D49_Barn_Bid-Drawings_250711.pdf
PDF 9 MB Posted
- Attached to
- Central Office Additions State and local contract opportunity
- Solicitation number
- RFP # 2025-CO-0717
- Issued by
- El Paso County, Colorado
About this file
The document is a comprehensive set of bid drawings for the School District 49 Grounds Expansion Barn project, located at 10850 E Woodmen Road in Peyton, Colorado, dated July 11, 2025. The project involves constructing a new 9,668 square foot pre-engineered metal barn building for storage purposes, with associated site improvements. The drawings include architectural, civil, structural, mechanical, electrical, and communications plans, covering everything from building layout and structural details to electrical systems, communications infrastructure, and site logistics. The drawings specify a Type II-B non-sprinklered storage occupancy with a single-story design featuring an 18-foot eave height.
The project documents indicate the barn will be constructed on an existing school district complex, with careful consideration for integration with existing buildings and infrastructure. The design includes provisions for electrical systems, communications networks, security systems, and specific equipment storage requirements. The total project budget and specific funding sources are not explicitly detailed in the drawings, but the comprehensive nature of the documentation suggests a well-planned municipal infrastructure expansion. The drawings also demonstrate compliance with 2021 International Building Code standards, including specific requirements for fire resistance, electrical systems, and structural design, with detailed specifications for materials, mounting heights, and technical infrastructure.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix C PEMB Covered Parking Quote.pdf | ||
| Barn Shop Drawings.pdf | ||
| D49_Site_Bid-Drawings_250711.pdf | ||
| Overhead Coiling Doors Specs.pdf | ||
| Sample Contract.pdf | ||
| D49_CoveredParking_Bid-Drawings_250711.pdf | ||
| Final Q_A from Previous IFB.pdf | ||
| Q_A From 2ndIFB.pdf | ||
| Seeding _ Mulching City of Colorado Springs.pdf | ||
| 2025 Contract Format NEW.pdf | ||
| Appendix C PEMB Barn Quote.pdf | ||
| Covered Parking Shop Drawings.pdf | ||
| Drainage Report.pdf | ||
| RFP_2025_CO_0717.pdf | ||
| Soils Report Kumar.pdf | ||
| D49 Bid Form 2025.docx | DOCX document | |
| GROUNDS EXPANSION BARN AND COVERED PARKING Project Manual-Bid Documents 20250711.pdf | ||
| RFP_Cover_Page _ Signature Sheet (2) (1).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHOOL DISTRICT 49
GROUNDS EXPANSION
BARN
10850 E WOODMEN RD,
PEYTON, CO 80831
BID DOCUMENTS
JULY 11, 2025
INDEX OF DRAWINGS PROJECT TEAMVICINITY MAP
PROJECT DATA
MECHANICAL / PLUMBING ENGINEER
M-E ENGINEERS, INC
1125 KELLY JOHNSON BLVD, SUITE 301
COLORADO SPRINGS, CO 80920
719.536.0036
CONTACT:
JEREMY O'BRIEN, PE, LEED AP
JEREMY.OBRIEN@ME-ENGINEERS.COM
ELECTRICAL ENGINEER
M-E ENGINEERS, INC
1125 KELLY JOHNSON BLVD, SUITE 301
COLORADO SPRINGS, CO 80920
719.536.0036
CONTACT:
JEREMY O'BRIEN, PE
JEREMY.OBRIEN@ME-ENGINEERS.COM
TECHNOLOGY DESIGN
BCER
10807 NEW ALLIGIANCE DR, SUITE 400
COLORADO SPRINGS, CO 80921
719.533.1112
CONTACT:
DAVID HOAG, PE
DAVID.HOAG@BCER.COM
GENERAL CONTRACTOR
COMPANY NAME
ADDRESS
PHONE #
CONTACT:
NAME
CLIENT
FALCON SCHOOL DISTRICT 49
10850 E WOODMEN RD,
PEYTON, CO 80831
CONTACT:
JIM ROHER, CONTRACTS AND
PROCUREMENT MANAGER
JAMES.ROHR@D49.ORG
ARCHITECT | INTERIOR DESIGN
DLR GROUP
523 S CASCADE, SUITE 100
COLORADO SPRINGS, CO 80903
719.634.0205
CONTACT:
JADEE HARSMA, AIA, LEED AP BD+C
JHARSMA@DLRGROUP.COM
DAVID RIGGS, AIA
DRIGGS@DLRGROUP.COM
STRUCTURAL ENGINEER
MGA STRUCTURAL ENGINEERS, INC.
115 S WEBER ST #101
719.635.4473
CONTACT:
KEVIN ROTH, P.E., PRESIDENT
KEVIN@MGASE.COM
CIVIL ENGINEER
KIOWA ENGINEERING
1604 S 21ST ST,
COLORADO SPRINGS, CO 80904
719.630.7342
CONTACT:
ANDY MCCORD
AMCCORD@KIOWAENGINEERING.COM
PROJECT ADDRESS: 10850 E WOODMEN RD.
PEYTON, CO 80831
GROSS BUILDING FOOTPRINT: TOTAL 10,063 SF
CONSTRUCTION
CLASSIFICATION: TYPE IIB
USE & OCCUPANCY: S-2 LOW-HAZARD STORAGE
REFER TO SHEET CP1.1 FOR COMPLETE CODE STUDY INCLUDING ALLOWABLE AREA,
EXITING, AND FIRE RATING REQUIREMENTS.
E Woodmen RdE Woodmen Rd E Woodmen Rd
Woodmen Frontage RdWoodmen Frontage Rd
B en t G ra ss M ea do w s
D r
Bent Grass Meadows Dr
PROJECT SITE
F al co n
M ea do w s B lv d
Accipiter Dr
Tamlin Rd
Ta m lin R d
Rolling Thunder Way
Rolling Thunder W ay
Eastonville Rd
M er id ia n R d
M eridian Rd
Highway 2
Highway 2
FALCON MKT PL
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:4
:3
A
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
COVER SHEET
G0.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
.ARCHITECTURAL.
AS1.1 ARCHITECTURAL SITE PLAN
A1.1 LEVEL 01 - FLOOR PLAN, EXTERIOR ELEVATIONS
A1.3 ROOF PLAN, SECTIONS, DOOR, FRAME TYPE, WALL TYPE, FINISH
SCHEDULES
A9.1 REFLECTED CEILING PLAN, DETAILS
.GENERAL.
G0.1 COVER SHEET
G1.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
.CIVIL.
C-1 CIVIL SITE PLAN
C-2 CIVIL DEMO PLAN
.STRUCTURAL.
S1.0 GENERAL NOTES
S1.1 FOUNDATION PLAN & DETAILS
.MECHANICAL.
M0.1 MECHANICAL LEGEND
M1.1 MECHANICAL FLOOR PLAN
.ELECTRICAL.
E0.1 ELECTRICAL LEGEND
E0.2 ELECTRICAL SPECIFICATIONS
E0.3 ELECTRICAL SPECIFICATIONS
ED1.1 ELECTRICAL DEMOLITION SITE PLAN
ES1.1 ELECTRICAL NEW WORK SITE PLAN
E1.1 ELECTRICAL PLAN & SCHEDULES
E1.2 LIGHTING PLAN & SCHEDULES
E2.1 ELECTRICAL DIAGRAMS
.CODE.
CP1.1 CODE PLAN
.SPECIAL SYSTEMS.
T0.1-B COMMUNICATIONS TITLE SHEET
T0.2-B COMMUNICATIONS PROJECT NOTES
T0.3-B COMMUNICATIONS SCHEDULES
T0.4-B COMMUNICATIONS SCHEDULES
T1.1-B COMMUNICATIONS SITE PLAN
T2.1-B LEVEL 1 BARN COMMUNICATION PLAN
T2.1-E LEVEL 1 EXISTING COMMUNICATIONS PLAN
T5.2-B ONE_LINE DIAGRAMS
T6.1-B COMMUNICATIONS DETAILS
T6.2-B COMMUNICATIONS DETAILS
T6.3-B COMMUNICATIONS DETAILS
PR-1
PR-1 03.17.2025
GENERAL NOTES
A. GENERAL NOTES APPLY TO ALL SHEETS.
B. DIMENSIONS ARE ACTUAL AND ARE TO FACE OF STUDS, FACE
OF CONCRETE WALLS, FACE OF CMU WALLS, FACE OF FRAMES,
OR CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE.
C. THE OWNER SHALL FURNISH AND INSTALL THE FOLLOWING
ITEMS: 1. PRE ENGINEERED METAL BUILDING 2. EQUIPMENT AS
INDICATED ON PLANS
D. INCLUDE ALL OWNER-FURNISHED AND INSTALLED ITEMS AND
OWNER-FURNISHED AND CONTRACTOR-INSTALLED ITEMS IN
THE CONSTRUCTION SCHEDULE, AND SHALL COORDINATE
WITH THE OWNER TO ACCOMMODATE THESE ITEMS.
E. COORDINATE ALL MECHANICAL CHASE SIZES WITH THE
MECHANICAL CONTRACTOR.
F. ARCHITECTURAL FINISH FLOOR ELEVATION 0'-0" EQUALS
ACTUAL SITE REFERENCE ELEVATION OF FINISH FLOOR 6917.00
FEET.
G. COORDINATE WITH MECHANICAL AND ELECTRICAL
CONTRACTORS THE SIZE AND LOCATION OF EQUIPMENT PADS
SHOWN ON PLANS.
H. CONSTRUCTION DOCUMENTS ARE COMPLEMENTARY. SEE
DRAWING FOR QUANTITIES AND LOCATION OF WORK. SEE
SPECIFICATIONS FOR QUALITIES AND CONDITIONS OF WORK.
I. WORK: ALL ASPECTS OF THE WORK AND ITEMS NOT
SPECIFICALLY MENTIONED, BUT NECESSARY TO MAKE A
COMPLETE WORKING INSTALLATION, SHALL BE INCLUDED AND
INDICATED IN THE CONTRACTOR'S BID.
J. GENERAL SHEET NOTES ONLY APPLY TO PARTICULAR
DRAWING OR SERIES OF DRAWINGS.
K. NO ASBESTOS OR PCB CONTAINING MATERIALS SHALL BE USED
ON THIS PROJECT.
L. DO NOT SCALE DRAWINGS. DIMENSIONS NOTED PREVAIL.
NOTIFY ARCHITECT IN CASE OF DISCREPANCY.
M. HORIZONTAL AND VERTICAL DIMENSIONS ARE MINIMUM
DIMENSIONS. CLEARANCES ARE GIVEN TO FINISH SURFACES.
GC TO VERIFY ALL CLEARANCES. NOTIFY ARCHITECT IN CASE
OF DISCREPANCY.
GENERAL SYMBOLS
SIM
ROOM NAME
XXX-XX
DETAIL NUMBER
SHEET NUMBER
CROSS REFERENCE
WALL SECTION
SIMILAR OR TYPICAL
REFERENCE
DETAIL REFERENCE
BUILDING SECTION
SHEET NOTE
COLUMN GRID LINE
ROOM NUMBER/NAME
REVISION NUMBER
EARTH
GRAVEL
SAND
CONCRETE
PRECAST CONCRETE
STEEL
STONE
CONCRETE MASONRY UNIT
BRICK VENEER
LEVEL XX
XXX'-XX"
LEVEL ELEVATION
GYM FLOOR
WOOD
(CONTINUOUS BLOCKING)
WOOD
(NON-CONTINUOUS BLOCKING)
WOOD (TRIM/FINISH)
GLASS
SHINGLES
PLYWOOD (LARGE SCALE)
GYPSUM WALL BOARD
BLANKET INSULATION
RIGID INSULATION
SPRAY FOAM INSULATION
MINERAL WOOL INSULATION
PROTECTION BOARD
CARPET (LARGE SCALE)
ACOUSTIC TILE (LARGE SCALE)
TILE (LARGE SCALE)
REFERENCE KEYNOTE
XX A4.XX BUILDING ELEVATION
A12.X
XX
XX XX
XX
INTERIOR ELEVATION
100'-0"
TYP FF EL=
100'-0"
FINISH FLOOR
ELEVATION
SPOT ELEVATION
X
PROPERTY LINE
LOT LINE
EASMENT LINE
BUILDING LINE, EXISTING
BUILDING LINE, NEW W/DOOR
OPENING AND STRUCTURAL STOOP
PRIMARY CONTOUR, EXISTING
PRIMARY CONTOUR, NEW
SECONDARY CONTOUR, EXISTING
SECONDARY CONTOUR, NEW
SLOPE, PAVEMENT
DRAINAGE DITCH OR SWALE
STREET CENTERLINE
CURB, THICKENED EDGE
CURB, EXISTING
CURB, NEW
PAVING CONTRACTION JOINT
PAVING KEYED CONSTRUCTION JOINT
PAVING TIED CONSTRUCTION JOINT
PAVING EXPANSION JOINT
FENCE, SECURITY
FENCE, BARBED WIRE
FENCE, CHAIN LINK
FENCE, WOOD
SEED LIMIT
SOD LIMIT
FOUNDATION DRAIN, NON-PERFORATED
FOUNDATION DRAIN, PERFORATED
SUBDRAIN, PERFORATED
SANITARY SEWER
FORCE MAIN
WATER
FIRE
GAS
HIGH PRESSURE STEAM
MEDIUM PRESSURE STEAM
LOW PRESSURE STEAM
UNDERGROUND ELEC/TELEPHONE
OVERHEAD POWER
LAWN SPRINKLER HOT LINE
LAWN SPRINKLER LATERAL
1% SLOPE
DOWN
KCJ
KCT
EJ
xx xx xx xx x x x x
FD
S
FM
W
F
G
HPS
MPS
LPS
UGE/UGT
OHP
HOT
LAT
AREA INLET
CURB INLET
MANHOLE
HEAD WALL
FLARED END
CLEAN OUT
CAP
THRUST BLOCK
VALVE
POST INDICATOR VALVE
REDUCER
FIRE HYDRANT
POWER POLE
LIGHT POLE
TELEPHONE MANHOLE
TELEPHONE BOX
SPRINKLER HEAD, 360°
SPRINKLER HEAD, 270°
SPRINKLER HEAD, 180°
SPRINKLER HEAD, 90°
QUICK COUPLING
TREE, EXISTING DECIDUOUS
TREE, EXISTING CONIFER
SHADE TREE
ORNAMENTAL TREE
DECIDUOUS TREE
SHRUB
CLIPPED SHRUB
X'
X"
QC
FH
PIV
CO
SITE SYMBOLS
FD
PSD
ARCHITECTURAL SYMBOLS
XX/ A11.X
XX. X. XX
CASEWORK ELEVATION
DOOR NUMBER
EXTERIOR WINDOW /
CURTAIN WALL NUMBER
WALL TYPE
A110
A124
XX/ A11.X XXXX
XX
XX
APC-1
9' - 0"
CEILING TYPE
CEILING HEIGHT
CEILING TYPE
INTERIOR WINDOW
NUMBER
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:2
:3
P
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
GENERAL NOTES,
SYMBOLS AND
ABBREVIATIONS
G1.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
GENERAL ABBREVIATIONS
# NUMBER
& AND
@ AT
ADA AMERICANS WITH DISABILITY ACT
ADDN ADDITION OR ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BLDG BUILDING
BSMT BASEMENT
CL CENTER LINE
CLG CEILING
CM CENTIMETER
CONC CONCRETE
CONN(S) CONNECTION(S)
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT(OR)
CTR CENTER
D DEPTH
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DIA DIAMETER
DIM DIMENSION
DIV SPECIFICATION DIVISION
DN DOWN
DTL DETAIL
DWG(S) DRAWING(S)
E EAST
EA EACH
EC ELECTRICAL CONTRACTOR
EL ELEVATION
ELEC ELECTRICAL
ENG ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EXST EXISTING
EXT EXTERIOR
FIN FINISHED
FL FLOOR
FT FEET
FUT FUTURE
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
H HEIGHT
HORIZ HORIZONTAL
HT HEIGHT
i.e. THAT IS
IBC INTERNATIONAL BUILDING CODE
IN INCH
INT INTERIOR
LB(S) POUND(S)
M METER
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OPP OPPOSITE
OVHD OVERHEAD
PAR PARALLEL
PENT PENTHOUSE
PLYWD PLYWOOD
QTY QUANTITY
REQ(D) REQUIRE(D)
REV REVISION(S)
RM ROOM
RND ROUND
S SOUTH
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SYM SYMETRICAL
TEMP TEMPORARY
TYP TYPICAL
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W WEST
W/ WITH
W/O WITHOUT
ARCHITECTURAL ABBREVIATIONS
A/E ARCHITECT/ENGINEER
AB AIR BARRIER
ABS ASBESTOS
ACC ADA ACCESSIBLE
ACR ACRYLIC
ACT ACOUSTIC CEILING TILE
AD ACCESS DOOR
ADJ ADJUSTABLE
ADJT ADJACENT
ADMIN ADMINISTRATION
AEC AUTOMATED EXTERNAL DEFIBRILLATORS
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
ASPH ASPHALT
AUTO AUTOMATIC
AVG AVERAGE
AWP ACOUSTIC WALL PANEL
B.O. BOTTOM OF
BCS BABY CHANGING STATION
BD BOARD
BLK BLOCK
BLKG BLOCKING
BLKHD BULKHEAD
BM(S) BEAM(S)
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BT BATHTUB
BTWN BETWEEN
CAB CABINET
CBD CHALKBOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFMF COLD-FORMED METAL FRAMING
CGD CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CJA CONTROL JOINT ABOVE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATIONS
COMPR COMPRESSIBLE
CONF CONFERENCE
CONFIG CONFIGURATION
CORR CORRIDOR
CP COVER PLATE
CPT CARPET
CR CHAIR RAIL
CS COUNTERSINK
CSTJ CONSTRUCTION JOINT
CSWK CASEWORK
CT CERAMIC TILE
CU COPPER
CU COMBINATION UNIT
CV CONDOM VENDOR
CY CUBIC YARD
CYL CYLINDER
DB DECIBEL
DBL DOUBLE
DC DUST COLLECTOR
DEPR DEPRESS(ION)(ED)
DEPT DEPARTMENT
DET DETENTION
DF DRINKING FOUNTAIN
DG DOOR GRILLE
DIAG DIAGONAL
DPFG DAMPROOFING
DR DOOR
DSN DOWNSPOUT NOZZLE
DW DISHWASHER
DWL(S) DOWEL(S)
DWR DRAWER
EB EXPANSION BOLT
EE EACH END
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE WASH SHOWER
EFF EFFICIENCY
EJ EXPANSION JOINT
ELAS ELASTOMERIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
ERF EPOXY RESIN FLOORING
EUI ENERGY USE INTENSITY
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXP EXPANSION
EXP EXPOSED
F FABRIC
F.O. FACE OF
FAB FABRICATE(D)
FB FACE BRICK
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIX FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLG FLOORING
FLM FULL LENGTH MIRROR
FLUOR FLUORESCENT
FO FINISH OPENING
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIREPROOFING
FR FIRE RESISTANT
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RESISTANCE TREATED
FS FLOOR SINK
FSS FOLDING SHOWER SEAT
FTG FOOTING
FVC FIRE VALVE CABINET
FWC FABRIC WALL COVERING
CTIG CLEAR TEMPERED INSULATING GLASS
G GROUT
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GD GARBAGE DISPOSAL
GEN GENERAL
GFA GROSS FLOOR AREA
GL GLUE LAMINATED
GMP GUARANTEED MAXIMUM PRICE
GR GUARD RAIL
GR GRADE
GRS GALVANIZED RIGID STEEL
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HOLLOW CORE
HD HAND DRYER
HDF HIGH DENSITY FIBERBOARD
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HR HOUR
HR HANDRAIL
HS HARDWARE SET
HSS HOLLOW STRUCTURAL SHAPE
HVAC HEATING VENTILATING AND AIR CONDITIONING
IAW IN ACCORDANCE WITH
ID INSIDE DIAMETER
IF INSIDE FACE
IJ ISOLATION JOINT
IJS IN JOIST SPACE
INC INCLUDE(ING)
INSUL INSULATION
JAN JANITOR
JBE JOIST BEARING ELEVATION
JBX JUNCTION BOX
JCT JUNCTION
JFB JOINT FILLER BOARD
JST JOIST
JT JOINT
KCJ KEYED CONSTRUCTION JOINT
KD KNOCKDOWN
KH KITCHEN HOOD
KIT KITCHEN
L ANGLE
LAB LABORATORY
LAM LAMINATED
LAV LAVATORY
LBR LUMBER
LDG LOADING
LF LINEAR FOOT
LG LENGTH (LONG)
LG LAMINATED GLASS
LIN LINEAR
LINO LINOLEUM
LKR LOCKER
LOC LOCATION
LONG LONGITUDINAL
LSC LIFE SAFETY CODE
LTG LIGHTING
LV LOUVER
LVT LUXURY VINYL TILE
MAG MAGNETIC
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MB MOP BASIN
MBD MARKER BOARD
MBH MOP/BROOM HOLDER
MC MEDICINE CABINET
MEMB MEMBRANE
MH MANHOLE
MR/S MIRROR WITH SHELF
MTD MOUNTED
MTG MOUNTING
MUL MULLION
NC NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NOM NOMINAL
O to O OUT TO OUT
OA OVERALL
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER INSTALLED
OH OPPOSITE HAND
OPG(S) OPENING(S)
OSHA OPERATIONAL SAFETY AND HEALTH ADMINISTRATION
OTB OPEN TO BELOW
OVFL OVERFLOW
P PAINT
PAN B PANIC BOLT
PB PARTICLE BOARD
PC PRECAST CONCRETE
PCD PAPER CUP DISPENSER
PCT PORCELAIN CERAMIC TILE
PD PANIC DEVICE
PERF PERFORATED
PERP PERPENDICULAR
PIC PORTABLE INSTRUMENT CONNECTION
PL PLATE
PL PROPERTY LINE
PL PLASTIC LAMINATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT(OR) (ION)
PS PROJECTION SCREEN
PT POINT
PT POINT OF TANGENCY
PTD PAPER TOWEL DISPENSER
PTD/R COMBINATION TOWEL DISPENSER/RECEPTACLE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWL SOUND POWER LEVEL
QGV QUAD GAS VALVE
QT QUARRY TILE
QTR RND QUARTER ROUND
R RISER
RAD RADIUS
RB RUBBER BASE
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFERENCE
REFL REFLECTED
REM REMOVABLE
RESIL RESILIENT
RF RESILIENT FLOORING
RF RUBBER FLOOR
RFM RECESSED FLOOR MAT
RH ROBE HOOK
RI&C ROUGH IN AND CONNECT
S SINK
SAT SPRAYED ACOUSTIC TREATMENT
SAW SOUND ABSORBING WALL UNITS
SB SPLASH BLOCK
SC SOLID CORE
SC SHOWER CURTAIN
SCD SEAT COVER DISPENSER
SCH SHOWER CURTAIN HOOK
SCR SHOWER CURTAIN ROD
SCT STRUCTURAL CLAY TILE
SD SOAP DISPENSER
SECY SECRETARY
SF SQUARE FEET
SG SPANDREL GLASS
SGL SINGLE
SGV SINGLE GAS VALVE
SH SHOWER
SHM SECURITY HOLLOW METAL
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPOSAL
SNV SANITARY NAPKIN VENDOR
SO SENSOR OPERATED
SPL SOUND PRESSURE LEVEL
SQ SQUARE
SR SURFACE MOUNTED ELECTRICAL RACEWAY
SS SOLID SURFACE
SSA STORM SHELTER AREA
SSM SOLID SURFACE
SSS STAINLESS STEEL SHELF
SST STAINLESS STEEL
ST STONE
ST STAIR
STAG'D STAGGERED
STC SOUND TRANSMISSION CLASS
STGR STRINGER
SUBFL SUBFLOOR
SUL SULPHUR
SURF SURFACE
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SVF SERVICE FIXTURE
SVG SERVICE FIXTURE GROUP
T TREAD
T&G TONGUE AND GROOVE
T.O. TOP OF
TAN TANGENT
TB TOWEL BAR
TBD TACK BOARD
TCP TOILET COMPARTMENT PARTITION
TERR TERRAZZO
TG TEMPERED GLASS
TH THRESHOLD
THK THICK(NESS)
TI TENANT IMPROVEMENT
TMR TILT MIRROR UNIT
TOIL TOILET
TOP TOP OF PAVING
TRANS TRANSVERSE
TT TERRAZZO TILE
TTD TOILET TISSUE DISPENSER
TW TACK WALL
UL UNDERWRITERS LABORATORIES
UR URINAL
US UTILITY SHELF
UTIL UTILITY
VB VAPOR BARRIER
VB VINYL BASE
VCB VENTED COVE BASE
VF VINYL FLOOR
VOC VOLITILE ORGANIC COMPOUND
VOL VOLUME
VP VENEER PLASTER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE
WB WALL BASE
WC WATER CLOSET
WC WALL COVERING
WCL WATER CLOSET/LAVATORY COMBINATION
WD WOOD
WDF WOOD FLOORING
WDW WINDOW
WI WROUGHT IRON
WOM WALK OFF MAT
WR WASTE RECEPTACLE
WRB WEATHER RESISTANT BARRIER
WW WARM WHITE
WWF WELDED WIRE FABRIC
YD YARD
ST
EP
D .S.
CO
CO
SN
SN
CO
CO
CO
D .S.
D .S.
D .S.
AC
AC
AC
AC
AC
EP
D .S.
AC
AC
D .S.
E.M
TF
EP
EP
AC
EP
G .M.
EP
AC
EP
EP
EP
EP
CO
CO
W T
COCO
D .S.
D .S.
D .S.
D .S.
E.V.
AC
AC
EP
CO
CO
ELEC
E.M
EP
E.V.
TF
CO
CO
CO
D .S.
EP
EP
W .M
E.V.
SN
SN
ST
ST
SN
SN
EP
EP
EP
EP
TF
E.M
P O
ST
P O
ST P
O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
STP
O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
EP
EP
G .M.
D .S.
G .P.
G .P.
G .P.
G .P.
G .P.
D .W.
AN
T
T N
T N
T N
T N
T N
T N T N
T N
T N
T
NT
N
FLAG
P O
LE
ST
E
E
E E
E
E
E
E.V.
P O
ST
P O
STP
O
ST
P O
ST
TF
F.O .V.
LEGEND - CODE FLOOR PLANS
1"0
0"0.
OCCUPANT LOAD TAG (GROSS)
- SEE PATTERN FOR APPLIED LOAD FACTOR
PD
XX MIN - DOOR FIRE RATING
Space Function
XXXX SF
XXX SF/OCCXXX OCC
Area name
G
REQUIRED WIDTH FOR OCCUPANT LOAD (INCHES)
REQUIRED OCCUPANT LOAD
CAPACITY OF EGRESS COMPONENT (WIDTH IN INCHES)
CAPACITY OF EGRESS COMPONENT (OCCUPANTS)
LOAD FACTOR (INCHES/OCCUPANT)
- WHEN CAPACITY FACTOR TRIANGLE IS FILLED - THIS IS TOTAL
OCCUPANT LOAD AT THIS EXIT FROM THIS STORY
DOOR TAG
- PANIC DEVICE
OCCUPANT LOAD TAG (NET)
- THIS LOAD DOES NOT EXTEND BEYOND THIS SPACE
- SEE PATTERN FOR APPLIED LOAD FACTOR
MAX TRAVEL = Length
XXXX SF
XXX
EXIT ACCESS TRAVEL DISTANCE
EXIT TAG
- CUMULATIVE OCCUPANT LOAD
- EGRESS CAPACITY
AREA (SF)
ROOM NUMBER
OCCUPANT LOAD
EXIT SIGN
COMMON PATH OF EGRESS TRAVEL DISTANCE
MAX CP = Length
1/3 DIAG = X'-X"
MAX DIAG DIM = X'-X" MAX OVERALL DIAGONAL DIM OF AREA SERVED
DISTANCE = X'-X"
MIN SEPARATION MIN EXIT SEPARATION
D49 GROUNDS BARN BUILDING
CODE STUDY
APPLICABLE CODES AND STANDARDS:
2021 IBC INTERNATIONAL BUILDING CODE
2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE
2021 CFGC COLORADO FUEL GAS CODE
2021 IMC INTERNATIONAL MECHANICAL CODE
2021 CPC COLORADO PLUMBING CODE
2023 NEC NATIONAL ELECTRICAL CODE
2021 IFC INTERNATIONAL FIRE CODE
2021 NFPA 10 PORTABLE FIRE EXTINGUISHERS
2019 NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS
2012 NFPA 101 LIFE SAFETY CODE
2017 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
SUMMARY
THE PROPOSED BARN BUILDING IS PLANNED TO BE USED FOR STORAGE OF EQUIPMENT, IS 9,668 SF AND NON-SPRINKLERED.
THE BUIDLING IS ON THE SAME LOT AT OTHER BUILDINGS OWNED BY THE SCHOOL DISTRICT. THE CONSTRUCTION TYPE IS II-B.
NEW ONE STORY BUILDING:
FIRST LEVEL = 9,668 S.F.
TOTAL AREA OF NEW BUILDING: = 9,668 S.F.
USE AND OCCUPANCY
OCCUPANCY CLASSIFICATIONS
S-2: LOW-HAZARD STORAGE
HEIGHT AND AREA
LOW-HAZARD STORAGE (S-2 OCCUPANCY, NON-SPRINKLERED, TYPE II-B CONSTRUCTION)
THE ALLOWABLE BUILDING HEIGHT IS 55 FEET (NON-SPRINKLERED)
BASED ON IBC TABLE 504.3 AND TYPE II-B CONSTRUCTION & U OCCUPANCY 55 FEET (IBC 504.2). DOES NOT INCLUDE
ROOF STRUCTURES SUCH AS TOWERS, SPIRES, AND STEEPLES.
THE MAXIMUM NUMBER OF STORIES IS 3 STORIES (IBC 504.4).
BASED ON IBC TABLE 504.4 AND TYPE II-B CONSTRUCTION & U OCCUPANCY NON-SPRINKLERED.
BUILDING HEIGHT AND AREA:
55 FEET & 3 STORIES ALLOWABLE,
PROPOSED BARN BUILDING = 24'-4" & 1 STORY ACTUAL
ALLOWABLE INCREASE FOR FRONTAGE:
Aa (ALLOWABLE AREA) = [At + (NS X If)] (EQUATION 5-1)
Aa = [26,000 SF + (26,000 SF X 0.75)] Aa = 45,500 SF PER STORY
ACTUAL FIRST LEVEL = 9,668 SF
FIRE RESISTANCE RATED CONSTRUCTION
TYPE II-B FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS):
STRUCTURAL FRAME 0HR IBC TABLE 601
BEARING WALLS – EXTERIOR 0HR IBC TABLE 601
BEARING WALLS – INTERIOR 0HR IBC TABLE 601
NONBEARING WALLS – EXTERIOR IBC TABLE 705.5
1HR: DISTANCE < 5’
1HR: 5’ < DISTANCE < 10’
0HR: 10’ < DISTANCE < 30’
0HR: DISTANCE > 30’
NONBEARING WALLS – INTERIOR 0HR IBC TABLE 601
FLOOR CONSTRUCTION 0HR IBC TABLE 601
ROOF CONSTRUCTION 0HR IBC TABLE 601
MEANS OF EGRESS
OCCUPANT LOAD FACTORS (IBC TABLE 1004.1.2):
ACCESSORY STORAGE AREAS 300 GROSS
MAXIMUM OCCUPANT LOAD: 33
COMMON PATH OF EGRESS TRAVEL (IBC 1006.2.1):
S OCCUPANCY: 75 FEET WITHOUT FIRE SPRINKLER SYSTEM
EXIT ACCESS TRAVEL DISTANCE (IBC TABLE 1017.2):
S OCCUPANCY: 300 FEET WITHOUT FIRE SPRINKLER SYSTEM
MINIMUM CORRIDOR WIDTH:
36 INCHES WITH A REQUIRED OCCUPANCY CAPACITY LESS THAN 50(IBC TABLE 1020.2)
MINIMUM NUMBER OF EXITS FOR OCCUPANT LOAD (IBC 1006.3.1):
1-500 OCCUPANTS: 2 EXITS PER STORY
501-1000 OCCUPANTS: 3 EXITS PER STORY
1001+ OCCUPANTS: 4 EXITS PER STORY
NUMBER OF EXITS FROM EACH SPACE:
TWO EXITS FROM SPACE WITH OCCUPANT LOAD > 49 (IBC TABLE 1006.2(2))
MAXIMUM DEAD END CORRIDOR:
20 FEET (IBC 1020.4)
NOTE: THE PROPOSED STORAGE BUILDING IS AN UNCONDITIONED BUILDING.
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
ACCESSORY STORAGE,
MECH EQUIP ROOMS
9668 SF
300 SF/OCC G33 OCC
STORAGE
M A
X D
IA
G
D
IM
6" 1/
D
IA
G
3" M
IN
S E
P A
R A
T
IO
N D
IS
T
A N
C E
8"
0.2
0.2
9668 SF
S-2 S-2 LOW HAZARD STORAGE
OCCUPANCY GROUP PATTERNS
LEGEND - OCCUPANCY GROUP PLANS
SINGLE USE OCCUPANCY GROUP TAG
- TAG USED TO INDICATE OCCUPANCY GROUP
AND GROSS BUILDING AREA PER STORY IN SF
MIXED-USE OCCUPANCY GROUP TAG
- TAG USED FOR SEPARATED, NON-
SEPARATED, AND ACCESSORY USES
SEP
150 SF
X-X
150 SF
X-X
ASSIGNED OCCUPANCY GROUP
OPTIONS:
SEP = SEPARATED
NON = NON-SEPARATED
ACC = ACCESSORY
PRIMARY OCCUPANCY GROUP
FOR NON OR ACC OCCUPANCIES
GROSS BUILDING AREA
PER STORY IN SF
OCCUPANT LOAD FACTOR PATTERNS
300 GROSS SF
53' - 0" 32' - 0" 44' - 4" 80' - 0" 98' - 0" 50' - 0"
0'
EXISTING
CENTRAL
OFFICE
EXISTING
WAREHOUSE/
TRANSPORTATION
AND SUPPORT
OFFICES
EXISTING
MODULAR
NEW
STORAGE
BUILDING
FUTURE
COVERED
PARKING,
N.I.C.
IMAGINARY LOT LINE
IMAGINARY LOT LINE
48' - 10 1/2" 48' - 10 1/2"
1/ 4"
1/ 4"
22' - 1 1/4" 22' - 1 1/4"
FUTURE
MATERIAL
STORAGE,
N.I.C.
EXISTING BUILDING CONTAINING
OFFICES, MAINTENANCE SHOP,
WAREHOUSE AND TOILET ROOMS.
EXISTING BUILDING CONTAINING
OFFICE SPACE AND TOILET ROOMS.
EXISTING FUEL PUMPS
PROPERTY LINE
EXISTING MALE AND FEMALE
TOILET ROOMS
MAXIMUM TRAVEL DISTANCE TO
EXISTING TOILET ROOMS = 520 FEET
D
L R
G ro u p
REVISIONS
/1
/2
:2
:0
P
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
CODE PLAN
CP1.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
N
SCALE: 1/16" = 1'-0"
CODE FLOOR PLAN
N
SCALE: 1/16" = 1'-0"
OCCUPANCY GROUP PLAN
GROSS AREA SCHEDULE
LEVEL NAME OCCUPANCY GROUP AREA
LEVEL 01 NON-OCCUPIED S-2 9668 SF
NON-OCCUPIED
LEVEL 01
N
SCALE: 1" = 80'-0"
CODE SITE PLAN
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
LEGEND
W oodm en Frontage Road
Bent Grass Meadows Drive
Existing Warehouse/Transportation and Support Offices
Bent Grass Meadows Drive
Existing Conex
Existing Warehouse/Transportation and Support Offices
Existing Central Office
Material Storage
Material Piles Material Hopper
Covered Storage
New Barn
D
LR
G ro up
REVISIONS
A B C D E F
2/
/2
:0 4:
A
M
Au to de sk
D oc s:
//3
7-
8-
D
G ro un d Ya rd P ro je ct /3
7-
8-
_D
_C ov er ed Pa rk in g_
AR
_2
2.
rv t
37-24108-00
July 11, 2025
D
G R
O U
N D
S
EX
PA
N
SI
O
N
BID
DOCUMENTS
Civil Site Plan
C-1
E
W O
O D
M
EN
R D
C O
LO
R
AD
O
S
PR
IN
G
S, C
O
C O
VE
R
ED
P
AR
KI
N G
SCALE: 1"=30'
0 30' 60'
7/15/2025
LEGEND
oodm en Frontage Road
Bent Grass Meadows Drive
Existing Warehouse/Transportation and Support Offices
Bent Grass Meadows Drive
Existing Conex
Existing Warehouse/Transportation and Support Offices
Existing Central Office
D
LR
G ro up
REVISIONS
A B C D E F
2/
/2
:0 4:
A
M
Au to de sk
D oc s:
//3
7-
8-
D
G ro un d Ya rd P ro je ct /3
7-
8-
_D
_C ov er ed Pa rk in g_
AR
_2
2.
rv t
37-24108-00
D
G R
O U
N D
S
EX
PA
N
SI
O
N
Civil Demo Plan
C-2
E
W O
O D
M
EN
R D
C O
LO
R
AD
O
S
PR
IN
G
S, C
O
C O
VE
R
ED
P
AR
KI
N G
SCALE: 1"=30'
0 30' 60'
REVISIONS
07.11.2025
BID
DOCUMENTS
IN LIEU OF
CONSTRUCTION
DOCUMENTS
7/15/2025
ST
SN
ST
ST
E P
D S.
C O
C O
SN
SN
C O
C O
C O
D S.
D S.
D S.
AC
AC
AC
AC
AC
E P
D S.
AC
AC
D S.
E M.
T F
E P
E P
AC
E P
G M.
E P
AC
E P
E P
E P
E P
C O
C O
W T
C O
C O
D S.
D S.
D S.
D S.
E V.
AC
AC
E P
C O
C O
ELEC
E M.
E P
E V.
T F
C O
C O
C O
D S.
E P
E P
W M.
E V.
SN
SN
ST
ST
SN
SN
E P
E P
E P
E P
T F
E M.
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST P
O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
STP
O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST P
O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
P O
ST
E P
E P
G M.
D S.
G P.
G P.
G P.
G P.
G P.
D W.
A N T
T N
T N
T N
T N
T N
T N T N
T N
T N
T
NT
N
F L
AG
P
OL
E
ST
E
E
E E
E
E
E
E V.
P O
ST
P O
ST
P O
ST
P O
ST
TF
F.O.V.
53' - 0" 32' - 0" 44' - 4" 80' - 0" 98' - 0" 50' - 0"
EXISTING
CENTRAL
OFFICE
EXISTING
WAREHOUSE/
TRANSPORTATION
AND SUPPORT
OFFICES
NEW
STORAGE
BUILDING
FUTURE
COVERED
PARKING
N.I.C.
FUTURE
MATERIAL
STORAGE
N.I.C.
ROCK MULCH. REFER
TO CIVIL DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
EXISTING FUEL PUMPS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
EXISTING LANDSCAPE AREA EXISTING LANDSCAPE AREA
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
SEED AND MULCH,
REFER TO CIVIL
DRAWINGS
EXISTING
LANDSCAPE
AREA
ROCK MULCH. REFER
TO CIVIL DRAWINGS
ROCK MULCH.
REFER TO CIVIL
DRAWINGS
ROCK MULCH.
REFER TO CIVIL
DRAWINGS
EXISTING UTILITY
EASEMENTS
EXISTING UTILITY
EASEMENTS
EXISTING BUILDING
SETBACK
EXISTING UTILITY
EASEMENT
EXISTING PAVED PARKING LOT
WOODMEN FRONTAGE ROAD
B E
N T
G R
A S
S M
E A
D O
W S
D R
IV
E
BOLLARD, TYP. OF (4)
AROUND FIRE HYDRANT,
REFER TO DETAIL 3C/A9.1
NEW FIRE HYDRANT, REFER TO
WATER PLAN. PROVIDE A MIN.
OF 3'-0" CLEARANCE ALL
AROUND FIRE HYDRANT.
BOLLARD, TYP.
OF (4) AROUND
FIRE HYDRANT,
REFER TO
DETAIL 3C/A9.1
NEW FIRE
HYDRANT, REFER
TO WATER PLAN.
PROVIDE A MIN. OF
3'-0" CLEARANCE
ALL AROUND FIRE
HYDRANT.
PR-1
EXISTING
MODULAR
MATERIAL
HOPPER BY
OWNER
CONCRETE BLOCKS TO
BE PLACED AROUND
MATERIAL ENCLOSURE
PERIMETER BY OWNER
EXISTING LIGHT
POLE TO REMAIN
EXISTING LIGHT
POLE TO REMAIN
EXISTING LIGHT POLES AND
BLOCK HEATERS TO REMAIN OR
BE REINSTALLED IN THIS ROW
WEST OF THE COVERED PARKING
AFTER ADJUSTING FOR THE
GRADING, REFER TO CIVIL AND
ELECTRICAL DRAWINGS
EXISTING
ELECTRICAL
TRANSFORMER
EXISTING
ELECTRICAL
PANELS
EXISTING
ELECTRICAL
PANELS
EXISTING STORAGE SHED
PROPERTY LINE
CONTRACTOR TO PATCH AND REPAIR
ASPHALT ROAD AT WATER MAIN
CONNECTIONS FOR NEW FIRE HYDRANT
LINES, REFER TO CIVIL DRAWINGS
GENERAL NOTES:
1. CONTRACTOR TO REMOVE CONCRETE
LIGHT POLE BASE AND POST FOR
BLOCK HEATERS WHERE ELECTRICAL
DRAWINGS INDICATE THE LIGHT
POLES AND BLOCK HEATERS ARE TO
BE REMOVED.
2. REMOVE EXISTING CONCRETE
SIDEWALKS WHERE GRADING IS TO
BE MODIFIED, REFER TO CIVIL
DRAWINGS
MATERIAL
HOPPER BY
OWNER
EXISTING
ELECTRICAL
PANEL
EXISTING
ELECTRICAL
PANEL
EXISTING
ELECTRICAL
VAULT
EXISTING FENCE
EXISTING FENCE
EXISTING FENCE
EXISTING
ELECTRICAL
TRANSFORMER
EXISTING
ELECTRICAL
VAULT
REMOVE TOWER,
REFER TO CIVIL
DRAWINGS
CONCRETE BLOCKS TO
BE PLACED AROUND
MATERIAL ENCLOSURE
PERIMETER BY OWNER
GRAVEL, REFER
TO CIVIL
DRAWINGS
GRAVEL, REFER
TO CIVIL
DRAWINGS
GRAVEL, REFER
TO CIVIL
DRAWINGS
GRAVEL, REFER
TO CIVIL
DRAWINGS
GRAVEL, REFER
TO CIVIL
DRAWINGS
CONCRETE APRON,
REFER TO CIVIL
DRAWINGS
CONCRETE APRON,
REFER TO CIVIL
DRAWINGS
CONCRETE
STOOP, REFER
TO CIVIL
DRAWINGS
CONCRETE
STOOP, REFER
TO CIVIL
DRAWINGS
CONCRETE APRON,
REFER TO CIVIL
DRAWINGS
16' - 4"
4' - 0"
5'
CONCRETE
STOOP, REFER
TO CIVIL
DRAWINGS
5' - 0"
4'
16' - 4" 4' - 0"
1' - 2"
5'
CONCRETE
STOOP, REFER
TO CIVIL
DRAWINGS
4'
5' - 0"
CONCRETE APRON,
REFER TO CIVIL
DRAWINGS
7'
7'
2'
2'
10' - 0"
7'
10' - 0"
10' - 0"10' - 0"
2'
2'
7'
2'
2'
" 1' - 2"
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:5
:5
A
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
ARCHITECTURAL
SITE PLAN
AS1.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
N
SCALE: 1" = 40'-0"
SITE PLAN
A1.15B
A1.1
A1.1
A1.1
3D
4B
3E
0'
CBA
50' - 0"
25' - 0" 25' - 0"
TRUCK
PLOW
9'X6'
,OFOI
TRACTOR
PLOW
8'X4'
,OFOI
TRACTOR
PLOW
8'X4'
,OFOI
SMALL
SANDER
5'4"X2'
,OFOI
LARGE
SANDER
5'4"X2'
,OFOI
TRACTOR 7'X17'6,OFOI
MOWER 8'X17',OFOI
MOWER 10'X17',OFOI
PORTABLE LIGHT
4'6"X16',OFOI
FIELD
EQUIP.
5'6"X4'
,OFOI
FIELD
EQUIP.
7'X3'
,OFOI
O V
E R
S E
E D
E R
9'
X 4'
,O F
O I
5B
A1.3
5B
A1.3
4B
A1.3
4B
A1.3
3C
A1.3
BARN
100B
0A
100D 10 0E
100C
100F
BL-3
BL-1
TYP.
TYP.
SA. 8. 00
SA. 8. 00
5E
A9.1
TYP
5D
A9.1
TYP
5F
A9.1
4C
A9.1
TYP
TYP
MOUNT FIRE
EXTINGUISHER
BRACKET 44" AFF TO
3/4" PLYWOOD
SURFACE MOUNTED
TO GIRTS
2' - 0"
MOUNT FIRE
EXTINGUISHER
BRACKET 44" AFF TO
3/4" PLYWOOD
SURFACE MOUNTED
TO GIRTS
MOUNT FIRE EXTINGUISHER
BRACKET 44" AFF TO 3/4"
PLYWOOD SURFACE
MOUNTED TO GIRTS
2' - 0"
A9.1
2D TYP.
A9.1
2E TYP.
SPLASH BLOCK -
RE: 5C/A9.1
SPLASH BLOCK -
RE: 5C/A9.1
SPLASH BLOCK -
RE: 5C/A9.1
SPLASH BLOCK -
RE: 5C/A9.1
SPLASH BLOCK -
RE: 5C/A9.1
SPLASH
BLOCK -
RE: 5C/A9.1
SPLASH
BLOCK -
RE: 5C/A9.1
SPLASH
BLOCK -
RE: 5C/A9.1
SPLASH
BLOCK -
RE: 5C/A9.1
SPLASH
BLOCK -
RE: 5C/A9.1
10-2 10-2
10-2
10-2
10-2
10-2
REFERENCE KEYNOTES
GENERAL ARCHITECTURAL NOTES
1. PARTITION TYPES SHALL BE DESIGNATED ON FLOOR PLANS
THUS: SEE SHEET A1.3 FOR TYPES.
2. PROVISIONS SHALL BE MADE AT ALL FULL HEIGHT NON-
BEARING WALLS FOR 1-INCH VERTICAL MOVEMENT OF THE
BUILDING STRUCTURE WITHOUT TRANSFER OF COMPRESSIVE
LOADS TO WALL. FILL IRREGULARITIES BETWEEN TOP OF WALL
AND DECK ABOVE WITH MINERAL WOOL INSULATION OR FIRE
STOPPING MATERIALS AS REQUIRED TO MEET FIRE RATING OF
RESPECTIVE WALLS. SEE DETAILS ON SHEET XX.X.
3. FURNISH AND INSTALL FIRE-TREATED WOOD BLOCKING OR
METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE
PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.
TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-
MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR
STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED
ITEMS.
4. GYPSUM BOARD SURFACES SHALL BE ISOLATED WITH
CONTROL JOINTS WHERE SHOWN ON DRAWINGS AND AS
DESCRIBED IN THE SPECIFICATIONS.
5. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL
PENETRATIONS.
XX. X. XX
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
C B A
5B
A1.3
5B
A1.3
MP-1
MRP-1
GTR-1
GTR-1
3" / 1'-0" 3" / 1'-0"
BL-3
3D
A9.1
4C
A9.1
4D
A9.1
SIM
SIM
SIM
8'
26-1
26-1
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
1 2 3 4 5 6
4B
A1.3
4B
A1.3
3C
A1.3
3C
A1.3
MP-1
GTR-1
MRP-1
7 8 9
07-I
3D
A9.1
4C
A9.1
4D
A9.1
XXXXXX
10-1
T Y
P
26-126-126-1
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
CBA
5B
A1.3
5B
A1.3
MP-1
MRP-1
GTR-1 GTR-1
3" / 1'-0" 3" / 1'-0"
BL-3
XXXXXX
10-1
8'
26-1
26-1
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
123456
4B
A1.3
4B
A1.3
3C
A1.3
3C
A1.3
MP-1
MRP-1
GTR-1
07-I 26-1
T Y
P
26-126-1
BUILDING ELEMENTS PAINT COLOR
METAL WALL PANEL: POLAR WHITE SP
METAL ROOF PANEL: POLAR WHITE SP
ACCENT TRIM: FOX GRAY SP
HOLLOW METAL FRAMES: PAINT TO MATCH, FOX GRAY SP
HOLLOW METAL DOORS: PAINT TO MATCH, POLAR WHITE SP
COILING DOOR FRAMES: PAINT TO MATCH, FOX GRAY SP
COILING DOORS: ARCHITECT TO SELECT FINAL COLOR
FROM MANUFACTURERS FULL LINE
OF COLOR OPTIONS
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:2
:0
P
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
LEVEL 01 - FLOOR
PLAN, EXTERIOR
ELEVATIONS
A1.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
N
SCALE: 1/8" = 1'-0"
OVERALL FLOOR PLAN, LEVEL 1
07-I SNOW GUARDS
10-1 BUILDING ADDRESS NUMBERS IN CONTRASTING
COLOR FROM BACKGROUND COLOR, 10" HIGH AND 1"
WIDE STROKE WIDTH. CONTRACTOR TO
COORDINATE EXACT BUILDING ADDRESS NUMBERS
AND LOCATION WITH OWNER AND FALCON FIRE
DEPARTMENT PRIOR TO FABRICATION.
10-2 NO STACKING ABOVE THIS LINE SIGN, REFER TO
DETAIL 1E/A9.1. CONTRACTOR TO CONFIRM SIGN
WORDING AND LOCATION OF SIGNS WITH FALCON
FIRE PROTECTION DISTRICT PRIOR TO FABRICATION
AND INSTALLATION.
26-1 BUILDING MOUNTED LIGHT FIXTURE
BL-1 6" INTERIOR PIPE BOLLARD
BL-3 6" EXTERIOR PIPE BOLLARD
GTR-1 PRE-FINISHED METAL GUTTER AND DOWNSPOUT BY
METAL BLDG MFR
MP-1 FORMED METAL WALL PANEL BY METAL BLDG MFR
MRP-1 FORMED METAL ROOF PANEL BY METAL BLDG MFR
SCALE: 1/8" = 1'-0"A1.1
3D EXTERIOR ELEVATION - NORTH
SCALE: 1/8" = 1'-0"A1.1
5B EXTERIOR ELEVATION - EAST
SCALE: 1/8" = 1'-0"A1.1
3E EXTERIOR ELEVATION - SOUTH
SCALE: 1/8" = 1'-0"A1.1
4B EXTERIOR ELEVATION - WEST
PR-1
PR-1
PR-1
PR-1
PR-1PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1 PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
ROOF PLAN GENERAL NOTES
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN
SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF
STRUCTURE UNLESS NOTED OTHERWISE. SEE STRUCTURAL
DRAWINGS FOR ELEVATIONS OF THE HIGH AND LOW POINTS TO
DETERMINE PROPER TAPER IN INSULATION.
C. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
D. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS
FOR MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR PENETRATIONS
NOT SHOWN ON THIS DRAWING.
E. FLASH DRAINS, CURBS, VENTS AND STACKS PER
MANUFACTURER'S RECOMMENDATIONS IF DETAIL NOT SHOWN
ON DRAWINGS.
CBA
5B
A1.3
5B
A1.3
4B
A1.3
4B
A1.3
3C
A1.3
MRP-1
3" / 1'-0" 3" / 1'-0"
07-I
07-I
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
123456
4B
A1.3
4B
A1.3
BARN
MRP-1
OVERHEAD
COILING
DOOR
EXHAUST
FAN
WEATHER
HOOD SEE
MECHANICAL
OVERHEAD
COILING
DOOR
EXHAUST
FAN
WEATHER
HOOD SEE
MECHANICAL
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
C B A
5B
A1.3
5B
A1.3
BARN
3" / 1'-0" 3" / 1'-0"
GTR-1
MRP-1
GTR-1
A1.3
3C
LIGHTING SEE
ELECTRICAL
LEVEL 01
0' - 0"
EAVE HEIGHT
18' - 0"
A
METAL PANEL BY
METAL BLDG MFR
METAL FRAMING BY
METAL BLDG MFR
INSULATION BY
METAL BLDG MFR
FABRIC LINER BY
METAL BLDG MFR
GTR-1
MRP-1
FOUNDATION SEE
STRUCT
FOOTING BY SEE
STRUCT
CONCRETE SLAB
SEE STRUCT, BY GC
RIGID FRAME BY
METAL BLDG MFR
METAL PANEL BY METAL BLDG MFR
METAL FRAMING BY METAL BLDG MFR
T H
K
R O
U G
H
INSULATION BY METAL BLDG MFR
WALL FABRIC LINER BY METAL
BLDG MFR
WEATHER BARRIER
MATERIAL DESCRIPTION
S = STEEL (METAL STUDS)
W = WOOD STUDS
H = SHAFT WALLS
M = MASONRY
C = CONCRETE
RATING / HEIGHT
A = FULL HEIGHT / UNDERSIDE OF STRUCT (NOT RATED)
B = 6" ABOVE CEILING (NOT RATED)
C = UNDERSIDE OF CEILING (NOT RATED)
D = PARTIAL HEIGHT (NOT RATED)
X = VARIABLE HEIGHT (NOT RATED)
S = SMOKE PARTITON (NOT RATED)
0 = 0 HOUR RATED (CORRIDOR)
5 = 0.5 HOUR RATED
1 = 1 HOUR RATED
2 = 2 HOUR RATED
3 = 3 HOUR RATED
4 = 4 HOUR RATED
UNIT WIDTH / CONFIGURATION
F = FURRING STRIPS / CHANNELS
1 = 1 5/8" METAL
2 = 2 1/2" METAL / 1 1/2" WOOD
3 = 3 5/8" METAL
4 = 4" METAL / 3 1/2 WOOD / 3 5/8" CMU
6 = 6" METAL / 5 1/2" WOOD / 5 5/8" CMU / 6" CONC
8 = 8" METAL / 7 1/4" WOOD / 7 5/8" CMU / 8" CONC
10 = 10" CONC
12 = 11 5/8" CMU / 12" CONC
X = NON-STANDARD WIDTH, SEE DETAILS
D = DOUBLE STUD FRAMING
S = STAGGERED STUD FRAMING
GYPSUM WALLBOARD INDICATOR
(NOT INCLUDING SHAFT LINER)
0 = NO GWB
1 = ONE LAYER, TAG SIDE
2 = ONE LAYER, EACH SIDE
3 = TWO LAYERS TAG SIDE, ONE LAYER OTHER
4 = TWO LAYERS, EACH SIDE
5 = TWO LAYERS TAG SIDE, NO GWB OTHER
6 = THREE LAYERS, EACH SIDE
UNIQUE CONDITION (SEE SCHEDULE)
0 = NO UNIQUE CONDITION
SA.3.10
MATERIAL
RATING / HEIGHT
UNIT WIDTH
GWB INDICATOR
UNIQUE CONDITION
WALL TYPE TAG
PARTITION TYPES
DESCRIPTIONS
F FLUSH PANEL
N NARROW LITE GLASS
DOOR PANEL TYPE DESCRIPTIONS
DOOR AND FRAME SCHEDULE
GENERAL NOTES
A. ALL EXTERIOR HOLLOW METAL FRAMES SHALL BE FILLED WITH
INSULATION.
B. ALL HOLLOW METAL FRAMES SET IN METAL STUD WALLS
SHALL BE FILLED WITH MINERAL WOOL BLANKET INSULATION.
C. ALL EXTERIOR FRAMES SHALL BE INSTALLED WITH 1/4" SHIM
AND SEALANT AROUND PERIMETER OF FRAME.
D. MASONRY LINTELS AND STEEL LINTELS ARE SHOWN ON
STRUCTURAL DRAWINGS.
E. GLASS TYPES FOR DOORS ARE INDICATED IN THE DOOR
GLAZING COLUMN OF THE DOOR AND FRAME SCHEDULE.
GLASS TYPES FOR FRAMES ARE INDICATED ON THE FRAME
ELEVATIONS.
F. FOR COILING DOORS, GRILLES AND SECTIONAL DOORS, WIDTH
AND HEIGHT DIMENSIONS SHOWN IN DOOR AND FRAME
SCHEDULE REPRESENT FINISHED OPENING SIZE.
CONTRACTOR TO COORDINATE EXACT SIZE OF DOOR WITH
MANUFACTURER.
G. FRAME MANUFACTURER SHALL COORDINATE LOCATIONS OF
ALL CONCEALED CONDUIT AND J-BOXES REQUIRED FOR
SECURITY SYSTEM HARDWARE PRIOR TO MANUFACTURING OF
HOLLOW METAL FRAMES AND COORDINATE WITH SECURITY
HARDWARE AND DEVICES.
H. SEE SPECIFICATIONS HARDWARE SECTION FOR HARDWARE
SETS NOTED IN DOOR AND FRAME SCHEDULE.
2"
2"
2"
SCHEDULE
SEE
S E
E S
C H
E D
U
LE
N
NARROW LIGHT
J
S E
E S
C H
E D
U L E
SEE SCHEDULE
S E
E S
C H
E D
U L E
SEE SCHEDULE
4"6"
REFERENCE KEYNOTES
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:2
:1
P
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
ROOF PLAN,
SECTIONS, DOOR,
FRAME TYPE,
WALL TYPE,
FINISH
SCHEDULES
A1.3
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
N
SCALE: 1/8" = 1'-0"
ROOF PLAN
SCALE: 1/8" = 1'-0"A1.3
5B NORTH SOUTH SECTION
SCALE: 1/8" = 1'-0"A1.3
4B EAST WEST SECTION
SCALE: 1/2" = 1'-0"A1.3
3C WALL SECTION
S_-_-0_ NON-RATED STUD EXTERIOR WALL
MARK
ROUGH
THICKNESS
FIRE/SMOKE SOUND
T.O. WALL
DETAIL
B.O. WALL
DETAIL COMMENTSRATING TESTED ASSEMBLIES
STC
RATING TESTED ASSEMBLIES
SA 8 00 9 1/2" NR NA 5F/A9.1
DOOR AND FRAME SCHEDULE
NUMBER
PANEL FRAME
FIRE
RATING HARDWARE SET
DETAILS
COMMENTS
NO. OF
PANELS WIDTH HEIGHT THICKNESS MATERIAL GLASS TYPE MATERIAL TYPE HEAD JAMB LEFT JAMB RIGHT SILL
100A 1 3' - 0" 7' - 0" 1 3/4" HM CTIG N HM 1 -- 01 1B/A1.1 2B/A1.1 2B/A1.1 3B/A1.1
100B 14' - 0" 15' - 0" STL -- J STL -- -- OH-01 1C/A1.1 2C/A1.1 2C/A1.1 3C/A1.1
100C 1 3' - 0" 7' - 0" 1 3/4" HM CTIG N HM 1 -- 01 1B/A1.1 2B/A1.1 2B/A1.1 3B/A1.1
100D 14' - 0" 15' - 0" STL -- J STL -- -- OH-01 1C/A1.1 2C/A1.1 2C/A1.1 3C/A1.1
100E 1 3' - 0" 7' - 0" 1 3/4" HM CTIG N HM 1 -- 01 1B/A1.1 2B/A1.1 2B/A1.1 3B/A1.1
100F 1 3' - 0" 7' - 0" 1 3/4" HM CTIG N HM 1 -- 01 1B/A1.1 2B/A1.1 2B/A1.1 3B/A1.1
GLAZING TYPE DESCRIPTIONS
CTIG CLEAR TEMPERED INSULATING GLASS
LG LAMINATED GLASS
SG SPANDREL GLASS
TG TEMPERED GLASS
EXTERIOR FRAME TYPESDOOR PANEL TYPES
07-I SNOW GUARDS
GTR-1 PRE-FINISHED METAL GUTTER AND DOWNSPOUT BY
METAL BLDG MFR
MRP-1 FORMED METAL ROOF PANEL BY METAL BLDG MFR
J J
WALL FABRIC LINER
BY METAL BLDG MFR
GRID
GRADE
PROTECTION BOARD ON
DAMP PROOFING
METAL BASE TRIM BY
METAL BLDG MFR
METAL WALL PANEL
BY METAL BLDG MFR
INSIDE PANEL CLOSURE
BY METAL BLDG MFR
STRUCTURAL FASTENER
BY METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
CONCRETE SLAB -
SEE STRUCT
ISOLATION JOINT -
SEE STRUCT
CONCRETE FOUNDATION -
SEE STRUCT
1/
8"
T O
P O
F
S
LA
B B
O T
T O
M O
F
A
LL
P
A N
E L
FASTEN AT 3'-0" O.C. MAX
BY METAL BLDG MFR
SEALANT
WEATHER BARRIER
VAPOR BARRIER
GRANULAR FILL -
SEE STRUCT
PROTECTION
BOARD ON DAMP
PROOFING
STRUCTURAL SLAB -
SEE STRUCT
DOOR JAMB BEYOND
THRESHOLD -
SET IN
CONTINUOUS BED
OF MASTIC
ISOLATION JOINT -
SEE STRUCT
STRUCTURAL STOOP,
DOWEL INTO SLAB
- SEE STRUCT
CONCRETE FOOTING
- SEE STRUCT
PERIMETER INSULATION
VAPOR BARRIER
8 3/8"
GRID
8"
GRID
BACKER ROD AND
SEALANT
PREFINISHED PANEL TRIM
BY METAL BLDG MFR
INSIDE PANEL CLOSURE
BY METAL BLDG MFR
STRUCTURAL FASTENER
BY METAL BLDG MFR
8" STEEL CHANNEL BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
WALL FABRIC LINER
BY METAL BLDG MFR
8" STEEL GIRT BY
METAL BLDG MFR
WEATHER BARRIER
PREFINISHED METAL
PANEL SYSTEM BY
METAL BLDG MFR
1"
3"
COILING DOOR HOOD
COILING DOOR
TRACK BEYOND
1/4" STL BENT PLATE,
PNT TO MATCH
ACCENT TRIM
8"
GRID
DOOR, SEE SCHEDULE
BACKER ROD AND
SEALANT
PREFINISHED METAL
HEAD FLASHING
PREFINISHED PANEL TRIM
BY METAL BLDG MFR
INSIDE PANEL CLOSURE
BY METAL BLDG MFR
STRUCTURAL FASTENER
BY METAL BLDG MFR
8" STEEL CHANNEL BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
WALL FABRIC LINER
BY METAL BLDG MFR
8" STEEL GIRT BY
METAL BLDG MFR
WEATHER BARRIER
PREFINISHED METAL PANEL
SYSTEM BY METAL BLDG MFR
HOLLOW METAL
FRAME - SEE DOOR
AND FRAME SCHEDULE
FILL WITH INSULATION
PREFINISHED METAL
PANEL SYSTEM BY
METAL BLDG MFR
PRE FINISHED
PANEL TRIM BY
METAL BLDG MFR
BACKER ROD AND
SEALANT
8" STEEL CHANNEL
BY METAL BLDG MFR
WEATHER BARRIER
8" STEEL GIRT BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
8"
GRID
A
LI
G N
1"
1/4" STL BENT PLATE,
PNT TO MATCH
ACCENT TRIM
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
S
LO
P E
COILING DOOR - SEE
DOOR SCHEDULE
DOOR TRACK
WALL FABRIC LINER
BY METAL BLDG MFR
STRUCT FASTENER
12" O.C. BY METAL
BLDG MFR
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
A
LI
G N
HOLLOW METAL FRAME -
SEE DOOR AND FRAME
SCHEDULE
DOOR, SEE SCHEDULE
PREFINISHED METAL
PANEL SYSTEM BY
METAL BLDG MFR
FILL WITH
INSULATION
PRE FINISHED
PANEL TRIM BY
METAL BLDG MFR
PREFINISHED METAL
JAMB FLASHING
BACKER ROD AND
SEALANT
JAMB ANCHOR
8" STEEL CHANNEL
BY METAL BLDG MFR
WEATHER BARRIER
8" STEEL GIRT BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
F
LO
O R
P
LA
N S
V A
R
IE
S
S E
E
GRID
WALL FABRIC LINER
BY METAL BLDG MFR
3/ 4"
1/ 4"
PERIMETER
INSULATION -
SEE STRUCT
2 LAYERS OF BLDG
FELT - SEE STRUCT
FOOTING - SEE
STRUCT
CONCRETE SLAB -
SEE STRUCT
JAMB BEYOND
EXP JT FILLER
& SEALANT -
SEE STRUCT
S E
E S
T R
S E
E C
IV
IL
1/2"
GRID
PROTECTION
BOARD ON DAMP
PROOFING
VAPOR BARRIER
GRANULAR FILL -
SEE STRUCT
GRID
LOUVER BY MECH
BACKER ROD AND
SEALANT
PREFINISHED METAL
SILL FLASHING, PNT
TO MATCH ACCENT
TRIM
PREFINISHED PANEL TRIM
BY METAL BLDG MFR
INSIDE PANEL CLOSURE
BY METAL BLDG MFR
STRUCTURAL FASTENER
BY METAL BLDG MFR
8" SILL CHANNEL BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
WALL FABRIC LINER
BY METAL BLDG MFR
8" STEEL GIRT BY
METAL BLDG MFR
WEATHER BARRIER
PREFINISHED METAL
PANEL SYSTEM BY
METAL BLDG MFR
STITCH FASTENERS 12"
O.C. BY METAL BLDG MFR
SHIM AS REQUIRED
BACKER ROD AND
SEALANT
PREFINISHED METAL
PANEL SYSTEM BY
METAL BLDG MFR
PRE FINISHED
PANEL TRIM BY
METAL BLDG MFR
PREFINISHED METAL
JAMB FLASHING
BACKER ROD AND
SEALANT
8" STEEL CHANNEL
BY METAL BLDG MFR
WEATHER BARRIER
8" STEEL GIRT BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
F
LO
O R
P
LA
N S
V A
R
IE
S
S E
E
GRID
WALL FABRIC LINER
BY METAL BLDG MFR
LOUVER BY MECH
8"
GRID
BACKER ROD AND
SEALANT
PREFINISHED METAL
HEAD FLASHING,
PNT TO MATCH
ACCENT TRIM
PREFINISHED PANEL TRIM
BY METAL BLDG MFR
INSIDE PANEL CLOSURE
BY METAL BLDG MFR
STRUCTURAL FASTENER
BY METAL BLDG MFR
8" STEEL CHANNEL BY
METAL BLDG MFR
BATT INSULATION BY
METAL BLDG MFR
WALL FABRIC LINER
BY METAL BLDG MFR
8" STEEL GIRT BY
METAL BLDG MFR
WEATHER BARRIER
PREFINISHED METAL PANEL
SYSTEM BY METAL BLDG MFR
LOUVER BY MECH
1' - 6"
ROUNDED CONCRETE CAP
6" HEAVY DUTY STEEL PIPE
BOLLARD POST -
CONCRETE FILLED, PAINT
SAFETY YELLOW
SLOPED CONCRETE AT BASE
CONCRETE WHERE OCCURS
18" DIAMETER CONCRETE FOOTING
9"
1/
2"
3/4"
1 3/4"
1'
1" 1"
2"
3/ 4"
A. REFLECTED CEILING PLAN GENERAL NOTES APPLY TO ALL
REFLECTED CEILING PLAN SHEETS.
B. ALL DIMENSIONS ON REFLECTED CEILING PLANS ARE ACTUAL
AND ARE TO THE FOLLOWING UNLESS NOTED OTHERWISE:
a. FACE OF FINISHED WALL
b. FACE OF FINISHED BULKHEADS
c. CENTERLINE OF COLUMNS
d. CENTERLINE OF TEES
C. IN AREAS WITH EXPOSED STRUCTURE CEILINGS, COORDINATE
EXACT LOCATIONS OF MECHANICAL GRILLES, DIFFUSERS,
DUCTWORK AND ELECTRICAL FIXTURES WITH EACH
REPRESENTATIVE SUBCONTRACTOR.
REFLECTED CEILING PLAN
GENERAL NOTES
CBA
5B
A1.3
5B
A1.3
4B
A1.3
4B
A1.3
3C
A1.3
OPEN TO
STRUCTURE
LIGHTING SEE ELECTRICAL
J BOX SEE ELECTRICAL
EMERGENCY LIGHTING
SEE ELECTRICAL
WALL PACK LIGHT SEE
ELECTRICAL
EXIT SIGN SEE
ELECTRICAL
1'
1"
8" 3'
GRID
A
LI
G N
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
A
LI
G N
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
COLUMN BY METAL
BLDG MFR
A9.1
3C
A9.1
3C
8"1' - 4"
GRID
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
1/4" X 6" DIA. BOLLARD
W/ CAST IN PLACE
FDN, PNT, EA SIDE
COLUMN BY METAL
BLDG MFR
GRID
A9.1
2C
A9.1
2C
1' - 6"
ROUNDED CONCRETE CAP
6" HEAVY DUTY STEEL PIPE
BOLLARD POST -
CONCRETE FILLED, PAINT
SAFETY YELLOW
SLOPED CONCRETE AT BASE
CONCRETE WHERE OCCURS
18" DIAMETER CONCRETE FOOTING
DRILL, DOWEL AND EPOXY BOLLARD
FOOTING TO PAD FOOTING - SEE
STRUCTURAL
PAD FOOTING SEE STRUCTURAL
NO STACKING ABOVE THIS LINE
BY ORDER OF FFPD
1'
3' - 0"
1/
2" 3"
1/
2"
RED STRIPE
SIGN SHALL HAVE A 3-INCH RED STRIPE, 2-INCH BLACK LETTERING, AND
WHITE BACKGROUND. CONTRACTOR TO CONFIRM WORDING ON SIGN AS
WELL AS SIGN LOCATIONS WITH FALCON FIRE PROTECTION DISTRICT
PRIOR TO FABRICATION.
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:2
:1
P
M
A u to d e s k D o c s /3
-2
-0
D
G ro u n d
Y a rd P ro je c t/
-2
-0
D
B a rn
A
R
.r v t
37-24108-00
07.11.2025
D
G
R O
U N
D S
E X
P A
N S
IO
N
BID DOCUMENTS
REFLECTED
CEILING PLAN,
DETAILS
A9.1
E
W O
O D
M E
N R
D P
E Y
T O
N C
O
B A
R N
SCALE: 1 1/2" = 1'-0"A9.1
5F BASE OF WALL
SCALE: 1 1/2" = 1'-0"A9.1
5E EXTERIOR DOOR THRESHOLD
SCALE: 1 1/2" = 1'-0"A9.1
3F HEAD DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
3E HEAD DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
4F JAMB DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
4E JAMB DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
5D SILL AT COILING DOOR
SCALE: 1 1/2" = 1'-0"A9.1
4C SILL DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
4D JAMB DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
3D HEAD DETAIL
SCALE: 3/4" = 1'-0"A9.1
3C BOLLARD SECTION DETAIL
SCALE: 3" = 1'-0"A9.1
5C SPLASH BLOCK DETAIL
N
SCALE: 1/8" = 1'-0"
OVERALL REFLECTED CEILING PLAN, LEVEL 1
SCALE: 1" = 1'-0"A9.1
2D BOLLARD PLAN DETAIL
SCALE: 1" = 1'-0"A9.1
2E BOLLARD PLAN DETAIL
SCALE: 3/4" = 1'-0"A9.1
2C BOLLARD SECTION DETAIL
SCALE: 1 1/2" = 1'-0"A9.1
1E SIGN DETAIL
1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, SPECIFICATIONS, AND THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC), AS ADOPTED AND AMENDED BY THE PIKES PEAK
REGIONAL BUILDING CODE, 2023 EDITION.
2. DESIGN MINIMUM LOADING CRITERIA:
FLOOR LOADS:
OCCUPANCY OR USE: LIVE LOADS: CONCENTRATED LOAD:
PARKING .................................................................................................... 50 p.s.f. 3000 lbs LIGHT STORAGE ....................................................................................... 125 p.s.f. N/A
ROOF LOAD:
ROOF LIVE LOAD .............................................................................................. 20 p.s.f.
SNOW LOADS:
GROUND SNOW LOAD, Pg ............................................................................... 43 p.s.f.
FLAT ROOF SNOW LOAD, Pf .............................................................................. 36 p.s.f.
ROOF SNOW LOAD DATA:
EXPOSURE FACTOR, Ce .............................................................................. 1.0 IMPORTANCE FACTOR, Is ............................................................................ 1.0 THERMAL FACTOR, Ct ................................................................................... 1.2
SEISMIC LOADS
RISK CATEGORY .................................................................................... II IMPORTANCE FACTOR, Ie ..................................................................... 1.0
MAPPED SPECTRAL RESPONSE ACCELERATIONS (USGS MAPS):
SS ........................................................................................ 0.185 S1 ........................................................................................ 0.059
SITE CLASS ............................................................................................ C
DESIGN SPECTRAL RESPONSE ACCELERATIONS:
SDS ...................................................................................... 0.163 SD1 ....................................................................................... 0.055
SEISMIC DESIGN CATEGORY ...................................................................... A
BASIC SEISMIC FORCE-RESISTING SYSTEM(S):
STEEL SYSTEM NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE.
DESIGN BASE SHEAR, V ........................................................................ 1.72 KIPS SEISMIC RESPONSE COEFFICIENT, CS ............................................. 0.010
RESPONSE MODIFICATION FACTOR, R ............................................ 3.0
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
WIND LOADS:
BASIC WIND SPEED (3 SECOND GUST), VULT .................................... 130 m.p.h.
WIND EXPOSURE ................................................................................. C INTERNAL PRESSURE COEFFICIENT, GCpi ....................................... ±0.18
FLOOD LOADS:
PROJECT IS NOT IN FLOOD HAZARD ZONE
TYPE CONTINUOUS
DURING TASK LISTED
PERIODICALLY DURING
TASK LISTED
1. VERIFY MATERIALS BELOW SHALLOW
FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE
DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER
DEPTH AND HAVE REACHED PROPER MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF
COMPACTED FILL MATERIALS
4. DURING FILL PLACEMENT, VERIFY USE OF PROPER
MATERIALS, AND PROCEDURES IN ACCORDANCE WITH
PROVISIONS OF THE APPROVED GEOTECHNICAL
REPORT. VERIFY DENSITIES AND LIFT THICKNESSES
DURING PLACEMENT AND COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL,
OBSERVE SUBGRADE AND VERIFY THAT SITE
HAS BEEN PREPARED PROPERLY.
X
X
X
X
X
_ X
ACI 318: 26.11.1.2(b)
ACI 318: 26.11.2
ACI 318: 26.9
ACI 318: 26.10
ACI 318: 26.5.3 - 26.5.5
ACI 318: 26.5
ASTM C 172
ACI 318: 26.5, 26.12
ACI 318: CH. 19, 26.4.3, 26.4.4
ACI 318: 17.8.2.4
ACI 318: 17.8.2
AWS D1.4
ACI 318: 26.6.4
ACI 318: CH. 20, 25.2, 25.3,
26.6.1-26.6.3
X
X
X
X
X
X
X
X
X
X
X
14. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
13. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENDONS IN
POST-TENSIONED CONCRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS
FROM BEAMS AND STRUCTURAL SLABS.
10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.
9. INSPECT PRESTRESSED CONCRETE FOR:
a. APPLICATION OF PRESTRESSING FORCES; AND
b. GROUPING OF BONDED PRESTRESSING TENDONS.
8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.
7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION
TECHNIQUES
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH
TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE
TEMPERATURE OF THE CONCRETE.
5. VERIFYING USE OF REQUIRED DESIGN MIX.
4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS.
a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.a
3. INSPECT ANCHORS CAST IN CONCRETE
2. REINFORCING BAR WELDING:
a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706 b.INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5/16, AND
C.INSPECT ALL OTHER WELDS
1. INSPECT REINFOREMENT, INCLUDING PRESTRESSING
TENDONS, AND VERIFY PLACEMENT.
REFERENCED STANDARDPERIODICCONTINUOUS
TABLE 1705.3 REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
TYPE IBC REFERENCE
X
X X
ACI 318: 17.8.2
X
IBC 1904.1, 1904.2
ASTM C 31
11. INSPECTION OF PRECAST CONCRETE DIAPHRAM CONNECTIONS
REINFORCEMENT AT JOINTS CLASSIFIED AS MODERATE OR HI
DEFORMABILITY ELEMENTS (MDE OR HDE) IN STRUCTURES ASSIGNED TO
SEISMIC DESIGN CATAGORY C,D,E OR F,
INSPECT SUCH CONNECTIONS AND REINFORCEMENT IN FIELD FOR:
a. INSTALLATION OF EMBEDDED PARTS
b. COMPLETION OF THE CONTINUITY OF REINFORCEMENT ACROSS JOINTS
c. COMPLETION OF CONNECTIONS IN THE FIELD
X X
ACI 318: 26.13.1.3
ACI 550.5
12. INSPECT OF INSTALLATION TOLERANCES OF PRECAST CONCRETE DIAPHRAM
CONNECTIONS FOR COMPLIANCE WITH ACI 550.5
x ACI 318: 26.13.1.3
X
TABLE 1705.6 REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS
GENERAL NOTES:
DESIGN CRITERIA
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THE LOCATION OF MECHANICAL OPENINGS, FLOOR DRAINS, INSERTS, DEPRESSIONS, BURIED CABLES, AND UTILITIES, ETC. WITH ARCHITECTURAL, CIVIL, MECHANICAL AND ELECTRICAL DRAWINGS.
4. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS, NOTIFY ARCHITECT/ENGINEER OF DISCREPANCIES.
WRITTEN DIMENSIONS TAKE PRECIDENCE OVER SCALED DIMENSIONS.
SOIL AND FOUNDATIONS
1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE SOIL REPORT BY KUMAR & ASSOCIATES, INC., NUMBER 23-2-218, DATED DECEMBER 14, 2023.
2. DESIGN OF FOOTINGS AND WALLS IS BASED ON THE FOLLOWING CRITERIA:
MAXIMUM ALLOWABLE SOIL BEARING PRESSURE ..................................................................... 2000 p.s.f.
EQUIVALENT FLUID PRESSURE FOR RETAINING:
ACTIVE .................................................................................................................................. 45 p.c.f.
AT-REST ............................................................................................................................... 55 p.c.f.
PASSIVE ............................................................................................................................... 180 p.c.f.
3. SOIL BENEATH FOOTINGS, WALLS AND SLAB-ON-GRADE SHALL BE APPROVED STRUCTURAL FILL COMPACTED IN ACCORDANCE WITH THE SOIL REPORT AND SPECIFICATIONS WITH MINIMUM DENSITY AS FOLLOWS:
FOOTINGS, WALLS 98% OF STANDARD PROCTOR, ASTM D698.
SLAB-ON-GRADE 95% OF STANDARD PROCTOR, ASTM D698.
4. A REPRESENTATIVE OF THE SOIL ENGINEER SHALL INSPECT THE OPEN EXCAVATION TO VERIFY THAT THE SOIL TYPE AND CONDITIONS ARE CONSISTENT WITH DESIGN CRITERIA OF THE SOIL REPORT. IF THE SOIL PROPERTIES ARE FOUND TO BE DIFFERENT FROM THIS CRITERIA, THEN THE ENGINEER SHALL BE
PROMPTLY NOTIFIED SO THAT THE FOUNDATION DESIGN MAY BE REVIEWED.
5. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THE LOCATION OF MECHANICAL OPENINGS, FLOOR DRAINS, INSERTS, DEPRESSION, BURIED CABLES AND UTILITIES, ETC. WITH
ARCHITECTURAL, CIVIL, MECHANICAL, AND ELECTRICAL DRAWINGS.
6. WHERE NEW WORK JOINS TO EXISTING, THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO THE SUBMISSION OF SHOP DRAWINGS OR BEGINNING OF WORK. NOTIFY ARCHITECT/ENGINEER IMMEDIATELY OF ANY CONDITIONS OR DIMENSIONS DIFFERING FROM THOSE SHOWN.
7. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS, NOTIFY ARCHITECT/ENGINEER OF
DISCREPANCIES. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
8. THE FOUNDATION HAS BEEN DESIGNED FOR STRUCTURAL LOADINGS…