HHS CONCESSIONS - Electrical - PERMIT.pdf
PDF 11 MB Posted
- Attached to
- Weber Concession & Bathroom Building
- Solicitation number
- S-P30001-00014684
- Issued by
- Union County, Oregon
About this file
These are electrical design documents for a new concessions and restrooms project for the Hermiston School District located at 600 South 1st Street in Hermiston, Oregon. The permit set was prepared by Energy System Engineers from Spokane, Washington, and is dated 04/25/2025. The electrical drawings cover a comprehensive set of plans including legends, abbreviations, specifications, electrical one-line diagrams, schedules, site power plans, first floor lighting and power plans, and electrical details.
The project involves installing a new electrical system for the facility, including a new 75kVA transformer (480-208/120V), a new panelboard (P1) with 225A main circuit breaker, and associated electrical infrastructure. The electrical design includes LED lighting fixtures, power outlets, ground bus bars, and various electrical equipment like exhaust fans, water heaters, and receptacles. Key design considerations include meeting Washington State Energy Code (WSEC) requirements, providing ground fault circuit interrupters (GFCI), ensuring proper conduit and wiring installations, and coordinating with other trades for a complete electrical system. The documents specify detailed requirements for equipment installation, device mounting, grounding, and compliance with national electrical codes.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M##
M##
TAG
CROSS-SECTION SYMBOL
(TOP=SECTION NUMBER,BOTTOM=SHEET NUMBER)
DETAIL SYMBOL
(TOP=DETAIL NUMBER, BOTTOM=SHEET NUMBER)
POINT OF CONNECTION (POC) SYMBOL
KEY NOTES
REVISION NUMBER
LIGHT DASHED LINES = HIDDEN OR UNDERGROUND
DARK LINE = NEW
GENERAL SYMBOLS
LINE WEIGHT LEGEND
FLOODLIGHT EMERGENCY REMOTE HEAD
A a
WALL BRACKET LUMINAIRE
STRIP LUMINAIRE
RECESSED LUMINAIRE
EXIT LUMINAIRE, ARROWS INDICATE DIRECTION,
SHADING INDICATES LIGHTED FACES
LUMINAIRE CONNECTED
TO LIFE SAFETY BRANCH
SURFACE OR PENDANT MOUNTED LUMINAIRE
LUMINAIRE CONNECTED TO
CRITICAL BRANCH
LUMINAIRE CONNECTED TO
UNSWITCHED BRANCH (NIGHT LIGHTING)
LOWERCASE LETTER INDICATES
EQUIPMENT CONTROLLED
UPPERCASE LETTER INDICATES LUMINAIRE TYPE
SURFACE DIRECTIONAL LUMINAIRE
SURFACE OR PENDANT MOUNTED LUMINAIRE
RECESSED DOWNLIGHT LUMINAIRE
MODULAR WIRED RECESSED LUMINAIRE
RECESSED DIRECTIONAL LUMINAIRE
FLOODLIGHT EMERGENCY WITH BATTERY BACKUP
LIGHT TRACK
# OF LUMINAIRES AS SHOWN
POLE MOUNTED LUMINAIRE
NUMBER OF HEADS AS INDICATED
LIGHTING LEGEND
DUPLEX RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
GFCI
SINGLE RECEPTACLE
A ABANDONED POKE-THROUGH
DUPLEX RECEPTACLE, WITH GROUND FAULT
CIRCUIT INTERRUPTING DEVICE
DUPLEX RECEPTACLE, WITH GROUND FAULT
CIRCUIT INTERRUPTING PROTECTION
S
SINGLE RECEPTACLE, FLOOR MOUNTED
SINGLE RECEPTACLE, CEILING MOUNTED
DUPLEX RECEPTACLE, FLOOR MOUNTED
DUPLEX RECEPTACLE, CEILING MOUNTED
DOUBLE DUPLEX RECEPTACLE, FLOOR MOUNTED
DOUBLE DUPLEX RECEPTACLE, CEILING MOUNTED
SPECIAL PURPOSE OUTLET AS NOTED
SPECIAL PURPOSE OUTLET AS NOTED,
FLOOR MOUNTED
SPECIAL PURPOSE OUTLET AS NOTED,
CEILING MOUNTED
DUPLEX RECEPTACLE, CONTROLLED
IT/POWER POLE, DEVICES AS INDICATED
COMBINATION SWITCH AND RECEPTACLE
POKE-THROUGH, DEVICES AS INDICATED
POWER OUTLETS LEGEND
MCC
J
PULL BOX
JUNCTION BOX
TRANSFORMER
PANELBOARD
PB
T
BR
DB
BUS RISER
MDB
TC TIMECLOCK
H HAND (ON)
O OFF
A AUTO
TWO SPEED
REDUCED VOLTAGE
SURGE PROTECTIVE DEVICE
VARIABLE FREQUENCY DRIVE
LOCAL DISCONNECT
LOCAL CONTACTOR
START STOP PUSHBUTTON
VFD
SPD
RV
2S
METER
FVNR
FVR
C
PUSHBUTTON
GROUND
GAP
ELECTRICAL DISTRIBUTION EQUIPMENT ( =TYPE)
JUNCTION BOX FLOOR MOUNTED
OVERHEAD POWER SERVICE ENTRANCE
GENERATOR ANNUNCIATOR PANEL
SELECTOR SWITCH ( * =POSITION)
LOCAL DISCONNECT WITH OVERCURRENT PROTECTION
LOCAL MOTOR STARTER ( * =TYPE)
LOCAL COMBINATION MOTOR STARTER ( * =TYPE)
MAIN DISTRIBUTION BOARD
MOTOR CONTROL CENTER
DISTRIBUTION BOARD
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
POWER DISTRIBUTION LEGEND
CIRCUIT DESIGNATION
ELECTRICALLY POWERED MECHANICAL
EQUIPMENT DESIGNATION (RE: MECHANICAL)
ELECTRICAL DISTRIBUTION EQUIPMENT DESIGNATION
(PANELBOARDS, TRANSFORMERS, DIST. BOARDS, ETC.)
ELECTRICALLY POWERED EQUIPMENT DESIGNATION
(PROVIDED BY OTHERS)
NIC
AFF
MC
EC
GC
(R)
(F)
(D)
(E)
(N)
DEMOLISH & REMOVE
RELOCATED
FUTURE
EXISTING
NEW
NOT IN CONTRACT
ABOVE FINISHED FLOOR
MECHANICAL CONTRACTOR
ELECTRICAL CONTRACTOR
GENERAL CONTRACTOR
NTS NOT TO SCALE
(TYP.) TYPICAL
UF UNDER FLOOR
AFG ABOVE FINISHED GRADE
TCC TEMPERATURE CONTROLS CONTRACTOR
PC PLUMBING CONTRACTOR
(RR) REMOVE & RELOCATE
GROUND FAULT CIRCUIT INTERRUPTER
HIGH PRESSURE SODIUM
HIGH VOLTAGE
INCANDESCENT
ISOLATED GROUND
JUNCTION BOX
HIGH INTENSITY DISCHARGE
SHORT CIRCUIT CURRENT
LOW VOLTAGE
GENERATOR
PUSH BUTTON OR PULL BOX
PRIMARY
POWER FACTOR
PHASE
PANEL (OR PANELBOARD)
POLE
POLYVINYL CHLORIDE
NORMALLY OPEN
P
PB
PVC
PNL
PRI
PF
NO
TVSS
UNDERGROUND
VOLT
VOLT-AMPERE
WIRE OR WATT
WEATHERPROOF
TRANSFORMER
WP
XFMR
UG
V
W
VA
UPS
SPEAKER
SWITCH
TELEPHONE
SOLENOID VALVE
SWITCHBOARD
SYMMETRICAL
TAMPER RESISTANT
STAINLESS STEEL
SWBD
TELE
SYM
TR
SPKR
SV
SW
SS
SPD SURGE PROTECTION DEVICE
EP EXPLOSION PROOF
EPO EMERGENCY POWER OFF
RIGID METALLIC CONDUIT
COMBINATION MOTOR STARTER
AUTOMATIC TRANSFER SWITCH
AMPERE INTERRUPTING CAPACITY
CIRCUIT BREAKER
BONDING JUMPER
ATS
CMS
AUX
CCT
CB
C
BJ
AUXILIARY
CIRCUIT
CONDUIT
AIC
AT
AL
A
AF
AC
AMPERE TRIP
ALUMINUM
AMPERE
AMPERE FRAME
MERC
MCB
MLO
MV
NC
MH
EMERGENCY
ELECTRICAL METALLIC TUBING
FLUORESCENT
GROUND
GROUNDING ELECTRODE CONDUCTOR
FOOTCANDLE
G
GEC
EMT
EM
FLUOR
FC
MAIN CIRCUIT BREAKER
MAIN LUG ONLY
MEDIUM VOLTAGE
NORMALLY CLOSED
METAL HALIDE
MERCURY VAPOR
N NEUTRAL
RECEPTACLE
SECONDARY
RCPT
SEC
RMC
HPS
HID
GEN
GFCI
IG
INC
JB
LV
ISC
HV
COPPER
COMMUNICATION
DISTRIBUTION
DISCONNECT
CONTROL POWER TRANSFORMER
CURRENT TRANSFORMER
DISC
DIST
COMM
CT
CU
CPT
ALTERNATING CURRENT OR
ABOVE COUNTER/BACK SPLASH
TRANSIENT VOLTAGE SURGE SUPPRESSION
UNINTERRUPTIBLE POWER SUPPLY
CLG CEILING
DIA DIAMETER
OC ON CENTER
SCH SCHEDULE
NL NIGHT LIGHT
ELECTRICAL ABBREVIATIONS
G
POWER GROUND PANEL
SLAVE GROUND PANEL
MG
SG
PG
OG
GB GROUND BUS
GROUNDING ROD
THROUGH WALL CONNECTION
CABLE CONNECTION
AIR TERMINAL
EQUIPOTENTIAL GROUNDING DEVICE ( * =TYPE)
MASTER GROUND PANEL
OPERATING ROOM POWER GROUND PANEL
LIGHTNING PROTECTION & GROUNDING
DOUBLE DUPLEX RECEPTACLE, BOTH CONTROLLED
COORDINATION NOTESELECTRICAL GENERAL NOTES
A. THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIAGRAMMATIC.
DRAWINGS DO NOT NECESSARILY REPRESENT ALL ELBOWS, OFFSETS,
HANGERS, ETC., REQUIRED FOR A COMPLETE WORKING SYSTEM.
CONTRACTOR SHALL PROVIDE ALL NECESSARY ACCESSORIES AND
RELATED ITEMS FOR A COMPLETE SYSTEM.
B. IT IS THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS TO RESULT IN
A COMPLETE SYSTEM INSTALLATION IN COMPLETE ACCORDANCE WITH ALL
APPLICABLE LOCAL CODES AND ORDINANCES.
C. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS
CALLED FOR IN EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH. IF
THERE IS A CONFLICT IN THE CONTRACT DOCUMENTS, THE MORE
DEMANDING AND COSTLY DESIGN SHALL BE SELECTED FOR BIDDING
PURPOSES. UPON NOTICING CONFLICT IN THE DOCUMENTS, THE
CONTRACTOR SHALL IMMEDIATELY PRESENT THE CONFLICT FOUND IN THE
CONTRACT DOCUMENTS TO THE ARCHITECT/ENGINEER FOR RESOLUTION.
D. DRAWINGS SHALL NOT BE SCALED FOR ROUGH-IN MEASUREMENTS OR
USED AS SHOP DRAWINGS. WHERE DRAWINGS ARE REQUIRED FOR THESE
PURPOSES OR HAVE TO BE MADE FROM FIELD MEASUREMENTS, THE
CONTRACTOR SHALL TAKE THE NECESSARY MEASUREMENTS AND
PREPARE THE DRAWINGS.
E. BEFORE ANY WORK IS INSTALLED, DETERMINE THAT EQUIPMENT WILL
PROPERLY FIT IN THE SPACE, THAT REQUIRED CLEARANCES CAN BE
MAINTAINED AND THAT EQUIPMENT CAN BE LOCATED WITHOUT
INTERFERENCES BETWEEN SYSTEMS, WITH STRUCTURAL ELEMENTS, AND
WITH THE WORK OF OTHER TRADES.
F. CONFER, COOPERATE, AND COORDINATE WORK WITH OTHER TRADES.
COORDINATE CEILING PLENUM SPACE CAREFULLY WITH ALL TRADES.
G. IF MANUFACTURER'S MATERIAL OR EQUIPMENT IS LISTED IN SCHEDULES OR
ON DRAWINGS, THEY ARE TYPES TO BE PROVIDED FOR ESTABLISHMENT OF
SIZE, CAPACITY, GRADE, AND QUALITY. IF OTHER ACCEPTABLE
MANUFACTURER'S ARE USED, ALL IMPACTS, COSTS OR OTHERWISE,
RELATED TO THE CHANGE IN CONSTRUCTION REQUIRED BY THEIR USE
SHALL BE BORNE BY THE CONTRACTOR.
H. EQUIPMENT SHALL CONFORM TO AHJ ADOPTED ENERGY CONSERVATION
CODES INCLUDING ANY LOCAL AMENDMENTS.
I. REFER TO ARCHITECT FOR PAINTING REQUIREMENTS.
J. SEAL ALL PENETRATIONS THROUGH FIRE RATED WALLS AND CEILING WITH
APPROVED FIRE PROOFING MATERIALS.
K. PROVIDE CEILING AND WALL ACCESS DOORS SIZED AS REQUIRED TO
ACCOMMODATE RECOMMENDED SERVICE CLEARANCE ACCESS TO
EQUIPMENT THAT WOULD OTHERWISE BE CONCEALED WITHOUT ACCESS.
L. FIELD COORDINATE ACCESS DOORS AND EQUIPMENT LOCATIONS TO
MINIMIZE THE QUANTITY. INDICATE ACCESS DOORS ON CONTRACTOR SHOP
DRAWINGS FOR REVIEW BY OWNER AND ARCHITECT. REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
M. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS.
WSEC NOTES
A. THIS PROJECT ACHIEVES THE FOLLOWING EFFICIENCY CREDITS PER C406 RELATED
TO POWER AND LIGHTING:
a. DESIGN INTENT OF THE LIGHTING PLAN IS THAT THE INSTALLING
CONTRACTOR MEETS AT A MINIMUM 10% REDUCED LIGHTING POWER TO
COMPLY WITH WSEC 2021 SECTION C406.2.3.
A. ALL CONDUIT IN FINISHED AREAS SHALL BE CONCEALED, UNLESS NOTED
OTHERWISE.
B. PROVIDE GROUND CONDUCTORS FOR EACH RACEWAY PER NATIONAL ELECTRICAL
CODE.
C. MINIMUM CONDUIT SIZE SHALL BE 3/4 INCH.
D. ALL CONNECTORS, LUGS, AND DEVICES SHALL BE RATED FOR A MINIMUM OF 75-
DEGREE CELSIUS. NOTIFY OWNER AND ENGINEER IF EQUIPMENT CONNECTORS,
LUGS, ETC. ARE NOT RATED FOR A MINIMUM OF 75-DEGREE CELSIUS
E. CONTRACTOR SHALL REVIEW ALL LOCATIONS OF GFCI RECEPTACLES. WHERE GFCI
PROTECTION IS REQUIRED, PROVIDE REMOTE RESET BUTTONS OR PROVIDE GFCI
BREAKERS WHERE APPLIANCES, WATER COOLERS, VENDING MACHINES, ETC. WILL
OBSTRUCT ACCESS TO THE RECEPTACLE. RE: NEC 210.8.
F. PROVIDE TYPEWRITTEN PANELBOARD DIRECTORIES OF AFFECTED PANELBOARDS.
SPARES SHALL BE LABELED "SPARE" IN PENCIL.
G. EC SHALL PROVIDE RACEWAYS AND OTHER ASSOCIATED COMPONENTS AS
REQUIRED FOR TELECOMMUNICATIONS, AUDIO/VISUAL, ACCESS CONTROL, CCTV,
SOUND MASKING, FIRE ALARM, SECURITY, AND RADIO SYSTEMS. REFER TO THE
SYSTEMS PLANS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
H. FEEDER RATINGS ARE A MINIMUM, SUBMIT VOLTAGE DROP CALCULATIONS AND
ADJUST FEEDER RATINGS TO LIMIT THE VOLTAGE DROP TO 3 PERCENT. WHERE
EQUIPMENT IS SUB-FED, THE VOLTAGE DROP SHALL BE TO THE END DISTRIBUTION
EQUIPMENT. TO LIMIT VOLTAGE DROP, 120 V BRANCH CIRCUITS WITH LENGTH FROM
PANELBOARD TO FIRST OUTLET EXCEEDING 75 FEET SHALL BE #10 OR LARGER. FOR
277 V BRANCH CIRCUITS WITH LENGTH FROM PANELBOARD TO FIRST OUTLET
EXCEEDING 150 FEET SHALL BE #10 OR LARGER. CONDUCTOR SIZES FOR ALL
BRANCH CIRCUITS SHALL BE SIZED TO LIMIT VOLTAGE DROP TO 3 PERCENT, AT FULL
RATING OF CIRCUIT, UNLESS OTHERWISE NOTED. ADJUST CONDUCTORS AND
CONDUIT AS REQUIRED.
I. COORDINATE POWER AND CONNECTION REQUIREMENTS (RECEPTACLE TYPE,
MOUNTING HEIGHT, ETC.) WITH EACH SYSTEM PROVIDER INCLUDING BUT NOT
LIMITED TO TELECOMMUNICATIONS, AUDIO/VISUAL, ACCESS CONTROL, CCTV,
SOUND MASKING, FIRE ALARM, SECURITY, AND RADIO SYSTEMS.
J. COORDINATE WITH MECHANICAL CONTRACTOR FOR LOCATION OF MECHANICAL
CONTRACTOR PROVIDED FIRE/SMOKE AND SMOKE DAMPERS. REFER TO POWER
DRAWINGS FOR POWER CONNECTIONS. PROVIDE DUCT MOUNTED SMOKE
DETECTOR AT EACH DAMPER AND CONTROL DAMPER VIA A DEDICATED FIRE ALARM
CONTROL MODULE. FIRE/SMOKE AND SMOKE DAMPERS PROVIDED WITH DUCT
MOUNTED SMOKE DETECTOR, MONITOR WITH FIRE ALARM CONTROL PANEL AND
CONTROL FIRE/SMOKE AND SMOKE DAMPERS VIA FIRE ALARM CONTROL MODULE
PER AIR HANDLING ZONE PER FLOOR.
K. REFER TO OTHER TRADES FOR INFORMATION REQUIRED TO SUPPORT THE
ASSOCIATED EQUIPMENT. COORDINATE ROUGH-IN LOCATIONS, LUG RATINGS, LUG
QUANTITIES, AND IMPACTS TO ACCESS AND CLEARANCE OF ELECTRICAL
COMPONENTS. MAKE FINAL ELECTRICAL CONNECTIONS TO EQUIPMENT.
L. COORDINATE WITH TELECOMMUNICATION DOCUMENTS AND ADJUST RECEPTACLE
LOCATIONS TO LOCATE AN OUTLET WITHIN 18 INCHES OF A COMMUNICATION
OUTLET. PROVIDE POWER CONNECTIONS TO TELECOMMUNICATION DEVICES.
M. COORDINATE WITH TEMPERATURE CONTROL CONTRACTOR FOR LOCATION OF
TEMPERATURE CONTROL PANELS, VALVES, CONTROL TRANSFORMERS, ETC.
REQUIRING 120 VOLT POWER. CONNECT TO CIRCUITS INDICATED ON THE
PANELBOARD SCHEDULES.
PH OR Ø
THERMOSTAT-LINE VOLTAGE
THERMOSTAT - LINE-VOLTAGET
J
M
SINGLE MANUAL THERMAL OVERLOADSSMTO
SPOKANE, WA
WWW.ES-ENG.COM
Project number
Date
Drawn by
Checked by
SHEET TITLE:
E-0.1
LEGENDS,
ABBREVIATIONS, AND
NOTES
25.10
N E W
C O
N C E S S
IO
N S
R E S T R O
O M
S
PERMIT SET
04/25/2025
CHD
CHD
H E R M
IS
T O
N S
C H
O O
L D
IS
T R
IC
T
S
O U
T H
S T S
T R E E T
H E R M
IS
T O
N
O R E G
O N
K N
E R R C
O N
S T R U
C T
IO
N
IN
C
ELECTRICAL DRAWING INDEX
SHEET NAME SHEET #
LEGENDS, ABBREVIATIONS, AND
NOTES
E-0.1
LEGENDS, ABBREVIATIONS, AND
NOTES
E-0.2
SPECIFICATIONS E-0.3
SPECIFICATIONS E-0.4
ELECTRICAL ONE-LINE & SCHEDULES E-0.5
ELECTRICAL SCHEDULES E-0.6
SITE - POWER PLAN E-1.1
FIRST FLOOR - LIGHTING PLAN E-2.1
FIRST FLOOR - POWER PLAN E-3.1
ELECTRICAL DETAILS E-4.1
REV # DESCRIPTION DATE
LOCAL CONTACTOR
C
2 DOUBLE-POLE
PES
PO PILOT LIGHT-LOAD OFF
VARIABLE SPEED
PHOTO ELECTRIC SWITCH
SWITCHBANK DESIGNATION
TIMECLOCK
T TIME
V a
THREE WAY
FOUR WAY
KEY OPERATED
DIMMER
LOW VOLTAGE
PILOT LIGHT-LOAD ON
MTO
OS
P
LV
K
M
D
* SINGLE POLE SWITCH
TC
OS
VS
VS
DS DAYLIGHT SENSOR
MANUAL MOTOR STARTER WITH THERMAL OVERLOADS
WALL BOX OCCUPANCY SENSOR
WALL BOX VACANCY SENSOR
LOWER CASE LETTER INDICATES EQUIPMENT CONTROLLED
SWITCH ( * =TYPE)
MANUAL MOTOR STARTER
CEILING OR WALL MOUNTED OCCUPANCY SENSOR
CEILING OR WALL MOUNTED VACANCY SENSOR
S
SWITCHING LEGEND
MULTI-OUTLET ASSEMBLY
BUSHED CONDUIT
CAPPED CONDUIT
SEAL OFF FITTING
HOME RUN TO PANELBOARD, CIRCUITS AS INDICATED
# (#=ON CENTER DEVICES)
RACEWAY OR WIRING ASSEMBLY RUN
RACEWAY OR WIRING ASSEMBLY RUN,
UNDERGROUND OR UNDERFLOOR
RACEWAY OR WIRING ASSEMBLY DOWN
RACEWAY OR WIRING ASSEMBLY UP
SURFACE RACEWAY, DEVICES AS INDICATED
MODULAR CONNECTOR AND FLEXIBLE CABLE
RACEWAYS LEGEND
PHOTO ELECTRIC SWITCH
STRESS RELIEF DEVICE
SURGE ARRESTOR
(#=ANSI NUMBER)
PROTECTIVE RELAY
SHORT CIRCUIT CURRENT KEY
GROUND FAULT INTERRUPTER
N.O. N.C.
GFI
CONTACTS
N.O. = NORMALLY OPEN
PES
TC
SA
TIMECLOCK
GENERATOR
LINE FILTER
HAND (ON)
TWO SPEED
REDUCED VOLTAGE
SURGE PROTECTIVE DEVICE
VARIABLE FREQUENCY DRIVE
LOCAL DISCONNECT
LOCAL CONTACTOR
START STOP PUSHBUTTON
POTENTIAL TRANSFORMER
OVERHEAD POWER SERVICE ENTRANCE
O OFF
VFD
SPD
RV
2S
METER
FVNR
FVR
C
A AUTO
PUSHBUTTON
H
PANELBOARD
DRAWOUT DEVICE
# FEEDER KEY
GROUND
CURRENT TRANSFORMER
PNL
JUNCTION BOX
ATS AUTOMATIC
MTS MANUAL
GAP
COIL
CIRCUIT BREAKER DISTRIBUTION BOARD MOUNTED
DISCONNECT SWITCH DISTRIBUTION BOARD MOUNTED
LOCAL MOTOR STARTER ( =TYPE)
LOCAL COMBINATION MOTOR STARTER ( =TYPE)
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
GENERATOR ANNUNCIATOR PANEL
ELECTRICAL EQUIPMENT ENCLOSURE
MOTOR STARTER ( * =TYPE)
SELECTOR SWITCH ( *( =TYPE)
MEDIUM VOLTAGE VACUUM SWITCH
MEDIUM VOLTAGE SWITCH WITH OPERATOR
MEDIUM VOLTAGE FUSED SWITCH
MEDIUM VOLTAGE BLADE SWITCH
MEDIUM VOLTAGE ELBOW CONNECTOR
LOCAL DISCONNECT WITH OVERCURRENT PROTECTION
TRANSFER SWITCH ( * =TYPE)
MCC
DISTRIBUTION BOARD MOUNTED
CONVERTER ( * =TYPE)
AC
DC
FUSE DISTRIBUTION BOARD MOUNTED
FUSED DISCONNECT 600 VOLTS AND UNDER
TRANSFORMER (LINES INDICATE SHIELDED)
ONE-LINE DIAGRAM AND SCHEMATIC LEGEND
N.C. = NORMALLY CLOSED
M
J
C
A
SPOKANE, WA
WWW.ES-ENG.COM
Project number
Date
Drawn by
Checked by
SHEET TITLE:
E-0.2
LEGENDS,
ABBREVIATIONS, AND
NOTES
25.10
N E W
C O
N C E S S
IO
N S
R E S T R O
O M
S
PERMIT SET
04/25/2025
CHD
CHD
H E R M
IS
T O
N S
C H
O O
L D
IS
T R
IC
T
S
O U
T H
S T S
T R E E T
H E R M
IS
T O
N
O R E G
O N
K N
E R R C
O N
S T R U
C T
IO
N
IN
C
ELECTRICAL SPECIFICATIONS
SECTION 260500 -COMMON WORK RESULTS FOR ELECTRICAL
1. DEFINITIONS: WHENEVER USED IN THESE SPECIFICATIONS OR DRAWINGS, THE FOLLOWING TERMS SHALL HAVE
THE INDICATED MEANINGS:
a. FURNISH: “TO SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLING, INSTALLING, AND SIMILAR OPERATIONS.”
b. INSTALL: “TO PERFORM ALL OPERATIONS AT THE PROJECT SITE, INCLUDING, BUT NOT LIMITED TO, AND AS
REQUIRED: UNLOADING, UNPACKING, ASSEMBLING, ERECTING, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, TESTING, COMMISSIONING, STARTING UP AND
SIMILAR OPERATIONS, COMPLETE, AND READY FOR THE INTENDED USE.”
c. PROVIDE: “TO FURNISH AND INSTALL COMPLETE, AND READY FOR THE INTENDED USE.”
d. FURNISHED BY OWNER (OR OWNER-FURNISHED) OR FURNISHED BY OTHERS: “AN ITEM FURNISHED BY THE
OWNER OR UNDER OTHER DIVISIONS OR CONTRACTS, AND INSTALLED UNDER THE REQUIREMENTS OF THESE SPECIFICATIONS, COMPLETE, AND READY FOR THE INTENDED USE, INCLUDING ALL ITEMS AND SERVICES INCIDENTAL TO THE WORK NECESSARY FOR PROPER INSTALLATION AND OPERATION. INCLUDE
THE INSTALLATION UNDER THE WARRANTY REQUIRED BY THESE SPECIFICATIONS.”
e. ARCHITECT: FOR THE PURPOSES OF THESE DOCUMENTS WHERE ARCHITECT IS USED IT REFERS TO THE
PRIME DESIGN CONSULTANT.
f. ENGINEER: WHERE REFERENCED IN THESE SPECIFICATIONS, “ENGINEER” IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THESE SPECIFICATIONS. WHEN USED IN THESE SPECIFICATIONS, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER.
g. AHJ: THE LOCAL CODE AND/OR INSPECTION AGENCY (AUTHORITY) HAVING JURISDICTION OVER THE WORK.
2. THESE ELECTRICAL DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND INDICATE THE GENERAL ARRANGEMENT
AND LAYOUT OF ELECTRICAL WORK. LOCATIONS SHOWN ARE APPROXIMATE. DO NOT SCALE FROM THESE DRAWINGS. TAKE ALL DIMENSIONS FROM THE ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS, AND FROM THE STRUCTURE ITSELF BEFORE PERFORMING WORK. COORDINATE SPACE REQUIREMENTS WITH OTHER TRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE EXACT FITTING OF MATERIALS AND EQUIPMENT. DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS, OR REGULATIONS AND CODES GOVERNING THIS WORK SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT / ENGINEER IN WRITING BEFORE THE DATE OF BID OPENING OR AGREEMENT TO PERFORM SERVICES. IN THE EVENT SUCH DISCREPANCIES EXIST AND THE ARCHITECT / ENGINEER IS NOT SO NOTIFIED, THE ADJUDICATION OF
RESPONSIBILITY SHALL BE SOLELY AT THE DISCRETION OF THE ARCHITECT / ENGINEER.
3. FURNISH ALL LABOR, MATERIALS, EQUIPMENT, AND INCIDENTALS FOR THE COMPLETION OF THE ELECTRICAL SYSTEMS. THE EXTENT OF WORK MAY INCLUDE ELECTRICAL DETAILS NOT MENTIONED OR SHOWN, WHICH ARE NECESSARY FOR THE SUCCESSFUL OPERATION OF ALL SYSTEMS. ALL ELECTRICAL SYSTEMS SHALL BE COMPLETE
AND OPERATIONAL TO THE BENEFIT OF THE OWNER.
4. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GENERAL CONDITIONS, SUPPLEMENTAL REQUIREMENTS, AND THE CONSTRUCTION DOCUMENTS (INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, MECHANICAL, PLUMBING, TELECOMMUNICATIONS, FIRE ALARM, AND ELECTRICAL).
5. IN THE EVENT THAT ADDITIONAL INFORMATION IS REQUIRED DURING CONSTRUCTION, REQUEST SUCH INFORMATION FROM THE ARCHITECT IN WRITING PRIOR TO PERFORMING RELATED WORK. THE REQUEST FOR INFORMATION SHALL INCLUDE AN EXPLANATION OF THE INFORMATION REQUIRED INCLUDING REFERENCES TO
RELATED PORTIONS OF THE DOCUMENTS AND CONTRACTOR’S RECOMMENDATIONS.
6. WORKMANSHIP: ALL ELECTRICAL EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH RELATED REQUIREMENTS AND IN A NEAT AND WORKMAN-LIKE MANNER BY SKILLED AND COMPETENT ELECTRICIANS IN CONFORMANCE WITH THE STANDARD PRACTICES OF THE ELECTRICAL INDUSTRY.
7. MATERIALS: ALL ELECTRICAL MATERIALS SHALL BE NEW, UNLESS NOTED OTHERWISE, AND SHALL CONFORM TO CURRENT INDUSTRY STANDARDS, NEMA, IEEE, ANSI, AND UL STANDARDS. INSTALL EQUIPMENT AND MATERIALS IN
ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDATIONS.
8. THE TERMS "APPROVED EQUAL", “EQUIVALENT”, OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN “ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER, ARCHITECT, AND OWNER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED”. THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY AN NRTL, AND
ACCEPTABLE TO THE AHJ OVERSEEING THIS PROJECT.
9. MANUFACTURERS: THE LISTING OF SPECIFIC MANUFACTURERS DOES NOT IMPLY ACCEPTANCE OF THEIR PRODUCTS THAT DO NOT MEET THE SPECIFIED RATINGS, FEATURES AND FUNCTIONS. MANUFACTURERS LISTED
ARE NOT RELIEVED FROM MEETING THESE SPECIFICATIONS IN THEIR ENTIRETY.
10. COORDINATION: THE CONTRACTOR SHALL COORDINATE THE SEQUENCE AND PROGRESS OF ELECTRICAL WORK WITH THE OTHER TRADES’ AND THE OWNER’S SCHEDULE. COORDINATE CEILING CAVITY SPACE AND CHASES WITH THE GENERAL CONTRACTOR. COORDINATE ACCESS PANELS AND DOORS THAT ARE CONCEALED BY FINISHED
SURFACES.
11. TEMPORARY LIGHTING AND POWER: PROVIDE TEMPORARY POWER, LIGHTING, AND SUPPORT EQUIPMENT AS REQUIRED TO ACCOMODATE THE PLANNED CONSTRUCTION ACTIVITIES. INSTALL AND MAINTAIN FACILITIES IN A
MANNER THAT WILL PROTECT THE PUBLIC AND WORKERS..
12. COMPLY WITH FEDERAL, STATE, AND LOCAL CODE REQUIREMENTS AND ORDINANCES, AS WELL AS THE APPLICABLE UTILITY COMPANY (POWER, PHONE, CABLE, FIBER) REQUIREMENTS. IN THE CASE OF DIFFERENCES BETWEEN THESE REQUIREMENTS AND ORDINANCES, THE MOST STRINGENT STANDARDS SHALL GOVERN.
13. COMPLY WITH APPLICABLE BUILDING CODES AND ORDINANCES (INCLUDING BUT NOT LIMITED TO): NEC, IBC, NFPA, IFC, IMC, ADA, AND LOCAL JURISDICTIONAL REQUIREMENTS, CODES, AND AMENDMENTS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR REQUESTING AND REVIEWING ANY APPLICABLE CLIENT DESIGN AND
CONSTRUCTION STANDARDS TO WHICH COMPLIANCE WILL BE MANDATORY.
15. REFERENCES: REFERENCE THE LATEST EDITIONS OF THE FOLLOWING INDUSTRY STANDARDS: UL, NEMA, ANSI, ICEA, IECC, NESC, NECA, AND OSHA.
16. APPLY FOR AND PAY FOR ALL RELATED PERMITS, FEES, LICENSES, AND INSPECTIONS FOR DIVISION 26 WORK.
17. MODIFICATIONS OR CHANGES THAT DEVIATE FROM THE DESIGN INTENT OF THE CONSTRUCTION DOCUMENTS
THAT ARE MADE BY THE CONTRACTOR AND THAT ARE NOT PREVIOUSLY APPROVED BY THE DESIGN TEAM OR OWNER, EITHER IN SCOPE, METHODS, OR IN SUBSTITUTION OF PRODUCTS OR DEVICES, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL REWORK COSTS SHALL BE THE RESPONSBILITY OF THE CONTRACTOR.
18. ROOF PROVISIONS: RACEWAY PENETRATIONS IN ROOFS SHALL PRESERVE THE INTEGRITY OF THE ROOF AND NOT VOID ITS WARRANTY. PROVIDE WEATHERPROOF FLASHING AND COUNTER FLASHING FOR ALL ROOF PENETRATIONS. PROVIDE SUPPORT AND ANCHORING MEANS FOR DEVICES AND EQUIPMENT. DEVICES SHALL NOT
BE SUPPORTED BY CONDUIT STEMS.
19. THE CONTRACTOR SHALL MAKE PROVISIONS FOR SAFE DELIVERY AND SECURE STORAGE OF MATERIALS.
20. SUBMITTALS: SUBMIT SHOP DRAWINGS FOR MAJOR MATERIALS AND EQUIPMENT. SEND THE SUBMITTALS TO THE
ARCHITECT AND/OR THE GENERAL CONTRACTOR. PRIOR TO ROUGH-IN OF EQUIPMENT, AND TO AVOID FORESEEABLE COST IMPACTS, THE CONTRACTOR SHALL REVIEW THE SHOP DRAWINGS FOR RELATED EQUIPMENT WITH THE APPLICABLE TRADES FOR FINAL EQUIPMENT SELECTION, LOADS, VOLTAGE, PHYSICAL DIMENSIONS, AND
CONNECTION REQUIREMENTS.
21. CLEANING AND PROTECTION: AT THE COMPLETION OF THE PROJECT, INSPECT, RETEST, DEBURR, AND CLEAN THE INSTALLED EQUIPMENT (LIGHTS, PANELS, TRANSFORMERS, CONDUITS AND FITTINGS, RECEPTACLES, DEVICES, ETC.). TOUCH UP AND PAINT EQUIPMENT AND DEVICES AS REQUIRED. LEAVE PREMISES IN A CLEAN AND ORDERLY
CONDITION.
22. DO NOT USE THE CONSTRUCTION DOCUMENTS AS THE FINAL RECORD DOCUMENTS. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH (1) SET OF NEAT, LEGIBLE, AND BOUND PROJECT RECORD DOCUMENTS MARKED WITH
ELECTRICAL FIELD CHANGES OR MODIFICATIONS.
23. TRAINING: PROVIDE FORMAL OPERATION AND MAINTENANCE TRAINING FOR ALL MAJOR EQUIPMENT TO THE OWNER AND BUILDING ENGINEER. SUBMIT ALL KEYS FOR ELECTRICAL SWITCHES, PANELS, CABINETS, ENCLOSURES, ETC. TO THE GENERAL CONTRACTOR OR THE OWNER. IN ADDITION, PROVIDE ALL NECESSARY
OPERATING MANUALS FOR ALL MAJOR EQUIPMENT IN THE BUILDING TO OWNER.
24. WARRANTIES: PROVIDE A WRITTEN "ONE YEAR" WARRANTY TO THE OWNER COVERING THE ENTIRE ELECTRICAL WORK TO BE FREE FROM DEFECTIVE MATERIALS, EQUIPMENT AND WORKMANSHIP FOR A MINIMUM PERIOD OF (1)
YEAR, AFTER DATE OF OWNER ACCEPTANCE.
25. EQUIPMENT COORDINATION: PRIOR TO ROUGH-IN AND PURCHASE OF MATERIALS, THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH EACH TRADE AND EQUIPMENT SUPPLIER IN TERMS OF THE FINAL WIRING REQUIREMENTS, VOLTAGE AND PHASE, LOADS, OVERCURRENT PROTECTION, DISCONNECTS, CONNECTION POINTS, ETC. FOR ALL EQUIPMENT (MECHANICAL, PLUMBING, CABINETRY AND FURNITURE, FIRE ALARM, SECURITY, SPECIAL EQUIPMENT, ETC.). PROVIDE MATCHING PLUG CONFIGURATIONS AND CORD AND PLUG SETS.
26. THE CONTRACTOR SHALL REVIEW ALL MAJOR EQUIPMENT SUBMITTALS. VERIFY LOCATION, SIZE AND TYPE OF CONNECTIONS. COORDINATE DETAILS OF EQUIPMENT CONNECTIONS WITH THE SUPPLIERS AND INSTALLERS.
27. EQUIPMENT INSTALLATION: ALL EQUIPMENT PROVIDED BY OTHER TRADES REQUIRING ELECTRICAL POWER OR CONTROL, THE CONTRACTOR SHALL PROVIDE THE REQUIRED CONDUIT, WIRING, OUTLETS, RECEPTACLES, DISCONNECT SWITCHES, ETC., AND MAKE UP ALL FINAL ELECTRICAL CONNECTIONS TO PROVIDE COMPLETE AND
OPERATING SYSTEMS IN ACCORDANCE WITH EQUIPMENT SHOP DRAWINGS AND MANUFACTURERS
RECOMMENDATIONS. ALL ELECTRICAL CONNECTIONS SHALL BE IN ACCORDANCE WITH EQUIPMENT MANUFACTURER'S INSTRUCTIONS. USE WIRE AND CABLE WITH INSULATION SUITABLE FOR TEMPERATURES
ENCOUNTERED.
28. MAKE WIRING CONNECTIONS IN CONTROL PANEL OR IN WIRING COMPARTMENT OF PRE-WIRED EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. PROVIDE INTERCONNECTING WIRING WHERE INDICATED.
29. INSTALL TERMINAL BLOCK JUMPERS AS NEEDED TO COMPLETE EQUIPMENT WIRING REQUIREMENTS.
30. INSTALL DISCONNECT SWITCHES, CONTROLLERS, CONTROL STATIONS, AND CONTROL DEVICES SUCH AS LIMIT
SWITCHES AND TEMPERATURE SWITCHES AS INDICATED. CONNECT WITH CONDUIT AND WIRING AS INDICATED.
31. EQUIPMENT GROUNDING: AS SPECIFIED IN THE GROUNDING AND BONDING SECTION.
32. EQUIPMENT RACEWAYS AND BOXES: PROVIDE CONDUIT, BOXES, WIRE, CABLE, AND CONNECTIONS AS REQUIRED.
33. EQUIPMENT CONNECTION SCHEDULE: FURNISH, SET IN PLACE, AND WIRE, EXCEPT AS INDICATED ON
MECHANICAL/ELECTRICAL COORDINATION MATRIX SHOWN ON DRAWINGS.
34. PROVIDE TYPED DIRECTORY CARDS UNDER PLASTIC ON THE INSIDE OF DOORS OF BRANCH CIRCUIT
PANELBOARDS. DIRECTORY CARDS SHALL BE COMPLETELY FILLED OUT WITH ALL CIRCUITS ADEQUATELY MARKED AND SHALL BE TYPEWRITTEN. ROOM NUMBERS SHALL BE CONFIRMED PRIOR TO COMPLETION.
DIRECTORIES SHALL INDICATE DEVICES BEING SERVED INCLUDING SPACE NUMBERS OR SPACE NAMES IN WHICH DEVICES OR LOADS ARE LOCATED. SPARES SHALL BE MARKED “SPARE” IN PENCIL. SPACES SHALL BE MARKED
“SPACE” IN PENCIL.
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
1. PRODUCTS: ALL GROUNDING AND BONDING MATERIALS AND PRODUCTS SHALL BE LISTED, MARKED, AND PROPERLY RATED FOR THE INTENDED PURPOSE AND INSTALLED PER THE MANUFACTURERS, NEC, AND LOCAL AHJ REQUIREMENTS.
COMPLY WITH UL 467 FOR GROUNDING AND BONDING MATERIALS AND EQUIPMENT.
2. GROUNDING CONDUCTORS FOR RACEWAYS AND EQUIPMENT: ALL CABINETS, RACEWAYS, CONDUITS, ETC. SHALL
HAVE GROUND BONDS PER NEC 250 REQUIREMENTS. PROVIDE A SEPARATE GROUND WIRE IN ALL FEEDERS AND BRANCH CIRCUITS. PROVIDE ALL BONDING JUMPERS, WIRE, GROUNDING BUSHINGS, CLAMPS, ETC.
3. MATERIAL: ALL GROUNDING CONDUCTORS AND BOND WIRES SHALL BE COPPER. PROVIDE GREEN-COLORED INSULATION FOR EQUIPMENT GROUNDING CONDUCTORS. FOR ISOLATED GROUND CONDUCTORS UP TO #8, PROVIDE INSULATED WIRE WITH GREEN-COLORED INSULATION WITH YELLOW STRIPE. ON FEEDERS WITH ISOLATED GROUND, USE COLORED TAPE, ALTERNATING BANDS OF GREEN AND YELLOW TAPE TO PROVIDE A MINIMUM OF THREE BANDS OF GREEN AND TWO BANDS OF YELLOW. PROVIDE STRANDED CABLE FOR GROUNDING
ELECTRODE CONDUCTORS.
4. BONDING JUMPER: BARE, BRAIDED, COPPER STRIP, TERMINATED WITH COPPER FERRULES; 1-5/8 INCHES WIDE AND 1/16 INCH THICK. BONDING JUMPERS SHALL BE USED AS INDICATED IN OTHER PARTS OF THIS SPECIFICATION AND FOR BONDING
ITEMS WHICH MOVE SUCH AS GATES, DOORS, ETC.
5. GROUND RING: INSTALL MINIMUM NO. 2/0 TINNED-COPPER GROUNDING CONDUCTOR, ELECTRICALLY CONNECTED
TO EACH BUILDING STRUCTURE GROUND AND TO EACH STEEL COLUMN (IF PRESENT) EXTENDING AROUND THE PERIMETER OF BUILDING. BURY GROUND RING NOT LESS THAN 24 INCHES FROM BUILDING FOUNDATION.
6. GROUNDING BUS: PRE-DRILLED RECTANGULAR BARS OF ANNEALED COPPER, 1/4 INCH BY 4 INCHES IN CROSS SECTION, WITH 9/32 INCH HOLES SPACED 1-1/8 INCHES APART. 2-INCH STAND-OFF INSULATORS FOR MOUNTING SHALL
COMPLY WITH UL 891 FOR USE IN SWITCHBOARDS, 600V AND SHALL BE LEXAN OR PVC, IMPULSE TESTED AT 5000V.
CONNECTORS SHALL BE MECHANICAL TYPE, CAST SILICON BRONZE, COMPRESSION-TYPE TERMINALS, AND LONG-BARREL, TWO-BOLT CONNECTION TO GROUND BUS BAR.
7. SIZE: INSTALL SOLID CONDUCTORS FOR NO. 8 AWG AND SMALLER, AND STRANDED CONDUCTORS FOR NO. 6 AWG AND
LARGER UNLESS OTHERWISE INDICATED.
8. GROUND RODS: COPPER-CLAD, ¾ INCH BY 10 FT. CONNECT GROUNDING ELECTRODE CONDUCTORS WITH MECHANICAL
TYPE, COPPER OR COPPER ALLOY, TERMINAL WITH HEX HEAD BOLT.
9. GROUNDING AT THE SERVICE: EQUIPMENT GROUNDING CONDUCTORS AND GROUNDING ELECTRODE CONDUCTORS
SHALL BE CONNECTED TO THE GROUND BUS. INSTALL A MAIN BONDING JUMPER BETWEEN THE NEUTRAL AND GROUND
BUSES.
10. PAD-MOUNTED TRANSFORMER AND SWITCHES: INSTALL TWO (2) GROUND RODS AND GROUND RING AROUND THE PAD.
INSTALL MINIMUM #2 AWG TINNED-COPPER CONDUCTOR FOR GROUND RING AND FOR TAPS TO EQUIPMENT GROUNDING TERMINALS. BURY GROUND RING MINIMUM 24 INCHES BELOW GRADE AND NOT LESS THAN 6 INCHES FROM FOUNDATION.
11. TEST WELLS: INSTALL AT LEAST ONE TEST WELL FOR EACH SERVICE UNLESS OTHERWISE INDICATED. PROVIDE HANDHOLE MINIMUM 12 INCHES DEEP, WITH COVER. PROVIDE GROUND ROD DRIVEN THROUGH DRILLED HOLE IN BOTTOM OF HANDHOLE. INSTALL AT GROUND ROD CLOSEST TO SERVICE ENTRANCE. SET TOP OF TEST WELL FLUSH WITH
FINISHED GRADE OR FLOOR.
12. NONMETALLIC RACEWAYS: INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN NONMETALLIC RACEWAYS UNLESS THEY
ARE DESIGNATED FOR TELEPHONE OR DATA CABLES.
13. TESTING: PERFORM VISUAL AND MECHANICAL TESTS ACCORDING TO NETA ATS STANDARDS. PERFORM FALL-OF- POTENTIAL TEST AS DIRECTED BY IEEE 81 TWO DAYS AFTER LAST TRACE OF MOISTURE OR PRECIPITATION. MEASURE RESISTANCE AT SERVICE DISCONNECT ENCLOSURE GROUNDING TERMINAL, AT EACH TEST WELL INDICATED, AND AT EACH GROUND ROD INSTALLATION. COMPARE VALUES AGAINST NETA ATS AND CORRECT AND RE-TEST AT AREAS OF
DEFICIENCY WHERE MEASURED VALUES ARE HIGHER THAN THOSE LISTED.
14. BONDING STRAPS AND JUMPERS: INSTALL SO VIBRATION BY EQUIPMENT MOUNTED ON VIBRATION ISOLATION HANGERS
AND SUPPORTS IS NOT TRANSMITTED TO RIGIDLY MOUNTED EQUIPMENT.
SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
1. PROVIDE HANGERS AND SUPPORTS THAT ARE ADEQUATE TO CARRY THE LOADS OF EQUIPMENT, PANELBOARDS, RACEWAYS, AND CABLES. FACTOR IN THE WEIGHT OF THE CONDUCTORS AND CABLES IN THE RACEWAYS.
2. THE CONTRACTOR SHALL COORDINATE THAT ALL LOW VOLTAGE SYSTEMS CABLING ABOVE ACCESSIBLE CEILING SPACES
ARE HUNG FROM BRIDLE-TYPE RINGS OR PLACED IN CABLE TRAYS.
3. DRY LOCATION MATERIALS: COLD-FORMED, CHANNEL-TYPE STEEL WITH CORROSION-RESISTANT COATING.
4. DO NOT FASTEN SUPPORTS TO PIPES, DUCTS, MECHANICAL EQUIPMENT, OR CONDUITS.
5. INSTALL SURFACE-MOUNTED CABINETS AND PANELBOARDS WITH A MINIMUM OF FOUR ANCHORS.
6. TRANSFORMERS: ALL SUSPENDED OR WALL-MOUNTED TRANSFORMERS SHALL BE COORDINATED WITH OTHER TRADES
TO VERIFY THE LOCATION, SUPPORT MEANS, AND THE INTEGRITY OF THE BUILDING STRUCTURE TO SUPPORT THE
EQUIPMENT LOADS.
7. TESTS AND INSPECTIONS: AFTER INSTALLING GROUNDING SYSTEM AND COMPONENTS, BUT PRIOR TO ENERGIZATION, PERFORM A PHYSICAL AND MECHANICAL INSPECTION. VERIFY TIGHTNESS OF ACCESSIBLE CONNECTIONS WITH A
CALIBRATED TORQUE WRENCH ACCORDING TO MANUFACTURER’S WRITTEN INSTRUCTIONS.
SECTION 260533 – RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
1. ALL MATERIALS AND INSTALLATION METHODS SHALL BE THE APPLICABLE UL LISTING, NEC SIZE AND INSTALLATION REQUIREMENTS, AND LOCAL JURISDICTIONAL REQUIREMENTS. ALL RACEWAYS SHALL BE PROPERLY SUPPORTED. ALL WORK SHALL MEET THE OWNERS REQUIREMENTS AND AUTHORITY HAVING JURISDICTION (AHJ) STANDARDS.
2. RACEWAY APPLICATION OUTDOORS: APPLY RACEWAY PRODUCTS AS SPECIFIED BELOW UNLESS OTHERWISE INDICATED:
a. EXPOSED CONDUIT: GRC.
b. CONCEALED CONDUIT, ABOVEGROUND: IMC.
c. UNDERGROUND CONDUIT: RNC, TYPE EPC-40-PVC OR TYPE EPC-80-PVC.
d. CONNECTION TO VIBRATING EQUIPMENT (INCLUDING TRANSFORMERS AND HYDRAULIC, PNEUMATIC, ELECTRIC
SOLENOID, OR MOTOR-DRIVEN EQUIPMENT): LFMC.
e. BOXES AND ENCLOSURES, ABOVEGROUND: NEMA 250, TYPE 3R.
3. RACEWAY APPLICATION INDOORS: APPLY RACEWAY PRODUCTS AS SPECIFIED BELOW UNLESS OTHERWISE
INDICATED:
a. EXPOSED, NOT SUBJECT TO PHYSICAL DAMAGE: EMT.
b. EXPOSED, NOT SUBJECT TO SEVERE PHYSICAL DAMAGE: EMT.
c. EXPOSED AND SUBJECT TO SEVERE PHYSICAL DAMAGE: GRC. RACEWAY LOCATIONS INCLUDE THE FOLLOWING:
LOADING DOCKS; CORRIDORS USED FOR TRAFFIC OF MECHANIZED CARTS, FORKLIFTS, AND PALLET-HANDLING
UNITS; MECHANICAL ROOMS.
d. CONCEALED IN CEILINGS AND INTERIOR WALLS AND PARTITIONS: EMT.
e. CONNECTION TO VIBRATING EQUIPMENT (INCLUDING TRANSFORMERS AND HYDRAULIC, PNEUMATIC, ELECTRIC
SOLENOID, OR MOTOR-DRIVEN EQUIPMENT): FMC, EXCEPT USE LFMC IN DAMP OR WET LOCATIONS.
f. DAMP OR WET LOCATIONS: GRC.
g. BOXES AND ENCLOSURES: NEMA 250, TYPE 1, EXCEPT USE NEMA 250, TYPE 4 STAINLESS STEEL IN INSTITUTIONAL
AND COMMERCIAL KITCHENS AND DAMP OR WET LOCATIONS.
4. APPLICATION: ELECTRICAL METALLIC TUBING (EMT) COUPLINGS SHALL BE STEEL COMPRESSION-TYPE OR SET SCREW
FITTINGS TORQUED PER MANUFACTURERS REQUIREMENTS. IN EXISTING FACILITIES, COORDINATE THE FITTING TYPE
WITH THE OWNERS REQUIREMENTS.
5. APPLICATION: MC CABLE WITH GREEN INTERNAL GROUND WIRES SHALL HAVE A LIMITED USE. THE FIRST JUNCTION BOX ON THE RUN TO THE PANEL SHALL BE EMT. NO MC RACEWAYS SHALL BE RUN EXPOSED. PROVIDE ANTI-SHORT BUSHINGS. MC RACEWAYS AND SYSTEMS SHALL BE INSTALLED IN A PROFESSIONAL AND WORKMAN-LIKE MANNER.
6. ALL NON-BRANCH CIRCUIT RUNS SHALL BE EMT, IMC, OR GRC AS APPLICABLE.
7. FLEXIBLE CONNECTIONS: FLEXIBLE METAL CONDUIT (FMC) WITH INTERNAL GROUND WIRE SHALL BE USED FOR ALL
CONNECTIONS TO VIBRATING EQUIPMENT, MOTORS, AND MACHINERY. THE MINIMUM DISTANCE IS 2 FEET; THE MAXIMUM IS 6 FEET. INSTALL ANTI-SHORT BUSHINGS AS REQUIRED. LIQUID-TIGHT UV-RATED FLEX CONDUIT SHALL BE USED FOR
EXTERIOR APPLICATIONS, OR WHERE HUMIDITY OR LIQUIDS ARE PRESENT.
8. FITTINGS AND ACCESSORIES: INCLUDE COUPLINGS, OFFSETS, ELBOWS, EXPANSION JOINTS, ADAPTERS, HOLD-DOWN STRAPS, END CAPS, AND OTHER FITTINGS TO MATCH AND MATE WITH WIREWAYS AS REQUIRED FOR COMPLETE SYSTEM.
9. ALL CONDUITS SHALL BE ROUTED PARALLEL OR PERPENDICULAR WITH THE BUILDING WALLS.
10. SYSTEMS RACEWAYS: INSTALL PULL WIRES IN EMPTY RACEWAYS. LEAVE AT LEAST 12-INCHES OF SLACK AT EACH END OF
PULL WIRE. RACEWAYS SHALL HAVE BUSHINGS ON ENDS. PROVIDE WIDE SWEEP BENDS FOR INSTALLATION OF DATA/IT
CABLE RUNS.
11. MINIMUM SIZE: 3/4 INCH TRADE SIZE.
12. COORDINATION: THE CONTRACTOR SHALL COORDINATE THE TIMING AND ROUTING OF RACEWAYS WITH OTHER TRADES
(TO AVOID FIELD CONFLICTS WITH PARTITION ASSEMBLIES, SUPPORTS, PENETRATIONS, LIGHT FIXTURES, HVAC
EQUIPMENT, AND FIRE-SUPPRESSION SYSTEMS).
13. MOISTURE TRAPS: AVOID MOISTURE TRAPS IN AREAS WHERE CONDUIT ENCOUNTERS LARGE ENVIRONMENTAL FLUCTUATIONS BETWEEN ROOMS, AS MAY BE PRESENT BETWEEN SERVER ROOMS AND ADJACENT OFFICES. PROVIDE
SEAL OFFS WHERE NECESSARY.
14. BOXES, ENCLOSURES, AND CABINETS SHALL MATCH BUILDING STANDARDS AND APPLICATION. COORDINATE BOX TYPE, SIZE, AND APPLICATION FOR ALL BOXES, ENCLOSURES, OR HOUSINGS THAT IS PROVIDED TO SUPPORT OTHER TRADES.
15. BOXES: ZINC-COATED SHEET STEEL BOXES.
16. INSTALLATION: BACK TO BACK MOUNTING IS NOT PERMITTED. LOCATE AND MOUNT OUTLETS AND BACK BOXES SO THAT
THE TRANSMISSION OF SOUND THROUGH COMMON WALLS WILL NOT OCCUR. THE MINIMUM SEPARATION BETWEEN DEVICES SHALL BE 6 INCHES O.C. IN COMMON WALLS AND 24 INCHES O.C. IN SOUND-RATED OR TENANT-SEPARATION
WALLS.
17. SIZES: BOX CHARACTERISTICS SHALL BE SIZED TO HANDLE DEVICES AND MATCH EQUIPMENT REQUIREMENTS, AND MEET NEC STANDARDS. USE GANG BOXES WHERE MORE THAN ONE DEVICE IS MOUNTED TOGETHER. DO NOT USE SECTIONAL BOXES. DIFFERENT VOLTAGES OR VOLTAGE WITH CONTROLS IN COMMON BOXES SHALL HAVE SEPARATION.
18. COMMUNICATIONS: PROVIDE A 4-INCH SQUARE WITH SINGLE GANG RING AND MATCHING FACE PLATE FOR EACH COMMUNICATIONS DEVICE, WITH CONDUIT STUBBED UP 6 INCHES ABOVE THE ACCESSIBLE CEILING SPACE WITH PULL
STRING AND CONDUIT BUSHING.
19. MECHANICAL: THE CONTRACTOR SHALL PROVIDE BACK BOXES FOR LINE VOLTAGE THERMOSTATS AND CONTROL DEVICES, WITH CONDUITS STUBBED 6 INCHES ABOVE THE ACCESSIBLE CEILING WITH PULL STRING AND BUSHING. IN EXTERIOR LOCATIONS, ROUTE THE RACEWAY FOR CONTROL WIRING TO AN ACCESSIBLE LOCATION OR AS
DIRECTED BY THE MECHANICAL CONTRACTOR.
20. EQUIPMENT CONNECTIONS: THE BRANCH CIRCUIT AND COMMUNICATIONS SERVICE BOXES FEEDING FURNITURE SYSTEMS AND EQUIPMENT SHALL BE COORDINATED WITH THE FURNITURE AND EQUIPMENT PROVIDER PRIOR TO
ROUGH-IN AND PURCHASE OF MATERIALS.
21. MANUFACTURERS FOR BOXES, ENCLOSURES, AND CABINETS: COOPER, CROUSE-HINDS, HOFFMAN, STEEL CITY, APPLETON, HUBBELL, & WIREMOLD.
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
1. RACEWAY LABELING: PROVIDE LABELING FOR ALL RACEWAYS AND CABLES.
2. DEVICE LABELING: PROVIDE INDIVIDUAL TYPED DEVICE LABELS FOR EACH DEVICE. BLACK LETTERS ON WHITE FACE, EXCEPT FOR EMERGENCY SYSTEMS, OR AS DIRECTED BY THE OWNER. LABELS SHALL BE APPLIED IN A CLEAN AND
WORKMAN-LIKE MANNER. LABELS SHALL INDICATE PANEL AND CIRCUIT.
3. NAMEPLATES: PROVIDE ENGRAVED PLASTIC NAMEPLATES FOR ALL POWER AND SYSTEMS EQUIPMENT: (CABINETS, ENCLOSURES, PANELBOARDS, DISTRIBUTION EQUIPMENT, MOTOR CONTROLLERS, TRANSFORMERS, CONTROL DEVICES, PULLBOXES, FIRE ALARM CONTROLS, REMOTE PILOT LIGHTS, TEST SWITCHES, BACKUP POWER EQUIPMENT, SECURITY AND CCTV SYSTEMS, ETC.). STATE VOLTAGE AND PHASE, IF APPLICABLE.
4. CONDUCTOR IDENTIFICATION: CONDUCTORS #2 AWG OR SMALLER SHALL BE FACTORY COLOR-CODED. WIRE #1 AND LARGER SHALL BE COLOR CODED BY FIELD COLORED TAPE-6 INCH LENGTH AT EXPOSED END. STANDARD
CONDUCTOR COLOR CODES:
208/120 VOLTAGE:
a. PHASE A - BLACK
b. PHASE B - RED
c. PHASE C - BLUE
d. NEUTRAL - WHITE
e. GROUND - GREEN
f. ISO G - GREEN W/ YELLOW STRIPES
SECTION 262416 - PANELBOARDS
1. COORDINATION: THE CONTRACTOR SHALL COORDINATE LAYOUT, INSTALLATION, AND CLEARANCES FOR PANELS AND COMPONENTS WITH OTHER TRADES AND CONSTRUCTION THAT PENETRATES WALLS OR IS SUPPORTED BY THEM, INCLUDING ELECTRICAL AND OTHER TYPES OF EQUIPMENT, RACEWAYS, PIPING, AND ENCUMBRANCES TO WORKSPACE CLEARANCE REQUIREMENTS. COORDINATE THE WALL DEPTHS FOR ALL RECESS-MOUNTED PANELS
WITH THE GENERAL CONTRACTOR PRIOR TO CONSTRUCTION.
2. AIC BRACING: UNLESS SPECIFICALLY ADDRESSED IN THE DRAWINGS, ALL PANELBOARDS SHALL BE FULLY BRACED FOR THE FAULT CURRENT CONDITIONS OF THE PROJECT. ALL SERIES RATED EQUIPMENT SHALL CONTAIN INDUSTRY
STANDARD AND CODE COMPLIANT LABELING THAT MEETS THE REQUIRED STANDARDS.
3. PROVIDE THE NEMA CONFIGURATION TO MEET ENVIRONMENTAL CONDITIONS.
4. DIRECTORY CARD/INDEX: PROVIDE A TRANSPARENT PROTECTIVE COVER, MOUNTED INSIDE METAL FRAME, INSIDE
THE PANEL DOOR. INDEX CARDS SHALL BE NUMBERED ODD ON THE LEFT SIDE AND EVEN ON THE RIGHT SIDE. ALL CIRCUIT INFORMATION SHALL BE TYPED AND NOTED IN A CLEAR AND PROFESSIONAL MANNER. HANDWRITTEN
ENTRIES SHALL NOT BE PERMITTED.
SPOKANE, WA
WWW.ES-ENG.COM
Project number
Date
Drawn by
Checked by
SHEET TITLE:
E-0.3
SPECIFICATIONS
25.10
N E W
C O
N C E S S
IO
N S
R E S T R O
O M
S
PERMIT SET
04/25/2025
CHD
CHD
H E R M
IS
T O
N S
C H
O O
L D
IS
T R
IC
T
S
O U
T H
S T S
T R E E T
H E R M
IS
T O
N
O R E G
O N
K N
E R R C
O N
S T R U
C T
IO
N
IN
C
ELECTRICAL SPECIFICATIONS
SECTION 262416 - PANELBOARDS
1. COORDINATION: THE CONTRACTOR SHALL COORDINATE LAYOUT, INSTALLATION, AND CLEARANCES FOR PANELS AND COMPONENTS WITH OTHER TRADES AND CONSTRUCTION THAT PENETRATES WALLS OR IS SUPPORTED BY THEM, INCLUDING ELECTRICAL AND OTHER TYPES OF EQUIPMENT, RACEWAYS, PIPING, AND ENCUMBRANCES TO WORKSPACE CLEARANCE REQUIREMENTS. COORDINATE THE WALL DEPTHS FOR ALL RECESS-MOUNTED PANELS
WITH THE GENERAL CONTRACTOR PRIOR TO CONSTRUCTION.
2. AIC BRACING: UNLESS SPECIFICALLY ADDRESSED IN THE DRAWINGS, ALL PANELBOARDS SHALL BE FULLY BRACED FOR THE FAULT CURRENT CONDITIONS OF THE PROJECT. ALL SERIES RATED EQUIPMENT SHALL CONTAIN INDUSTRY
STANDARD AND CODE COMPLIANT LABELING THAT MEETS THE REQUIRED STANDARDS.
3. PROVIDE THE NEMA CONFIGURATION TO MEET ENVIRONMENTAL CONDITIONS.
4. DIRECTORY CARD/INDEX: PROVIDE A TRANSPARENT PROTECTIVE COVER, MOUNTED INSIDE METAL FRAME, INSIDE
THE PANEL DOOR. INDEX CARDS SHALL BE NUMBERED ODD ON THE LEFT SIDE AND EVEN ON THE RIGHT SIDE. ALL CIRCUIT INFORMATION SHALL BE TYPED AND NOTED IN A CLEAR AND PROFESSIONAL MANNER. HANDWRITTEN
ENTRIES SHALL NOT BE PERMITTED.
5. CIRCUIT BREAKERS: PROVIDE FORMAL MAIN CIRCUIT BREAKERS (MCBS) AS NOTED ON THE DRAWINGS OR PER NEC.
DO NOT PROVIDE BRANCH CIRCUIT CHASSIS-MOUNTED CIRCUIT BREAKERS AS MCBS. IN THE CASES WHERE THE PHYSICAL DIMENSIONS OF CIRCUIT BREAKERS ARE LARGER THAN THE BRANCH CIRCUIT CHASSIS, PROVIDE UL LISTED CONNECTIONS BELOW THE PANEL BUSSING THAT MATCHES THE DEVICE REQUIREMENTS. WHERE STANDARD PANEL CONFIGURATIONS AND INCREASED CIRCUIT BREAKER HOUSING EXCEEDS INDUSTRY OFF-THE-
SHELF PANEL TYPES, PROVIDE SWITCHBOARD-STYLE PANELBOARDS.
a. ALL CIRCUIT BREAKERS SHALL BE SPECIFICATION-GRADE, BOLT-ON, MOLDED-CASE, THERMAL-MAGNETIC
DEVICES.
b. NO SLIMLINE OR TWIN-POSITION, OR “2-FOR-1” CIRCUIT BREAKERS SHALL BE PERMITTED.
c. PROVIDE MANUFACTURER SPECIFIC FILLER PLATES FOR ALL INDICATED SPACES.
d. GROUND-FAULT PROTECTION: INTEGRALLY MOUNTED RELAY AND TRIP UNIT WITH ADJUSTABLE PICKUP AND
TIME-DELAY SETTINGS, PUSH-TO-TEST FEATURE, AND GROUND-FAULT INDICATOR.
e. ADDITIONAL COMPONENTS: PROVIDE PER DESIGN INTENT AND AS REQUIRED; A) SHUNT TRIP WITH 120-V TRIP
COIL ENERGIZED FROM SEPARATE CIRCUIT, RATED FOR CONTINUOUS DUTY, B) KEY INTERLOCK KIT MOUNTED TO PROHIBIT DEVICE OPERATION, C) ZONE-SELECTIVE INTERLOCKING WITH INTEGRAL ELECTRONIC TRIP UNIT. SET FIELD-ADJUSTABLE SWITCHES AND CIRCUIT-BREAKER TRIP RANGES.
6. LUGS: THE LUGS SHALL BE MECHANICAL-TYPE AND SUITABLE FOR THE CONDUCTOR MATERIALS AND UPSIZED FOR ALL FEEDERS THAT ARE INCREASED FOR VOLTAGE DROP REQUIREMENTS. PROVIDE MANUFACTURER MATCHED AND UL LISTED FEED-THROUGH LUGS FOR ADDITIONAL PANEL SECTIONS AS REQUIRED OR NOTED ON THE DRAWINGS.
7. BUSSING: PANELS SHALL HAVE HARD-DRAWN COPPER. ALL PANELS SHALL BE FULLY BUSSED. PROVIDE MOUNTING BRACKETS, BUSS CONNECTIONS, AND NECESSARY COMPONENTS TO SUPPORT THE FUTURE INSTALLATION OF
DEVICES. PROVIDE FORMAL GROUND AND NEUTRAL GROUND BUSSES.
8. PANELS SHALL NOT BE USED AS PULLBOXES. DO NOT TIE BRANCH CIRCUITS TOGETHER IN THE PANELS. PROVIDE GUTTER BARRIERS TO ISOLATE INDIVIDUAL PANEL SECTIONS OR LINE VOLTAGE AND LOW VOLTAGE WIRING.
9. SERVICE EQUIPMENT LABEL: PROVIDE UL LABEL FOR USE AS SERVICE EQUIPMENT WITH EXPANDED GROUND BUSSING FOR PANELBOARDS WITH MAIN SERVICE DISCONNECT SWITCHES AS NOTED ON THE DRAWINGS.
10. ENCLOSURES: MEET ENVIRONMENTAL CONDITIONS OF INSTALLED LOCATION.
11. ALL PANELBOARDS SHALL HAVE DOOR-IN-DOOR CONSTRUCTION.
12. INSTALLATION: INSTALL ENCLOSURES SO THEY ARE RIGIDLY SUPPORTED AND SQUARELY ALIGNED, AND PROVIDE
TEMPORARY LIFTING PROVISIONS AS REQUIRED WITH REMOVAL OF TEMPORARY BRACKETS AND BLOCKING AT THE END OF THE PROJECT. INSTALL PANEL AND ACCESSORIES ACCORDING TO NEMA PB1.1 WITH MOUNTING HEIGHTS AND TOP OF TRIM 74 INCHES ABOVE FINISHED FLOOR (UNLESS OTHERWISE INDICATED), AND MOUNTING CONDITIONS THAT ARE PLUMB AND RIGID WITHOUT DISTORTION OF BOX. MOUNT RECESSED PANELS WITH FRONTS UNIFORMLY FLUSH WITH WALL FINISH. PROVIDE ENGRAVED NAMEPLATES PER SECTION 260553 AND MEET SECTION
260500 QUALITY AND INSTALLATION REQUIREMENTS.
13. FINAL QUALITY PROVISIONS: TIGHTEN ELECTRICAL CONNECTORS AND TERMINALS ACCORDING TO MANUFACTURERS PUBLISHED TORQUE-TIGHTENING VALUES. PERFORM VISUAL AND MECHANICAL INSPECTIONS AND TEST CIRCUIT BREAKERS. CORRECT MALFUNCTIONING DEVICES AND RETEST TO DEMONSTRATE COMPLIANCE. WITHOUT ADDITIONAL PROJECT COSTS, REVISIT THE SITE AFTER OCCUPANCY AND DURING A WORKING SCHEDULE OF THE FACILITY TO MEASURE PANEL LOADS, REBALANCE BRANCH CIRCUIT LOADS AND DOCUMENT FIELD MODIFICATIONS.
RECORD READINGS AND INCLUDE INFORMATION IN AS-BUILT DOCUMENTATION. AVOID DISRUPTING CRITICAL 24-
HOUR SERVICES AND OWNER OPERATIONS.
14. MANUFACTURERS: EATON / CUTLER-HAMMER, GENERAL ELECTRIC, SCHNEIDER ELECTRIC / SQUARE D, SIEMENS, OR
APPROVED EQUIVALENT.
SECTION 262726 - WIRING DEVICES
1. DEVICES: DEVICES SHALL BE SPECIFICATION-GRADE, AMP, VOLTAGE, AND RATED FOR THE APPLICATION. DUPLEX RECEPTACLES SHALL HAVE A MINIMUM RATING OF 20 AMPS, 120V, UNLESS NOTED OTHERWISE. ALL DEVICES SHALL COMPLY WITH NEC AND UL REQUIREMENTS. DEVICE COLOR = WHITE, UNLESS DIRECTED OTHERWISE BY THE
ARCHITECT.
2. RECEPTACLES: LIMITED USE = SPECIFICATION-GRADE, STRAIGHT-BLADE, 20 AMPERE, 120V, DUPLEX-TYPE. PROVIDE
GFCI/GFI, AND ISOLATED GROUND DEVICES ACCORDINGLY.
3. MATCHING THE EQUIPMENT VOLTAGE AND AMPERAGE CONFIGURATION SHALL TAKE PRECEDENCE.
4. SWITCHES: SPECIFICATION-GRADE, HEAVY-DUTY, QUIET-TYPE, 20 AMPERE, 120V / 277V AC-RATED. OTHER DEVICES
SHALL BE AS NOTED OR REQUIRED (FOR EXAMPLE: THREE-WAY, FOUR-WAY, KEYED SWITCH, AND PILOT LIGHT, SINGLE-POLE DOUBLE-THROW, ETC.).
5. GFI DEVICES: GROUND FAULT CIRCUIT INTERRUPTER (GFCI OR GFI) DEVICES SHALL BE PROVIDED AS NOTED OR REQUIRED BY THE AHJ. NO FEED-THROUGH GFI PROTECTION SHALL BE PERMITTED FOR DOWNSTREAM DEVICES.
GFI RECEPTACLES SHALL BE UL 943 2006 "LOCK-OUT" OR NOTIFICATION COMPLIANT. ALL DEVICES SHALL BE FIELD TESTED FOR LOCAL FAULT SIMULATIONS.CORD / CONNECTOR DEVICES: PROVIDE MATCHING, LOCKING TYPE, PLUG AND RECEPTACLE BODY CONNECTOR, AND CONFIGURATIONS TO MATCH EQUIPMENT OR AS SPECIFIED ON THE
DRAWINGS.
6. DIMMERS: ALL DIMMERS SHALL BE AS NOTED ON THE CONSTRUCTION DOCUMENTS AND COMPATIBLE WITH THE DRIVERS / BALLASTS IN THE LUMINAIRE SCHEDULE; IF DIMMERS ARE NOT IDENTIFIED, THEY SHALL BE COMMERCIAL- GRADE, SLIDE TYPE DEVICES AND MATCH THE LAMP, DRIVER / BALLAST, AND VOLTAGE OF THE LUMINAIRES.
7. FACEPLATES: WHITE, HIGH-ABUSE NYLON, SCREW ON, UNLESS DIRECTED OTHERWISE BY THE ARCHITECT. IN PATIENT-ACCESSIBLE AREAS (INCLUDING WAITING AREAS), PROVIDE HEAVY-DUTY TAMPER-RESISTANT NYLON WITH
TAMPER-RESISTANT SCREWS. DEVICE COLOR TO MATCH THE FACEPLATES.
8. INSTALLATION: INSTALL DEVICES AND ASSEMBLIES PLUMB AND SECURE. INSTALL WALL PLATES WHEN PAINTING IS COMPLETE. INSTALL WALL DIMMERS TO ACHIEVE INDICATED RATING AFTER DERATING FOR GANGING AS
INSTRUCTED BY THE MANUFACTURER. DO NOT SHARE NEUTRAL CONDUCTORS FOR DIMMERS.
9. DEVICE ARRANGEMENT: UNLESS OTHERWISE INDICATED, MOUNT FLUSH, WITH LONG DIMENSION VERTICAL, AND GROUNDING TERMINAL OF RECEPTACLES ON TOP. GROUP ADJACENT SWITCHES UNDER SINGLE, MULTI-GANG WALL PLATES. IF HORIZONTAL MOUNTING IS REQUIRED, INSTALL GROUND PIN TO THE LEFT. IN EXISTING FACILITIES, ORIENTATION SHALL MATCH BUILDING STANDARDS.
10. COORDINATION: PRIOR TO ROUGH-IN, THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE EXACT DEVICE TYPE WITH FURNISHED EQUIPMENT AND SYSTEMS. DEVICE SHALL MATCH VOLTAGE, CURRENT, AND CORD AND PLUG
ASSEMBLIES.
11. LABELS: ALL DEVICES SHALL HAVE PERMANENT (OWNER APPROVED) LABELS INDICATING THE PANEL AND CIRCUIT
NUMBER, OR DEVICE “IT” DESIGNATION.
12. MANUFACTURERS: HUBBELL, LEVITON, COOPER, PASS & SEYMOUR, OR APPROVED EQUIVALENT.
SECTION 262813 - FUSES (600-V AND LESS)
1. PROVIDE NEW FUSES AS REQUIRED ON THE PROJECT. DO NOT REUSE EXISTING FUSES. DO NOT MIX FUSE TYPES OR MANUFACTURERS. FUSE TYPE SHALL MATCH THE APPLICATION. INSTALL FUSES SO THE LABEL IS READABLE.
PROVIDE EXTRA MATERIALS, ADAPTERS, FUSE HOLDERS, ETC.
2. COORDINATION: THE CONTRACTOR SHALL COORDINATE THE FUSE RATINGS WITH HVAC, MOTORS, AND SPECIALTY
EQUIPMENT WITH THEIR CONTRACTORS.
3. MANUFACTURER: BUSSMANN / COOPER.
SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
1. FUSED DISCONNECT SWITCHES SHALL BE COMPLETE WITH REJECTION-TYPE FUSES AND DEAD-FRONT ACCESS.
DISCONNECTS SHALL BE A MINIMUM GENERAL DUTY-RATED, HORSEPOWER-RATED, AND SHALL HAVE A QUICK MAKE
/ BREAK MECHANISM.
2. ENCLOSED CIRCUIT BREAKERS SHALL BE MOLDED-CASE, THERMAL-MAGNETIC TYPE WITH AN INTERRUPTING CAPACITY TO MEET THE AVAILABLE FAULT CURRENT OF THE ELECTRICAL SYSTEM AND INFRASTRUCTURE.
3. ENCLOSURES: NEMA-TYPE TO MATCH THE SURROUNDINGS AND ENVIRONMENTAL CONDITIONS.
4. PROVIDE DISCONNECT MEANS FOR MOTOR OVERCURRENT PROTECTION, LOCAL DISCONNECTS FOR EQUIPMENT, AND AS REQUIRED BY THE NEC OR AHJ. ALL DEVICES SHALL BE RATED AND LISTED FOR THE APPLICATION.
5. COORDINATE THE LAYOUT AND INSTALLATION OF DISCONNECT SWITCHES AND CIRCUIT BREAKERS WITH OTHER
TRADES, INCLUDING CONDUIT, DUCTWORK, PIPING, EQUIPMENT, AND ADJACENT SURFACES. MAINTAIN REQUIRED
WORKSPACE CLEARANCES.
6. ENCLOSED SWITCHES AND CIRCUIT BREAKERS SHALL BE PROVIDED WITH AN EQUIPMENT GROUND KIT, AND IF REQUIRED AN INSULATED, GROUNDABLE, BONDABLE NEUTRAL KIT. SHUNT-TRIP WITH COILS, GFCI, AND ISOLATED GROUND KITS MAY ALSO BE REQUIRED. PROVIDE DEVICES WITH MECHANICAL-STYLE LUGS SUITABLE FOR NUMBER, SIZE, TRIP RATINGS, AND MATERIAL OF CONDUCTORS (COORDINATE LUG SIZES WITH CONDUCTORS THAT MAY BE
INCREASED DUE TO VOLTAGE DROP). REFER TO THE DRAWINGS FOR MORE INFORMATION.
7. ADDITIONAL COMPONENTS: PROVIDE ALL ACCESSORY COMPONENTS REQUIRED FOR A
COMPLETE DEVICE.
8. INSTALLATION: INSTALL ENCLOSURES SO THEY ARE RIGIDLY SUPPORTED AND
SQUARELY ALIGNED, AND PROVIDE TEMPORARY LIFTING PROVISIONS AS REQUIRED
WITH REMOVAL OF TEMPORARY BRACKETS AND BLOCKING AT THE END OF THE
PROJECT.
9. CONNECTIONS:
a. INSTALL EQUIPMENT GROUNDING CONNECTIONS FOR SWITCHES AND CIRCUIT
BREAKERS WITH GROUND CONTINUITY TO MAIN ELECTRICAL GROUND BUS.
b. INSTALL POWER WIRING AND WIRING BETWEEN SWITCHES AND CIRCUIT
BREAKERS, AND CONTROL AND INDICATION DEVICES.
c. TIGHTEN ELECTRICAL CONNECTORS AND TERMINALS PER MANUFACTURER'S
TORQUE VALUES OR UL 486A AND UL 486B.
10. DO NOT USE A DISCONNECT SWITCH OR CIRCUIT BREAKER ENCLOSURE AS A PULL BOX.
ALL CONDUCTORS ENTERING AN ENCLOSURE MUST TERMINATE ON LUGS WITHIN THE
ENCLOSURE.
11. MANUFACTURERS: PROVIDE THE SAME MANUFACTURER AS THE PANELBOARDS OR
PER BUILDING STANDARDS.
SECTION 265119 - INTERIOR LIGHTING
1. PRODUCTS / MANUFACTURERS: REFER TO LUMINAIRE SCHEDULE FOR LIGHT FIXTURE
SELECTIONS. COORDINATE THE FINAL FIXTURE PROVIDED WITH THE GENERAL
CONTRACTOR, THE ARCHITECT, AND THE OWNER.
2. PROVIDE THE ADDITIONAL FEATURES TO SUPPORT COMPLETE AND WORKING
SYSTEMS: EMERGENCY DRIVERS / BALLASTS, WIRE GUARD, SUPPORT MEANS, YOKES,
MOUNTING PLATES AND COMPONENTS, ETC. PROVIDE COMPONENTS THAT ARE
REQUIRED TO MEET THE DESIGN INTENT AND A COMPLETE SYSTEM.
3. DELIVERY: THE CONTRACTOR IS RESPONSIBLE FOR ANTICIPATING THE DELIVERY
SCHEDULE OF FIXTURES.
4. COMMERCIAL STANDARDS: ALL LIGHT FIXTURES SHALL MEET NEC, IBC, IECC, IEEE, ADA, ANSI, NEMA, UL, AND NFPA COMPLIANCE REQUIREMENTS. ALL FIXTURES SHALL BE
RATED FOR THE APPLICATION.
5. EGRESS REQUIREMENTS: ALL FIXTURES, BATTERY PACKS, AND EXIT SIGNS THAT SERVE
AS NIGHT LIGHTS, EGRESS LIGHTS, AND EMERGENCY LIGHTS SHALL COMPLY WITH
NFPA, IBC, AND AHJ VISIBILITY AND LUMINANCE REQUIREMENTS. FACEPLATES AND
COLORS SHALL BE COORDINATED WITH LOCAL CODES.
6. COORDINATION: THE CONTRACTOR SHALL COORDINATE FINAL MOUNTING
CHARACTERISTICS AND SUPPORT REQUIREMENTS OF THE LIGHT FIXTURES WITH THE
GENERAL CONTRACTOR PRIOR TO ORDERING THE FIXTURES. COORDINATE THE
HARDWARE AND TRIM THAT WILL BE REQUIRED FOR THE APPLICATION. COORDINATE
THE MOUNTING OF THE FIXTURES WITH CEILING GRIDS, DUCT WORK, DIFFUSERS,
SPRINKLER PIPING, CEILING TRANSITIONS, ETC. PRIOR TO ROUGH-IN OF DEVICES.
REFER TO THE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATIONS.
COORDINATE LUMINAIRE MOUNTINGS AND PLACEMENTS PRIOR TO ROUGH-IN.
7. INSTALLATION REQUIREMENTS: PROVIDE LIGHT FIXTURES THAT ARE UL LISTED AND
RATED FOR THE APPLICATION FOR THE NEMA ENVIRONMENTAL PLACEMENT. ALL DAMP
AND WET LOCATION FIXTURES SHALL BE GASKETED. PROVIDE ALL HANGERS AND TRIM
RINGS TO MAKE A COMPLETE SYSTEM.
8. FIRE RATINGS: PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL COORDINATE THE
FIRE RATING OF LIGHT FIXTURES WITH THE ARCHITECT AND GENERAL CONTRACTOR.
FIXTURES INSTALLED IN FIRE-RATED CORRIDORS OR CEILINGS MUST BE PROVIDED
WITH A LABEL FROM THE MANUFACTURER AND MUST BE PROVIDED WITH SOME TYPE
OF FIRE-RATED TENTING.
9. IC RATINGS: IN SPECIFIC CONSTRUCTION APPLICATIONS AND/OR RESIDENTIAL
APPLICATIONS, PROVIDE IC-RATED HOUSINGS AND FIXTURES THAT MATCH THE
APPLICATION. COMPLY WITH NEMA AND UL REQUIREMENTS.
10. DIMMING FIXTURES: DIMMING DRIVERS / BALLASTS, DIMMING CONTROLS, AND LED
BOARDS / LAMPS SHALL ALL BE COMPATIBLE AND CERTIFIED BY THE MANUFACTURER.
CON…
This is the start of the file's text. The full file is on GovTribe.