-cycle CPAR report has been prepared.
4.1. Initial Reports
An initial CPAR is required for new contracts that have a period of performance greater than 365 days. The initial CPAR must reflect evaluation of at least the first 180 days of performance under the contract, and may include up to the first 365 days of performance. For contracts with a period of performance of less than 365 days, see “Final Reports” below.
4.2.Intermediate Reports
Intermediate CPARs are required every 12 months throughout the entire period of performance of the contract after the initial report and up to the final report. An intermediate CPAR is limited to contractor performance occurring after the preceding normal cycle CPAR. To improve efficiency in preparing the CPAR, it is recommended that the CPAR be completed together with other reviews (e.g., award fee determinations, major program events, program milestones and quality assurance surveillance records).
4.3. Final Report
A final CPAR will be completed upon contract completion, transfer of program management responsibility outside the original buying activity or delivery of the final major end item on contract. Final Reports are to be prepared on all contracts with a period of performance of less than 365 days. The final CPAR does not include cumulative information but is limited to the period of contractor performance occurring after the preceding CPAR. The CPAR Focal Point has the authority to approve extensions when special circumstances arise.
4.4.Out-of-Cycle Reports
An Out-of-Cycle CPAR may be appropriate when there is a significant change in performance that alters the assessment in one or more evaluation area(s). The contractor may request an updated (new) assessment or the AO may unilaterally prepare an updated (new) evaluation and process an Out-of-Cycle (new) CPAR through the automated
5.0. CPAR Markings and Protection
Those granted access to the CPARS are responsible for ensuring that CPARs are appropriately marked and handled. All CPAR forms, attachments and working papers must be marked “FOR
OFFICIAL USE ONLY/SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104”
Freedom of Information Act Program, FAR 3.104, and 41 USC Sect. 423. CPARs may also contain information that is proprietary to the contractor. Information contained on the CPAR, such as trade secrets and protected commercial or financial data obtained from the contractor in confidence, must be protected from unauthorized disclosure.
ATTACHMENT 5
Wide Area Work Flow (WAWF)
BACKGROUND
• Wide Area Work Flow is a web-based DoD application for submitting invoices and receiving reports.
• It was created to comply with the DoD Paperless Contracting Initiative
• Vendor will create and route the invoice and receiving report via WAWF
• Government Acceptor will officially accept the goods/services with a digital signature. Once accepted the receiving report will be electronically forwarded to DFAS to be matched with the invoice for payment.
BEFORE YOU BEGIN
• Complete the WAWF Self Registration at https://wawf.eb.mil (See next page for complete registration instructions)
• Complete the DD2875 and forward to the USTRANSCOM Group Administrator (GAM): Mr.
Andrew Renth, Andrew.renth@ustranscom.mil, DSN 576-6617
• The USTRANSCOM GAM will activate your account once they verify that you have completed the QAP Phase I and Phase II training. You will receive your password via e-mail once your account is activated.
https://wawf.eb.mil/ mailto:Andrew.renth@ustranscom.mil
ATTACHMENT 5
INSTRUCTIONS FOR WAWF
Complete Parts I and II. Submit to your local Security Manager who will complete Part III. Then submit to the Contracting Officer to sign Part II.
TYPE OF REQUEST: Initial
SYSTEM NAME: WIDE AREA WORK FLOW (21) Signature of Information Owner/OPR. Leave Blank LOCATION: Ogden DMC (21a) Phone Number. Leave Blank
PART I
(1) NAME: The last name, first name, and middle initial of the user. (21b) DATE: Leave Blank
(2) Social Security Number: Leave Blank Blocks 22 – 27 Leave Blank
(3) Organization: The user’s current organization (i.e. HQ AMC) C. PART III: Certification of Background Investigation or Clearance. Must be completed by your local security manager
(4) Office Symbol/Department: The office symbol within the current (28) Type of Investigation. The user’s last type of office organization investigation (i.e., NAC, NACI, or SSBI).
(5) Telephone Number/DSN: Complete with the DSN #
(6)Official E’mail Address. The user’s official e’mail address. (28a) Clearance Level: The user’s current security clearance level (Secret, Top Secret).
(7) Job Title/Grade/Rank. The civilian job title (Example: QAP (28b) IT Level Designation. The user’s ADP designation
(8) Official Mailing Address. The user’s official mailing address. IADP1, ADP3, etc.),
(9) Citizenship. The user’s citizenship status, (28c) Date, Date of last investigation.
(10) Designation of Person: Complete as either CIVILIAN or MILITARY (28d) Type of Designation, The user’s last ADP designation IADP1, ADP2, etc.), IA Training and Awareness Certification Requirements: Leave Blank (29) Verified By. The Security Manager or representative prints his or her name to indicate that the above
(11) User’s Signature. User must sign the DD Form 2875 with the clearance and investigation information has been understanding that they are responsible and accountable for their verified.
password and access to the system(s).
(30) Signature. The Security manager or
(12) Date, The date that the user signs the form. representative signature indicates the above clearance and investigation information has been verified.
PART II:
(31) Date. The date that the form was signed by the (13). Justification for Access: Complete with the your ROLE and Security Manager or his/her representative DODAAC + SRAN. For example: A Contracting Officer would complete as: ROLE: Admin By/View Only for FA4428 PART IV Leave Blank A QAP would fill out as: ROLE: Acceptor for FA4428 + SRAN ( 6 digit ext) If you do not know your 6 digit ext contact your Contracting Officer
(14) Type of Access Required: Authorized
(15) User Requires Access To: Place an “X” in UNCLASSIFIED
(16) This will be completed by the Contracting Officer
(16a) Fill in with “N/A”
(17) Type the name of the Contracting Officer
(18) and (19) To be completed by the CO
(20) Supervisor’s Organization/Department. Complete with the Contracting Officer’s Organization: HQ AMC/A34Y
(2Oa) E-mail Address. Supervisor’s e-mail address:
Complete with the Contracting Officer’s email address
(20b) Phone Number: Complete with the Contracting Officer’s telephone number
| Task Order 0002 |
| 1.1. This Quality Assurance Surveillance Plan (QASP) provides the Contracting Officer’s Representative (COR) effective and systematic surveillance procedures to be used in monitoring contractor performance in accordance with the requirements listed in... |
| Step 1 - The COR shall call the CO and discuss the discrepancy to ascertain whether a CDR is warranted. |
File details come from the government source that posted it.