Exhibit_1_Price_Services_Schedule.docx

DOCX document 30 KB Posted

Attached to
911 Federal Building Elevator Design Modernization Federal contract opportunity
Solicitation number
GS-10P-16-LT-R-9000
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Exhibit 1 Price Services Schedule

View the file

Other files for this federal contract opportunity

Other files attached to 911 Federal Building Elevator Design Modernization, newest first.
File Type Posted
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A006.docx DOCX document
2_-_GS10P16LTR9000_A006_Q A_24_May_2016.docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_19_May_2016_(A005).docx DOCX document
Exhibit_5_911_Portland_Elevator_DB_SOW_19_MAY_2016_(A005).docx DOCX document
0_-_SF30_for_GS10P16LTR9000-1.pdf PDF
3_-_GS10P16LTR9000_A005_Q A_19_May_2016.docx DOCX document
1_-_AMENDMENT_A005.docx DOCX document
1_-_AMENDMENT_A004.docx DOCX document
Exhibit_1_Price_Services_Schedule_Amd_04_05_18_16.docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Freight_Elevator_Capacity_Label_-_A003.pdf PDF
1_-_AMENDMENT_A003_(Final).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Passenger_Elevator_Capacity_Label-A003.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_17_MAY_2016_(Final).docx DOCX document
2_-_GS10P16LTR9000_A003_Q A_17_May_2016_(Final).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Exhibit_7_-_Contruction_Wage_Determination_OR160029_04_22_2016_(Mod_4).pdf PDF
1_-_AMENDMENT_A002_-_Wording_(Rev_1).docx DOCX document
Exhibit_10_Elevator_Pit_Visit_-_911_(Rev_1)_(2).docx DOCX document
Site_Visit_Attendee_List_GS10P16LTR9000_Attended.docx DOCX document
GS10P16LTR9000_A001.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_4.21.16.docx DOCX document
1-GS-10P-16-LT-R-9000_Cover_Page SF1442.docx DOCX document
0_-_GS-10P-16-LT-R-9000_DB_AGREEMENT_(4.15.16).docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_(4.15.16).docx DOCX document
911_DWGS.zip-10.zip ZIP file
911_DWGS.zip-9.zip ZIP file
911_DWGS.zip-7.zip ZIP file
911_DWGS.zip-6.zip ZIP file
911_DWGS.zip-4.zip ZIP file
911_DWGS.zip-3.zip ZIP file
911_DWGS.zip-2.zip ZIP file
911_DWGS.zip-1.zip ZIP file
911_CAD.zip ZIP file
Exhibit_9_Pre-Proposal_Conference_-_911.docx DOCX document
Exhibit_5_911_Portland_Elevator_Design_Build_SOW.docx DOCX document
Division_1.pdf PDF
Exhibit_6a_R10_OMA_HSPD12_FY16.pptx PPTX presentation
Exhibit_8b_2004.08_Portland_911_Final_Facility_Condition_Assessment_Report.pdf PDF
Exhibit_7_Construction_Wage_Determination_OR160029_04_1_2016.pdf PDF
Exhibit_7A_Representations_and_Certifications_2016.docx DOCX document
Exhibit_8a_2001_Asbestos_Survey_Report.pdf PDF
Exhibit_4_Performance_Evaluation_Factors_-_Commercial_Client.docx DOCX document
Exhibit_6_HSPD-12_Documents.pdf PDF
Exhibit_3_Sample_Key_Personnel_Resume_Format.docx DOCX document
Exhibit_2_Project_Experience_Form.docx DOCX document
BLG_10.OR0033.pdf PDF
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Show all 50

911 Federal Building Elevator Design Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICES AND PRICE SCHEDULE

CLIN Description Quantity Unit Amount

0001DesignPhase Services1LS$__________________
Relocate Air Intakes

**See note below

0002DesignPhase Services1LS$__________________
Elevator Control Upgrades

**See note below

0003Construction Phase Services1LS$__________________
Relocate Air Intakes

**See note below

0004Construction Phase Services1LS$__________________
Elevator Control Upgrades

**See note below

0005Bonds/Insurance1LS$__________________
**See note below
0006HSPD-12 Clearance Costs1LS$__________________
**See note below
0007Closeout1LS$__________________
** See Note below
0008Lead Based Paint Allowance1LSNTE$ 10,000.00
**See note below
0009ACM Abatement Allowance1LSNTE$ 10,000.00
** See note below

TOTAL BASE BIDS ITEMS: $__________________

0010Elevator Mech Rm – Meter1LS$__________________Optional Bid Item #1
**See note below

TOTAL OPTIONAL ITEMS: $__________________

TOTAL PROPOSED PRICE: $__________________

Period of Performance offered: _______________Days

Future Modification Mark-up Rate: _______________%

Government Caused Delay Rate: $______________/Day

PROPOSAL PRICE SCHEDULE NOTES:

1. Offeror shall prepare pricing in accordance with the attached Statement of Work (Exhibit 5) and associated attachments/appendices. See FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984).

2. Offeror shall submit pricing (inclusive of profit and overhead as applicable) on all items. For purposes of price analysis the TOTAL EVALUATED PROPOSED PRICE will be utilized.

3. The total award price associated with this contract shall include all design and construction costs.

4. CLINs 0001, 0002, 0003, 0004, 0006 & 0007: Prices for these CLINs shall be supported by a High Level Specification Breakdown (CSI) MasterFormat® 2014 Level 3 for the major tasks of this project.

5. CLIN 0005 – Bonds/Insurance. Offerors shall clearly annotate what Payment and Performance Bond Premiums will be charged if awarded the contract. Provide the Bond Rate (i.e. $X.XX/thousand dollars) and calculate total Premium payable using Total Proposed Contract Price. Do not include Optional Bid Items in this calculation.

6. CLIN 0006 – HSPD-12 Clearance costs. Offerors shall provide a breakout of the lump sum pricing proposed for estimated HSPD-12 clearance costs using this worksheet. This amount will be award as a NTE amount and will be monitored during the course of performance. If additional HSPD-12 clearances determined to be reasonable and above what is originally estimated herein are required, the Contracting Officer will negotiated an equitable adjustment after award using the breakout information contained herein. Similarly, if less than the estimated number of clearances proposed by the Offeror herein is used during performance, a deductive modification will be executed at the end of the contract to deobligate any remaining unused funds.

For purposes of calculating Long Term Clearance costs, contractor personnel who require routine access to GSA-controlled facilities for more than six months and/or access to government information technology (IT) systems must receive a favorable HSPD-12 security background investigation. The following information is provided to assist the contractor in estimating the costs associated with this requirement. The contractor will be expected to utilize the nearest credentialing site to their offices or place of contract performance. The credentialing station may be a mobile station in the area or credentialing stations may be located through the following: http://www.fedidcard.gov/centerlocator.aspx. Credentialing centers that are listed as “Open to all Agency personnel” means that they are open to personnel from any GSA Managed Service Office (MSO) customer agency including GSA contractors. Credentialing centers that are listed as “For use by personnel from this Agency only” means that they are only open to personnel of the agency that is hosting that credentialing center. Currently a minimum of two visits to a credentialing center are required to enroll and activate the card once received. Travel distance to a credentialing center will vary based on availability of enrollment and activation stations. If there is a problem activating the PIV card, one additional visit to the credentialing center may be required. Additional visits to a credentialing center may also be required if the card holder needs to: renew a PIV card that has expired or will expire within 60 days; have new certificates downloaded to the PIV card because the current certificates on the card have expired or will expire within 60 days; or replace a lost, stolen, or damaged PIV card. Each visit to a credentialing center is scheduled for 15 minutes. Filling out the form for a NACI clearance takes about 4 hours on average. Individual contractor employee involvement in processing, getting questions answered, fingerprints, etc. takes another 3 hours on average. Times may vary depending on individual circumstances and the level of clearance required.

If a Long Term HSPD-12 credential is required, the contractor is responsible for all travel and labor costs associated with fingerprinting to meet background investigation requirements and PIV Card enrollment and activation to meet HSPD-12 requirements and shall include these costs in the breakout worksheet and Price Schedule lump sum price proposal above. Travel costs are comprised of mileage, vehicle rental or other modes of transportation, per diem, and lodging.

For purposes of calculating Short Term Clearance costs, contractor personnel who require temporary (less than 6 months) access to the facility need only complete the Contractor Information Worksheet (CIW) and fingerprint requirements for submission of an initial suitability determination review. Travel to credentialing stations is not required for this type of clearance. Contractors shall, however, still be responsible for including all anticipated labor and travel costs associated with completion of the required CIW paperwork and obtainment of acceptable fingerprints.

Additional information can be found in Exhibit 5 of the Request for Proposal.

4. CLIN 0007 – Closeout. This CLIN shall include all closeout effort as specified in paragraph 3.5 CLOSEOUT STAGE, which is inclusive of as-built submission, operations and maintenance (O&M) manual submission, completion of any turn-over training, records drawings, etc. as required in the Statement of Work.

5. CLIN 0008 & 0009 – Lead Based Paint (LBP) & ACM Allowances. These CLINs are hereby established as an allowance to be used solely and exclusively for the abatement and removal of hazardous materials, which have not been previously identified or referenced in reports or other RFP documents which was provided prior to proposals due as part of the acquisition package.

The following protocol applies to CLIN 0008 & 0009, should their use become necessary

a) Any remaining funds on this CLIN will be unilaterally deobligated upon definitization.

b) The amount agreed to by both parties will be used to establish the not-to-exceed estimate (NTE) used for pricing this work and shall form the basis for future negotiations when definitizing this SOW.

c) Any work accomplished related to this CLIN will require a written work plan which will clearly identify area of work performed, schedule for work (dates/times), which trades will be performing the work and any specialized equipment which may be needed while performing the work. All premium time/OT rate work shall be proposed by the contractor and approved by the CO/COR prior to execution.

INCURRENCE OF COSTS AND PAYMENTS. Until such time as the NTE amount may be definitized into a FFP amount, the Contractor shall not incur costs, nor shall the Government make payments, for work in excess of 50% of the estimated amounts until FFP pricing has been definitized.

7. CLIN 0010 – Elevator Mechanical Rm - Meter. (Optional Bid Item)

The main switchgear is missing power monitoring equipment. The missing meter section should contain a volt meter, ammeter and watt-hour meter with a demand register. Meters should be of the pulse type for easy connection to the BAS network.

Optional Bid items may, at the option of the government, be added to the contract at the time of initial award or anytime within 180 calendar days after receipt of notice to proceed.

8. Period of Performance: The period of shall not exceed 495 calendar days from receipt of initial design notice to proceed. Offerors may propose a shortened period of performance schedule duration if so inclined. Evaluation of alternate schedule duration shall be evaluated as part of Factor 3 – Project Management Plan and will be incorporated into this Price Schedule upon award if a shorter duration is proposed. See Evaluated Price Information Worksheet.

The intent of this solicitation is to obtain the best proposal within the cost limitation for the price proposed and to ensure the best value when considering price and non-price factors. Offerors are advised that there is no obligation to approach or match the cost limitation in the offer.

EVALUATED PRICE INFORMATION WORKSHEET

FOR USE IN PRICE ANALYSIS

1. TOTAL BASE BID. $_________________

Enter total price proposed for Base Bid + Optional Bids Items (i.e. CLINs 0001 – 0010) as indicated on Price Schedule above.

2. EVALUATED GOVERNMENT ADMINISTRATION COSTS.

Enter the number of days proposed to complete the project, inclusive of design and construction efforts.

For price evaluation purposes, complete the formula below to calculate this cost.

A. calendar daysX$1,551/day=$__________________
(Construction Duration Offered)(Est. Gov’t Daily Rate)

TOTAL EVALUTED GOV’T ADMIN COSTS: $__________________

3. EVALUATED FUTURE MODIFICATIONS MARK-UP COSTS.

Enter the percentage proposed for use as the predetermined profit and overhead mark-up rate on future modification. This proposed percentage shall be inclusive of all Contractor overhead, general and administrative (G&A), bonds, insurance fees, all other indirect costs and commission, profit and other associated fees. The rates offered shall be used by the Government for future contract modifications. The same rate will be applied to subcontractors costs, except for Government-caused delays, if any arise after award. For price evaluation purposes, complete the formula below to calculate this cost.

____________%X$50,000.00=$__________________
(Mark-up Rate Offered)(Est. Future Mods Direct Costs)

4. EVALUATED GOVERNMENT CAUSED DELAY COSTS.

Enter the proposed daily delay rate for use in calculating Government caused delay costs during contract performance. The daily delay rate shall be inclusive of Contractor and Subcontractor field overhead, home office overhead, general and administrative costs, commissions, profits, bonds, and insurance fees which are the result of delays caused by the Government. The rate shall be used by the Government for calculating delay costs during contract performance if the contractor demonstrates the delay caused increased costs to be incurred. For price evaluation purposes, complete the formula below to calculate this cost.

$_________________X30 days=$__________________
(Daily Delay Rate Offered)(Est. Calendar Days Delay)
TOTAL EVALUATED PROPOSED PRICE:$__________________
(1+2+3+4+5+6+7+8+9+10 from above)
GS-10P-15-LT-R-9000/EXHIBIT 16 May 2015

File details come from the government source that posted it. Updated .