GROUNDS EXPANSION BARN AND COVERED PARKING Project Manual-Bid Documents 20250711.pdf

PDF 12 MB Posted

Attached to
Central Office Additions State and local contract opportunity
Solicitation number
RFP # 2025-CO-0717
Issued by
El Paso County, Colorado

About this file

This document is a comprehensive Project Manual and Bid Document for the Grounds Expansion Barn and Covered Parking project for Falcon School District 49, located in Peyton, Colorado. The project involves constructing two single-story pre-engineered metal buildings - a barn and a covered parking structure - at the district's central office complex at 10850 E. Woodmen Road. The project manual, dated July 11, 2025, includes detailed specifications for concrete forming, reinforcing, and placement, as well as comprehensive requirements for construction, formwork, materials, and installation procedures. The documents are prepared by DLR Group and cover multiple construction divisions including concrete, metals, electrical, communications, and commissioning requirements.

The project specifications indicate a single prime contract approach, with specific technical requirements for site improvements and building construction. The pre-engineered steel buildings will include specific design parameters, such as no active ventilation in the covered parking building and insulation but no conditioning in the barn building. The project manual includes extensive documentation for quality assurance, submittal procedures, execution requirements, and commissioning processes. While specific budget details are not explicitly stated, the comprehensive nature of the documentation suggests a structured procurement process with detailed technical and performance expectations for potential contractors.

View the file

Other files for this state and local contract opportunity

Other files attached to Central Office Additions, newest first.
File Type Posted
Appendix C PEMB Covered Parking Quote.pdf PDF
Barn Shop Drawings.pdf PDF
D49_Site_Bid-Drawings_250711.pdf PDF
Overhead Coiling Doors Specs.pdf PDF
Sample Contract.pdf PDF
D49 Bid Form 2025.docx DOCX document
RFP_Cover_Page _ Signature Sheet (2) (1).pdf PDF
2025 Contract Format NEW.pdf PDF
Appendix C PEMB Barn Quote.pdf PDF
Covered Parking Shop Drawings.pdf PDF
Drainage Report.pdf PDF
RFP_2025_CO_0717.pdf PDF
Soils Report Kumar.pdf PDF
D49_Barn_Bid-Drawings_250711.pdf PDF
D49_CoveredParking_Bid-Drawings_250711.pdf PDF
Final Q_A from Previous IFB.pdf PDF
Q_A From 2ndIFB.pdf PDF
Seeding _ Mulching City of Colorado Springs.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE: These documents are instruments of professional service, and information contained therein is incomplete unless used in conjunction with DLR Group’s interpretations, decisions, observations and administrations. Use or reproduction of these documents in whole or in part without DLR Group’s consent is in violation of common law, copyrights, statutory and other reserved rights, which preempts state and local public records act. Portions of these specifications were created with the MasterSpec® specification writing system, are subject to the copyright of the American Institute of Architects, and require a current MasterSpec® license for editing or use on other projects.

Copyright DLR Group

Falcon School District 49 Grounds Expansion Barn and Covered Parking Peyton, Colorado

Project Manual Construction Documents

DLR Group Project No. 37-24108-00

July 11, 2025

GROUNDS EXPANSION BARN AND COVERED PARKING 37-24108-00

SCHOOL DISTRICT 49 JULY 11, 2025

PEYTON, CO BID DOCUMENTS

TABLE OF CONTENTS 000110 - 1

TABLE OF CONTENTS

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

000106 - SEALS PAGE

003132 - GEOTECHNICAL DATA

GEOTECH ENGINEERING STUDY

DIVISION 01 — GENERAL REQUIREMENTS

011000 - SUMMARY

012500 - SUBSTITUTION PROCEDURES

012500a - SUBSTITUTION REQUEST FORM

012600 - CONTRACT MODIFICATION PROCEDURES

012900 - PAYMENT PROCEDURES

013100 - PROJECT MANAGEMENT AND COORDINATION

013200 - CONSTRUCTION PROGRESS DOCUMENTATION

013233 - PHOTOGRAPHIC DOCUMENTATION

013300 - SUBMITTAL PROCEDURES

013333 - ELECTRONIC DRAWINGS

013333.1 - ELECTRONIC FILE TRANSFER AGREEMENT

014000 - QUALITY REQUIREMENTS

014200 - REFERENCES

015000 - TEMPORARY FACILITIES AND CONTROLS

016000 - PRODUCT REQUIREMENTS

017300 - EXECUTION

017700 - CLOSEOUT PROCEDURES

017823 - OPERATION AND MAINTENANCE DATA

017839 - PROJECT RECORD DOCUMENTS

017900 - DEMONSTRATION AND TRAINING

019100 - GENERAL COMMISSIONING REQUIREMENTS

019200 - AIA SAMPLE DOCUMENTS

DIVISION 03 — CONCRETE

031000 - CONCRETE FORMING AND ACCESSORIES

032000 - CONCRETE REINFORCING

033000 - CAST-IN-PLACE CONCRETE

DIVISION 05 — METALS

055000 - METAL FABRICATIONS

DIVISION 08 — OPENINGS

081113 - HOLLOW METAL DOORS AND FRAMES

083323 - OVERHEAD COILING DOORS

087100 - DOOR HARDWARE

088000 - GLAZING

TABLE OF CONTENTS 000110 - 2

DIVISION 09 — FINISHES

099114 - EXTERIOR PAINTING (MPI STANDARDS)

099124 - INTERIOR PAINTING (MPI STANDARDS)

DIVISION 26 — ELECTRICAL

267400 - ELECTRICAL FOR COMMUNICATIONS SYSTEMS

DIVISION 27 — COMMUNICATIONS

270010 - BASIC COMMUNICATIONS REQUIREMENTS

270020 - CONTRACTOR QUALIFICATIONS

270030 - BIDDING

270040 - WARRANTY

270050 - QUALITY ASSURANCE

270060 - TRAINING

270405 - COMMON WORK - SLEEVES, PENETRATIONS, AND FIRESTOPPING

270406 - COMMON WORK - HANGERS AND SUPPORTS

270500 - ELECTRICAL TECHNOLOGY - GENERAL REQUIREMENTS

270526 - ELECTRICAL TECHNOLOGY - GROUNDING AND BONDING

270533 - ELECTRICAL TECHNOLOGY - CONDUIT AND BOXES

270543 - ELECTRICAL TECHNOLOGY - UNDERGROUND DUCTS AND RACEWAYS

271000 - COMMUNICATIONS - GENERAL REQUIREMENTS

271119 - COMMUNICATIONS - TERMINATION EQUIPMENT

271300 - COMMUNICATIONS - BACKBONE CABLING

271500 - COMMUNICATIONS - HORIZONTAL CABLING

271543 - COMMUNICATIONS - FACEPLATES AND CONNECTORS

271619 - COMMUNICATIONS - PATCH CORDS

271710 - COMMUNICATIONS - IDENTIFICATION

271720 - COMMUNICATIONS - TESTING

DIVISION 28 — ELECTRONIC SAFETY AND SECURITY

280000 - SECURITY GENERAL REQUIREMENTS

281000 - SECURITY - ACCESS CONTROL SYSTEM

282000 - SECURITY - VIDEO SURVEILLANCE SYSTEM

END OF TABLE OF CONTENTS

SEALS PAGE 000106 - 1

DOCUMENT 000106 - SEALS PAGE

DESIGN PROFESSIONALS OF RECORD

A. Architect B. Structural Engineer

C. Mechanical / Plumbing Engineer D. Electrical Engineer

END OF DOCUMENT 000106

JDietrich Stamp

GEOTECHNICAL DATA 003132 - 1

DOCUMENT 003132 - GEOTECHNICAL DATA

1.1 GEOTECHNICAL DATA

A. This Document, with its referenced attachments, is part of the Procurement and Contracting

Requirements for the Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information. This Document and its attachments are not part of the Contract Documents.

B. Because subsurface conditions indicated by the soil borings are a sampling in relation to the entire construction area, and for other reasons, Owner, Architect, Architect's consultants, and the firm reporting the subsurface conditions do not warranty the conditions below the depths of the borings or that the strata logged from the borings are necessarily typical of the entire site.

Any party using the information described in the soil borings and geotechnical report accepts full responsibility for its use.

C. Subsurface soil investigations have been made by Kumar & Associates, Inc. and the results are included in the Specifications. The report is included only to inform the Contractor of the type and character of materials to be encountered.

1. Geotechnical Engineering Study, Proposed Transportation Facility Improvements, 10850 E. Woodmen Road, Peyton, Colorado. Kumar & Associates, Inc.

Project No. 23-2-218 dated December 14, 2023.

END OF DOCUMENT 003132

Kumar & Associates, Inc.

TABLE OF CONTENTS

SUMMARY

PURPOSE AND SCOPE OF STUDY

PROPOSED CONSTRUCTION

SITE CONDITIONS

FIELD EXPLORATION

LABORATORY TESTING

SUBSURFACE CONDITIONS

GEOTECHNICAL CONSIDERATIONS

FOUNDATION RECOMMENDATIONS

SEISMIC DESIGN CRITERIA

FLOOR SLABS

FOUNDATION WALLS AND RETAINING STRUCTURES

UNDERDRAIN SYSTEM

SURFACE DRAINAGE

SITE GRADING

WATER SOLUBLE SULFATES

EXCAVATION CONSIDERATIONS

DESIGN AND SUPPORT SERVICES

LIMITATIONS

FIG. 1 - LOCATION OF EXPLORATORY BORINGS

FIG. 2 - LOGS OF EXPLORATORY BORINGS

FIG. 3 - LEGEND AND NOTES

FIG. 4 - SWELL-CONSOLIDATION TEST RESULTS

FIGS. 5 THRU 7 - GRADATION TEST RESULTS

TABLE I - SUMMARY OF LABORATORY TEST RESULTS

SUMMARY

1. The generalized upper subsurface profile included approximately 8 inches to 3 feet of man-placed fill consisting of silty sand with gravel and well graded sand with gravel, followed by predominantly native granular soils which extended to depths between 7.5 to

13.5 feet. The granular soils were underlain by 2.5 to 5.5-foot thick layers of sandy lean clay in three of the borings, beginning at depths between 7 and 9.5 feet. Sandstone and/or claystone bedrock was encountered below the overburden soils, beginning at depths between 8 and 13.5 feet, and extending to the 20-foot depths explored.

2. With proper site preparation, shallow spread footing foundations with slab-on-grade floor construction should be feasible. Proper site preparation should include complete removal of existing fills where present within the proposed building footprint, down to the native granular soils and replacement with suitable compacted nonexpansive fill.

3. Based on the properties of the native granular soils and existing fill encountered, it is our opinion they would be suitable for reuse as nonexpansive fill (minus any deleterious materials) if sufficiently processed and moisture conditioned. The “Site Grading” section of the report provides additional discussion.

4. At the time of drilling, groundwater was encountered in each of the borings at depths ranging from 7 to 18 feet. When the borings were checked 7 days later, groundwater was encountered in each of the borings at depths between 6 and 6.9 feet. Fluctuations in the water level may occur with time, particularly during wetter seasons and after precipitation events.

5. Depending on the depth of excavation planned and the time of year that construction occurs, dewatering will likely be necessary for portions of the site during construction.

The “Excavation Considerations” section of the report provides additional discussion.

PURPOSE AND SCOPE OF STUDY

This report presents the results of a geotechnical engineering study for the proposed transportation facility improvements located at 10850 E. Woodmen Road in Peyton, Colorado.

The project site is shown on Fig. 1. This study was conducted in accordance with the scope of work in our Proposal C23-314, dated November 9, 2023, to develop recommendations for foundations and floor slabs, and other geotechnical considerations related to the proposed construction.

This report has been prepared to summarize the data obtained during this study and to present our conclusions and recommendations based on the proposed construction and the subsurface conditions encountered. Design parameters and a discussion of geotechnical engineering considerations related to the proposed construction are included in the report.

We previously prepared a geotechnical engineering study for the transportation facility (Project No. 002-261, dated February 28, 2001). Information from the 2001 study was referenced when developing the recommendations presented herein.

-2-

PROPOSED CONSTRUCTION

We understand the proposed construction will include the following new building structures:

- Building addition to north side of existing garage, 125’x55’,

- Covered parking building, 200’x80’, and

- Barn building, 200’x80’.

Each of the structures will consist of a single-story metal building with a slab-on-grade floor and no basement level. No new pavements are anticipated. We have assumed site grading in the areas of the proposed construction will be negligible, with construction occurring at the approximate existing grades. If the proposed construction is significantly different from that described above or depicted in this report, we should be notified to reevaluate the recommendations contained in this report.

SITE CONDITIONS

The subject site is bound by Bent Grass Meadows Drive to the east, a self-storage facility to the north, vacant land with high-voltage transmission lines to the west, and the Woodmen Frontage

Road to the south. The southern portions of the property included a warehouse/garage with a fueling area, several smaller buildings and storage areas, and the district central office building with employee parking areas. The northern portion of the property included material storage and school bus parking space. Five concrete crosspans run north to south in the bus parking area, with light poles running adjacent to the concrete. An additional concrete crosspan separates the south end of the bus parking area from an employee parking area. The topography of the site is nearly level, with a slight slope down to the south. The entire property is generally devoid of vegetation.

FIELD EXPLORATION

The field exploration of subsurface conditions consisted of drilling a total of six borings on

November 30, 2023. The boring locations were approximated by using a handheld GPS unit, and the approximate locations are shown on Fig. 1. The boring logs and corresponding legend and notes are presented on Figs. 2 and 3, respectively.

The borings were drilled with 4-inch diameter continuous flight augers and were logged by a representative of Kumar & Associates, Inc. Samples of the soils and bedrock were taken with either a 2-inch I.D. California sampler or a 1 3/8-inch I.D. split spoon sampler. The samplers were driven into the various strata with blows from a 140-pound hammer falling 30 inches.

Penetration resistance values, when properly evaluated, provide an indication of the relative

-3-density or consistency of the soils. Depths at which the samples were taken and the penetration resistance values are shown on the boring logs.

LABORATORY TESTING

Samples obtained from the exploratory borings were visually classified in the laboratory by the project engineer and samples were selected for laboratory testing. Laboratory testing included index property tests such as in-situ moisture content and dry unit weight, grain size analysis, and Atterberg limits. Additional testing performed included swell-consolidation testing and concentration of water soluble sulfates. The testing was conducted in general accordance with recognized test procedures, primarily those of the American Society for Testing of Materials

(ASTM). Results of the laboratory testing program are shown on Figs. 2, 4 through 7, and are summarized on Table I.

SUBSURFACE CONDITIONS

The generalized upper subsurface profile included approximately 8 inches to 3 feet of man-placed fill consisting of silty sand with gravel and well graded sand with gravel, followed by predominantly native granular soils which extended to depths between 7.5 to 13.5 feet. The granular soils were underlain by 2.5 to 5.5-foot thick layers of sandy lean clay in three of the borings, beginning at depths between 7 and 9.5 feet. Sandstone and/or claystone bedrock was encountered below the overburden soils, beginning at depths between 8 and 13.5 feet, and extending to the 20-foot depths explored.

The following subsurface descriptions are of a generalized nature to highlight the soil types encountered in the borings drilled for this study. The boring logs should be reviewed for more detailed information.

Existing Fill: The fill was encountered in each of the borings and extended to depths between approximately 8 inches and 3 feet. The fill consisted of silty sand with gravel (SM) and well-graded sand with gravel (SW-SM), and appeared dry, and tan, brown, and pink in color. Our study did not determine the exact lateral or vertical extent of the fill.

Native Granular Soils: Granular soil types, to include clayey sand (SC), silty sand (SM), and poorly to well-graded sand with varied amounts of silt (SP, SW, SP-SM, SW-SM) were encountered below the fill, and extending to depths between 7.5 feet and 13 feet. The granular soils included occasional gravel, appeared slightly moist to wet, and varied from tan to brown in color. Sampler penetration blow counts indicate the soils are medium dense.

-4-

Native Clay Soils: The granular soils were underlain by 2.5 to 5.5-foot thick layers of sandy lean clay in Borings 2, 5, and 6, beginning at depths between 7 and 9.5 feet. The clay appeared moist and varied from brown to light gray in color. Sampler penetration blow counts indicate the soils are medium stiff to very stiff. Swell-consolidation test results presented on Fig. 4 indicate the tested sample of sandy lean clay had a low swell potential after wetting under a 1 ksf surcharge.

Bedrock: Sandstone and/or claystone bedrock was encountered below the overburden soils in each of the borings, beginning at depths between 8 and 13.5 feet and extending to the maximum 20-foot depth explored. The sandstone was poorly cemented, moist to wet, and tan to light gray in color. The claystone was moist and gray in color. Sampler penetration blow counts indicates the materials range from hard to very hard.

Groundwater: At the time of drilling, groundwater was encountered in each of the borings at depths ranging from 7 to 18 feet. When the borings were checked 7 days later, groundwater was encountered in each of the borings at depths between 6 and 6.9 feet. The borings were backfilled with auger cuttings upon completion of these measurements. Fluctuations in the water level may occur with time, particularly during wetter seasons and after precipitation events.

GEOTECHNICAL CONSIDERATIONS

With proper site preparation, shallow spread footing foundations with slab-on-grade floor construction should be feasible. Given the unknown placement history of the existing fill, it is our opinion that the fill should be considered unsuitable for support of the proposed construction. Foundations and floor slabs placed on uncontrolled fill can experience large total and differential movement resulting structural distress, particularly if debris or loose zones are present within the existing fill zone. Because of this, we recommend complete removal of existing fills where present within the proposed building footprint, down to the native granular soils and replacement with compacted structural fill. The intent of this recommendation is to provide a low risk of settlement relative movement beyond about 1-inch in magnitude.

Based on the properties of the native granular soils and existing fill encountered, it is our opinion they would be suitable for reuse as nonexpansive fill (minus any deleterious materials) if sufficiently processed and moisture conditioned. The “Site Grading” section of the report provides additional discussion.

Drilled footings or helical piers may also be utilized, depending on the owners’ preferences.

Because of the relatively shallow groundwater and presence of granular soils, casing and/or

-5-dewatering would likely be required to facilitate drilled footing construction. Recommendations for these alternatives can be provided upon request.

FOUNDATION RECOMMENDATIONS

Spread Footings: The design and construction criteria presented below should be observed for a spread footing foundation system. The construction details should be considered when preparing project documents.

1. Any areas of existing fill, loose or soft material encountered within the foundation excavation should be removed and replaced with suitable nonexpansive fill. New structural fill should extend down from the edges of the foundations at a minimum 1 horizontal to 1 vertical projection.

2. Footings supported on the properly compacted structural fill as recommended herein should be designed for an allowable soil bearing pressure of 2,000 psf.

3. Fill placed for support of foundations should meet the material and compaction criteria presented in the “Site Grading” section of the report.

4. Spread footings should have a minimum footing width of 16 inches for continuous footings and of 24 inches for isolated pads.

5. Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 30 inches below the exterior grade is typically used in this area.

6. Criteria for the lateral resistance of a spread footing placed on native granular soils or properly compacted structural fill is presented in the “Foundation Walls & Retaining

Structures” section of this report.

7. Continuous foundation walls should be reinforced top and bottom to span an unsupported length of at least 10 feet.

8. Care should be taken when excavating the foundations to avoid disturbing the supporting materials. Excavation methods that reduce soil disturbance, such as hand excavation or careful soil removal with a backhoe positioned outside of the excavation may be required.

-6-

9. Granular foundation soils should be densified with a smooth vibratory compactor prior to placement of formwork and reinforcing steel.

10. A representative of the geotechnical engineer should confirm proper subgrade preparations have been met prior to placing foundation formwork. Loose disturbed material should be removed from the foundation subgrade prior to placement of concrete. Placement of structural fill should be observed and tested by a representative of the geotechnical engineer. In addition, representatives of the geotechnical and/or structural engineer should check reinforcement placement immediately prior to concrete placement.

SEISMIC DESIGN CRITERIA

Using estimated shear wave velocities for the subgrade materials encountered based on standard penetration testing, calculations indicate a design Site Class C per the International

Building Code (IBC). Based on the subsurface profile and site seismicity, liquefaction is not a design consideration.

FLOOR SLABS

The native granular soils or reconditioned fill are suitable to support light to moderately loaded slab-on-grade construction. The following measures should be taken to reduce the damage which could result from movement should the underslab materials be subjected to moisture changes.

1. Existing fill encountered below the floor slab should be overexcavated entirely and replaced with suitable nonexpansive fill.

2. Fill placed for support of floor slabs should meet the material and compaction criteria presented in the “Site Grading” section of the report.

3. Floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement.

4. Floor slabs should not extend beneath exterior doors or over foundation grade beams, unless saw cut at the beam after construction.

-7-

5. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The appropriate joint spacing is dependent on slab thickness, concrete aggregate size and slump, and should be consistent with recognized guidelines such as those of the Portland

Cement Association (PCA) or American Concrete Institute (ACI). The joint spacing and any requirements for slab reinforcement should be established by the designer based on experience and the intended slab use.

6. The subsurface conditions encountered at the site indicate shallow groundwater exists at the site below the slab level. We therefore recommend use of vapor retarder below the slab, especially if moisture sensitive coverings are used on the slab. However, the use of the vapor retarder should made by the owner/client and should be based on the use of the structures and space above as recommended by the applicable code requirements. If vapor retarder is used, special precautions may be required to prevent differential curing problems which could cause the slabs to warp. This topic is addressed by ACI 302.1R. A minimum 2-inch sand layer between the concrete and the vapor retarder is sometimes used for this purpose with precautions to prevent water intrusion into the sand layer.

7. All plumbing lines should be tested before operation. Where plumbing lines or other slab protrusions enter through the floor, a positive bond break should be provided. Flexible connections should be provided for slab-bearing mechanical equipment.

The precautions and recommendations itemized above will not prevent the movement of floor slabs if the underlying expansive materials are subjected to alternate wetting and drying cycles.

However, the precautions should reduce the damage if such movement occurs.

FOUNDATION WALLS AND RETAINING STRUCTURES

Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a moderate amount of deflection should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 55 pcf for backfill consisting of the on-site granular soils, or 50 pcf if an imported CDOT Class I structural backfill is used. Cantilevered retaining structures which can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 45 pcf for backfill consisting of the on-site granular soils, or 40 pcf for CDOT Class I structural backfill.

-8-

All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent buildings, traffic, construction materials and equipment.

The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure.

The lateral resistance of a foundation or retaining wall footing placed on undisturbed native granular soils or properly compacted structural fill material will be a combination of the sliding resistance of the foundation on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings may be calculated based on an allowable coefficient of friction of 0.3. Passive pressure against the sides of the footings may be calculated using an allowable equivalent fluid unit weight of 180 pcf.

The onsite soils are suitable for use as wall backfill. Imported granular wall back fill, if used, should meet the requirements of a CDOT Class I structural backfill with less than 20% passing the

No. 200 sieve. Proposed material should be approved by the geotechnical engineer prior to use.

The backfill behind foundation and retaining walls should be sloped from the base of the wall at an angle of at least 45 degrees from the vertical. Backfill should be placed in uniform lifts and compacted to the criteria presented in the “Site Grading” section of the report. Care should be taken not to overcompact the backfill since this could cause excessive lateral pressure on the walls. Some settlement of deep foundation wall backfills will occur even if the material is placed properly.

UNDERDRAIN SYSTEM

Based on our understanding that there will be no basements or below grade space, it is our opinion an underdrain system will not be necessary for the proposed buildings. If the proposed construction differs from our assumptions, we should be consulted to reevaluate the recommendations for an underdrain in these areas.

SURFACE DRAINAGE

Proper surface drainage is very important for acceptable performance of the development during construction and after the construction has been completed. The following recommendations should be used as guidelines and changes should be made only after consultation with the geotechnical engineer.

-9-

1. Excessive wetting or drying of the foundation and slab subgrades should be avoided during and after construction.

2. Care should be taken when compacting around the foundation walls to avoid damage to the structure.

3. The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 6 inches in the first 10 feet in unpaved areas. Site drainage beyond the 10-foot zone should be designed to promote runoff and reduce water infiltration. A minimum slope of 3 inches in the first 10 feet is recommended in the paved areas. These slopes may be changed as required for handicap access points in accordance with the Americans with Disabilities

Act.

4. Ponding of water should not be allowed on backfill material or within 10 feet of the foundation walls, whichever is greater.

5. Roof downspouts and drains should discharge well beyond the limits of all backfill.

6. Lawn sprinkler heads and landscaping which requires typical irrigation should be located at least 10 feet from foundation walls.

7. Plastic membranes should not be used to cover the ground surface adjacent to foundation walls. A pervious geotextile may be used to inhibit weed growth.

SITE GRADING

We recommend the following criteria be used when preparing the site grading plans.

Fill Material Specifications: The following material specifications are presented for fills on the project site.

1. Structural Fill: The on-site fill and native soils should generally be suitable for reuse as compacted fill, including structural fill beneath foundations, floor slabs, exterior flatwork and pavements. Imported structural fill, if required, should consist of nonexpansive granular soil material having a maximum of 40% passing the No. 200 sieve, and a maximum plasticity index of 15. New fill should extend down from the edge of foundations at a minimum 1:1 horizontal to vertical projection.

-10-

2. Utility Trench Backfill: Materials excavated from the utility trenches may be used for trench backfill above the pipe zone fill provided they do not contain unsuitable material or particles larger than 4 inches.

3. Material Suitability: All fill material should be free of vegetation, brush, sod, trash and debris, and other deleterious substances, and should not contain rocks or lumps having a diameter of more than 4 inches.

4. Subgrade Preparation: The ground surface shall be stripped of vegetation/organics prior to fill placement. The resulting ground surface should be scarified to a depth of 12 inches, moisture conditioned as necessary, and compacted in a manner specified below for the subsequent layers of fill. Loose or unstable soils shall be removed, where present, in order to provide a stable platform prior to placement of fill.

5. Overexcavation: As discussed in the “Geotechnical Engineering Considerations” section, we recommend the existing fill encountered below foundation and floor slab bearing elevations be overexcavated in its entirety, moisture conditioned, and placed back properly compacted. New structural fill should extend down from the edges of the foundations at a 1 horizontal to 1 vertical projection. We should be consulted at the time of excavation to assist the contractor in determining the limits of overexcavation required.

Compaction Requirements: A representative of the geotechnical engineer should observe fill placement operations on a full-time basis. We recommend the following minimum compaction criteria be used on the project.

Area Percentage of Standard Proctor

Maximum Dry Density (ASTM D 698) Foundation Subgrade 98% Floor Slab Subgrade 95% Foundation Wall Backfill 95% Beneath Pavement Areas/Exterior Flatwork/Utility Trenches

95%

Landscape and Other Misc. Overlot Fill Areas 95%

Compaction of granular soils should be achieved at a moisture content within +/- 2% of the optimum. Cohesive materials should be placed at a moisture content within 0% to +3% of the optimum.

-11-

Subgrade Stabilization: Unstable subgrade may be encountered during subgrade preparations.

A layer of lean concrete or crushed aggregate may be placed in the bottom of excavations prior to fill or concrete placement. If properly installed, this "mud mat" will reduce disturbance of the native materials caused by construction operations. All disturbed foundation soils should be removed and replaced with compacted crushed aggregate.

Other methods to stabilize the subgrade include scarifying/ripping the subgrade and allowing it to dry, using a relatively thick layer of cobble size angular rock in combination with the crushed aggregate, or by using a Type 2 biaxial geogrid in combination with a Class 6 aggregate.

Where coarse angular rock is used, the rock should be layered and pressed into the subgrade with a backhoe positioned outside of the excavation. Layering should continue until the subgrade begins to firm.

Specific stabilization requirements should be evaluated at the time of construction. We are unable to accurately predict or quantify areas where unstable subgrade conditions may occur, however, we recommend this work activity, if required, be included as a line item in the bid schedule to avoid cost overruns.

WATER SOLUBLE SULFATES

The concentration of water soluble sulfates measured in a sample obtained from the exploratory borings was 0.02%. This concentration of water soluble sulfate represents a Class 0 severity of exposure to sulfate attack on concrete exposed to these materials. The degree of attack is based on a range of Class 0 to Class 3 severity of exposure as presented in ACI 201. Based on the laboratory data and our experience, we believe special sulfate resistant cement will not be required for concrete exposed to the on-site soils.

EXCAVATION CONSIDERATIONS

In our opinion, the overburden soils and near surface bedrock encountered in the exploratory borings drilled for this study can be excavated with heavy-duty construction equipment. Ripper teeth or other means may be required for excavations that extend into bedrock. It is possible that localized, harder lenses of bedrock may be encountered within the excavation in portions of the site. If harder lenses of rock are encountered, hydraulic chiseling may be required, particularly in confined excavations such as trench cuts. Excavated slopes may soften or loosen due to construction traffic and erode from surface runoff. Measures to keep surface runoff from excavation slopes, including diversion berms, should be considered.

-12-

We assume that the temporary excavations will be constructed by overexcavating the slopes to a stable configuration where enough space is available. All excavations should be constructed in accordance with OSHA requirements, as well as state, local and other applicable requirements.

Excavations generally will extend through man placed fill soils, natural granular soils, and sandstone or claystone bedrock. The natural soils and man-placed fill soils will likely classify as a

Type C soil, requiring temporary slopes no steeper than 1.5:1 H to V for excavations up to 20 feet.

The bedrock will likely classify as a Type B soil requiring temporary slopes no steeper than 1:1.

Excavations encountering groundwater will require much flatter side slopes than those allowed by

OSHA or require temporary shoring. Temporary shoring may also be necessary in any areas where there is insufficient lateral space to construct slopes at the required inclination. The contractor’s competent person should evaluate the soils at the time of excavation, and make adjustments as necessary based on the conditions observed.

Construction Dewatering: Groundwater was encountered at depths between 6 feet and 6.9 feet in each of the borings. Depending on the depth of excavation planned and the time of year that construction occurs, dewatering will likely be necessary for portions of the site during construction.

Assuming properly designed slopes are excavated, we anticipate dewatering for small areas may be achieved using a system of trenches and sumps around the perimeter of the base of the excavation. The trenches should be sloped to the sumps where water can be pumped from the excavation. The sumps should be installed below the foundation elevations to avoid loss of supporting capacity of the soils. This system will intercept and remove water seeping from the excavated slope, but will not be effective in dewatering the remaining soil subgrade in the base of the excavation. The base of the excavation will be wet and unstable. Discussion on stabilizing the base of the excavation is presented in the “Site Grading” section of this report.

If larger amounts of water are encountered, or if larger areas require dewatering, we anticipate groundwater inflow can be controlled using closely-spaced well points, or more widely spaced dewatering wells. Dewatering should be done in advance of excavation below the proposed base of the excavation, and must be maintained through the time period the excavation is open. Any failure of dewatering system may result in soil disturbance and could contribute to excess post construction settlement. The dewatering system should be properly designed, installed and maintained by an experienced dewatering contractor. The bottom and sides of the excavation may become unstable if the groundwater level is not maintained at a sufficient depth below the bottom of the excavation. The dewatering system should be capable of maintaining a groundwater level at least 3 feet below the bottom of the excavation. Dewatering should continue until construction and

-13-associated backfilling extends well above the groundwater table. Selection of a dewatering system should be the responsibility of the contractor.

DESIGN AND SUPPORT SERVICES

Kumar & Associates, Inc. should be retained to review the project plans and specifications for conformance with the recommendations provided in this report. We are also available to assist the design team in preparing specifications for geotechnical aspects of the project and, if necessary, perform additional studies to accommodate any changes in the proposed construction.

We recommend that Kumar & Associates, Inc. be retained to provide observation and testing services to document that the requirements of the plans and specifications are being followed during construction, and to identify possible variations in subsurface conditions from those encountered in this study.

LIMITATIONS

This study has been conducted for exclusive use by the client for geotechnical related design and construction criteria for the project. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings at the locations indicated on Fig. 1 or as described in the report, and the proposed type of construction. This report may not reflect subsurface variations that occur, and the nature and extent of variations across the site may not become evident until site grading and excavations are performed. If during construction, fill, soil, rock or water conditions appear to be different from those described herein, Kumar & Associates, Inc. should be advised at once so that a re-evaluation of the recommendations presented in this report can be made. Kumar & Associates, Inc. is not responsible for liability associated with interpretation of subsurface data by others.

The scope of services for this project does not include any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such contamination, other studies should be undertaken.

DPC/sw

Kumar & Associates

Date Received: 12/1/2023

BORING DEPTH

(ft)

GRAVEL

SAND

LIQUID

LIMIT

PLASTICITY

INDEX

1 2' 12/6/23 2.8 123.6 17 76 7 NP A-1-b (0) Well Graded Sand w/Silt & Gravel

(SW-SM)

2 9' 12/6/23 15.6 115.8 57 41 22 A-7-6 (10) Sandy Lean Clay / Claystone

3 2' 12/6/23 7.0 108.4 20 68 12 NP A-1-b (0) Fill: Well Graded Sand w/Silt & Gravel (SW-SM)

4 4' 12/6/23 3.5 114.5 6 86 8 NP A-1-b (0) Well Graded Sand w/Silt (SW-SM)

5 2' 12/6/23 5.8 101.3 0 81 19 NP 0.02 A-2-4 (0) Silty Sand (SM)

6 4' 12/6/23 2.3 104.9 14 83 3 NP A-1-b (0) Poorly Graded Sand (SP)

Kumar and Associates, Inc.

Project No.: 23-2-218

Date Sampled: 11/30/2023

AASHTO

CLASSIFICATION

(Group Index)

PERCENT

PASSING NO.

200 SIEVE

ATTERBERG LIMITS

NATURAL

DRY

DENSITY

(pcf)

TABLE I

SUMMARY OF LABORATORY TEST RESULTS

SAMPLE LOCATION

NATURAL

MOISTURE

CONTENT

Project Name: D49 Transportation Facility

DATE

TESTED

WATER

SOLUBLE

SULFATES

GRADATION

SOIL OR BEDROCK TYPE

(Unified Soil Classification)

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and other

Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Work under separate contracts.

4. Future work.

5. Owner-furnished products.

6. Contractor-furnished, Owner-installed products.

7. Access to site.

8. Work restrictions.

9. Specification and drawing conventions.

10. Miscellaneous provisions.

B. Related Requirements:

1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: Grounds Expansion Barn and Covered Parking

1. Project Location: 10850 E. Woodmen Road, Peyton, CO 80831

B. Owner: Falcon School District 49.

1. Owner's Representative: Jim Rohr, D-49

C. Architect: DLR Group, Contact, JaDee Harsma.

D. Architect's Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents:

1. Civil Engineering: Kiowa Engineering Corp, contact Andrew McCord.

2. Structural Engineering: MGA Structural Engineers, contact Kevin Roth, PE.

3. Mechanical Engineering: ME Engineers, contact Jeremy O’Brien, PE.

4. Electrical Engineering: ME Engineers, contact Adnan Morshed, PE.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

SUMMARY 011000 - 2

1. The project consists of site improvements and building construction of two single story covered parking and barn storage buildings. Building structure consists of pre-engineered steel buildings. There is to be no active ventilation in the new covered parking building.

The new barn building is to be insulated and ventilated but not conditioned.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.5 WORK UNDER SEPARATE CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts.

Coordinate the Work of this Contract with work performed under separate contracts.

B. Concurrent Work: Owner will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.

1. Communications: Contractor to be named. To provide:

a. Equipment room fittings including telecommunications mounting equipment and grounding.

b. Backbone cabling including cables, connecting hardware and cable identification systems.

c. Horizontal cabling including cables, connecting hardware and cable identification systems.

d. Audio/Visual system including cabling, connecting hardware and cable identification.

e. Service pathways and conduit sleeves are part of the Work of the Contract and are not under Work under Separate Contract.

2. Electronic Safety and Security: Contractor to be named. To provide:

a. Conductors and cables for Electronic Safety and Security for Intrusion Detection including cables connecting hardware and identification systems.

b. Intrusion Detection including detection devices, controls and alarms.

c. Service pathways and conduit sleeves are part of the Work of the Contract and are not under Work under Separate Contract.

1.6 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

SUMMARY 011000 - 3

1.7 COORDINATION WITH OCCUPANTS

A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial

Completion of the Work, provided such occupancy does not interfere with completion of the

Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.

1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work.

2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited

Owner occupancy.

3. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work.

4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work.

1.8 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. Nonsmoking Building: Smoking is not permitted on Owner’s property.

C. Employee Identification: Provide identification tags for Contractor personnel working on Project site after Owner occupancy. Require personnel to use identification tags at all times.

D. Employee Screening: Comply with Owner's requirements for drug and background screening of

Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.9 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

SUMMARY 011000 - 4

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations indicated or scheduled on Drawings.

1.10 INTERPRETATION OF DRAWINGS AND SPECIFICATIONS

A. In general, addenda or bulletins to specifications take precedence over original specifications or earlier addenda; dimensional figures take precedence over scaled measurements; large scale drawings and details take precedence over those of a smaller scale; drawings of the latest date take precedence over earlier ones. Work indicated or required (but not expressly noted, detailed, or specified) shall be made the same as similar or corresponding elements which are fully noted, detailed, or specified. The Construction Manager shall comply with the true intent and meaning of the drawings and specifications taken as a whole. Standards of quality and performance indicated on the drawings or described in the specifications shall be understood to be minimum requirements only. When building codes or other legal authority demand higher standards, such legal requirements shall be met.

1. Figures on the drawings indicate rough construction with no allowance for finish of any kind, except the dimensions of details of the finished work. The Architect will not be responsible for scaling the drawings.

2. The drawings are generally diagrammatic and indicate manner, method, and nature of the installation. The specifications denote style and quality of material and workmanship.

Where a conflict between the drawings and the specification arise, the Architect shall be promptly notified. The Architect will make the proper interpretation and his decision shall be final. Where a conflict exists between the General Conditions and General

Requirements, the Architect shall make the proper interpretation and his decision shall be final. When the term "or equal" or "approved equal" or "equivalent to" is used, it shall be construed to mean approval by the Architect. Substitutions made without Architect's approval shall be removed and replaced without additional cost to the Owner.

B. Where a conflict exists in the drawings or specification, the Construction Manager and/or

Subcontractors shall prepare a "Request for Information (R.F.I.)" which identifies the problem and proposes a solution for the Architect to review. Do not proceed with that portion of the Work until the Architect has issued or concurred with the resolution. All R.F.I.s are to be submitted to the Architect by the Construction Manager. The Construction Manager shall maintain a status register of all "Requests for Information."

1.11 MISCELLANEOUS PROVISIONS

A. Watertight-Weathertight:

1. Anything in the Contract Documents notwithstanding, the Construction Manager accepts the responsibility of constructing a watertight, weathertight project.

2. Discovery of Fungi (Mold): In accordance with Subparagraph 1.13.A.1 above, Construction Manager is responsible for providing labor, material, products, equipment and services to install insulation, air/vapor barrier, and ventilation systems that maintain

SUMMARY 011000 - 5

effective control of air, moisture, and heat transfer within the building envelope as indicated in the contract documents, is normal for standard construction practice or is per product manufacturer recommendations whichever is most restrictive.

a. Should Construction Manager proceed to install insulation, ceiling tiles, gypsum wallboard or similar products having paper, cardboard and other cellulose surfaces prior to the building's being enclosed and weatherproof (including ambient conditions of temperature and humidity being continuously maintained at values near those indicated for final occupancy), the Construction Manager is at risk for mold contamination of the building components.

b. During the course of construction of the Project, Construction Manager shall perform continuous visual inspection/verification of building components and ventilation systems (particularly for damp filters) for possible contamination by mold.

c. If the presence of mold is suspected, detected or found, visible water damage observed or musty odors detected, immediate remediation action shall be initiated by the Construction Manager. In all instances, any source(s) of water shall be stopped and the extent of water damage determined. Water-damaged materials shall be immediately removed and replaced with new materials at the Construction

Manager's expense. The Construction Manager shall provide an approved independent test report documenting the completed environmental status.

1) Mold-damaged materials shall be remedied in accordance with Construction

Manager's Mold Remediation Plan.

2) Construction Manager shall submit his Mold Remediation Plan, which outlines and describes in detail the procedures and policies to be followed for this Project.

B. Accessibility of Valves, Controls and Electrical Junction Boxes:

1. No equipment that has to be operated or maintained, such as valves, traps, controls, unions, motors, etc., shall be placed in any inaccessible location.

2. Any dampers, controls, valves, expansion joints, electrical junction boxes, or other apparatus which must by necessity be located in walls, above ceilings etc., shall be provided with suitable access doors (fitted in a framed opening) which will permit…

This is the start of the file's text. The full file is on GovTribe.