Atch_13_TEA_PP_Ref_Sheet.docx
DOCX document 21 KB Posted
- Attached to
- TRAFFIC ENGINEERING ANALYSIS
- Solicitation number
- HTC711-18-R-D007
About this file
PAST PERFORMANCE REFERENCE SHEET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HTC711-18-R-D007_SDDC_TEA_Amendment_0002.pdf | ||
| Atch_2_HTC711-18-R-D007_Ques_Ans.pdf | ||
| Atch_1_HTC711_18_R_D007_Amendment_0002__6_Jul_18.pdf | ||
| HTC711-18-R-D007_SDDC_TEA_Amendment_0001_signed.pdf | ||
| Atch_1_Amendment_0001_HTC711-18-R-D007_TEA_Synp.pdf | ||
| Atch_10_TO_1_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| Atch_5_QASP_TO_1.pdf | ||
| Atch_2_PWS_TO_1_27_Mar_18.pdf | ||
| Atch_11_TO_2_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| Atch_14_TEA_PPQ.docx | DOCX document | |
| Atch_9_TEA_RFP_Info_Sheet_22_May_18.docx | DOCX document | |
| HTC711_18_R_D007_TEA__Final.pdf | ||
| Atch_4_PWS_TO_3_27_Mar_18_(SAMPLE_ONLY).pdf | ||
| Atch_1_PWS_IDIQ_5_APR_18.pdf | ||
| Atch_6_QASP_TO_2.pdf | ||
| Atch_8_-_IDIQ_Labor_Categories_&_Rates.xls | XLS spreadsheet | |
| Atch_3_PWS_TO_2_27_Mar_18.pdf | ||
| Atch_7_Labor_Cat_Requirements.pdf | ||
| Atch_12_TO_3_Staffing_Matrix.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HTC711-18-R-D007
Atch 13
SOURCE SELECTION INFORMATION -- SEE FAR 2.101 & 3.104
Atch 13 Past Performance Information Sheet #_____
RFQ: HTC711-18-R-D007
TRAFFIC ENGINEERING ANALYSIS
| Contract and/or Task Order Number: |
| Contractor Name: |
| Point of Contact: |
| Telephone No. and Email: |
| Period of Performance: |
| CAGE |
| Contract Type (FFP/CPAF, etc): |
| Total Dollar Value of Contract |
(If Known)
| Performance Area 1: |
| Knowledge and experience in performing traffic engineering studies. |
Explain how this reference is relevant to Performance Area 1
Performed as a Prime or Sub-contractor ___ Prime ___ Sub-contractor What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:1] [1: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.
Performance Area 2:
Knowledge and experience of traffic engineering software and tools, i.e. Highway Capacity Software or Synchro (HCM based); Microstation CAD software; ESRI, ARCGIS or GIS application; and Institute of Transportation Engineers (ITE) based travel demand modeling, traffic projections and trip generation.
Explain how this reference is relevant to Performance Area 2
Performed as a Prime or Sub-contractor
___ Sub-contractor
What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:2] [2: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]
| Performance Area 3: |
| Knowledge and experience with civil sector transportation guidelines, standards, and procedures from American Association of State Highway Transportation Office (AASHTO), Federal Highway Administration (FHWA); State Departments of Transportation and ITE. |
Explain how this reference is relevant to Performance Area 3
Performed as a Prime or Sub-contractor
___ Sub-contractor
What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:3] [3: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]
| Performance Area 4: |
| Knowledge and experience with operation, design and threat analysis of entry control facilities or access control points for military installations; application of DoD and Service oriented traffic control and entry/access control facilities standards/guidelines/publications (i.e. UFC, AR, AFMAN, OPNAVINST, MCO and SDDCTEA tools and publications); and antiterrorism and force protection guidelines and standards. |
Explain how this reference is relevant to Performance Area 4
Performed as a Prime or Sub-contractor
___ Sub-contractor
What was the Approximate Dollar Value of this Performance Area in the referenced contract?[footnoteRef:4] [4: Offerors shall identify the approximate dollar value of the work performed that is applicable to the contractor’s role as either a prime or sub-contractor specifically for this performance area. Offerors should not include the total dollar value of the contract unless they performed 100% of the effort and it was totally in support of this performance area.]
File details come from the government source that posted it.