Covered Parking Shop Drawings.pdf
PDF 5 MB Posted
- Attached to
- Central Office Additions State and local contract opportunity
- Solicitation number
- RFP # 2025-CO-0717
- Issued by
- El Paso County, Colorado
About this file
These shop drawings, prepared by Nucor Building Systems for Bighorn Steel Buildings, detail the design and specifications for a D49 Covered Parking project located in Colorado Springs, Colorado. The documents are comprehensive engineering drawings for a pre-engineered metal building system, specifically showing structural framing plans, roof and wall sheeting layouts, anchor bolt plans, erection details, and installation instructions for a metal building structure. The drawings cover multiple aspects of the project, including structural steel configurations, roof and wall panel configurations, fastener spacing, insulation details, and trim specifications.
The project involves a metal building with specific design parameters, including R-panel roofing, various structural components, and detailed installation guidelines. The drawings indicate a precise engineering approach with multiple sheets covering different technical aspects such as endwall framing, roof structural fastener spacing, side lap fastener requirements, and specific installation notes for various building components. The documents include technical specifications for materials, fasteners, and installation procedures, with particular attention to structural integrity, weather sealing, and proper erection techniques. The drawings are dated 06/04/2024 and carry a job number of U24L0386A, suggesting this is a planned construction project with detailed pre-construction engineering documentation.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix C PEMB Covered Parking Quote.pdf | ||
| Barn Shop Drawings.pdf | ||
| D49_Site_Bid-Drawings_250711.pdf | ||
| Overhead Coiling Doors Specs.pdf | ||
| Sample Contract.pdf | ||
| D49_Barn_Bid-Drawings_250711.pdf | ||
| D49_CoveredParking_Bid-Drawings_250711.pdf | ||
| Final Q_A from Previous IFB.pdf | ||
| Q_A From 2ndIFB.pdf | ||
| Seeding _ Mulching City of Colorado Springs.pdf | ||
| 2025 Contract Format NEW.pdf | ||
| Appendix C PEMB Barn Quote.pdf | ||
| Drainage Report.pdf | ||
| RFP_2025_CO_0717.pdf | ||
| Soils Report Kumar.pdf | ||
| D49 Bid Form 2025.docx | DOCX document | |
| GROUNDS EXPANSION BARN AND COVERED PARKING Project Manual-Bid Documents 20250711.pdf | ||
| RFP_Cover_Page _ Signature Sheet (2) (1).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
C O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
O
06/04/2024
FOR OCCUPANCY (RISK) CATEGORY I OR II, IBC PROVISIONS INDICATE THAT
SINGLE-STORY BUILDINGS SHALL HAVE "NO DRIFT LIMIT" PROVIDED THAT INTERIOR
WALLS, PARTITIONS, CEILINGS, AND EXTERIOR WALL SYSTEMS HAVE BEEN
DESIGNED TO ACCOMMODATE THE SEISMIC STORY DRIFTS. INTERIOR WALLS,
PARTITIONS, CEILINGS, OR EXTERIOR WALL SYSTEMS NOT PROVIDED BY THE
METAL BUILDING MANUFACTURER SHALL BE DESIGNED AND DETAILED BY OTHERS
TO ACCOMMODATE THE SEISMIC STORY DRIFTS. SEISMIC DRIFT VALUES MAY BE
OBTAINED FROM THE METAL BUILDING MANUFACTURER.
M O
ACCESSORIES (DOORS, WINDOWS, ETC.) NOT PROVIDED BY THE METAL BUILDING
MANUFACTURER MUST BE DESIGNED AS "COMPONENTS AND CLADDING" IN
ACCORDANCE WITH THE SPECIFIC WIND PROVISIONS OF THE REFERENCED
BUILDING CODE DISPLAYED ON THE COVER PAGE OF THIS DRAWING PACKET.
M O
FRAMED OPENINGS HAVE BEEN DESIGNED TO SUPPORT WIND LOAD NORMAL TO
THE WALL BASED ON THE STANDARD BUILDING CODE CRITERIA. FRAMED
OPENINGS HAVE NOT BEEN DESIGNED FOR ANY ADDITIONAL MOMENT OR
CATENARY FORCES FROM THE DOOR. ANY CHANGE TO THE INFORMATION SHOWN
HERE WILL REQUIRE AN ENGINEERING INVESTIGATION AND POSSIBLE BUILDING
REINFORCEMENT.
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
C O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
F O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
F O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
E O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
ROD ASSEMBLY MK.
HILLSIDE WASHER,
COUPLING NUT
WEB OF COLUMN
COUPLING NUTSROD MARK HILLSIDE FLAT A307/A325
SEE PLANS AND ELEVATIONS FOR BRACING
Q3
ROD BRACE DETAIL
WEB TO WEB
RD__-
FLAT WASHER, AND
NUT
IF REQUIRED
OR RAFTER
(QTY VARIES)DIAMETER NUMBER WASHERS WASHERS NUTS
MARK NUMBERS
H0860
(2) H0450
(2) H0240
(2) H0285RD06-
RD05-
RD07-
RD08-
RD09-
RD10-
(2) H0280
(2) H0285
(2) H0290
(2) H0290
(2) H0295
(2) H0230
(2) H0220
(2) H0210
(2) H0250
(2) H0260 (2) H0340
(2) H0325
(2) H0320
(2) H0310
(2) H0330
H0850
H0840
H0830
H0810
H0820
AF0011
BOLTS REQ'D AS SHOWN
3"
1/4"
PLATE WASHER
MK. ESW01 (2)
RAFTER/
CAP PLATE/
SHOP WELDED SHELF
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
NAA0030
EAVE STRUT ANGLE
LINER LOW EAVE ANGLE
LINER EAVE ANGLE
LINER EAVE ANGLE
EAVE ANGLE
GIRT ANGLE
GIRT ANGLE
GIRT ANGLE
GIRT ANGLE
RAKE PARAPET ANGLE
RAKE PARAPET ANGLE
RAKE ANGLE
STANDING SEAM RAKE/EAVE STRUT ANGLE
LINER EAVE ANGLE
NA00030
STANDARD ANGLE SCHEDULE
GALVANIZED
1" x 2-1/2" x 12"
GALVANIZED
6" x 7-3/4" x 120"
GALVANIZED
3" x 3" x 120"
GALVANIZED
3" x 7-3/4" x 120"
GALVANIZED
4" x 5" x 120"
GALVANIZED
1" x 2-1/2" x 12"
GALVANIZED
1" x 2-1/2" x 24"
GALVANIZED
1" x 2-1/2" x 30"
GALVANIZED
1" x 2-1/2" x 120"
GALVANIZED
2" x 12" x 120"
GALVANIZED
6" x 6" x 120"
GALVANIZED
3" x 5" x 242"
BASE ANGLE
GALVANIZED
2" x 3" x 242"
GALVANIZED
1" x 2-1/2" x 12"
GALVANIZED
3" x 5" x 120"
A00030
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
TRIM_547
GENERAL ROOF PANEL NOTES
FASTENER INSTALLATION
RECOMMENDED TOOL TYPES: SEE ALSO FASTENER SCHEDULE
4 AMP OR HIGHER RATED TOOLS (DO NOT USE IMPACTING TOOLS)
2000 - 2500 RPM SCREW GUN WITH TORQUE ADJUSTABLE CLUTCH
MANUAL OR ELECTRIC RIVET TOOL
DO NOT USE IMPACTING TOOLS
TO ASSURE PROPER VOLTAGE TO THE TOOL, EXTENSION CORDS SHOULD BE CHECKED FOR PROPER WIRE
SIZE/CHORD LENGTH.
16 GAGE WIRE, MAXIMUM CHORD LENGTH = 100’
14 GAGE WIRE, MAXIMUM CHORD LENGTH = 200’
12 GAGE WIRE, MAXIMUM CHORD LENGTH = 300’
DRIVING TIPS:
SET THE NUT DRIVER AS DESCRIBED BELOW PRIOR TO INSTALLING FASTENERS TO PREVENT FASTENER WOBBLE...
SOCKET EXTENSIONS (4" OR 6") ARE RECOMMENDED TO BE USED FOR INSTALLING PANEL CLIP FASTENERS TO
MAINTAIN VERTICAL FASTENER INSTALLATION.
EXCESSIVE PRESSURE CAN CAUSE DRILL POINT FAILURE. LET THE FASTENER DO THE WORK.
DO NOT OVER TIGHTEN FASTENERS AS THIS WILL LEAD TO PANEL DIMPLING AND DISTORTION.
GAP
NO
GAP
1. PUT THE TOP OF THE FASTENER INTO THE NUT
DRIVER. NOTE: FOR PAINTED FASTENERS,
PLACE A SINGLE OR DOUBLED LAYER OF
PLASTIC BETWEEN THE FASTENER HEAD AND
THE NUT DRIVER.
2. PLACE THE POINT OF THE FASTENER ONTO
A HARD SURFACE AND FIRMLY HIT THE TOP OF
THE NUT DRIVER 2-3 TIMES.
4. BAD SET VS. GOOD SET.3. THE BASE OF THE NUT DRIVER SHOULD NOW
BE CONTACTING THE TOP OF THE HEAD OF THE
FASTENER WITH NO GAPS.
ROOF PLANE
S T
A R
T P
A N
E L
FULL WIDTH PANELS
"BEARING LEG"
F
IN
IS
H
P A
N E
L
LOW EAVE
LOW EAVE
"BEARING LEG"
FULL WIDTH PANELS
F
IN
IS
H
P A
N E
L
S T
A R
T P
A N
E L
BEARING LEG
1.) THE ROOF SHEETING PLAN IS SHOWN WITH THE ROOF PANELS BEING ERECTED FROM "LEFT-TO-RIGHT".
IF THE DESIRE IS TO ERECT THE ROOF PANELS FROM "LEFT-TO-RIGHT", FOLLOW THE ROOF SHEETING PLAN
AS SHOWN. IF THE DESIRE IS TO ERECT THE ROOF PANELS FROM "RIGHT-TO-LEFT", FOLLOW THE
INSTRUCTIONS SHOWN BELOW.
2.) WHEN SETTING BUNDLES OF PANELS ON THE ROOF, THE "BEARING LEG" MUST ALWAYS BE AWAY FROM
THE END OF THE BUILDING WHERE THE SHEETING WILL BEGIN.
ORIGINAL LAYOUT
(LEFT-TO-RIGHT)
ROTATE PANELS
180°
(RIGHT-TO-LEFT)
ROOF SHEETING DIRECTION
ROOF SYSTEM
THE ROOF SYSTEM CONSISTS OF 24/26 GAUGE PANELS WITH A NOMINAL COVERAGE OF 3'-0" AND A PANEL RIBS THAT
ARE 1 1/4" HIGH AND THROUGH FASTENED ON THE FLAT OF PANEL INTO SECONDARY MEMBERS.
STRUCTURAL FASTENER SPACING REQUIREMENTS
THE ROOF SYSTEM USES STRUCTURAL FASTENERS TO ATTACH THE PANELS TO THE ROOF SECONDARY MEMBERS.
STRUCTURAL FASTENER SPACING REQUIREMENTS ARE SHOWN IN A SEPARATE DETAIL SPECIFIC TO THIS PROJECT.
SIDE LAP FASTENER SPACING REQUIREMENTS
SIDE LAP FASTENERS ARE REQUIRED AT THE SIDELAP OF THE PANELS. THE SPACING OF THESE FASTENERS VARIES
BY DESIGN OF SPECIFIC PROJECT REQUIREMENTS AND MAY VARY IN DIFFERENT AREAS OF THE ROOF. REFERENCE
THE SIDE LAP FASTENER SPACING DETAIL FOR PROJECT SPECIFIC REQUIREMENTS.
ROOF TOP UNITS AND CURB SUPPORTS
THE ROOF CURBS SUPPLIED BY MBS ARE DESIGNED TO BE INSTALLED AFTER THE ROOF PANEL IS INSTALLED.
REFERENCE ROOF CURB INSTALLATION DETAILS IF PROJECT HAS CURBS SUPPLIED BY MBS.
IF CURBS ARE NOT SUPPLIED BY MBS, CARE SHOULD BE TAKEN TO ENSURE WATER TIGHTNESS AND PROPER
INSTALLATION ARE ACHIEVED. MBS IS NOT RESPONSIBLE FOR INSTALLATION DETAILS OR METHODS RELATED TO
CURBS NOT SUPPLIED BY MBS.
INSULATION REQUIREMENTS
INSULATION IS RECOMMENDED TO BE USED IN ALL ROOF APPLICATIONS TO AVOID PROBLEMS WITH CONDENSATION
FORMING ON THE UNDERSIDE OF THE SHEETING. THIS ALSO PROVIDES A BUFFER BETWEEN THE PURLINS AND THE
ROOF TO ELIMINATE NOISE AND POSSIBLE DAMAGE DUE TO METAL-TO-METAL CONTACT.
PAINTED ROOF
PAINTED ROOF PANELS ARE OFTEN PROVIDED BY MBS. IN THIS CASE, GUTTER BRACKETS WILL BE PAINTED TO MATCH
THE ROOF COLOR AS A STANDARD.
SEALING MATERIAL COMPRESSED
UNDER CAP OF FASTENER.
SEALING MATERIAL VISIBLE UNDER
CAP OF FASTENER.
SEALING MATERIAL COMPRESSED
BUT DIMPLED THE PANEL / TRIM.
CORRECT TOO LOOSE TOO TIGHT
2" COMPRESS TO SINGLE
THICKNESS AFTER
LAPPING
MASTIC APPLICATION
TEMPERATURE EXTREMES
TEMPERATURE EXTREMES MUST BE CONSIDERED DURING INSTALLATION OF THE ROOF DUE TO THE SENSITIVITY OF
MASTICS. THE RECOMMENDED INSTALLATION TEMPERATURE RANGE IS 20-120 DEGREES FAHRENHEIT. AT COLDER
TEMPERATURES, THE MASTIC STIFFENS RESULTING IN LOSS OF ADHESION AND COMPRESSIBILITY. AT HOTTER
TEMPERATURES, THE MASTIC BECOMES TOO SOFT FOR PRACTICAL HANDLING. ON COLD BUT SUNNY DAYS, THE
PANEL SURFACE MAY BECOME WARM ENOUGH TO ACCEPT THE APPLICATION OF HEATED MASTIC EVEN THOUGH THE
AIR TEMPERATURE IS BELOW 20 DEGREES FAHRENHEIT.
WHEN OVERNIGHT TEMPERATURES FALL BELOW FREEZING, THE MASTIC SHOULD BE STORED IN A HEATED ROOM SO
IT WILL BE WARM ENOUGH TO USE THE FOLLOWING DAY. ON HOT DAYS, THE MASTIC CARTONS SHOULD BE STORED
OFF THE ROOF IN A COOL AND SHADED AREA. WHILE ON THE ROOF, MASTIC ROLLS SHOULD BE KEPT SHADED UNTIL
ACTUAL USE.
IN VERY COLD WEATHER, IT IS RECOMMENDED THAT THE FASTENERS BE TIGHTENED SLOWLY AND ONLY TIGHT
ENOUGH THAT THE MASTIC IS IN FULL CONTACT WITH THE PANEL OR FLASHING. THEN ON THE NEXT SUNNY DAY, COMPLETE THE TIGHTENING PROCESS AFTER THE SUN WARMS THE PANEL AND FLASHING SURFACES.
CONTAMINATION
TO ASSURE PROPER ADHESION AND SEALING, THE MASTIC MUST HAVE COMPLETE CONTACT WITH ADJOINING
SURFACES. CONTAMINANTS SUCH AS WATER OIL, DIRT AND DUST PREVENT SUCH CONTACT. THE PANEL AND
FLASHING SURFACES MUST BE DRY AND THOROUGHLY CLEANED OF ALL CONTAMINANTS. BEFORE APPLYING TAPE
MASTIC, THE MASTIC SHOULD BE CHECKED FOR CONTAMINANTS. IF THE MASTIC SURFACES ARE CONTAMINATED, IT
MUST NOT BE USED.
DURING COOL WEATHER, CONDENSATION OR LIGHT MIST CAN ACCUMULATE ON THE PANEL AND FLASHING SURFACE
AND NOT BE EASILY NOTICED. IT IS RECOMMENDED THAT THE MASTICS ALWAYS BE KEPT UNDER PROTECTIVE COVER
AND THAT THE PANEL AND FLASHING SURFACES BE WIPED DRY IMMEDIATELY BEFORE INSTALLATION.
TAPE MASTIC IS PROVIDED WITH A PROTECTIVE PAPER TO REDUCE CONTAMINATION. INCOMPLETE REMOVAL OF THE
PROTECTIVE PAPER WILL PREVENT THE MASTIC ADHESION TO THE PANEL OR FLASHING SURFACES. ALWAYS CHECK
THAT THE PROTECTIVE PAPER IS COMPLETELY REMOVED. DO NOT REMOVE THE PROTECTIVE PAPER UNTIL
IMMEDIATELY BEFORE THE PANEL OR FLASHING IS INSTALLED OVER THE MASTIC.
COMPRESSION
TO ASSURE PROPER COMPRESSION AND SEAL, THE TAPE MASTIC MUST BE COMPRESSED BETWEEN THE PANEL AND
FLASHING SURFACES WITH FIRM AND UNIFORM PRESSURE. IN MOST CASES, THE REQUIRED PRESSURE IS APPLIED BY
THE CLAMPING ACTION OF SCREWS PULLING THE ADJOINING SURFACES TOGETHER. HOWEVER, THE TAPE SEALANT’S
RESISTANCE TO PRESSURE BECOMES GREATER IN COLD WEATHER.
DURING COLD WEATHER, THE FASTENERS MUST BE TIGHTENED SLOWLY TO ALLOW THE MASTIC TIME TO COMPRESS.
IF THE FASTENERS ARE TIGHTENED TOO FAST, THE FASTENERS MAY STRIP OUT BEFORE THE MASTIC COMPRESSES
ADEQUATELY, OR THE PANEL OR FLASHING MAY DEFORM IN THE IMMEDIATE AREA OF THE FASTENER, LEAVING THE
REST OF THE MASTIC INSUFFICIENTLY COMPRESSED.
INSIDE CORNERS
AN INSIDE RADIUS, SUCH AS WHERE THE PANEL FLAT MEETS A RIB, IS USUALLY THE MOST CRITICAL AREA TO SEAL. A
COMMON MISTAKE FOR THE INSTALLER IS TO BRIDGE THE MASTIC ACROSS THE INSIDE RADIUS.
WHEN THE LAPPING PANEL OR FLASHING IS PUSHED INTO PLACE, THE BRIDGED MASTIC IS STRETCHED AND THINNED.
THE MASTIC MAY THEN BE TOO THIN TO ADEQUATELY SEAL THIS CRITICAL AREA. WHEN TAPE MASTIC IS APPLIED AT
AN INSIDE RADIUS, IT IS RECOMMENDED THAT THE MASTIC BE FOLDED BACK, THEN PUSH THE MASTIC FOLD INTO THE
RADIUS.
PAPER
BACKING
ARM'S LENGTH
REMOVE PAPER BACKING
ONLY AS WORK PROGRESSES MASTIC LAP
INCORRECT CORRECT
DESIGN AND PERFORMANCE CRITERIA
REGULATIONS
REGULATIONS SET FORTH BY THE OCCUPATIONAL SAFETY AND HEALTH ACT, LOCAL, STATE, AND/OR FEDERAL
AGENCIES SHOULD BE ADHERED TO AT ALL TIMES. MBS IS NOT RESPONSIBLE FOR INJURY, DAMAGE, OR FAILURE, WHICH MAY BE THE RESULT FROM FAILING TO MEET ANY OF THESE REGULATIONS.
IN COMPLIANCE WITH THE HAZARD COMMUNICATION RULE 1910:1200, MATERIAL SAFETY DATA SHEETS (MSDS) HAVE
BEEN PROVIDED FOR YOUR USE AND SAFETY. THESE DATA SHEETS SHOULD BE MADE AVAILABLE TO ALL PERSONNEL
THAT COME IN CONTACT WITH THESE PRODUCTS. THESE DATA SHEETS WILL GIVE YOU THE NECESSARY
INFORMATION TO PROPERLY HANDLE SUCH MATERIALS AND WHAT TO DO IN CASE OF AN EMERGENCY. (THE MSDS
SHEETS ARE LOCATED ONLINE AND ARE AVAILABLE UPON REQUEST).
THE ERECTOR OF THE ROOF SYSTEM IS RESPONSIBLE FOR THE SAFE EXECUTION OF THIS DETAIL. THESE
INSTRUCTIONS ARE INTENDED TO DESCRIBE THE SEQUENCE AND PROPER PLACEMENT OF PARTS. THEY ARE NOT
INTENDED TO PRESCRIBE COMPREHENSIVE SAFETY PROCEDURES. THE PROCEDURES IN THIS DETAIL ARE BELIEVED
TO BE RELIABLE. HOWEVER, MBS SHALL NOT BE RESPONSIBLE FOR INJURY, DAMAGE, OR FAILURE DUE TO THE
MISAPPLICATION OF THESE PROCEDURES, IMPROPER ERECTION TECHNIQUES, OR NEGLIGENCE
WALKING AND WORKING ON ROOF PANELS
DO NOT PLACE BUNDLES OF PANELS ON THE ROOF STRUCTURE WITHOUT FIRST VERIFYING THE STRUCTURE WILL
SAFELY SUPPORT THE CONCENTRATED WEIGHT OF THE PANELS AND THE WEIGHT OF THE INSTALLATION CREW.
SOME ROOF STRUCTURES MAY NOT BE DESIGNED TO SUPPORT THE WEIGHT OF A FULL PANEL BUNDLE WITHOUT
ADDITIONAL STRUCTURE SUPPORT.
DO NOT USE A ROOF PANEL AS A WORKING PLATFORM. AN UNSECURED PANEL COULD COLLAPSE UNDER THE
WEIGHT OF A PERSON STANDING BETWEEN PURLINS OR AT THE PANEL END.
DO NOT WALK ON THE LAST INSTALLED PANEL RUN, AS THE UNSECURED EDGE COULD COLLAPSE UNDER A PERSON’S
WEIGHT. WHEN INSTALLING PANELS OR MAKING END LAP CONNECTIONS, ETC., STAND WHERE THE ROOF
STRUCTURAL WILL SUPPORT YOUR WEIGHT.
AN APPROVED AND SAFE WALKING PLATFORM SHOULD BE USED IN HIGH TRAFFIC AREAS TO PREVENT THE ROOF
PANEL FROM BEING DEFORMED, SCRATCHED, OR SCUFFED.
SAFETY EQUIPMENT
THE USE OF SAFETY EQUIPMENT FOR THE ROOF PANEL INSTALLATION IS RECOMMENDED AT ALL TIMES DURING THE
INSTALLATION PROCESS. HOWEVER, WHEN USING LANYARDS, ENSURE THAT THE CLASP, BELT HOOKS AND WIRE
CABLES ARE COVERED IN SUCH A MANNER THAT THEY WILL NOT SCRATCH THE PANEL SURFACE IF ACCIDENTALLY
DRAGGED ALONG THE PANEL.
CREW SIZE
THE LENGTH OF THE INDIVIDUAL ROOF PANELS SHOULD BE CONSIDERED WHEN DETERMINING CREW SIZE. IT IS
RECOMMENDED THAT UNDER NORMAL CONDITIONS, THERE BE ONE PERSON FOR EVERY TEN FEET OF PANEL LENGTH, PLUS ONE.
PANEL OVERHANG
DO NOT STAND ON THE END OF UNSUPPORTED (CANTILEVERED) PANELS AT THE EAVE OR RIDGE. STANDING ON THE
CANTILEVER PORTION MAY RESULT IN PANEL COLLAPSE.
POINT LOADS
WHEN PROPERLY SUPPORTED BY THE STRUCTURAL STEEL, PANELS ARE DESIGNED TO SUPPORT UNIFORM LOADS, WHICH ARE EVENLY DISTRIBUTED OVER THE PANEL SURFACES. POINT LOADS THAT OCCUR IN SMALL OR
CONCENTRATED AREAS, SUCH AS HEAVY EQUIPMENT, LADDER, OR PLATFORM FEET, ETC., MAY CAUSE PANEL
DEFORMATION OR EVEN PANEL COLLAPSE.
SLICK SURFACES
PANEL SURFACES AND STRUCTURAL STEEL SURFACES ARE HARD, SMOOTH, AND NONABSORBENT, WHICH CAUSES
THESE SURFACES TO BE VERY SLICK WHEN WET OR COVERED WITH SNOW OR ICE. EVEN BLOWING SAND OR HEAVY
DUST CAN MAKE THESE SURFACES DIFFICULT TO WALK ON WITHOUT SLIPPING.
UNPAINTED PANEL SURFACES ARE OFTEN COATED WITH OIL TO ACCOMMODATE THE PANEL-FABRICATION PROCESS.
ALTHOUGH DESIGNED TO WASH AWAY OR EVAPORATE DURING NORMAL WEATHER, THE OIL ON NEW PANELS CAN BE
EXTREMELY SLICK, ESPECIALLY DURING PERIODS OF LIGHT RAIN AND DEW.
CAUTION MUST BE EXERCISED TO PREVENT SLIPPING AND FALLING ONTO THE ROOF SURFACE OR EVEN SLIDING OFF
THE ROOF. NON-SLIP FOOTWEAR IS A NECESSITY AND NON-SLIP WORKING PLATFORMS ARE RECOMMENDED.
ELECTRICAL CONDUCTANCE
METAL PANELS ARE EXCELLENT ELECTRICAL CONDUCTORS. A COMMON CAUSE OF INJURY IS THE CONTACT OF
METAL PANELS WITH POWER LINES DURING HANDLING AND INSTALLATION. THE LOCATION OF ALL POWER LINES MUST
BE NOTED AND, IF POSSIBLE, FLAGGED. THE INSTALLATION PROCESS MUST BE ROUTED TO AVOID ACCIDENTAL
CONTACT WITH ALL POWER LINES AND HIGH VOLTAGE SERVICES AND EQUIPMENT. ALL TOOLS AND POWER CORDS
MUST BE PROPERLY INSULATED AND GROUNDED AND THE USE OF APPROVED GROUND FAULT CIRCUIT BREAKERS IS
RECOMMENDED.
FALSE SECURITY OF INSULATION
BLANKET AND RIGID BOARD INSULATION BLOCK THE INSTALLER’S VIEW OF THE GROUND BELOW THE ROOF. SERIOUS
INJURY CAN OCCUR WHEN THE INSTALLER GETS A FALSE SENSE OF SECURITY BECAUSE HE CANNOT SEE THE
GROUND AND STEPS THROUGH THE INSULATION.
SHARP EDGES
SOME EDGES OR PANELS AND FLASHING ARE RAZOR SHARP AND CAN CAUSE SEVERE CUTS IF PROPER PROTECTIVE
HAND GEAR IS NOT WORN. BE CAREFUL NOT TO INJURE OTHERS WHILE MOVING PANELS AND FLASHING.
COORDINATION WITH OTHER TRADES
SUPPORTS FOR THE ROOF SYSTEM SHALL BE PROVIDED AND ARE REQUIRED AS SHOWN IN THE SECTIONS AND AS
NOTED IN THESE SPECIFICATIONS. ALL NECESSARY CLEARANCE DIMENSIONS FOR PROPER ELEVATIONS RELATIVE TO
THE ROOF PANELS HAVE BEEN SHOWN. THE ERECTOR SHALL BE RESPONSIBLE FOR COORDINATING THESE
DIMENSIONAL REQUIREMENTS WITH OTHER TRADES ASSOCIATED WITH THE BUILDING ROOF SYSTEM.
ERECTION CARE
THE ERECTOR MUST BE SKILLED IN THE ERECTION OF METAL BUILDING SYSTEMS AND IS RESPONSIBLE FOR
COMPLYING WITH ALL APPLICABLE LOCAL, FEDERAL AND STATE CONSTRUCTION AND SAFETY REGULATIONS
INCLUDING OSHA REGULATIONS AS WELL AS ANY APPLICABLE REQUIREMENTS OF LOCAL, NATIONAL OR
INTERNATIONAL UNION RULES OR PRACTICES. THE ERECTOR REMAINS SOLELY RESPONSIBLE FOR THE SAFETY AND
APPROPRIATENESS OF ALL TECHNIQUES AND METHODS UTILIZED BY ITS CREWS IN THE ERECTION OF THE METAL
BUILDING SYSTEM AND/OR THE ROOF SYSTEM. THE ERECTOR IS ALSO RESPONSIBLE FOR SUPPLYING ANY SAFETY
DEVICES SUCH AS SCAFFOLDS, RUNWAYS, NETS, ETC. WHICH MAY BE REQUIRED TO SAFELY ERECT THE METAL
BUILDING SYSTEM AND/OR ROOF SYSTEM.
THE ERECTOR OF THE ROOF SYSTEM SHALL EXERCISE GREAT CARE AND ATTENTION TO THE DETAILS AS SHOWN ON
THESE DRAWINGS TO INSURE A SECURE AND PROPER FIT OF ALL COMPONENTS. MBS SHALL NOT BE RESPONSIBLE
FOR SUPERVISING AND/OR COORDINATING THE ERECTION OF THE ROOF SYSTEM WITH OTHER TRADES.
DUE CONSIDERATION MUST BE GIVEN BY THE ERECTOR TO THE EFFECTS OF THERMAL EXPANSION AND
CONTRACTION WHEN ERECTING A ROOF TIE-IN TO AN EXISTING STRUCTURE TO INSURE A SAFE, SECURE, WEATHERTIGHT CONDITION. FLASHING FOR TIE-INS TO EXISTING BUILDINGS IS TYPICALLY NOT INCLUDED AS PART OF
THE MATERIAL PROVIDED BY MBS. REFER TO THE SECTIONS/DETAILS FOR SPECIFIC MATERIALS PROVIDED BY MBS.
ERECTORS RESPONSIBILITY
R-PANEL ROOF GENERAL NOTES
BUILDING & PANEL PREPARATION
STEP 1: PLUMB AND SQUARE
THE FIRST STEP IN THE SUCCESSFUL INSTALLATION OF
ROOF PANELS IS TO HAVE THE PRIMARY FRAMING
PLUMB AND SQUARE. FOR BEST RESULTS, IT IS
RECOMMENDED THAT A TRANSIT BE USED WHEN
ERECTING THE STRUCTURAL STEEL. MAKE SURE THAT
THE FOUNDATION AND BUILDING STRUCTURE IS
SQUARE, LEVEL, AND CORRECT TO THE OUT-TO-OUT
STEEL LINE DIMENSIONS.
SEE FIGURE "A"
STEP 2: PRE-DRILL PANEL LAP
STACK PANELS WITH ENDS FLUSH ON A LEVEL PLACE
ON THE GROUND IN PILES NOT EXCEEDING 10 PANELS.
THEN PLACE SMALL WOODEN BLOCKS UNDER
SIDE-LAPPING EDGE OF STACK OF PANELS TO HOLD
THEM AT CORRECT HEIGHT AND POSITION WHILE
DRILLING FASTENER HOLES. HOLD PANELS TIGHTLY
TOGETHER AT EACH END WITH CLAMPING PLIERS.
CAREFULLY MARK POSITIONS FOR SIDE-LAP FASTENERS
ON TOP OF HIGH RIB. FASTENERS SHOULD BE LOCATED
“ON CENTER” OF HIGH RIB. DRILL HOLES FOR “STITCH”
FASTENER (USE #1,-7/32” - 15/64” DRILL-BIT) ON TOP
SHEET OF SIDE-LAP. BE SURE PANELS ARE WELL
NESTED BEFORE DRILLING.
SEE FIGURE "B"
FIELD CUTTING PANELS
WHEN FIELD CUTTING OR MITERING ROOF PANELS, NON-ABRASIVE CUTTING TOOLS SUCH AS NIBBLERS OR TIN-SNIPS
SHALL BE USED. ABRASIVE CUTTING TOOLS SUCH AS MECHANICAL GRINDERS OR POWER SAWS CAN DAMAGE THE
MATERIAL FINISH AND CREATE EXCESS METAL SHAVINGS THAT CAN CORRODE THE PANELS. THE USE OF
NON-APPROVED CUTTING DEVICES MAY VOID THE FACTORY WARRANTY.
ANY METAL SHAVINGS THAT ARE CREATED NEED TO BE CLEANED FROM THE PANEL TO PREVENT SCRATCHING
AND/OR CORROSION. THE MANUFACTURER WILL NOT ACCEPT CLAIMS FOR DAMAGE/DETERIORATION DUE TO USE OF
UNAPPROVED TOOLS.
SQUARE
SQUARE
FIGURE "A"
EAVE BEAM AT HIGH EAVEEAVE BEAM AT LOW EAVE
SECOND PURLIN SECOND PURLIN
FASTENER
IF THIS PROJECT HAS AN EAVE BEAM WITH (2) PURLINS, AS SHOWN, DO NOT ATTACH ROOF PANEL TO THE "SECOND"
PURLIN.
SPECIAL CONDITION AT A STRONG-BACK EAVE BEAM
DEFINITION
COMPONENTS WITH DETAILING DEFINITION IS A CASE WHERE MBS IS PROVIDING THE ROOF SYSTEM TO BE USED IN
CONJUNCTION WITH ANOTHER STRUCTURE. MBS REFERS TO THAT AS A "COMPONENTS WITH DETAILING." THIS SIMPLY
MEANS THAT MBS SHALL CALCULATE THE QUANTITIES AND LENGTHS FOR THE MATERIAL REQUIRED. MBS IS
PERFORMING NO ENGINEERING STUDY OF THE EXISTING STRUCTURE. THE ENGINEER OF RECORD ON THE PROJECT
SHALL BE RESPONSIBLE FOR COORDINATING THE ROOF SYSTEM WITH THE OTHER TRADES OF THE PROJECT TO
INSURE A SAFE, QUALITY AND PROPER APPLICATION OF THE ROOF SYSTEM.
DIAPHRAGM
THE ROOF IS DESIGNED TO ACT AS A DIAPHRAGM FOR RESISTING LATERAL LOAD FORCES OR PROVIDING LATERAL
STABILITY TO THE ROOF STRUCTURAL MEMBERS. DUE CONSIDERATION FOR THIS MUST BE ADDRESSED BY THE
PROJECT ENGINEER OF RECORD BASED ON PANEL CAPACITY INFORMATION AND FASTENING PATTERN. WHEN
REPLACING AN EXISTING SCREWDOWN ROOF, ADDITIONAL BRACING MAY BE REQUIRED TO LATERALLY SUPPORT THE
MEMBERS. ENGINEERING AND MATERIAL FOR THESE USES SHALL NOT BE PROVIDED BY MBS.
ROOF SYSTEM COMPONENT WITH DETAILING
STRIP A FASTENER?
IF YOU STRIP H1030 OR H1050
REPLACE IT WITH H1000
IF YOU STRIP H1000 IN ENDLAP YOU MUST
REBUILD THE ENDLAP
H1030 / H1050 H1000
PANEL ORIENTATION AND ALIGNMENT
NOTE THE ORIENTATION OF THE PROFILE AND BEARING LEG FOR THE LEADING EDGE OF THE PANEL. PANELS
SHOULD BE INSTALLED AS SHOWN BELOW TO HELP MAINTAIN PANEL MODULARITY / COVERAGE FOR THE LENGTH OF
THE ROOF.
PANEL ERECTION
STEEL LINE
LAP LEG
BEARING LEG
FIGURE "B"
3'-0" (PANEL COVERAGE
DRILL BIT
TOP LAP
PRE-DRILLED
TOP PANEL
WOOD BLOCK
CAUTION:
DO NOT ALLOW THE
MASTIC TO BRIDGE
ACROSS INSIDE RADII
CREATING VOIDS
MASTIC
VOID
VOID
ROOF
PANEL
FOLD MASTIC AND PUSH
FOLD INTO THE RADIUS
NO VOID
ROOF
PANEL
D A
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
TRIM_398
R-Panel ROOF w/ SCULPTURED RAKE DETAIL w/ WALL PANELS
SEE WALL SHEETING ERECTION NOTES FOR WALL PANEL FASTENER LOCATIONS
RAKE SCULPTURED
H1050 (4" O.C. BETWEEN SUPPORTS)
ROOF PANEL
ROOF INSULATIONV
A
R
IE
S
ROOF SECONDARY
H10 FASTENERS
SL
2 1/4" TAPE MASTIC MK. H3020
FILL CAVITY WITH
SLIDE FIELD CUT SECTION OF FLASHING ENDLAP BACKER ONTO THE LOWER TRIM PIECE AS SHOWN BELOW.
2"UPPER TRIM LOWER
FEB120
3/4" TAPE
5 1/4"
2 5/8" 2 5/8"
NOTCH HEM AND
FIELD CUT FROM STANDARD FEB120
FEB120
3/4" TAPE
H3152
2 1/4" TAPE
H1100 POP RIVETS
3/4" MASTIC
H1050 STITCH
H1030 STRUCTURAL H1050 STITCH
R-PANEL COR__
A-PANEL
REV. R-PANEL
COA__
COV__
WALL PANEL CLOSURE WALL INSULATION
WALL PANEL
START DIMENSION
FIELD CUT AS REQ'D
RAKE SCULPTURED DETAIL
MK. RS_ _ _ _
H1030/H1035 (AT SUPPORTS)
(NOT BY MBS)
T O
P O
F P
A N
E L
T O
E A
V E
MEMBER
@ 1'-0" O.C.
BETWEEN TRIM & ROOF PANEL
(APPLY MASTIC TO TRIM PRIOR
TO INSTALLING TRIM)
INSULATION
RAKE LAP & FLASHING BACKER
PLACE TAPE MASTIC NEXT TO HEM OF THE BACKER (NOT ON TOP OF HEM). APPLY CONTINUOUS BEAD OF
CAULK 1" FROM END OF TRIM DOWN PROFILE OF TRIM. FASTEN LAP WITH STITCH FASTENERS AND POP
RIVETS AS SHOWN. ROOF STRUCTURAL FASTENERS SHOULD BE USED TO FASTEN THROUGH PANEL FLAT
INTO RAKE ANGLE.
TRIM
MASTIC
BEND DOWN 90°
FLASHING ENDLAP BACKER
MASTIC
POLYURETHANE
CAULK
MASTIC
MARRY TO
MASTIC BELOW
FASTENERS
FASTENERS FASTENERS
(NOT BY MBS)
H1020 AT EACH SUPPORT
CL RIB
(SEE ROOF PLAN)
DE0010
TRIM_350
STANDARD CORRUGATED DOWNSPOUT DETAIL
MK. DSCS___
DOWNSPOUT "S"
REFERENCE GUTTER AND DOWNSPOUT SCHEDULE FOR
ERECTOR NOTES:
1. MITERING OF THE "S" WILL
BE REQUIRED AT SLOPES
OVER 4:12 FOR PROPER
LINE UP WITH THE
DOWNSPOUT.
2. IF PROJECT CONTRACT
SPECIFIES "S" SHAPES AT
THE BOTTOM OF THE
DOWNSPOUT IN LIEU OF
ELBOWS, SEE DETAIL
GA0105.
3. LOCATE ONE
DOWNSPOUT STRAP AT
EVERY "S", ELBOW AND
DOWNSPOUT SPLICE.
GUTTER
5"4"
USE (4) POP RIVETS MK.
H1100 AT ALL ELBOW, "S",
AND DOWNSPOUT
CONNECTIONS U.N.O.
DOWNSPOUT MARK NUMBERS
MK. DSCE___
REQUIRED
FEMALE END
MALE END
TYPICAL AT
ALL SPLICES
DSC120
DOWNSPOUT
ELBOW IF
FULL OR PARTIAL
SECTION AS
REQUIRED
DOWNSPOUT STRAP
MK. DSSTRAP (SCREW STRAP TO
WALL USING (1) H10 FASTENER
BEFORE INSERTING DOWNSPOUT)
FIELD BEND STRAP AND FASTEN TO
DOWNSPOUT WITH (2) H10
FASTENERS
DOWNSPOUT STRAP BRACKET MK.
DSSTBRK FOR USE WITH A-PANEL OR
REVERSE R-PANEL. ATTACH AT
PANEL RIB ONLY. USE (2) H10
FASTENERS
DOWNSPOUT STRAP (MK. DSSTRAP) AND STRAP BRACKETS (MK. DSSTBRK) ARE ALSO PROVIDED FOR MASONRY
WALL APPLICATIONS AS WELL AS FOR ATTACHMENT TO COLUMNS. FASTENERS TO MASONRY ARE NOT PROVIDED.
H10 FASTENERS ARE PROVIDED FOR COLUMN ATTACHMENT APPLICATIONS, PRE-DRILLING WILL BE REQUIRED.
MARK OPENING LOCATION
USING A DOWNSPOUT TO
SIZE OVAL AREA. NEXT, CUT
ALONG THE DASHED LINES.
BEND TABS DOWN ALONG
THE SOLID LINES AND
ATTACH DOWNSPOUT "S" TO
GUTTER TABS WITH (4) H10
FASTENERS
NOTE: GUTTER PROFILE MAY VARY.
SEE LOW EAVE GUTTER DETAIL.
G A
SEE WALL SHEETING ERECTION DETAIL FOR
MK. H4200 MK. H4210
UNTIL WALL PANELS ARE INSTALLED, (3) H10 SCREWS ARE TO BE USED
ERECTOR NOTE:
WALL PANEL
BASE TRIM MK. BSB121
BASE MEMBER
FASTEN AT 3'-0" O.C.
SEALANT (NOT BY
**-1/8" GAP RECOMMENDED
STEEL LINE
1/
8"
BASE TRIM DETAIL
END CLOSURE DETAIL OUTSIDE CORNER TRIM INSIDE CORNER TRIM
H10 FASTENERS
1" B
O T
T O
M O
F W
A
LL
T O
P O
F S
LA
B
O R
TRIM_365WALL PANEL FASTENER LOCATIONS
FOR TEMPORARY INSTALLATION OF THE BASE TRIM.
(ANGLE, CHANNEL
OR HOT ROLL
CHANNEL)
MAX (FASTENERS NOT
BY NBG)
NBG)
FOR WATER DRAINAGE
AT O.C.
P A
N E
L M
A S
O N
R Y
MK. @ R-PANEL
MK. @ A-PANEL
MK. @ REVERSE R-PANEL
GB0020
FIELD TAB AND BEND TO CLOSE
6"
H10 AT EACH SUPORT
H10 12" O.C. BETWEEN SUPPORTS
OUTSIDE CORNER
MK COB___
GIRTS
START / FINISH DIM
SEE ELEVATION
S T
A R
T
F
IN
IS
H
D
IM
S E
E E
LE
V
A T
IO
N
C L
SL CL
S L
H10 12" O.C.
NOTE 1
OUTSIDE CORNER DETAIL
NOTE 1
TYPICALLY FILLER TRIM MK. MFR121
(SHOWN) IS NOT REQUIRED WHERE
START/FINISH DIMENSION IS LESS THAN OR
EQUAL TO 3 1/2". HOWEVER AT LEAST (1)
RUN OF FILLER TRIM MAY BE PROVIDED
FOR WALL PANEL MODULARITY. SEE
ELEVATIONS
WALL PANEL
WALL PANEL
G C
TRIM_353
TRIM_362
H10
AT EACH SUPORT
WALL PANEL
PANEL TERMINATION
JAMB TRIM
MK JTA_
GIRT
FIELD CUT PANELS AS REQUIRED
G C
TRIM_351
CORRUGATED DOWNSPOUT DETAIL AT OVERHANG
REFERENCE GUTTER AND DOWNSPOUT SCHEDULE FOR
DOWNSPOUT MARK NUMBERS
ELBOW MK. DSCEAB
FULL OR PARTIAL
SECTION AS REQUIREDELBOW
MK. DSCEAA
ERECTOR NOTES:
1. IF PROJECT CONTRACT
SPECIFIES "S" SHAPES AT
THE BOTTOM OF THE
DOWNSPOUT IN LIEU OF
ELBOWS, SEE DETAIL
GA0105.
2. LOCATE ONE
DOWNSPOUT STRAP AT
EVERY ELBOW AND
DOWNSPOUT SPLICE.
USE (4) POP RIVETS MK.
H1100 AT ALL ELBOW AND
DOWNSPOUT CONNECTIONS
U.N.O.
GUTTER
NOTE: THIS TO BE SEAM
SIDE ON ELBOWS
DOWNSPOUT STRAP (MK. DSSTRAP) AND STRAP BRACKETS (MK. DSSTBRK) ARE ALSO PROVIDED FOR MASONRY
WALL APPLICATIONS AS WELL AS FOR ATTACHMENT TO COLUMNS. FASTENERS TO MASONRY ARE NOT PROVIDED.
H10 FASTENERS ARE PROVIDED FOR COLUMN ATTACHMENT APPLICATIONS, PRE-DRILLING WILL BE REQUIRED.
REQUIRED
FEMALE END
MALE END
TYPICAL AT
ALL SPLICES
ELBOW IF
FULL OR PARTIAL
SECTION AS
REQUIRED
MARK OPENING LOCATION USING A
DOWNSPOUT TO SIZE OVAL AREA.
NEXT, CUT ALONG THE DASHED
LINES. BEND TABS DOWN ALONG
THE SOLID LINES AND ATTACH
DOWNSPOUT ELBOW TO GUTTER
TABS WITH (4) H10 FASTENERS
MK. DSCE__
DOWNSPOUT STRAP
MK. DSSTRAP (SCREW STRAP TO
WALL USING (1) H10 FASTENER
BEFORE INSERTING DOWNSPOUT)
FIELD BEND STRAP AND FASTEN TO
DOWNSPOUT WITH (2) H10
FASTENERS
NOTE: GUTTER PROFILE MAY VARY.
SEE LOW EAVE GUTTER DETAIL.
DOWNSPOUT STRAP BRACKET MK.
DSSTBRK FOR USE WITH A-PANEL OR
REVERSE R-PANEL. ATTACH AT
PANEL RIB ONLY. USE (2) H10
FASTENERS
G A
DSC120
DOWNSPOUT
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
TRIM_451
EAVE GUTTER DETAIL w/ WALL PANELS
EAVE GUTTER DETAIL
5 1/4"
GUTTER HANGER
H2190 @ 2'-0" O.C. w/ (3)
H1050 FASTENERS
GUTTER
MK. GS_ _ _ _
H1050 FASTENERS
@ 12" O.C.
ROOF INSULATION
(NOT BY MBS)
T O
P O
F P
A N
E L T
O E
A V
E
LOW EAVE FLASH MK. LBU121
w/ H10 FASTENERS @ 1'-0" O.C.
(2" LAP WITH H3152
POLYURETHANE CAULK)
1/2" TAPE MASTIC
H3010
SEE WALL SHEETING ERECTION NOTES FOR WALL PANEL FASTENER LOCATIONS
GUTTER LAP & END CAP
APPLY BEAD OF POLYURETHANE CAULK 1" FROM END OF TRIM AND LAP SECTIONS 2" AND FASTEN AS
SHOWN. TO TERMINATE THE GUTTER APPLY POLYURETHANE CAULK TO THREE SIDES OF END CAP AND TOP
RETURN AREA AS SHOWN AND INSERT INTO THE GUTTER LEAVING 1/2" EXPOSED. ATTACH WITH RIVETS
SAME AS END LAP.
SL
2" LAP LINE
H3152
POLYURETHANE
CAULK
H1100
POP RIVETS
H3152
POLYURETHANE
CAULK
H4000_ GUTTER
END CAP
R-PANEL COR__
A-PANEL
REV. R-PANEL
COA__
COV__
WALL PANEL CLOSURE
EAVE MEMBER
WALL INSULATION
(NOT BY MBS)
WALL PANEL
INSIDE PANEL CLOSURE
MK. CIRS0 WITH 3/4" TAPE
MASTIC (MK. H3000) TOP
AND BOTTOM
R-PANEL ROOF
3/4" TAPE MASTIC
MK. H3000, CONTINUOUS
H10 FASTENER (SEE
THE ROOF STRUCTURAL
FASTENER SPACING
DETAIL)
3/4" TAPE MASTIC MK. H3000
(6" PIECE) DIRECTLY BELOW
FASTENERS
PLACE
GUTTER BRACKET
UNDER THE LIP OF
THE GUTTER
D D
TRIM_408
R-Panel ROOF
RIDGE CAP
AT EACH RIDGE CAP
ROOF INSULATION
CL
5 1/4" 5 1/4"
1'-4"
>1:12 & ≤ 2:12
H10 FASTENER (SEE
3"
≤ 1:12
>2:12 & ≤ 3:12
>3:12 & ≤ 4:12
RRD2
RRD1
RRD3
RRD4
3/4" TAPE MASTIC
WITH 60'-0" PANEL RUN AND 4:12 ROOF SLOPE
DIE-FORMED RIDGE CAP
MK. RRD_
SIDELAP INSTALL 1/2"
TAPE MASTIC MK. H3010
WITH (6) H1050
FASTENERS
EQUALLY SPACED
(NOT BY MBS)
RIDGE CAP OPTIONS
ROOF SLOPE MARK NUMBER
THE ROOF STRUCTURAL
FASTENER SPACING
DETAIL FOR SPACING)
H1020 FASTENERS WITH H2200 INSULATION WASHERS HAVE BEEN
SUPPLIED 12" O.C. FOR INSULATION ATTACHMENT AT RIDGE.
MK. H3000
DG0011
TRIM_472
EAVE WITH OR WITHOUT GUTTER CONTINUATION AT PARTIAL WALL
LOW EAVE PARTIAL WALL
3/4" TAPE MASTIC H3000
GUTTER LAP & END CAP
APPLY BEAD OF POLYURETHANE CAULK 1" FROM END OF TRIM AND LAP SECTIONS 2" AND FASTEN AS
SHOWN. TO TERMINATE THE GUTTER APPLY POLYURETHANE CAULK TO THREE SIDES OF END CAP AND TOP
RETURN AREA AS SHOWN AND INSERT 1/2" INTO END OF GUTTER. ATTACH WITH RIVETS SAME AS END LAP.
2" LAP LINE
H3152
POLYURETHANE
CAULK
H1100
POP RIVETS
H3152
POLYURETHANE
CAULK
H4000_ GUTTER
END CAP
EXTENSION TRIM LOW EAVE
ETL1121 @ 8", 9 1/2" & 10"
PURLINS
ETL2121 @ 12" PURLINS
60H10 FASTENERS
@ 1'-0" O.C.
5 1/4"
GUTTER HANGER
H2190 @ 2'-0" O.C.
w/ (3) H1050 FASTENERS
GUTTER
MK. GS_ _ _ _
H1050 FASTENERS
@ 1'-0" O.C. ROOF PANEL
LOW EAVE FLASH MK. LBU121
1/2" TAPE MASTIC
H3010
SL
H10 FASTENERS @ 1'-0" O.C.
H10 FASTENERS @ 1'-0" O.C.
H10 FASTENERS @ 1'-0" O.C.40
GUTTER SHOWN IF REQ'D
G
REQ'D ONLY
FOR GUTTER
G
G
G
G
G
H10 FASTENER (SEE
THE ROOF STRUCTURAL
FASTENER SPACING
DETAIL)
INSIDE PANEL CLOSURE
MK. CIRS0 WITH 3/4" TAPE
MASTIC (MK. H3000) TOP
AND BOTTOM
3/4" TAPE MASTIC MK. H3000
(6" PIECE), BETWEEN PANEL
AND HANGER @ FASTENERS
HTD121
D O
X
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
1/
2"
1/
2"
7"
12"
1/
2"
1/
2"
7"
12"
1/
2"
1/
2"
7"
12"
1/
2"
12"
1/
2"
12"
1/
2"
12"
9 1/2" 9 1/2"9 1/2"
1/
2"
1/
2" 12"
1/
2"
1/
2"
12"
1/
2"
1/
2"
12"
1/
2"
1/
2"
1/
2"
1/
2"
1/
2"
1/
2"
R-Panel ROOF STRUCTURAL FASTENER SPACING (STANDARD)
12"
12"
12"
36"
END LAP, IF REQUIRED
NOTE:
FIELD DRILLING AT LAPPED OR
NESTED PURLIN CONDITIONS
MAY BE REQUIRED FOR
STRUCTURAL FASTENERS
STRUCTURAL FASTENER
MK. H10
SEE THE R-Panel ROOF SIDE LAP
FASTENER SPACING DETAIL FOR
SIDE LAP FASTENER SPACING
LOW EAVE
END OF PANEL
EAVE MEMBER (VARIES), EAVE
STRUT SHOWN FOR REFERENCE
INTERMEDIATE
PURLIN
END LAP PURLIN
(IF END LAP IS REQUIRED)
INTERMEDIATE
PURLIN
RIDGE OR
HIGH EAVE
PURLIN
FASTEN INSULATION WITH H1020 FASTENER & H2200 INSULATION WASHER 12"
O.C. AT LOW SIDE AND HIGH SIDE MEMBERS. FASTEN AT AT HIGH RIB LOCATIONS.
D A
TRIM_496
1/2" TAPE MASTIC
MK. H3010
SIDE LAP MASTIC DETAIL
(AT FULL LENGTH OF ALL SIDE LAPS)
R-Panel ROOF SIDE LAP FASTENER SPACING (STANDARD)
6" O.C. 6" 6" 6" O.C. 6"
6" MAX
PURLIN
ROOF PANEL
PURLIN
ROOF PANEL
FIRST TWO LOW EAVE SPANS
SPANS GREATER THAN 5'-0"
PURLIN
ROOF PANEL
SPANS LESS THAN OR EQUAL TO 5'-0"
(EACH SUPPORT AND 1/3 POINTS BETWEEN SUPPORTS)
(EACH SUPPORT AND 6" ON CENTER BETWEEN SUPPORTS)
EAVE MEMBER
VARIES, EAVE
STRUT SHOWN
FIRST PURLIN
UPSLOPE FROM EAVE
EAVE MEMBER (VARIES), EAVE
STRUT SHOWN FOR REFERENCE
SIDE LAP FASTENERS (MK. H1050) AT EACH SUPPORT
AND 6" ON CENTER BETWEEN SUPPORTS
AT THE FIRST TWO LOW EAVE PURLIN SPANS
SECOND PURLIN
UPSLOPE FROM EAVE
BELOW LEFT FOR SIDE LAP FASTENER SPACING
AT THE REMAINDER OF THE PANEL RUN6"
TYPICAL SIDE LAP
SEE THE R-Panel ROOF STRUCTURAL
FASTENER SPACING DETAIL FOR
STRUCTURAL FASTENER SPACING
EQUAL EQUAL EQUAL
EQUAL* EQUAL*
NON-UL 90
EACH SUPPORT AND SPACED EQUALLY BETWEEN
SUPPORTS. NOT TO EXCEED 18" (1'-6").
UL 90
EACH SUPPORT AND MIDPOINT BETWEEN SUPPORTS.
SIDE LAP FASTENERS (MK. H1050) SEE DETAILS
D A
TRIM_497
DETAIL SHOWN WITH WALL PANEL AND CORNER TRIM. MASONRY AND
LOW EAVE
H1100 POP
FASTENERS (4" O.C.)
1 1/2"
H4000_GUTTER
RSCE RAKE
RSCE RAKE
H4000_GUTTER
RSCL/RSCR
RAKE TRIM
RSCL/RSCR
(6) H1100 POP
RSCE RAKE
H4000_GUTTER
WALL CORNER
COPE FLUSH
TRIM_501
APPLY POLYURETHANE TUBE CAULK (H3152) TO THE
OUTSIDE PERIMETER OF THE END CAP ASSEMBLY RSCE &
H4000_ AND PLACE IT INSIDE THE RAKE TRIM WITH THE
FLAT EDGE OF THE GUTTER END CAP FLUSH WITH THE
END OF THE RAKE TRIM. FASTEN WITH POP RIVETS
(H1100).
• RS_121 X 10’-1” • RS_242 X 20’-2”
EXTEND THE LOW EAVE END OF THE RAKE TRIM FLUSH
WITH THE LOW EAVE END OF THE ROOF PANEL. FASTEN
THE RAKE TRIM TO THE ROOF PANEL AS INDICATED IN
THE RAKE TRIM DETAIL.
COPE THE BOTTOM VERTICAL LEG OF THE RAKE TRIM
FLUSH WITH THE OUTSIDE EDGE OF THE WALL CORNER
TRIM.
ALWAYS START THE RAKE TRIM INSTALLATION AT THE
LOW EAVE WORKING TOWARD THE HIGH EAVE OR RIDGE.
INSULATED WALL PANEL CONDITIONS SIMILAR.
SCULPTURED RAKE TO BASIC LOW EAVE
BASIC TRIM
RIVETS
OPPOSITE VIEW
(FOR CLARITY)
END CAP
CAP END
CAP END
END CAP
RAKE CAP
RAKE CAP WITH
TUBE CAULK
RIVETS
CAP END
END CAP
TRIM
WITH WALL
CORNER TRIM
ASSEMBLE THE RAKE CAP END (RSCE) TO THE
GUTTER END CAP (H4000_) WITH (6) POP RIVETS
(H1100) AS SHOWN.
• RSCL (LEFT) • RSCR (RIGHT)
APPLY POLYURETHANE TUBE CAULK (H3152) TO (3)
SIDES OF THE RSCR/L AND PLACE IT ON THE END
OF THE PANEL. HOLD THE END CAP ASSEMBLY
AGAINST THE CORNER TRIM TO ALIGN THE RAKE
CAP TO THE BACK OF THIS ASSEMBLY. USE (1)
H1030 FASTENER FOR THE RAKE CAP TO EAVE.
DB7020
GUTTER END CAPS
APPLY A CONTINUOUS BEAD OF
POLYURETHANE TUBE CAULK (H3152) AROUND
THREE SIDES OF THE GUTTER END CAP
(H4000_).
INSERT THE GUTTER CAP 1/2" (H4000_) INTO
THE END OF THE GUTTER.
FASTEN WITH POP RIVETS (H1100) AS SHOWN
IN GUTTER DETAIL. APPLY POLYURETHANE
TUBE CAULK (H3152) AROUND PERIMETER
INSIDE GUTER TO SEAL CAP.
EXTEND GUTTER BEYOND FACE OF WALL
CORNER TRIM AS SHOWN.
RAKE CAP END INSTALLATION
HOLD THE RAKE CAP END (RSCE) TIGHT TO
THE BACK OF AND FLUSH WITH THE BOTTOM
OF THE GUTTER. FASTEN TO THE WALL
CORNER TRIM WITH (2) TRIM-COLORED
SELF-DRILLING SCREWS (H1050).
RAKE CAP INSTALLATION
BEFORE INSTALLING THE RAKE TRIM, THE
RAKE CAP MUST BE INSTALLED.
APPLY POLYURETHANE TUBE CAULK (H3152)
TO (3) SIDES OF THE RAKE CAP AND PLACE IT
ON THE END OF THE PANEL 1½” FROM THE
EDGE OF THE GUTTER END CAP (FLUSH WITH
FACE OF CORNER TRIM.) NO FASTENERS ARE
REQUIRED FOR THE RAKE CAP. FIELD COPE
FLAT OF RAKE CAP AS REQUIRED.
RAKE CAP PART NUMBERS
• RSCL (LEFT)
• RSCR (RIGHT)
RAKE TRIM INSTALLATION AT BUILDING WITH GUTTER
RAKE TRIM PART NUMBERS
• RS_121 X 10’-1”
• RS_242 X 20’-2”
ALL PARTS MUST BE POSITIONED PROPERLY BEFORE
TOUCHING THE MASTIC TO THE ROOF PANEL. MASTIC
CANNOT BE REUSED.
ALIGN THE END OF THE RAKE TRIM WITH THE END OF THE
ROOF PANEL. THIS WILL LAP ONTO THE GUTTER END CAP.
ALWAYS START THE RAKE TRIM INSTALLATION AT THE LOW
EAVE WORKING TOWARD THE HIGH EAVE OR RIDGE. INSTALL
RAKE TRIM ACCORDING RAKE TRIM DETAIL
COPE THE BOTTOM VERTICAL LEG OF THE RAKE TRIM FLUSH
WITH THE OUTSIDE EDGE OF THE WALL CORNER TRIM.
FASTEN THE RAKE TRIM TO THE END CAPS USING POP
RIVETS (H1100)
STEP 1
DETAIL SHOWN WITH WALL PANEL AND CORNER TRIM. MASONRY AND
INSULATED WALL PANEL CONDITIONS SIMILAR.
SCULPTURED RAKE TO ON SLOPE GUTTER
STEP 2
RAKE TRIM. COPE AS
SHOWN. DO NOT
FASTEN THE RAKE
TRIM TO WALL PANEL.
APPLY TUBE CAULK TO 3
SIDES OF THE RAKE CAP
(NO FASTENERS REQ'D)
RAKE CAP,
GUTTER/RAKE
TRIM, AND GUTTER
END CAP MUST BE
INSTALLED BEFORE
THE RAKE TRIM.
1 1/2"
ROOF PANEL
FASTENER
RAKE ANGLE
FIELD CUT THE
BOTTOM OF THE
RAKE CAP RSC_
TO AVOID THE
RAKE ANGLE
WALL PANEL
GUTTER/RAKE
TRIM RSCE
CORNER TRIM
GUTTER END
CAP H4000_
CORNER
TRIM
END OF
GUTTER
D D
TRIM_504
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b e c o n st ru e d as s u ch
S H
E E
T
IS
S
U E
D W
N C
H K
E N
G P
E D
A T
E P
R O
JE
C
T N
A M
E
C U
S T
O M
E R
N A
M E
JO
B
N U
M B
E R
S H
E E
T T
IT
L
E
D O
F
B ig h o rn
S te e l B u ild in g s
D C o v e re d P a rk in g
R
U L
A
C o lo ra d o S p ri n g s, C
O
P u e b lo C
TRIM_508
APPLY A CONTINUOUS BEAD OF TUBE CAULK ON
THE UNDERSIDE OF THE PEAK BOX AT ALL AREAS
WHERE IT COMES IN CONTACT WITH THE RAKE
TRIM.
METAL PEAK BOX PREPERATION
PEAK BOX PREPARATION
STEP 1
ERECTOR NOTE:
THE FIRST OR LAST PIECE OF RIDGE CAP MUST BE INSTALLED PRIOR TO THE PEAK BOX.
PEAK BOX
NEXT APPLY A CONTINUOUS BEAD OF POLYURETHANE TUBE CAULK (H3152) ON THE UNDERSIDE OF THE PEAK BOX
WHERE IT COMES IN CONTACT WITH THE RAKE TRIMS. APPLY POLYURETHANE TUBE CAULK (H3152) TO ANY GAPS ON
THE UNDERSIDE OF THE PEAK BOX.
RIDGE CAP WITH METAL PEAK BOX INSTALLATION
DETAIL SHOWN WITH ROOF AND WALL PANEL.
PEAK BOX INSTALLATION
STEP 2
RAKE TRIM SHOULD BE RUN UP TO 5" FROM RIDGE LINE OVER THE RIDGE CAP. PLACE 2 1/4" TAPE MASTIC OVER RIDGE
CAP & RAKE TRIM TO SEAL BETWEEN RAKE TRIM AND PEAK BOX.
ROOF SLOPE PEAK BOX
0.5:12 MPA 50
1:12 MPA 01
2:12 MPA 02
3:12 MPA 03
4:12 MPA 04
5:12 MPA 05
6:12 MPA 06
N
N N N N N N N
RAKE TRIM
PEAK BOX
H1050 FASTENER
4" O.C. MAX
NOTE: FILL RIDGE CAP
VOID WITH INSULATION
ROOF PANEL
RAKE TRIM
( RS __ )
SELF-DRILLING
SCREWS
ALIGN THE END OF THE
RIDGE CAP AS SHOWN
PEAK BOX
RIDGE CAP
TUBE CAULK
2 1/4" TAPE
MASTIC (H3020)
UNDER PEAK
BOX
D
G
WALL PANEL ERECTION
1. BLOCK GIRTS TO "LEVEL" POSITION BEFORE
STARTING PANEL ERECTION. MAINTAIN WOOD
BLOCKING (NOT BY METAL BUILDING SUPPLIER) UNTIL
PANEL TO STRUCTURAL FASTENERS ARE INSTALLED.
2. ALIGN AND PLUMB FIRST WALL PANEL.
3. TO PREVENT "OIL-CANNING", ALL PANEL FASTENERS
SHOULD START FROM BASE MEMBER AND THEN BE
SECURED TO EACH STRUCTURAL GIRT TOWARD THE
EAVE.
4. FOUNDATION MUST BE SQUARE, LEVEL, AND
CORRECT TO THE OUT-TO-OUT STEEL LINE
DIMENSIONS.
5. ERECTION CREW IS TO CLEAN ALL WALL PANELS
BEFORE LEAVING JOB SITE.
6. ERECTOR IS TO ERECT PANELS SO THAT SIDELAPS
ARE AWAY FROM THE MAIN TRAFFIC AREA'S LINE OF
SIGHT.
7. STORE PANELS PROPERLY TO PREVENT MOISTURE.
SEE ERECTION MANUAL.
8. AT FLUSH GIRT CONDITIONS, PRE-DRILL COLUMNS
(& STUBS IF REQ'D) FOR EASE OF PANEL ATTACHMENT
AT THESE AREAS.
9. INSTALL BASE PANEL CLOSURES (IF JOB REQUIRES
THEM). SEE BASE TRIM DETAILS.
H10 STITCH FASTENER
H10 STRUCTURAL FASTENER
H10
12" O.C. AT
TRIM
CORNER
TRIM
EAVE
MEMBER
WALL PANEL
SIDE LAP
GIRTS
H10
AT 30" O.C.
MAXIMUM
(MAY OR MAY
NOT LINE UP
WITH
SUPPORTS)
36"
NET COVERAGE
BASE
MEMBER
ERECTOR NOTE: 1/2" SIDELAP MASTIC (H3010) IS
REQUIRED IN SNOWDRIFT CONDITIONS. REFER TO THE
ELEVATIONS FOR LOCATION REQUIREMENTS.G
A
TRIM_532
T hi s se al p er ta in s o n ly to th e m a te ri a ls de si gn ed a nd s u p p lie d b y
N u co r
B ui ld in g S ys te m s, a d iv is io n o f N u co r C or po ra tio n.
T h e d ra w in g s a n d th e m et al b ui ld in g s w h ic h th e y re p re se n t ar e th e pr od u ct o f N u co r
B u ild in g S ys te m s.
T h e r e g is te r p ro fe ss io n a l en gi ne er w ho se s e a l a p p e a rs o n th e se dr aw in gs is e m p lo ye d b y N u co r B ui ld in gs
S ys te m s a n d d o e s n o t s e rv e as o r r ep re se n t t h e p ro je ct e n g in e e r o f re co rd a nd s h a ll n o t b…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .