About this file

This document contains drawings and specifications for an MRI site preparation project along with details of a related federal contract opportunity notice. The drawings indicate the placement and interconnections of MRI equipment components and reference pre-installation manuals, but are not construction drawings. The contract opportunity is for demolition and construction of a revised MRI suite and control room at the Oklahoma VA for $1-2 million. It is a 300-day project under NAICS code 236220 and is set aside for Service-Disabled Veteran Owned Small Businesses. Proposals are due on or after October 21, 2020 and work will comply with all VA infection control requirements while the adjacent MRI suite remains operational.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--MRI Site Prep (VA-21-00003189), newest first.
File Type Posted
RFI 4.pdf PDF
VENT 2.jpg JPG image
2021-02-01 VENT on third floor mech room.jpg JPG image
VENT FRONT LOCATION.jpg JPG image
36C25920R0145 0013.docx DOCX document
Drawing Vent.pdf PDF
36C25920R0145 PG 2.pdf PDF
36C25920R0145 0012.docx DOCX document
36C25920R0145 0012.pdf PDF
Mag Shield Design Info Siemens.pdf PDF
36C25920R0145 0011.docx DOCX document
RFI 3 Q 68 through 77.pdf PDF
MRI Site Prep 100_ Final Drawings.pdf PDF
36C25920R0145 0010.docx DOCX document
MRI Site Prep 100_ Final Specifications.pdf PDF
36C25920R0145 0009.docx DOCX document
36C25920R0145 0008.docx DOCX document
2020 07 26 100_ Final for Construction OKC MRI Specifications.pdf PDF
MRI Site Prep AD 101 Addendum 1.pdf PDF
General Decision Number OKC Jan 2021.docx DOCX document
RFI 3 1-67.pdf PDF
2020 07 26 100_ Final OKC MRI Drawings.pdf PDF
36C25920R0145 0007.docx DOCX document
36C25920R0145 0006.docx DOCX document
36C25920R0145 0005.docx DOCX document
RFI 1 MRI.pdf PDF
36C25920R0145 0004.docx DOCX document
2020-11-02 Pre-Bid Sign-In Sheet MRI.pdf PDF
36C25920R0145 Revised Pg1.pdf PDF
36C25920R0145 0003.docx DOCX document
RFIs 1.pdf PDF
36C25920R0145 0002.docx DOCX document
36C25920R0145 0001.docx DOCX document
Final Combined Drawings.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
Combined Final Specs.pdf PDF
36C25920R0145_1.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MRi Site Planning

Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes.

Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors.

New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

2. Power for drills and other test equipment, 3. Capability for image

GE Healthcare Customer Site Readiness

Requirements Drawing Index

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at:

www.gehealthcare.com/siteplanning

These sheets are a document set and should not be separated.

Electrical information and references are contained on all sheets.

GE Equipment Delivery Requirements

The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.

* REQUIRED REFERENCE *

Pre Installation Manual

These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.

File details come from the government source that posted it. Updated .