Link_38_Questions_-_Answers_2-26-15.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Defense Information Systems Network (DISN) Optical Network Enhancement Link 38
Solicitation number
HC1013-15-R-0004
Issued by

About this file

Link 38 Questions-Answers

View the file

Other files

File Type Posted
HC1013-15-R-0004-0003.doc DOC document
Link_38_Questions_-_Answers_3-17-15.xlsx XLSX spreadsheet
Attachment_J1_-_Link_38_PWS_-_16_Mar_15.pdf PDF
Link_38_Questions_-_Answers_3-16-15.xlsx XLSX spreadsheet
HC1013-15-R-0004-0002.doc DOC document
Link_38_Questions_-_Answers_3-10-15.xlsx XLSX spreadsheet
HC1013-15-R-0004-0001_-_Amendment.doc DOC document
Attachment_J3_-_Fiber_FRS_-_05_Mar_15.pdf PDF
Attachment_J6_-_Contract_Deliverable_Requirements_List_(CDRL)_-_05_Mar_15.pdf PDF
Link_38_Combined_Questions_-_Answers_-_3-6-15.xlsx XLSX spreadsheet
Attachment_J1_-_Link_38_PWS_-_05_Mar_15.pdf PDF
Link_38_Questions_-_Answers_2-23-15.xlsx XLSX spreadsheet
DISN_Class_JA_REDACTED.pdf PDF
Attachment_J2_-_POTS_LINK_38_MBOM_-_06_Feb_15.xlsx XLSX spreadsheet
Attachment_J7_-_Pricing_Template_Link_38_-_26_Jan_15.xlsx XLSX spreadsheet
HC1013-15-R-0004.doc DOC document
Attachment_J8_-_Mission_Essential_Contractor_Services_-_05_Feb_15.pdf PDF
Attachment_J3_-_Fiber_FRS_-_18_Dec_14.pdf PDF
Attachment_J6_-_Contract_Deliverable_Requirements_List_(CDRL).pdf PDF
Attachment_J1_-_Link_38_PWS_-_06_Feb_15.pdf PDF
Attachment_J4_-_DISN_Implementation_Standards_-_30_Jan_13.pdf PDF
Attachment_J5_-_Quality_Assurance_Surveillance_Plan_(QASP)_Link_38_-_03_Feb_15.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DISN Optical Network Enhancement Link 38 RFP & PWS– Comment Matrix
Question/Comment #RFP SectionPageRFP StatementQuestion/RecommendationGovernment Response
1PWS 6.1.13Initial Project Review (IPR)
Track and report installation progress to dateRemove "Track and report installation progress to date".Agree. Installation progress to date will be tracked in the Monthly Progress Report.
2PWS 6.46The Contractor will integrate the OLA and SDN sites with the fiber and the network management elements into a complete operating system. The Contractor shall lead in the integration effort with assistance from the Government Network Support Center (GNSC).Change to "The Contractor shall support the Government Network Support Center (GNSC) as they integrate the installed network elements into a complete operating system."Agree. PWS will be updated to "The Contractor shall support the Government Network Support Center (GNSC) as they integrate the installed network elements into a complete operating system."
3PWS 6.5.27All access fiber installations shall consist of a minimum of 12 strands in a single fully buried duct dedicated for use solely by the Government with one empty duct alongside.Remove language "with one empty duct alongside"If the access fiber exists, then two strands are required with no requirement for an empty duct alongside. If the access fiber does not currently exist, all new access fiber installations shall consist of a minimum of 12 strands in a single fully buried duct dedicated for use solely by the Government with one empty duct alongside.
4PWS 6.5.6.710The Contractor shall provide these underlying data (latitude/longitude) using the Visio diagrams and/or spreadsheets.Provide clarification of latitude and longitude of what underlying data? Please specify.The Contractor shall provide amplifier location latitude/longitude using the Visio diagrams and/or spreadsheets.
5PWS 6.816Table 6.8 Response and Repair Time for OLA Equipment FailureAdd the following note under Table 6.8: "Restore time of 8 hours does not include time awaiting parts/spares to be delivered.Agree to add the following note under Table 6.8: "Restore time of 8 hours does not include time awaiting parts/spares to be delivered.
6PWS 12.425Specifically, for C&A, the Government will conduct a formal Security Test and Evaluation (ST&E) to determine the overall security of the network.Provide clarification on scope of work regarding C&A and ST&E.The level of effort will depend on the fiber providers' security posture of the huts and buildings where government equipment is located. If security posture is standard telecom with locks on doors with limited access to government equipment, the level of effort would be escorting of government representative to facilities.
7Attachment 2MBOMPlease confirm if the MBOM is finalized. We are concerned with the amperage.The MBOM is provided as a sample for information purposes. The actual MBOM may vary depending on the proposed solution by the offeror. The number of amplifiers is dependent upon the path proposed by the offeror.
8PWS 6.7Would the Government please clarify whether the GSM-O contractor will be responsible for O&M at the SDN sites, and also confirm that the offeror will be responsible for O&M on the fiber IRU and the OLA sites?GSM-O contractor will be responsible for O&M at the SDN sites and the OLA locations. The offeror will be responsible for O&M on the fiber IRU. The offeror will be responsible to work with GSM-O contractor at OLA sites for the O&M of the DoDIN equipment.
9RFP Section B – Supplies or Services and Prices, p. 3List of Supplies and ServicesThe RFP refers to the Offeror providing equipment, meeting milestones, etc.; however, if the Government does not pay for equipment as received, it will be at a higher cost if the Offeror needs to finance this. In addition, the Period of Performance for the equipment is Mar 2016. Does this mean that the Offeror cannot bill before then?The earliest the equipment can be billed is when the IRU solution is in place and ready for use by the Government. This will be dependent upon the delivery schedule proposed by the offeror. Per the PWS, all installation, test and turn up must be completed within eight months of award. The equipment will not be accepted as GFE until it has passed Network Acceptance Testing and the results are acceptable to the Government.
10RFP Section M003 Evaluation Criteria, page 51The RFP states, “The Offeror’s proposal must demonstrate their ability to acquire and provide acceptable tested and IRU fiber (2 strands) from: Tinker Air Force Base (AFB), OK Building 3900 or 3001. From Tinker AFB the route must connect to Fort Sill, OK Building 1645 or 462. If Building 1645 is chosen as the starting point above, the route must continue from Fort Sill, OK, Building 462…If Building 462 is chosen as the starting point above, the route must continue from Fort Sill, OK Building 1645…”Will the Government accept diverse entrances into Building 1645 only as opposed to requiring an entrance through either of Buildings 1645 or 462 and continuing through the other and just omit Building 462 completely?No. The Government has requirements as stated in the PWS.
11Attachment J3 FRSThis FRS refers to alarm requirements throughout the document. We request that the Government further define the alarm thresholds and requirements more clearly, for the following: High Temp, Low Temp, AC Power Off Line, Intrusion Detection and Battery Alarms. In addition, what other environmental alarms are required?GSM-O contractor will be responsible for O&M of the DoDIN at the SDN and the OLA locations.
12Attachment J3 FRSWe request that the Government provide the name of the specific equipment that is being used for monitoring?GSM-O contractor will be responsible for OSS to O&M of the DoDIN at the SDN and the OLA locations.
13Attachment J3 FRSWe request that the Government clarify whether temperature alarms are to be set at a specific temperature. Typically high temperature alarms are set at 85 degrees and low temperature alarms are set at 65 degrees.GSM-O contractor will be responsible for O&M of the DoDIN at the SDN and the OLA locations.
14Attachment J6 Contract Deliverables Requirements List (CDRLs)Considering that there are eight (8) draft CDRLs due with the proposal submission, we request that the Government accept the CDRLs as attachments to the proposal, and that they be excluded from the 40 page limit.The Government will accept the draft CDRLS as part of the Contract Documentation Volume. There will be a 25 page limit for these CDRLs.
15Attachment J3 FRS; PWS 6.5.2We request that the Government please clarify the fiber count of new installations. Per FRS Section 1.2.2, fibers are required; however, per Section 6.5.2 of the PWS, new fiber should consist of 12.Fiber Optic Cable strands (two) shall be provided between the FSDP identified in Task Area 2. All access fiber installations shall consist of a minimum of 12 strands in a single fully buried duct dedicated for use solely by the Government with one empty duct alongside. These ducts shall be a minimum 70 mm in diameter. If the access fiber exists, then no additional fiber is required.
16Attachment J3 FRS; PWS 6.5.2Per section 1.2.2.5 of the FRS, “new ducts shall be a minimum of 70mm in diameter”; however, PWS Section 6.5.2 states 50mm. Please confirm which is accurate.Confirmed, the section 1.2.2.5 of the FRS, “new ducts shall be a minimum of 70mm in diameter” is required. PWS will be updated to state 70mm in diameter.
17PWS 6.1.2.1, Security, p. 4
PWS 12, Security Requirements, p. 23Is the Offeror responsible for any of the Information Assurance requirements pertaining to the Ciena software? The PWS requires that we are only required to provide the Government with access to contractor facilities to facilitate the Government’s C&A and ST&E evaluation.No. The Offeror is not responsible for any of the Information Assurance requirements pertaining to the Ciena software. The Government requires access to contractor facilities to facilitate the Government’s C&A and ST&E evaluation for the offeror facilities.
18RFP Section 2.2.1 Page Limitations, p. 42The RFP states, “Each page shall be counted except the following: cover page, table of contents, glossary, OCCI mitigation plans and Section 508 compliance.”
However, in RFP Section 4.2.2, the RFP states that the Offeror is to provide a List of Tables and Drawings.Please state whether the List of Tables and Drawings are also excluded from page count.The List of Tables and Drawings are excluded from the page count. However, the Tables and Drawings themselves are included in the page count.
19RFP Section 4.2.2, Volume Organization, 44The RFP provides and order for, and requires that a Table of Contents, List of Tables and Drawings and a Glossary be provided for the Technical/Management volume; however, this same structure is not provided for the other volumes.Is the Offeror required to provide the same structure and order for Table of Contents, List of Tables and Drawings and a Glossary in each volume?The Volume Organization in Section L 4.2.2 only applies to the Technical/Management Volume. The structure will vary depending upon the volume. For instance, Section L 5.2 details the Volume Organization for the Cost/Price Volume.
20RFP Section 6.1.1 Section A-Solicitation/Contract Form, p. 45The RFP shows the following: 6.1.4 Section G - Contract Administrative Data Offerors must complete “Contractor Point of Contact” in clause 52.204-9000. 6.1.6 Section I - Contract ClausesSection 6.1.5 is missing. Should this be Section H, and was this omitted in error?Section H was not omitted in error. The numbering will be corrected.
21Attachment J3 FRSAs a follow up to question 7 regarding the MBOM attachment, should the offeror price to the sample MBOM provided with the Link 38 RFP or develop a new MBOM for the proposed draft fiber design which is to be priced and submitted with the proposal.The offeror is not required to price the sample MBOM. The offeror is required to price the equipment necessary to provide an operational OTN Link related to the offeror proposed solution. The offeror should demonstrate that their proposed MBOM has been confirmed to the proposed solution utilizing the Ciena "One Planner" tool and industry practices.
22Attachment J6- CDRL; PWS 6.1.2, 11.1

21 The RFP calls for the Draft 15 days after modification to the network is identified and the final no later than 30 days after. Please clarify the delivery date for the Draft CIP The draft CIP is due with the proposal submission. Subsequently, the Contractor shall notify the Government 30 days in advance of implementing any equipment modifications to the existing infrastructure so the Government can coordinate the schedule impact.