This document is a response to Request for Qualifications (RFQ) 21-020EN-FC submitted by Griner Engineering, Inc. to the City of Plant City, Florida, for continuing professional consulting services in engineering and surveying disciplines. The response demonstrates Griner Engineering's qualifications across electrical engineering and registered surveying and mapping services for projects with estimated construction costs not exceeding $7.5 million or study costs not exceeding $0.5 million. The proposal submission included acknowledgment of four addenda issued between November 17, 2020, and December 1, 2020, with the firm committing to provide ongoing design, permitting, bidding, construction administration, and related services. The resulting contract, if awarded, would be effective upon issuance and extend for an initial three-year term with options for renewal.

Griner Engineering's response identified Joseph H. Griner III, P.E., as President and Principal-in-Charge, with Jose A. Rosario, P.E., serving as Electrical Engineer of Record and Project Manager. The firm demonstrated extensive relevant experience through multiple projects with municipalities including the City of Clearwater, City of St. Petersburg, and Pinellas County, with recent work on electrical lighting upgrades, lift station rehabilitations, and parking lot lighting installations ranging from $1,500 to $45,360 in design fees. Hyatt Survey Services, Inc., a certified Women Business Enterprise and Disadvantaged Business Enterprise subconsultant with 32 years of surveying experience, was included to provide surveying and mapping capabilities. The response did not qualify for local preference or minority business enterprise set-asides for Griner Engineering itself, though Hyatt Survey Services held relevant certifications. Professional liability insurance of $2 million and comprehensive general liability insurance of $1 million were provided, with the firm demonstrating current capacity through workload projections showing key staff allocation between 25 to 45 percent on concurrent projects.

View the file

Other files

File Type Posted
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
KCA_City_of_Plant_City_Library_of_Engineering_Svcs_for_Cont_Contracts_RFQ_21-020EN-FC.pdf PDF
Metzger_Willard_-Submittal_for_Library_Prof_Srvs_-.pdf PDF
Reiss_-_Plant_City_RFQ_21_20_EN_FC_.pdf PDF
Tierra.pdf PDF
Total_Scoring_and_Recap_21-020_Revised_(009).xlsx XLSX spreadsheet
Universal_Engineering_-RFQ_21-020EN-FC_-_Library_of_Engineering_Services.pdf PDF
Halff_Associates_Inc.pdf PDF
Hazen_and_Sawyer.pdf PDF
Hydro_Solutions_Consulting.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
PreproposalMeeting_042426.pdf PDF
Ramos_Engineering.pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
JMTs_CoPC_Library_of_Eng_Services_21-020EN-FC.pdf PDF
Mead__26_Hunt.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
PPM_Consultants_2C_Inc._RFQ_21-020-EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts_(Cat_3).pdf PDF
PreproposalMeeting_042426.pdf PDF
RK_26K.pdf PDF
SGM_Submittal_RFQ_21-020EN-FC_Library_of_Engineering_Continuing_Contracts.pdf PDF
Arcadis_-_RFQ_NO._21-020EN-FC_Response.pdf PDF
Burgess_and_Niple_21-020EN-FC.pdf PDF
CPC_RFQ_21-020EN-FC_Planty_City_Library_of_Engineering_Services.pdf PDF
Chastain_Skillman_SOQ-Plant_City_RFQ_2321-020EN-FC.pdf PDF
Dewberry_Engineers_Inc.pdf PDF
EES_Submital_RFQ_21_020EN_FC_(1).pdf PDF
Florida_Transportation_Engineering.pdf PDF
GOLDER_Plant_City_RFQ_21-020EN-FC_12-10-2020.pdf PDF
George_F_Young.pdf PDF
WATERMARK-RFQ_21-020EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts.pdf PDF
Woodard__26_Curran.pdf PDF
Arcadis_-_RFQ_NO._21-020EN-FC_Response.pdf PDF
Capital_Consulting_Solutions.pdf PDF
CivilSurv.pdf PDF
GLE_Plant_City_RFQ_21-020EN-FC_Response.pdf PDF
George_F_Young.pdf PDF
Wade_Trim_Plant_City_Continuing_Services.pdf PDF
ARMINIUS_CATEGORY_6.pdf PDF
Arehna_FQ_21-020EN-FC.pdf PDF
Atkins_RFQ-21-020EN-FC-Plant-City-FL-Gen-Eng-Svc.pdf PDF
Black_and_Veatch_RFQ21020ENFC.pdf PDF
Boggs_Enginering_RFQ_Response.pdf PDF
Carollo_Engineers.pdf PDF
CivilSurv.pdf PDF
DRMP_PlantCity_RFQ_21-020EN-FC.pdf PDF
DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf PDF
Professional_Consulting_Services_Continuing_Contracts.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Griner Engineering, Inc. Response to

RFQ 21-020EN-FC

City of Plant City Library of Engineering Services for Continuing Contracts

Table of Contents

Tab A – Ability of Professional Personnel & Staff Experience Organizational Chart ………………………………………………………………………………………1 Staff and Subconsultants Resumes .………………………………………………………………………..2 Staff Capabilities …………………………………………………………………………………………..9

Tab B – Relevant Experience Relevant Experience for Electrical Engineering ………………………………………………………….10 Relevant Experience for Registered Surveying and Mapping ……………………………………………13 FDOT Prequalification Letter …………………………………………………………………………….17 DBE Certificate of Eligibility …………………………………………………………………………….18

Tab C – Location/Accessibility Location/Accessibility ……………………………………………………………………………………19

Tab D – Volume of Similar Contracts and Past Performance of Respondent Griner Engineering Volume of Similar Contracts with Government Agencies ……………………….…21 Hyatt Surveying & Mapping Volume of Similar Contracts with Government Agencies ………………..22

Tab E – Current and Projected Workload Griner Engineering Current and Projected Workload ………………………………………………….…23 Hyatt Survey Services, Inc. Current and Projected Workload ……………………………………………24

Tab F – Certified Minority Business Enterprise Certified Minority Business Enterprise Statement ……………...………………………………………...27

Tab G – Local Preference Local Preference Statement ……………………...……………………………………………………….28

Tab H – Required Forms and Additional Information Category Checklist ………………………………………………………………………………………..29 Completed Form Required by all Respondents …………………………………………………………..30 Professional Licenses and Insurance ……………………………………………………………………..31 Completed W-9 – Request for Taxpayer Identification Number and Certification ………………………34 Certificate of Liability Insurance …………………………………………………………………………35 Sworn Statement Pursuant to Section 287.133(3)(a) ……………………………………………………..36 No Contact Clause ………………………………………………………………………………………..38 Conflict of Interest Disclosure Form ……………………………………………………………………..39 Drug-Free Workplace Form ………………………………………………………………………………40 Affidavit Certification Immigration Laws ………………………………………………………………..41 Agreement Modification Request ………….……………………………………………………..………42

Ability of Professional Personnel & Staff Experience

Library of Engineering Services for

Page | 1

ORGANIZATIONAL CHART

Subconsultants

Jose A. Rosario, P.E.

Electrical Engineer

Project Manager

Joseph H. Griner, P.E.

President

Principal-in-Charge

Hala Boshra Electrical Engineer

Support Staff

Richard Miller Senior Electrical

Designer, Support Staff

Sajid Khan Electrical Engineer

Support Staff

Debora Parker Office Manager

Curtis t. Latzo, PhD, P.E.

Arc Flash Study Pro Electrical Engineer

Heather Wallace Administrative Assistant

Russell Hyatt, PSM Hyatt Survey Services, Inc.

Senior Surveyor & Mapper

Library of Engineering Services for

Page | 2

Meet Our Staff and Subconsultants Joseph H. Griner III, P.E., LEED AP President

Project Role Principal in Charge

Education Bachelor of Science, Chemical Engineering, University of South Florida

Experience Mr. Griner has more than 35 years of engineering design and management experience for residential, municipal/recreational, educational, commercial, and healthcare facilities while at Griner Engineering. Mr.

Griner is a Professional Engineer and has been the President of Griner Engineering since 1995 (at that time Best, Griner and Associates). Today he manages the daily operation of this 11-person consulting firm.

As the president of Griner Engineering, Inc, Mr. Griner’s role for this contract is to provide oversight over the Project Manager and staff assigned to contracted projects with the City of Plant City.

Professional Registration Registered Professional Engineer in Alabama, Arizona, California, Colorado, Florida, Georgia, Indiana, Iowa, Kansas, Kentucky, Massachusetts, Michigan, Mississippi, Missouri, Montana, New Mexico, New York, North Carolina, Ohio, Pennsylvania, Puerto Rico, South Carolina, Tennessee, Texas, and Virginia.

(FL PE #39491)

Certified Building Commissioning Professional (#54128)

National Institute for Certification in Engineering Technologies (#84926) NICET Level I Fire Protection Engineering Technology Fire Alarm Systems NICET Level III Fire Protection Engineering Technology Water-Based Systems Layout

LEED® Professional Accreditation - LEED® AP

Affiliations American Institute of Energy Engineers ASHRAE Technical Committee TC 1.12 “Moisture Management Buildings” Florida Engineering Society Florida West Coast Chapter of ASHRAE (Past President) National Society of Professional Engineers Florida Institute of Consulting Engineers (Past Director)

Current Appointments Life Safety and Fire Board of Adjustment and Appeals, Pinellas County Construction Licensing Board

Library of Engineering Services for

Page | 3

Jose A. Rosario, P.E.

Project Role Electrical Engineer of Record

Education Bachelor of Science, Electrical Engineering & Power Systems, University of Puerto Rico

Experience Mr. Rosario has over 15 years of experience in electrical engineering design and system integration as well as commissioning experience and construction administration. His experience includes panel board to large switchgear voltage distribution systems; lighting protection and power systems; emergency power distribution; fire alarm systems; life safety code analysis and design; telephone, data and security systems;

power generation; energy efficient lighting systems (including public buildings, parking lots/garages, and recreational/sporting facilities); power distribution systems for IT applications; variable frequency drive systems; transient voltage protection systems; selective breaker coordination; and uninterruptible power supply systems.

In addition to electrical design, Mr. Rosario serves as the Project Manager in the electrical design division overseeing design coordination, project schedules, and other designers. He is skilled in ensuring projects are on time and within budget guidelines.

Professional Registration Registered Professional Engineer in Florida (FL PE #74457)

Relevant Projects City of Clearwater Countryside Soccer Field Lighting, Phase II On-Going Project manager overseeing the second phase of lighting upgrades to the Countryside Soccer Fields. Design includes the addition of poles and lights to bring the photometrics to 50 fc minimum for the remaining fields. Verification of photometric figures and construction administration is provided with this contract.

City of Clearwater Countryside Soccer Field, Phase I September 2020 Project manager - provided design for the addition of poles and lighting to achieve lighting of 50 fc minimum for fields 3 and 4. Design included coordination with local utility for the replacement of the transformer as well as a verification of the readings of the photometric analysis provided by the contractor.

Pre-bid meeting attendance, contractor bid analysis and recommendation, and construction administration was provided with this contract.

City of Clearwater State Street Park On-Going Project manager overseeing the design of a new electrical meter, service, and panel for an irrigation controller and LED lighting for the park identification sign.

Pinellas County Board of County commissioners Assembly Space On-Going Project manager overseeing the electrical design and coordination of mechanical, plumbing and fire protection for a partial remodel of the existing space into a pre-function space and assembly space. Design also included a new audio-visual system for the assembly space.

City of St. Petersburg I-375 Overpass Parking Lot On-Going Project manager for the addition of underpass lighting and electrical service for the future addition of electric vehicle charging stations. Pre-bid meeting attendance, contractor bid analysis and recommendation, and construction administration is provided with this contract.

Library of Engineering Services for

Page | 4

Richard H. Miller Senior Electrical Designer

Project Role Technical and Support Staff

Education Bachelor of Science, Electrical Engineering Technology, University of South Florida Associate of Science, Electrical Engineering Technology, St. Petersburg College United States Air Force, Generator/Power School

Experience Mr. Miller has over 30 years of experience in electrical engineering design and management in the construction industry. Mr. Miller’s electrical design experience with both new construction and existing buildings includes the design of condominiums, restaurants, municipal, public utilities, and recreational facilities.

He specializes in the design of UPS and power design for data centers, the electrical design of medium voltage generators, chillers, switchgears, photovoltaic, site lighting, equipment power wiring, emergency generator design and modifications of utility switching facilities.

As electrical project designer, Mr. Miller provides an assessment and coordination of the project to determine the scope of services and estimated costs associated with the proposed electrical design. He makes recommendations for upgrading and improvements to existing facilities, assists and reviews in the preparation of plans, specifications and permitting.

Relevant Projects City of St. Petersburg, Rehabilitation of Lift Stations 3, 9, and 60 On-Going Electrical Engineering Designer/Project Manager Replacement of the existing electrical equipment and wiring at City of St. Petersburg Lift Stations 3, 9, and 60 to include replacement of two pumps, SCADA control wiring and conduit, and replacement of service disconnects. Additionally, the pumps and controls will be relocated on site to accommodate the storing of a temporary generator within the fence. Upon completion of the installation of the new pumps and controls, a hot swap will occur in order to eliminate any interruption to service.

Northside Behavioral Health Generator Replacement 2020 Electrical Engineering Designer/Project Manager Provided the engineering design for the replacement of an existing emergency generator with a 125KW generator. During the design process, a breaker coordination study was performed on the existing breakers to ensure compatibility with the new generator. Interim Life Safety Measures were provided to the client to detail procedures in the event of loss of power during the project as well as specifications on the new generator.

Florida Orthopaedic Institute Surgery Center Generator Replacement 2020 Electrical Engineering Designer Electrical engineering design/drafting provided for the replacement of an existing emergency backup generator to a 150KW backup generator. A breaker coordination study was performed on the existing system to verify compatibility with the new generator. The client was also provided with generator specifications and Interim Life Safety Measures to be followed during the project.

Library of Engineering Services for

Page | 5

Hala Boshra

Project Role Technical and Support Staff

Education Bachelor of Science, Faculty of Engineering, Ain Shams University, El-Abaseya, Egypt Certificate of Completion, REVIT Drafting Program, Pinellas Technical Institute

Experience Mrs. Boshra has over 20 years of experience in electrical engineering design with the last 4 years as a Griner Engineering team member. She has experience in the design of electrical and telecommunication systems (voice/data/public address/CCTV/MATV). Her abundant experience encompasses indoor and outdoor street lighting systems, indoor and outdoor power distribution networks, infrastructure distribution networks, fire alarm systems, and access control systems as well as low-current systems, earthing and lightning systems, power and motor control centers, and photovoltaic systems.

Recent Projects Friendly Kia Remodel and Addition On-Going Electrical Engineering Designer Provided design of an upgraded electrical service to accommodate the new electrical load of the building addition including coordination with utilities; electrical distribution system including all necessary switchboards, panel boards, transformers, etc. needed for the expansion; connections and controls for interior and building mounted lighting; and power wiring.

Transwestern West Palm Beach Apartments On-Going Electrical Engineering Designer Electrical design of distribution system, connections and controls for interior lighting and building mounted lighting, power wiring to include receptacles, elevators, kitchen and mechanical equipment, complete ADA compliant fire alarm system, and design of special systems (i.e. sound, data, security, etc.)

for this 219 unit mixed use building. Design also includes a parking garage and “white box” retail spaces.

Library of Engineering Services for

Page | 6

Sajid Ali Khan

Project Role Technical and Support Staff

Education Bachelor of Science, Electrical and Electronics Engineering, North South University, Dhaka, Bangladesh Master of Science, Electrical Engineering, University of Texas at Arlington

Experience Mr. Khan has a strong background in electrical engineering design for residential, commercial, and industrial buildings, as well as healthcare facilities, multi-family dwellings, auto dealerships, retail establishments, storage facilities, and restaurants to include power distribution and lighting design, and fire alarm design. He is adept at performing load calculations, short circuit, and arc flash analyses.

Recent Projects City of Clearwater Countryside Soccer Field Lighting, Phase II On-Going Provided the electrical engineering design/drafting for the second phase of lighting upgrades to the Countryside Soccer Fields. Design for the addition of poles and lights to bring the photometrics to 50 fc minimum for the remaining fields.

City of Clearwater Countryside Soccer Field, Phase I September 2020 Provided he electrical engineering design/drafting for the addition of poles and lighting to achieve lighting of 50 fc minimum for fields 3 and 4. Design included coordination with local utility for the replacement of the transformer as well as a verification of the readings of the photometric analysis provided by the contractor.

City of Clearwater State Street Park On-Going Providing electrical engineering design/drafting of a new electrical meter, service, and panel for an irrigation controller and LED lighting for the park identification sign.

Library of Engineering Services for

Page | 7

Curtis T. Latzo, Ph.D., P.E.

Arc Flash Study Pro General Information:

Over 30 years of experience in the electrical engineering industry. Specialties have included electrical design, power systems analysis, telecom-data system design, and public safety distributed antenna system design.

In the past 20 years, more than 100 electrical system studies have been provided for Manufacturing Facilities, Hospitals, Data Centers, Schools, Telecommunications Facilities, and Municipal Infrastructure projects.

The focus of the consulting practice is with critical electrical systems where generators, UPS systems, and reliable power distribution systems are necessary. Arc Flash Hazard Analysis, Short Circuit and Protective Device Coordination Studies at medium and low voltage for data centers, manufacturing, institutional, industrial, telecommunication, and municipal clients are the core segment of the consulting business.

Electrical Engineer: Dr. Curtis T. Latzo, Ph.D., P.E.

Registration: State of Florida, Georgia, North Carolina, Delaware, Pennsylvania, Colorado, Tennessee, Louisiana, California, New York

NCEES Registered

NFPA 70E Certificate of Educational Achievement

IEEE Certificate of Achievement for Arc Flash Applications

Member of NFPA

Member of IEEE

Education Ph.D., University of South Florida 2011

MSEE, University of South Florida 2007

MBA, University of Central Florida 1997

BSEE, University of Central Florida 1990

Library of Engineering Services for

Page | 8

Russell Hyatt, PSM Senior Surveyor and Mapper Hyatt Survey Services, Inc.

Years of Experience: 32

Education:

Bachelor of Science, Survey and Mapping, University of Florida, 1990

26 years of continuing education in Florida Law, standards of practice, land title, environmental, GIS, GPS and business and professional development

Distinguishing Attributes:

• Mr. Hyatt has 32 years of professional surveying and mapping experience relating to transportation planning, construction and engineering. He also has experience as an expert witness in depositions regarding survey and property titles.

Affiliations:

• Florida Surveying and Mapping Society (Past President)

• Manasota & Tampa Bay Chapters of the Florida Surveying and Mapping Society

• University of Florida Surveying and Mapping Advisory Committee

• The Hydrographic Society of America

• National Society of Professional Surveyors

• Society of Military Engineers

• American Public Works Association

• Florida Shore and Beach Preservation Association

• West Coast Land Surveyors Association

• MAPPS

Expertise:

As Vice President of Hyatt Survey Services, Inc., Russell’s duties include local, state and federal contract administration, project management and overall quality control. In addition to his administrative duties, Russell is also responsible for the production of boundary, hydrographic and topographic surveys.

Previous Employment History:

• October 1992 – November 2002: Foresight Surveyors Inc., Clearwater, Florida

• May 1990 – October 1992: George F. Young, Inc. Bradenton, Florida

• July 1986 – December 1988: Fuquay Land Surveying, Inc., Fuquay Varina, N.C.

Completed Past Project Experience as Lead Consultant:

(2015-2017) 16th St, 17th St., 4th Ave. East, 21st St. West & 23rd Ave. West, Areas A-H, Bradenton, Florida Russell was responsible for providing the surveying services required for this design/build, bid and build project for the City of Bradenton Public Works Dept. which required a right of way & topographic survey of 30,000 LF of proposed water main route.

(2005-2009) IDIQ Continuing A/E Survey Services Contract, USACE-Jacksonville District As Project Manager and scheduler, Russell oversaw the successful completion of 51 Task Orders as assigned by the USACE - Jacksonville District. Scopes of work. These task orders consisted of Single/Multi Beam Hydrographic Surveys (near shore / offshore surveys, beach profiles, canal cross sections and channel surveys), Topographic Surveys (beach profiles, levee cross sections, upland disposal areas and LIDAR ground truthing), Horizontal & Vertical Geodetic Control Surveys (Static / RTK GPS Control Networks & Digital Leveling), Construction Support Surveys, Real Estate Boundary Surveys, Tidal Surveys, Ground Penetrating Radar & Vacuum Utility Excavation, photogrammetric mapping, orthophotography.

Library of Engineering Services for

Page | 9

Staff Capabilities The following table indicates the capabilities of each staff member for the technical services listed:

Jo se ph

G rin er

Jo se

R os ar io

Ri ch ar d

M ill

Ha la

B os hr a

Sa jid

K ha n

Cu rt is L at zo

Ru ss el l H ya tt

Change order negotiation X X X X

Claims management X X X X

Cost control X X X X X X X

Cost estimating of the GMP X X X X

Constructability analysis X X X X X

Design X X X X X X X

Life cycle cost analysis X X X X

Project close out X X X X X

Quality control (construction) X X X X X

Value engineering X X X X X X

As owners or officers of their respective companies, Mr. Griner and Mr. Latzo have the experience to provide expertise for all required services. As the electrical department manager for Griner Engineering, Mr. Rosario has the experience to fulfill all the required technical services as Owner’s Advisor. Mr. Hyatt can provide expertise in all technical areas that are related to surveying and mapping. Mr. Miller, Mrs.

Boshra, and Mr. Khan have experience with and can provide expertise for the specific services indicated.

Relevant Experience

Library of Engineering Services for

Page | 10

Relevant Experience for Electrical Engineering

Griner Engineering, Inc. was founded in 1968 as an electrical engineering firm. Since then, our company has grown into a well-respected firm offering mechanical, electrical, plumbing, and fire protection (MEP) engineering design and LEED® commissioning services. Our corporate offices are located in St.

Petersburg, FL, with our newest location in Sevierville, TN.

Our services include:

Design/Build documents, construction documents for competitive bidding, and value engineering.

Energy assessments, constructability analysis, life cycle cost analysis, arc flash analysis, and cost estimating.

Construction Administration services including change order negotiation, cost analysis, claims management, quality control, and project close out.

Phased services.

Griner Engineering, Inc. has extensive design experience in:

Airport Hangers (including offices) Arts/Cultural/Museums Commercial/Office/Retail Correctional/Criminal Justice Facilities Custom Homes/Multi-Family Dwellings Education: K—12 and Higher Financial Institutions

Health Care Facilities Historical renovation/preservation Hospitality Industry Municipal Facilities Nursing Homes/Assisted Living Facilities Religious Facilities Sports/Recreation Facilities

As a full-service consulting engineering firm, we have a number of current projects in various stages of development. Weekly project meetings ensure that each project is on time and within budget for delivery of documents. Griner Engineering will provide the City of Plant City with the necessary time for any project that is awarded to us and remain within budget for the agreed upon services.

Library of Engineering Services for

Page | 11

Related Experience

Countryside Soccer Fields, Phase I Clearwater, FL Griner Engineering was the Engineer of Record for the electrical design of the lighting and power upgrades to part of the soccer fields. Jose Rosario, P.E. and Sajid Khan were the staff assigned to the project. Services included development of construction documents, permitting support, RFI coordination, submittal review, photometric performance review, fault current coordination, site inspections during construction, and construction administration. This small to medium sized project was 95% complete in July 2020, but final closeout of the project was delayed due to COVID-19 issues.

Project Name

Project Design Budget

Final Costs

Original Project

Schedule

Actual Project

Schedule Owner Contact Information

Countryside Soccer Field Lighting Upgrades - Phase I

$9,345 $9,345 4 months 6 months

City of Clearwater, Parks & Recreation, 101 S Myrtle St, Suite

120, Clearwater, FL 33756 Leroy Chin, 727-224-7101

Leroy.Chin@MyClearwater.com

Countryside Soccer Fields, Phase II Clearwater, FL Griner Engineering is the Engineer of Record for the electrical design of the lighting upgrades to the remainder of the soccer fields not done in phase I. Jose Rosario, P.E. and Sajid Khan are the staff assigned to the project. Services include development of construction documents, permitting support, RFI coordination, submittal review, photometric performance review, fault current coordination, site inspections during construction, and construction administration. This small to medium sized project is currently on-going and is projected to be completed on time and within budget.

Design Budget

Final Costs

Original Project

Schedule

Actual Project

Schedule Owner Contact Information

Countryside Soccer Field Lighting Upgrades - Phase II

$5,400 N/A 6 months On-Going

City of Clearwater, Parks & Recreation, 101 S Myrtle St, Suite

120, Clearwater, FL 33756 Leroy Chin, 727-224-7101

Leroy.Chin@MyClearwater.com

State Street Park Electrical Additions Clearwater, FL Griner Engineering is the Engineer of Record for the electrical design for a new electrical meter, service and panel for an irrigation controller and LED lights for the park identification sign. Jose Rosario, P.E. and Sajid Khan are the staff assigned to the project. Besides providing construction documents, we are coordinating with the local utility provider on behalf of the client and responding to permit comments. This small project is currently on-going and is projected to be completed on time and within budget.

Library of Engineering Services for

Page | 12

Design Budget

Final Costs

Original Project

Schedule

Actual Project

Schedule Owner Contact Information

State Street Park Electrical $1,500 N/A 5 months On-Going

City of Clearwater, Parks & Recreation, 101 S Myrtle St, Suite

120, Clearwater, FL 33756 Leroy Chin, 727-224-7101

Leroy.Chin@MyClearwater.com

I-375 Overpass Parking Lot Lighting St. Petersburg, FL As the Engineer of Record for this on-going services contract, Griner is providing electrical engineering design, photometric design, project cost estimation, and submittal review for the lighting of the parking lot underneath the I-375 overpass and providing electrical service and infrastructure for two (2) future electric vehicle charging stations. Site visits are provided as necessary. For this small to medium sized project, the staff assigned are Jose Rosario, P.E. and Hala Boshra. The project is currently on-going and is expected to be completed on time and within budget.

Design Budget

Final Costs

Original Project

Schedule

Actual Project

Schedule Owner Contact Information

I-375 Overpass Parking Lot Lighting

$6,000 N/A 7 months On-Going

City of St. Petersburg, Engineering & Capital Improvements

One 4th Street N, St. Petersburg, FL 33701

Nicholas Head, P.E., 727-893-7851 Nicholas.Head@stpete.org

Lift Stations 3, 9, & 60 St. Petersburg, FL For this project, Griner Engineering is subcontracted as the electrical Engineer of Record for this medium to large sized project. For Lift Stations #3 and #9, the scope includes the replacement of two (2) pumps, SCADA control wiring and conduit, replacement of service disconnects, and associated relocations. For Lift Station #60, the scope includes replacement of security lights and two (2) pumps, SCADA control wiring and conduits, replacement of service disconnects, and associated relocations. Replacement of the two pumps will include a “hot swap” to ensure no interruption of service. Griner is providing construction documents and coordination with Infinity Controls. Richard Miller and Jose Rosario, P.E. are the staff assigned to this on-going project, which is currently on schedule and within budget.

Design Budget

Final Costs

Original Project

Schedule

Actual Project

Schedule Owner Contact Information

Lift Stations 3, 9, & 60 Rehabilitation

$3,000;

$2,600, $2,400

N/A 9 months On-Going

City of St. Petersburg, Engineering & Capital Improvements

One 4th Street N, St. Petersburg, FL 33701

Hamza Bouloudene, 727-551-3054 Hamza.Bouloudene@stpete.org

Library of Engineering Services for

Page | 13

Relevant Experience for Registered Surveying and Mapping

Hyatt Survey Services, Inc. is a full-service surveying and mapping company with a professional staff combining over 60 years of extensive experience in a variety of project areas. From boundary, topographic and right-of-way surveying to intricate geodetic, construction and hydrographic/bathymetric surveying, we can fulfill all your surveying requirements. Our current list of clients includes the US Army Corps of Engineers, the Florida Department of Transportation, South Florida Water Management District in addition to Hillsborough, Manatee, Sarasota, and Charlotte Counties.

Hyatt Survey Services is a certified WBE/MBE with the State of Florida Office of Supplier Diversity as well as a certified DBE with the Florida Department of Transportation.

With our Florida headquarters located in Manatee County, Hyatt Survey Services, Inc. has convenient access to a broad geographic area. We have provided professional surveying services throughout the state of Florida for more than 18 years for municipal, commercial, and private sector clientele.

Hyatt Survey offers a multitude of surveying services, including, but not limited to:

o Boundary surveys o Topographic (and tree) surveys o Hydrographic/Bathymetric surveys o Single Beam Sonar o Multibeam Sonar o Sidescan Sonar o Architectural/Design surveys o GPS o Horizontal and vertical control surveys o Construction staking and “as-built”/record surveys o Subsurface Utility location surveys o Legal descriptions and/or easement preparations o Earthwork surveys and volume computations o Right-of-way surveys o Jurisdictional/Mitigation line surveys o Geodetic Leveling o UAV/Drone surveys

Library of Engineering Services for

Page | 14

Related Experience

Project/Location: Tampa Bay Artificial Reef, Tampa Bay, FL Respondents Responsibility on Project: Hyatt Survey performed a multi-beam bathymetric survey of the artificial reef to depict the configuration of the bay bottom and the location of artificial reef debris in the area. This survey was performed utilizing a R2Sonic 2024 High Frequency Multibeam Fathometer coupled with an Applanix “Surf Master” inertial navigation system and Odom Digibar sound velocity profiler. All data was collected and processed with Hypack and Hysweep Hydrographic Data collection software and all horizontal survey data tied to the Florida State Plane Coordinate System, NAD 83/07 datum. All elevation or depth data was referenced to the NAVD 1988 (MLLW) vertical datum. All deliverables were georeferenced surveys depicting the contours of the area relative to MLLW along with a shapefile of the survey.

Owner: Manatee County Parks & Natural Resources Department Address: 5502 33rd Ave. Dr. W., Bradenton, FL 34209 Owner’s Rep/Contact: Alan Lai Hipp Ph: (941) 748-4501 ext. 6008 Email: alan.laihipp@mymanatee.org Key Personnel Role in Project: Pamela A. Hyatt, PSM, Contract Administration Russell P. Hyatt, PSM, Project Manager Steven Long, Crew Chief

Project/Location: 16-109 KRR SNT 10 – Topographic / Hydrographic Construction Support, Okeechobee County, FL

Respondents Responsibility on Project: Hyatt Survey performed pre & post construction topographic surveys of borrow areas along 6 miles of the Kissimmee River encompassing roughly 1,500 acres of property. Horizontal and vertical project control points were established from and verified against published NGS Control Points. Additional more densely spaced control points were established with RTK GPS and verified daily. 320 cross sections up to 1,500 feet wide were surveyed amounting to roughly 32,000 lf of river basin. The survey required the use of canoes, a marsh master, ATV's and airboat to gain access to and traverse the site. RTK GPS and robotic total stations were utilized for all upland topographic data collection with standardized feature codes. Single Beam Dual Frequency Hydrographic Surveys were performed along the 6-mile river basin. Field data was uploaded to the Hyatt Survey FTP site on a daily basis for processing, QA/QC and CADD by Hyatt office personnel.

MicroStation/InRoads/Hypack software packages were used for data processing and CADD of deliverables. All deliverables were provided in the required USACE CADD/GIS format.

Owner: US Army Corps of Engineers-Jacksonville District Agency’s Rep/Contact: Robert Swilley, PSM Address: 701 San Marco Blvd., Suite 5E, Jacksonville, FL 32207 Ph: (904) 232-1704 Email: Robert.W.Swilley@usace.army.mil Key Personnel Role in Project: Pamela A. Hyatt, PSM, Contract Administration Russell P. Hyatt, PSM, Project Manager Chris Whightsel, Project Surveyor Mike Ell, Crew Chief Taylor Gay, Crew Chief Brad Scott, Instrument Operator Paul Mahofski, Rod Person mailto:alan.laihipp@mymanatee.org mailto:Robert.W.Swilley@usace.army.mil

Library of Engineering Services for

Page | 15

Project/Location: Vila Brothers Park, Blake High School Trail/Linear Park, Calvin Taylor Park, Tampa, FL

Respondents Responsibility on Project: Hyatt Survey performed a boundary, topographic & tree survey of the Vila Brothers Park property which included the mapping of all visible aboveground encroachments.

Site elevations were determined on a 50’ grid, at grade breaks, at changes in direction of curbing/paving, extending to the centerline of the adjacent street or rights of way and to 10’ offsite on other sides not fronting the street/right of way. A boundary stakeout of the upland boundary of the Blake High School Trail/Linear Park was also performed. The services provided for Calvin Taylor Park also consisted of a Boundary Survey.

Owner: City of Tampa Real Estate Department Agency’s Rep/Contact: Karla Price, P.E.

Address: 701 San Marco Blvd., Suite 5E, Jacksonville, FL 32207 Ph: (813) 274-5134 Email: Karla.Price@tampagov.net

Key Personnel Role in Project: Pamela A. Hyatt, PSM, Contract Administration Russell P. Hyatt, PSM, Project Manager John Matthews, Project Surveyor Mike Wheeler, Crew Chief Brad Scott, Instrument Person

Project/Location: Broward, Lee and Manatee County Monitoring, Broward, Lee and Manatee Counties, FL

Respondents Responsibility on Project: Hyatt Survey provided a topographic and hydrographic monitoring survey for the purpose of utilizing the acquired data for monitoring and permit compliance.

This work consists of obtaining hydrographic and topographic beach profile data for 69 R-Monuments in Broward County, 35 R-Monuments in Lee County, and 43 R-Monuments in Manatee County. Profile lines extend 150 feet landward (or to the limits of the beach), from the established monument or until a building, road, wall, protected vegetation, water, etc. is encountered. Profile lines extend seaward from the most landward offshore data point a distance of no less than 3,000 fee to 30 feet of depth (NAVD88), whichever comes first. Collection of conventional spot elevation (X, Y, Z) on 10-foot ranges (land), all breaks in grade greater than 1 foot vertically, vegetation line, tops and toes of dunes, seawalls, or other manmade features along the profile line. Hyatt Survey is collection and recording spot elevations on all monuments that are recovered in good condition and soundings identified at 12.5-ft ranges along the profile. Hyatt Survey is utilizing RTK for horizontal and vertical positioning of all hydrographic data acquired as well as motion sensing compensation for all hydrographic data acquisition. In addition, structures will be located along each survey profile such as seawalls and dune walkovers. Above ground utility indicators, and outfalls along the beach. For any survey line terminating at the bulkhead or any permanently fixed structure, a lead line sounding was obtained. Positions and elevations were referenced to the Lee County project control provided by the client.

Owner: Owner: US Army Corps of Engineers-Jacksonville District Agency’s Rep/Contact: Robert Swilley, PSM Address: 701 San Marco Blvd., Suite 5E, Jacksonville, FL 32207 Ph: (904) 232-1704 Email: Robert.W.Swilley@usace.army.mil mailto:Karla.Price@tampagov.net mailto:Robert.W.Swilley@usace.army.mil

Library of Engineering Services for

Page | 16

Key Personnel Role in Project: Pamela A. Hyatt, PSM, Contract Administrator Russell P. Hyatt, PSM, Project Manager Chris Whightsel, Project Surveyor Steven Long, Crew Chief Brad Scott, Instrument Person

Library of Engineering Services for

Page | 17

Library of Engineering Services for

Page | 18

Location / Accessibility

Library of Engineering Services for

Page | 19

Location/accessibility Griner Engineering is located one mile from the I-275 North ramp and approximately 45 miles from City Hall.

Arc Flash Study Pro is located approximately 50 miles from City Hall.

Griner Engineering, Inc.

Library of Engineering Services for

Page | 20

Hyatt Survey Services is located approximately 55 miles from City Hall.

Volume of Similar Contracts with Government Agencies

Library of Engineering Services for

Page | 21

Volume of Similar Contracts with Government Agencies

Griner Engineering, Inc.

Projects Date Design Budget

City of Saint Petersburg Fire HQ Generator Design 2018 $6,500 City of Saint Petersburg Coliseum Fire Sprinkler Documents 2018 $3,500 City of Saint Petersburg Trash Compactor Enclosure 2018 $4,045

City of Saint Petersburg Police HQ Commissioning Services 2017 $45,360

City of Saint Petersburg Police HQ Building F HVAC Replacement 2017 $10,000

City of Saint Petersburg Oberly Water Treatment Plant On-Going $8,540

City of Saint Petersburg Cosme Water Treatment Plant On-Going $9,590

City of Saint Petersburg Fleet Fuel Dispensing & Security Updates 2016 $11,570

City of Saint Petersburg Central Chiller Plant 2016 $6,200

City of Saint Petersburg Central Records Warehouse 2016 $4,000

City of St. Petersburg Northeast Treatment Plant 2017 $4,000

City of Clearwater Joe DiMaggio Sports Complex Upgrades 2017 $12,500

City of Clearwater Spectrum Field Pete & Shorty’s Kiosk Electrical 2017 $1,500

Pinellas County FLEET Management Reroofing 2018 $6,500

City of Tampa Fire Station 23 New Construction 2019 $29,500

City of Clearwater Spectrum Field HVAC & Plumbing Upgrades Phase II 2019 $6,500

City of Clearwater Crest Lake Park Veteran’s Memorial Lighting Upgrades 2017 $1,000

City of St. Petersburg Jenny Pool at Wildwood Rec Center Upgrades 2018 $2,200

City of Largo City Hall Office and IT Room Remodel 2018 $3,000

City of Clearwater Eddie C. Moore Sports Complex Electrical Systems Analysis 2019 $2,200

Hernando County Fire Station #4 HVAC Replacement 2020 $4,400

City of Clearwater Coachman Ridge Park Site Lighting Upgrades 2020 $2,950

City of Clearwater Pier 60 Bait Shop Lift Station Upgrades On-Going $5,500

City of Dunedin Community Center Chiller Replacement On-Going $12,000

Pinellas County Safe Harbor & DIU Renovation 2020 $2,200

Pinellas County Board of County Commissioners Assembly Space Renovation On-Going $5,500

City of Clearwater Spectrum Field HVAC Replacement Phase III On-Going $41,000

Library of Engineering Services for

Page | 22

Hyatt Surveying & Mapping, Inc.

Below are continuing contracts awarded within the past 5 years and the volume of work issued to date.

1) Charlotte County Purchasing, Contract RFP#2014000320 and 2015000421, $578,202.00

2) City of Bradenton, Contract RFQ#18-07 JM, $268,180.00

3) City of Largo, Contract RFQ#19-Q-666, $0

4) City of St. Petersburg, Agreement #228201, $30,556.03

5) City of St. Petersburg Beach, RFQ for Engineering & Consulting Services, $0

6) City of Tampa, Contracts 16-D-52607, 18-D-00400 and 20-D-51110, $202,437.00

7) Manatee County Port Authority, Contract RFQ-1-0-2020/JZ, $0

8) Manatee County Purchasing Dept., Contracts 14-0695DC and 19-TA002998AEJ, $468,567.68

9) School District of Manatee County, Continuing Contract Professional Services, $2,200.00

10) School Board of Sarasota County, Construction Services Contract 2020-2023, $3,010.00

11) Southwest Florida Water Management District, Contract RFQ 001-18, $41,315.60

12) Town of Ft. Myers Beach, Contract RFQ 20-22-AD, $0

13) Town of Longboat Key Purchasing, Contract RFP 16-021, $294,767.52

14) U.S. Army Corps of Engineers, Contracts W912EP16D0003 and W912EP19D0007, $2,799,266.86

Some municipal clients refer to their Professional Services Library for pre-qualified consultants to provide services. For those clients, Hyatt Survey has provided services via a signed in-house proposal or through purchase orders issued by the client. The following municipal clients have received services without benefit of continuing contracts within the past 5 years and the volume of work to date.

1) City of Anna Maria Island, $16,105.00

2) City of Sarasota, $19,725.00

3) City of Wauchula, 3,795.00

4) Federal Aviation Authority, $8,160.00

5) Sarasota County Government, $16,840.00

6) Sarasota-Manatee Airport Authority, $39,351.00

Current and Projected Workload

Library of Engineering Services for

Page | 23

Current Workload

Griner Engineering, Inc.

Griner Engineering Current & Projected Workload Jo se ph

H

G ri ne r

II

I, P.

E

Jo se

A

R os ar io

, P .E

R ic ha rd

H

M

Sa jid

A

K ha n

H al a B os hr a

COSP Truck Wash 5% 3% 15% COSP Lift Stations 3, 9, & 60 2% 25% I-375 Overpass Parking Lot Lighting 5% 15% Griffith Condos 5% 3% 5% Ozona Site Lighting 3% 5% St. Pete Distillery Warehouse 5% 5% 10% Fishhawk Ranch (Multiple projects) 5% 10% 10% 10% Countryside Soccer Field Lighting Phase II 5% 5% COC Spectrum Field HVAC Replacement 5% 2% 15% State Street Park Electrical 2% 5% Total Workload 25% 40% 30% 45% 45%

Projected Workload

Griner Engineering Current & Projected Workload Jo se ph

H

G ri ne r

II

I, P.

E

Jo se

A

R os ar io

, P .E

R ic ha rd

H

M

Sa jid

A

K ha n

H al a B os hr a Pinellas County Taylor House 5% 5% 10% Pinellas Prep Academy Expansion 5% 5% 10% Suncoast Center Tenant Improvement 5% 5% 5% St. Peter Catholic Church Renovation 5% 5% 5% Stapleton Residence 5% 5% 5% Morningstar Classroom Building 5% 5% 5% Total Workload 30% 30% 10% 15% 15%

Library of Engineering Services for

Page | 24

Client/Hyatt Project Number/Project Name %

Complete Estimated Project Completed By

A2 Group, Inc.:19-2395-1 Lincoln Park Pool Awaiting

NTP

AECOM Technical Services, Inc.:20-2547 Oscar Scherer State Park PO#128861 80% 2020

AIM Engineering & Surveying, Inc.:20-2520-1 Cocohatchee River 60% 2020

Ajax Paving:20-2466 St. Pete-Clearwater Runway 18-36 81% 2021

All American Concrete, Inc.:07-1373-2 Duke Energy Trail Ext. Ph. II 56% 2021

American Infrastructure Development:18-2265-3 Venice Airport Taxiway E

VNC20011

Awaiting

NTP

Ayres Associates:20-2537 Spring Lake Bayou Bridge 105624 80% 2020

Ayres Associates:20-2538 Dug Creek Bridge 104346 80% 2020

CBRD Construction LLC:20-2564 Drs. Hospital of Sarasota Awaiting

NTP

CardnoTBE:18-2243 Moccasin Wallow Rd. 90% 2021

CardnoTBE:20-2558 LWR & Water Lily/Balmoral 90% 2020

City of St. Petersburg:20-2469 1st Street South TO#19-02-HSS/S(S) Proj#20071-

111 PO#232837

92%

City of St. Petersburg:20-2495 Bartlett Lake Improvements TO#19-01-HSS-S(S)

PO#232838

90%

D. N. Higgins:19-2434 Coon Key Multi Use Trail 96% 2020

D. N. Higgins:20-2541 Bayfront Park 31% 2021

D. N. Higgins:20-2541-1 Siesta Dr Awaiting

NTP

D. N. Higgins:20-2541-2 - 7th Street Awaiting

NTP

Dallas 1 Corp:19-2373 Culbreath Bayou 31% 2021

Dallas 1 Corp:19-2373-1 Culbreath Bayou-Baselines 90% 2021

GLF Construction:19-2367 TIA Taxiway A & Bridge 28% 2021

Gannett Fleming:20-2516-2 Berth 214 13% 2021

Gannett Fleming:20-2516-3 Port Ybor PO#061959.031 Awating

NTP

Garney Companies, Inc.:07-1333-5 LS 87 Phase 3 Gravity Mains 13% 2021

HDR One Company:19-2402 Boyette Rd. & Dorman Rd. 52% 2021

HDR One Company:19-2432 Symmes Rd. at East Bay Rd. WO#3 71% 2021

HDR One Company:20-2543 Bridge #105500 Platt Street PO#220211138 90% 2021

HDR One Company:20-2557 STA 1W Expansion #2 Awaiting

NTP

HNTB Corporation:20-2506 131st. Ave. PD&E 51% 2021

HNTB Corporation:20-2532 N. Wilder Road 95% 2021

Hazen & Sawyer PC:19-2377 Second FM under I-75 84% 2021

Hazen & Sawyer PC:19-2425 San Carlos PS 43% 2021

Hazen & Sawyer PC:19-2427-1 South County AWTP Headworks 90% 2021

Hazen & Sawyer PC:20-2467 City of Arcadia Gravity Sewer Basin 14 71% 2020

Hazen & Sawyer PC:20-2487 City of Arcadia Basin 17 77% 2020

Hyatt Survey Services, Inc.

Current & Projected Workload

Library of Engineering Services for

Page | 25

Hazen & Sawyer PC:20-2550 Boyette Reservior 14% 2021

Highway Safety Devices, Inc.:20-2493 SR580 (Bush Blvd) T7443 83% 2020

Humiston & Moore, Inc.:13-1807-2 Lyons Bay & Snake Island 55% 2020

Humiston & Moore, Inc.:13-1807-3 Snake Island - Disposal Area 75% 2020

Jones Edmonds:20-2464 Hanna Ave. & 56th Street 10% 2021

Jones Edmonds:20-2508 Old Homosassa Downtown West Septic 90% 2020

Jones Edmonds:20-2508-1 Old Homosassa East 5% 2021

Jones Edmonds:20-2522 Eastport WRF 80% 2021

Kelly Brothers, Inc.:18-2186 BGI Bridge 36% 2021

Kimley-Horn:18-2271-1 Punta Gorda Airport Runway 4-22 Rehab 93% 2020

Kimley-Horn:19-2349-2 Coastal Orthopedics Plat 1% 2021

Kimley-Horn:19-2357-1 North Port Connector 99% 2021

Kimley-Horn:19-2372 San Mateo WM IPO 64-048285025 85% 2021

Kimley-Horn:19-2395 Lincoln Park Pool 95% 2020

Kimley-Horn:20-2481-1 Lena Landfill Connector Rd. IPO 148400059 1% 2021

Kimley-Horn:20-2505 Sumner HS-Balm Rd. Imprv. IPO#75-0408020 54% 2021

Kimley-Horn:20-2544 1616 59th St. West 85% 2021

Kinard-Stone, Inc.:19-2396 US 27 5th St. to SR 78 82% 2021

Kinard-Stone, Inc.:20-2533 SR 64 @ Greyhawk (FDOT) 47% 2021

Kisinger Campo & Associates Corp.:18-2238 60th Ave East 67% 2021

Kisinger Campo & Associates Corp.:19-2368 Progress Blvd. 89% 2021

Kisinger Campo & Associates Corp.:19-2368-1 S. 78th Street - FDOT 70% 2021

Kisinger Campo & Associates Corp.:20-2504 19th Ave. NE Widening 14% 2021

LTA Engineers, LLC:20-2565 Gulf Drive North (SR 789) Awaiting

NTP

Magnum Builders of Sarasota Inc.:19-2369-1 SRQ Parking Lot Expansion 21% 2021

Manatee County Purchasing:16-2073-2 Palma Sola Road Plat W1700035 Awaiting

NTP

Manatee County Purchasing:16-2073-3 Palma Sola WA#10 W1600327 Awaiting

NTP

Manatee County Purchasing:19-2419-1 Township 33 & 34 CCRs W2020459 1% 2021

Manatee County Purchasing:19-2451 Jim Davis Rd. WA#36 W2020029 85% 2021

Manatee County Purchasing:20-2562 LWR at Clubhouse Dr. W2100055 5% 2020

McKim & Creed, Inc.:03-1070-1 Burnt Store WRF Update 42% 2021

Metric Engineers:20-2535 I-75 @ US 301 Interchange Awaiting

NTP

PCL Construction:14-1855-3 Lake Manatee WTP Ultra Filtration Upgrades 44% 2021

PCL Construction:19-2420 Dunn WRF Ph. I Design 34% 2021

Poole & Kent Companies:20-2556 NRWRF Wet Weather Awaiting

NTP

Quality Enterprises USA, Inc.:20-2478 SRQ Watermain Improvements 10% 2021

Rush Construction:18-2242 MacDill AFB Outdoor Rec Facility 87% 2021

School Board of Sarasota County:20-2561 Booker High School PO#22101678 43% 2021

Stellar Development, Inc.:19-2355-1 SRQ Fuel Farm Expansion 50% 2021

TLC Diversified:20-2518 Flatford Swamp 32% 2021

Thompkins Contracting, Inc:20-2474 City of Venice WM Replacement 95% 2020

Library of Engineering Services for

Page | 26

Traffic Management Solutions, Inc.:20-2548 Turnpike DMS & CCTV Awaiting

NTP

TranSystems:20-2546 I-4 @ SR 557 Awaiting

NTP

USACE: 19-234 Lido Key Beach Renourishment 42% 2021

USACE: 20-055HHD C2 & C12A 13% 2021

USACE: 20-077 HHD Matoc #4 7% 2021

USACE: 21-029 HHD SR 78 & S71 51% 2021

USACE: 20-198 Anna Maria Island SPP CS 50% 2021

USACE: 20-283 HHD S269 & S270 Awaiting

NTP

Westra Construction Corp.:18-2221-1 Holloman Branch Drainage 83% 2021

Westra Construction Corp.:19-2423 69th Street FM 62% 2021

Wharton-Smith, Inc.:18-2216-1 Capri Isle Pump Station Upgrades 94% 2021

Wood PLC:20-2491-1 Brooker Creek WMP 67% 2021

Woodruff & Sons, Inc.:18-2241 Cypress Street Outfall 32% 2021

Woodruff & Sons, Inc.:20-2559 Rubonia Water Quality Imprv. Awaiting

NTP

Certified Minority Business Enterprise

Library of Engineering Services for

Page | 27

Certified Minority Business Preference

Griner Engineering is not a Certified Minority Business; however, our subconsultant Hyatt Surveying & Mapping Services does fall in that category.

Local Preference

Library of Engineering Services for

Page | 28

Local Preference

Griner Engineering, Inc., Arc Flash Study Pro, and Hyatt Survey Services, Inc. do not qualify for local preference.

Required Forms and Additional Information

Library of Engineering Services for

Page | 29

Required Forms Category No. Category Descriptions Checkbox

1 General Engineering

2 Transportation Engineering

3 Environmental Engineering

4 Stormwater Engineering

5 Geotechnical Engineering

6 Water and Wastewater Engineering

7 Sub-Surface Utility Engineering

8 Instrumentation and Controls Engineering

9 Electrical Engineering X 10 Registered Surveying and Mapping X

Library of Engineering Services for

Page | 30

THE FOLLOWING SECTION MUST BE COMPLETED BY ALL PROPOSERS:

Company Name: Griner Engineering, Inc.

NOTE: COMPANY NAME MUST MATCH LEGAL NAME ASSIGNED TO TIN NUMBER. CURRENT

W9 MUST BE SUBMITTED WITH BID/PROPOSAL.

TIN#: 59-1305098 D-U-N-S® #

06-279-2577

3125 5th Avenue N, Suite 300, St. Petersburg (Street No. or P.O. Box Number)

Pinellas

(Street Name)

Florida

(City)

33713

(County) (State) (Zip Code)

Contact Person:

Joseph H. Griner III

Phone Number:

727-822-2335

Fax Number:

N/A

Email Address:

joe@grinerengineers.com

ACKNOWLEDGEMENT OF ADDENDA

The Proposer shall acknowledge receipt of any addenda issued to this solicitation by completing the blocks below or by completion of the applicable information on the addendum and returning it not later than the date and time for receipt of the bid. Failure to acknowledge an addendum that has a material impact on this solicitation may negatively impact the responsiveness of your bid. Material impacts include but are not limited to changes to specifications, scope of work, delivery time, performance period, quantities, bonds, letters of credit, insurance, or qualifications.

Addendum No. 1 Date 11/17/2020 Addendum No. 2 , Date 11/17/2020

Addendum No. 3 , Date 11/20/2020 Addendum No. 4 , Date 12/1/2020__

Emergency Contact Person: Debbie Parker

Telephone Number: _727-822-2335 Cell Phone Number: 727-238-9755

Library of Engineering Services for

Page | 31

Professional Licenses and Insurance

Library of Engineering Services for

Page | 32

Library of Engineering Services for

Page | 33

Library of Engineering Services for

Page | 34

Library of Engineering Services for

Page | 35

**Please note that the Professional Liability policy will be updated prior to the RFQ being awarded.

Library of Engineering Services for

Page | 36

Library of Engineering Services for

Page | 37

Library of Engineering Services for

Page | 38

Library of Engineering Services for

Page | 39

Library of Engineering Services for

Page | 40

Library of Engineering Services for

Page | 41

Library of Engineering Services for

Page | 42

Agreement Modification Request

Upon such time Griner Engineering, Inc. is awarded a continuing contract with the City of Plant City, we respectfully request a modification to the Agreement for Engineering Services in Section 19.0 – Disputes, to read as such:

In the event of a dispute, the City Manager shall decide all questions, difficulties, and disputes of any nature whatsoever that may arise under or by reason of this Agreement, including, but not limited to questions, difficulties and disputes relating to the prosecution and fulfillment of the services hereunder, and the character, quality, amount, and value thereof and shall provide a written decision to the A/E. The decision of the City Manager shall be final and conclusive, unless within fifteen (15) days from the date of receipt of such copy, the A/E mails or otherwise furnishes to the City’s Project Manager a written notice of dispute.

In the event a decision of the City’s Project Manager is the subject of a dispute, such dispute may be settled by appropriate legal proceeding or, if the…