TRAFFIC ENGINEERING ANALYSIS
Solicitation number
HTC711-18-R-D007
Issued by

About this file

PAST PERFORMANCE REFERENCE SHEET

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-18-R-D007

Atch 13

SOURCE SELECTION INFORMATION -- SEE FAR 2.101 & 3.104

Atch 13 Past Performance Information Sheet #_____

RFQ: HTC711-18-R-D007

TRAFFIC ENGINEERING ANALYSIS

Contract and/or Task Order Number:
Contractor Name:
Point of Contact:
Telephone No. and Email:
Period of Performance:
CAGE
Contract Type (FFP/CPAF, etc):
Total Dollar Value of Contract

(If Known)

Performance Area 1:
Knowledge and experience in performing traffic engineering studies.

Explain how this reference is relevant to Performance Area 1

Performed as a Prime or Sub-contractor ___ Prime ___ Sub-contractor What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:1] [1: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.

Performance Area 2:

Knowledge and experience of traffic engineering software and tools, i.e. Highway Capacity Software or Synchro (HCM based); Microstation CAD software; ESRI, ARCGIS or GIS application; and Institute of Transportation Engineers (ITE) based travel demand modeling, traffic projections and trip generation.

Explain how this reference is relevant to Performance Area 2

Performed as a Prime or Sub-contractor

___ Sub-contractor

What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:2] [2: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]

Performance Area 3:
Knowledge and experience with civil sector transportation guidelines, standards, and procedures from American Association of State Highway Transportation Office (AASHTO), Federal Highway Administration (FHWA); State Departments of Transportation and ITE.

Explain how this reference is relevant to Performance Area 3

Performed as a Prime or Sub-contractor

___ Sub-contractor

What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:3] [3: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]

Performance Area 4:
Knowledge and experience with operation, design and threat analysis of entry control facilities or access control points for military installations; application of DoD and Service oriented traffic control and entry/access control facilities standards/guidelines/publications (i.e. UFC, AR, AFMAN, OPNAVINST, MCO and SDDCTEA tools and publications); and antiterrorism and force protection guidelines and standards.

Explain how this reference is relevant to Performance Area 4

Performed as a Prime or Sub-contractor

___ Sub-contractor

What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:4] [4: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]