Amendment_5_Schedule_B.xls

XLS spreadsheet 205 KB Posted

Attached to
HVAC plus Other mechanical maintenances
Solicitation number
HSCG84-14-R-QAU000
Issued by

About this file

Revised Schedule B

View the file

Other files

File Type Posted
Amendment_6_Schedule_B.xls XLS spreadsheet
Amendment_6.pdf PDF
Amendment_5.pdf PDF
Amendment_4.pdf PDF
Amendment_3.pdf PDF
Past_Performance_Survey.doc DOC document
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Schedule_B.xls XLS spreadsheet
WD_05-2069.pdf PDF
HSCG84-14-R-QAU002.pdf PDF
Amend_SF30.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

III. ADDENDA – SCHEDULE OF SUPPLIES/SERVICES – Standard Form 1449, Blocks #19 through 24
1. General Scope SERVICES AND EQUIPMENT: The Contractor shall furnish all labor, tools, equipment, materials (other than government furnished supplies), and supervision to perform HVAC and Mechanical Maintenance services to buildings as described in the Performance Work Statement (PWS) except for work specifically identified as being included in the Indefinite Quantity (IQ) portions of the contract.
2. PRICE ALL INCLUSIVE: The offer must include prices for the Base Year and all Option years listed in this price schedule. Contract work not specifically listed, include but not limited to deliverables and reports and administrative requirements, are not priced separately and should be included in the appropriate line item price.
BASE YEAR: 1 August 2015 through 31 July 2016
CLINDESCRIPTIONQTYUNITMONTHLY PRICEANNUAL PRICE
0001Preventive Mainenance
0001ATRACEN Petaluma12MO$0.00
0001BCAMSPAC12MO$0.00
0002Service Calls
0002ATRACEN Petaluma12MO$0.00
0002BCAMSPAC12MO$0.00
Total for CLIN 0001 and 0002$0.00
3. These prices will be used to price work under PWS Paragraph 7.3 for labor to perform specific maintenance repair work that cannot be identified in sufficient detail to be included in Contract line items 0001 through 0002 The Labor Unit Price shall include all direct and indirect costs associated with performing a task hour of work including, but not limited to, direct wages, health and welfare benefits, FICA, FUTA, WC, all federal and state benefits, excise taxes, overhead, G&A and profit. This work is subject to wage rates under the Service Contract Act.
CLINDESCRIPTIONEst QTYUNITPRICEANNUAL PRICE
0003Maintenance Carpenter80TH$ - 0
0004Maintenance Electrician40TH$ - 0
0005Maintenance Plumber60TH$ - 0
0006Heating/Refrigeration Mechanic16TH$ - 0
0007Laborer80TH$ - 0
Total for CLINS 0003 - 0007$ - 0
4. The costs of materials, parts, and supplies will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property).
0008Estimated Cost Materials, Supplies, Parts and Accessories15,000.00
0009Contractor’s FBR (see e.g. in note above)X- 0
Total for CLINS 0008 and 0009$ 15,000.00
5. Subcontracting costs will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property). This estimate is an average of the task orders for the past five years.
CLINDESCRIPTIONEst QTYESTIMATED UNBURDEN PRICEANNUAL PRICE
This estimate is provided solely for evaluation purposes.
0010Estimated Cost Sub-Contracting8$ 172,000.00
0011Contractor’s FBR (see e.g. in note above)X$ - 0
Total for CLINS 0010 and 0011$ 172,000.00
TOTAL ESTIMATE PRICE$ 187,000.00

&LHSCG84-14-R-QAU002

Amendment A00005&RFacility HVAC and Mechanical Maintenance TRACEN Petaluma and CAMSPAC &C&P of 11

OptionYear 1

III. ADDENDA – SCHEDULE OF SUPPLIES/SERVICES – Standard Form 1449, Blocks #19 through 24
1. General Scope SERVICES AND EQUIPMENT: The Contractor shall furnish all labor, tools, equipment, materials (other than government furnished supplies), and supervision to perform refuse collection, disposal, and recycling services to buildings as described in the Performance Work Statement (PWS) except for work specifically identified as being included in the Indefinite Quantity (IQ) portions of the contract.
2. PRICE ALL INCLUSIVE: The offer must include prices for the Base Year and all Option years listed in this price schedule. Contract work not specifically listed, include but not limited to deliverables and reports and administrative requirements, are not priced separately and should be included in the appropriate line item price.
OPTION YEAR 1: 1 August 2016 through 31 July 2017
CLINDESCRIPTIONQTYUNITMONTHLY PRICEANNUAL PRICE
1001Preventive Mainenance
1001ATRACEN Petaluma12MO$0.00
1001BCAMSPAC12MO$0.00
1002Service Calls
1002ATRACEN Petaluma12MO$0.00
1002BCAMSPAC12MO$0.00
Total for CLIN 1001 and 1002$0.00
3. These prices will be used to price IDIQ work under PWS Paragraph 7.3 for labor to perform specific maintenance repair work that cannot be identified in sufficient detail to be included in Contract line items 1001 through 1002 The Labor Unit Price shall include all direct and indirect costs associated with performing a task hour of work including, but not limited to, direct wages, health and welfare benefits, FICA, FUTA, WC, all federal and state benefits, excise taxes, overhead, G&A and profit. This work is subject to wage rates under the Service Contract Act.
CLINDESCRIPTIONEst QTYUNITPRICEANNUAL PRICE
1003Maintenance Carpenter80TH$ - 0
1004Maintenance Electrician40TH$ - 0
1005Maintenance Plumber60TH$ - 0
1006Heating/Refrigeration Mechanic16TH$ - 0
1007Laborer80TH$ - 0
Total for CLINS 1003 - 1007$ - 0
4. The costs of materials, parts, and supplies will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property).
1008Estimated Cost Materials, Supplies, Parts and Accessories15,000.00
1009Contractor’s FBR (see e.g. in note above)X- 0
Total for CLINS 1008 and 1009$ 15,000.00
5. Subcontracting costs will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property). This estimate is an average of the task orders for the past five years.
CLINDESCRIPTIONEst QTYESTIMATED UNBURDEN PRICEANNUAL PRICE
This estimate is provided solely for evaluation purposes.
1010Estimated Cost Sub-Contracting8$ 172,000.00
1011Contractor’s FBR (see e.g. in note above)X$ - 0
Total for CLINS 1010 and 1011$ 172,000.00
TOTAL ESTIMATE PRICE$ 187,000.00

&LHSCG84-14-R-QAU002

Amendment A00005&RFacility HVAC and Mechanical Maintenance TRACEN Petaluma and CAMSPAC &C&P of 11

Option Year 2

III. ADDENDA – SCHEDULE OF SUPPLIES/SERVICES – Standard Form 1449, Blocks #19 through 24
1. General Scope SERVICES AND EQUIPMENT: The Contractor shall furnish all labor, tools, equipment, materials (other than government furnished supplies), and supervision to perform refuse collection, disposal, and recycling services to buildings as described in the Performance Work Statement (PWS) except for work specifically identified as being included in the Indefinite Quantity (IQ) portions of the contract.
2. PRICE ALL INCLUSIVE: The offer must include prices for the Base Year and all Option years listed in this price schedule. Contract work not specifically listed, include but not limited to deliverables and reports and administrative requirements, are not priced separately and should be included in the appropriate line item price.
OPTION YEAR 2: 1 August 2017 through 31 July 2018
CLINDESCRIPTIONQTYUNITMONTHLY PRICEANNUAL PRICE
2001Preventive Mainenance
2001ATRACEN Petaluma12MO$0.00
2001BCAMSPAC12MO$0.00
2002Service Calls
2002ATRACEN Petaluma12MO$0.00
2002BCAMSPAC12MO$0.00
Total for CLIN 2001 and 2002$0.00
3. These prices will be used to price IDIQ work under PWS Paragraph 7.3 for labor to perform specific maintenance repair work that cannot be identified in sufficient detail to be included in Contract line items 2001 through 2002 The Labor Unit Price shall include all direct and indirect costs associated with performing a task hour of work including, but not limited to, direct wages, health and welfare benefits, FICA, FUTA, WC, all federal and state benefits, excise taxes, overhead, G&A and profit. This work is subject to wage rates under the Service Contract Act.
CLINDESCRIPTIONEst QTYUNITPRICEANNUAL PRICE
2003Maintenance Carpenter80TH$ - 0
2004Maintenance Electrician40TH$ - 0
2005Maintenance Plumber60TH$ - 0
2006Heating/Refrigeration Mechanic16TH$ - 0
2007Laborer80TH$ - 0
Total for CLINS 2003 - 2007$ - 0
4. The costs of materials, parts, and supplies will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property).
2008Estimated Cost Materials, Supplies, Parts and Accessories15,000.00
2009Contractor’s FBR (see e.g. in note above)X- 0
Total for CLINS 2008 and 2009$ 15,000.00
5. Subcontracting costs will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property). This estimate is an average of the task orders for the past five years.
CLINDESCRIPTIONEst QTYESTIMATED UNBURDEN PRICEANNUAL PRICE
This estimate is provided solely for evaluation purposes.
2010Estimated Cost Sub-Contracting8$ 172,000.00
2011Contractor’s FBR (see e.g. in note above)X$ - 0
Total for CLINS 2010 and 2011$ 172,000.00
TOTAL ESTIMATE PRICE$ 187,000.00

&LHSCG84-14-R-QAU002

Amendment A00005&RFacility HVAC and Mechanical Maintenance TRACEN Petaluma and CAMSPAC &C&P of 11

Option Year 3

III. ADDENDA – SCHEDULE OF SUPPLIES/SERVICES – Standard Form 1449, Blocks #19 through 24
1. General Scope SERVICES AND EQUIPMENT: The Contractor shall furnish all labor, tools, equipment, materials (other than government furnished supplies), and supervision to perform refuse collection, disposal, and recycling services to buildings as described in the Performance Work Statement (PWS) except for work specifically identified as being included in the Indefinite Quantity (IQ) portions of the contract.
2. PRICE ALL INCLUSIVE: The offer must include prices for the Base Year and all Option years listed in this price schedule. Contract work not specifically listed, include but not limited to deliverables and reports and administrative requirements, are not priced separately and should be included in the appropriate line item price.
OPTION YEAR 3: 1 August 2018 through 31 July 2019
CLINDESCRIPTIONQTYUNITMONTHLY PRICEANNUAL PRICE
3001Preventive Mainenance
3001ATRACEN Petaluma12MO$0.00
3001BCAMSPAC12MO$0.00
3002Service Calls
3002ATRACEN Petaluma12MO$0.00
3002BCAMSPAC12MO$0.00
Total for CLIN 3001 and 3002$0.00
3. These prices will be used to price IDIQ work under PWS Paragraph 7.3 for labor to perform specific maintenance repair work that cannot be identified in sufficient detail to be included in Contract line items 3001 through 3002 The Labor Unit Price shall include all direct and indirect costs associated with performing a task hour of work including, but not limited to, direct wages, health and welfare benefits, FICA, FUTA, WC, all federal and state benefits, excise taxes, overhead, G&A and profit. This work is subject to wage rates under the Service Contract Act.
CLINDESCRIPTIONEst QTYUNITPRICEANNUAL PRICE
3003Maintenance Carpenter80TH$ - 0
3004Maintenance Electrician40TH$ - 0
3005Maintenance Plumber60TH$ - 0
3006Heating/Refrigeration Mechanic16TH$ - 0
3007Laborer80TH$ - 0
Total for CLINS 3003 - 3007$ - 0
4. The costs of materials, parts, and supplies will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property).
3008Estimated Cost Materials, Supplies, Parts and Accessories15,000.00
3009Contractor’s FBR (see e.g. in note above)X- 0
Total for CLINS 3008 and 3009$ 15,000.00
5. Subcontracting costs will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property). This estimate is an average of the task orders for the past five years.
CLINDESCRIPTIONEst QTYESTIMATED UNBURDEN PRICEANNUAL PRICE
This estimate is provided solely for evaluation purposes.
3010Estimated Cost Sub-Contracting8$ 172,000.00
3011Contractor’s FBR (see e.g. in note above)X$ - 0
Total for CLINS 3010 and 3011$ 172,000.00
TOTAL ESTIMATE PRICE$ 187,000.00

&LHSCG84-14-R-QAU002

Amendment A00005&RFacility HVAC and Mechanical Maintenance TRACEN Petaluma and CAMSPAC &C&P of 11

Option Year 4

III. ADDENDA – SCHEDULE OF SUPPLIES/SERVICES – Standard Form 1449, Blocks #19 through 24
1. General Scope SERVICES AND EQUIPMENT: The Contractor shall furnish all labor, tools, equipment, materials (other than government furnished supplies), and supervision to perform refuse collection, disposal, and recycling services to buildings as described in the Performance Work Statement (PWS) except for work specifically identified as being included in the Indefinite Quantity (IQ) portions of the contract.
2. PRICE ALL INCLUSIVE: The offer must include prices for the Base Year and all Option years listed in this price schedule. Contract work not specifically listed, include but not limited to deliverables and reports and administrative requirements, are not priced separately and should be included in the appropriate line item price.
OPTION YEAR 4: 1 August 2019 through 31 July 2020
CLINDESCRIPTIONQTYUNITMONTHLY PRICEANNUAL PRICE
4001Preventive Mainenance
4001ATRACEN Petaluma12MO$0.00
4001BCAMSPAC12MO$0.00
4002Service Calls
4002ATRACEN Petaluma12MO$0.00
4002BCAMSPAC12MO$0.00
Total for CLIN 4001 and 4002$0.00
3. These prices will be used to price IDIQ work under PWS Paragraph 7.3 for labor to perform specific maintenance repair work that cannot be identified in sufficient detail to be included in Contract line items 4001 through 4002 The Labor Unit Price shall include all direct and indirect costs associated with performing a task hour of work including, but not limited to, direct wages, health and welfare benefits, FICA, FUTA, WC, all federal and state benefits, excise taxes, overhead, G&A and profit. This work is subject to wage rates under the Service Contract Act.
CLINDESCRIPTIONEst QTYUNITPRICEANNUAL PRICE
4003Maintenance Carpenter80TH$ - 0
4004Maintenance Electrician40TH$ - 0
4005Maintenance Plumber60TH$ - 0
4006Heating/Refrigeration Mechanic16TH$ - 0
4007Laborer80TH$ - 0
Total for CLINS 4003 - 4007$ - 0
4. The costs of materials, parts, and supplies will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property).
4008Estimated Cost Materials, Supplies, Parts and Accessories15,000.00
4009Contractor’s FBR (see e.g. in note above)X- 0
Total for CLINS 4008 and 4009$ 15,000.00
5. Subcontracting costs will be reimbursed at cost plus Fixed Burden Rates (FBR) established below. These costs shall be used for bidding purposes only, the actual amounts will fluctuate. The estimated unburdened costs are shown for evaluation purposes only. The price for these items shall be calculated using the estimated amounts multiplied times (and added to) offer's FBR. FBRs shall be entered as a decimal number, not as a percentage (E.G. A FBR of 5% is entered as 0.05). The FBR is defined as all additional costs for handling and overhead to include all burden, profit, overhead and G&A ( including burden associated with Contractor's use of government furnished equipment and property). This estimate is an average of the task orders for the past five years.
CLINDESCRIPTIONEst QTYESTIMATED UNBURDEN PRICEANNUAL PRICE
This estimate is provided solely for evaluation purposes.
4010Estimated Cost Sub-Contracting8$ 172,000.00
4011Contractor’s FBR (see e.g. in note above)X$ - 0
Total for CLINS 4010 and 4011$ 172,000.00
TOTAL ESTIMATE PRICE$ 187,000.00

&LHSCG84-14-R-QAU002

Amendment A00005&RFacility HVAC and Mechanical Maintenance TRACEN Petaluma and CAMSPAC &C&P of 11

Sheet1

FFPTask HourSubTotal
Base Year$ - 015,000.00$ 172,000.00$ 187,000.00
Option Year 1$ - 0$ 15,000.00$ 172,000.00$ 187,000.00
Option Year 2$ - 0$ 15,000.00$ 172,000.00$ 187,000.00
Option Year 3$ - 0$ 15,000.00$ 172,000.00$ 187,000.00
Option Year 4$ - 0$ 15,000.00$ 172,000.00$ 187,000.00
Total$ - 0$ 75,000.00$ 860,000.00$ 935,000.00

File details come from the government source that posted it. Updated .