MRI Site Prep 100_ Final Drawings.pdf
PDF 8 MB Posted
- Attached to
- Z2DA--MRI Site Prep (VA-21-00003189) Federal contract opportunity
- Solicitation number
- 36C25920R0145
About this file
This solicitation notice provides details for an upcoming MRI site preparation project for the Oklahoma City VA Medical Center. The scope of work involves demolishing and constructing a revised MRI Suite 1 and Control Room along with adjoining areas. The contractor must ensure MRI Suite 2 remains operational for staff and patients throughout construction. The period of performance is 300 calendar days from notice to proceed. This opportunity is set aside for Service-Disabled Veteran Owned Small Businesses. The estimated value ranges from $1,000,000 to $2,000,000. The solicitation will be posted on or after October 21, 2020.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C H
A S
E
C H
A S
E
CHASE
C H
A S
E
CHASE
CHASE
(B
LO
C K
E D
PROJECT LOCATION (2ND LEVEL)
(1ST LEVEL WORK DIRECTLY BELOW)
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
SCHEMMER
1044 NORTH 115TH STREET SUITE 300
OMAHA, NE 68154
/2
/2
:1
:4
A
M
100% CONSTRUCTION DOCUMENTS
01/22/2021
COVER SHEET AND SHEET INDEX
G0-00
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE
PREP
JGCJR
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
635-CSI-105
NOT TO SCALE
PROJECTION LOCATION PLAN. VA MEDICAL CENTER OKLAHOMA CITY OK. 2ND FLOOR
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE PREP
OKLAHOMA CITY VA HEALTH CARE CENTER
DEPARTMENT OF VETERAN'S AFFAIRS
921 NE 13TH STREET,
OKLAHOMA CITY, OK 73104
PROJECT NO. 635-CSI-105
VA
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
SHEET INDEX
ARCHTECTURAL
G0-00 COVER SHEET AND SHEET INDEX
G-001 PHASING AND TEMP WALLS FLOOR PLAN
A-100 DEMO PLAN, FLOOR PLAN, REFLECTED CEILING PLAN AND SCHEDULES
A-101 ELEVATIONS AND DETAILS
MECHANICAL
M 00 MECHANICAL INFO SHEET
M001 MECHANICAL DEMOLITION PLANS
M101 MECHANICAL PLANS
M102 FLOOR PLAN - PLUMBING
M401 QUENCH VENT DETAILS
M501 MECHANICAL SCHEDULES AND DETAILS
ELECTRICAL
E 00 ELECTRICAL INFO SHEET
E101 FLOOR PLANS - ELECTRICAL
E102 FLOOR PLANS - ELECTRICAL
E201 ELECTRICAL DETAILS AND SCHEDULES
MRI EQUIPMENT
DRAWINGS
A - 101 ARCHITECTURAL EQUIPMENT PLAN
A - 102 SAFETY AND SERVICE CLEARANCE PLAN
A - 501 DETAILS
A - 502 DETAILS
S - 101 STRUCTURAL FLOOR PLAN
E - 101 ELECTRICAL RACEWAY PLAN
E - 102 ELECTRICAL DIMENSION PLAN
E - 501 DETAILS
M - 101 MECHANICAL PLAN
M - 501 DETAILS
THESE DRAWINGS ARE INCLUDED IN THE CONSTRUCTION DOCUMENT FOR THE GENERAL CONTRACTORS INFORMATION AND COORDINATION. SEE THE PHASING PLAN NOTES INCLUDED ON THE PHASING PLAN
ATTENTION!
All contractors will be required to comply with the VA provided "MRI PERSONNEL SCREENING FORM" for each individual working on site, in any capacity. This form will be completed, signed and dated by each individual with a copy turned over to the Resident Engineer, and a copy kept on site with the project Superintendent. Individuals not submitting this form will not be allowed on the site. A copy of this form is included in the General Requirements section of the specifications. The project Superintendent will be responsible for verifying daily, all individuals working, or visiting the site are compliant.
ALL CONTRACTORS SHALL BE FAMILIAR WITH THE FOLLOWING
TRAINING VIDEOS:
https://www.youtube.com/watch?v=IZrfDGI1mUO&feature=youtu.be https://www.youtube.com/watch?v=vn5H-6BbesQ&feature=youtu.be https://www.youtube.com/watch?v=C721AzAoNAO&feature=youtu.be
NOTICE:
THESE DOCUMENTS ARE THE CURRENT AND REVISED
DOCUMENTS. THE ORIGINALLY SUBMITTED DOCUMENTS
DATED 07/24/2020 ARE NULL AND VOID.
CHASE
TOILET
EQUIPMENT
MRI
CONTROL
GYP. BOARD PARTITION FOR INFECTION
CONTROL ACCESS TO WORK AREAS.
GYP. BOARD PARTITION, EXTENDING UP
TO DECK ABOVE, 1HR. CONSTRUCTION.
NO ACCESS THRU THIS PARTITION.
PHASE 1
TOILET
EQUIPMENT
MRI
CONTROL
GYP. BOARD PARTITION FOR INFECTION
CONTROL ACCESS TO WORK AREAS.
SEAL EXISTING DOOR WITH
PLASTIC SHEET AS REQUIRED
PHASE 2
TOILET
EQUIPMENT
MRI
CONTROL
GYP. BOARD PARTITION FOR INFECTION
CONTROL ACCESS TO WORK AREAS.
GYP. BOARD PARTITION, EXTENDING UP
TO DECK ABOVE, 1HR. CONSTRUCTION.
PROVIDE ACCESS THRU THIS PARTITION
TO WORK AREA.
PHASE 3
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
SCHEMMER
1044 NORTH 115TH STREET SUITE 300
OMAHA, NE 68154
/2
/2
:1
:4
A
M
100% CONSTRUCTION DOCUMENTS
01/22/2021
PHASING AND TEMP WALLS FLOOR
PLAN
G-001
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE
PREP
JGCJR
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
635-CSI-105
1/4" = 1'-0"
PHASE 1 PLAN
1/4" = 1'-0"
PHASE 2 PLAN
1/4" = 1'-0"
PHASE 3 PLAN
GENERAL NOTES:
1. THE MRI EQUIPMENT SUPPLIER (SIEMENS) IS CONTRACTED DIRECTLY TO THE VA AND WILL OPERATE AS
FOLLOWS:
a. SIEMENS WILL PROVIDE THE DESIGN, DELIVERY AND INSTALLATION OF ALL NEW MRI EQUIPMENT, AND
INCLUDING, BUT NOT LIMITED TO: THE EXISTING EQUIPMENT SHUT DOWN, INSTALLATION OF THE
EQUIPMENT CONNECTING TO SERVICES PROVIDED UNDER THIS DOCUMENT, REMOVAL OF OLD
EQUIPMENT, EQUIPMENT START UP, CALIBRATION AND TRAINING OF THE VA STAFF. REVIEW THE
SIEMENS DOCUMENTS TO COORDINATE REQUIREMENTS OF THE INSTALLATION.
b. SIEMENS DRAWINGS ARE INCLUDED WITH THIS CONSTRUCTION DOCUMENT PACKAGE FOR INFORMATION PURPOSES ONLY FOR THE GENERAL CONTRACTOR. THIS GENERAL CONTRACTOR WILL WORK DIRECTLY WITH SIEMENS TO VERIFY ALL WORK WITH THE EQUIPMENT, TO COORDINATE AND SCHEDULE THE WORK
AS A WHOLE.
c. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR THE PROJECT SCHEDULE.
2. THE RF AND MAGNETIC SHIELDING CONTRACTOR (TBD) WILL BE DIRECTLY CONTRACTED TO THE GENERAL
CONTRACTOR AND WILL FUNCTION AS HIS SUBCONTRACTOR.
a. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE TO COORDINATE THE DESIGN (USING CRITERIA
BASED ON THE SIEMENS DOCUMENTS), DELIVERY AND INSTALLATION OF THE NEW RF AND MAGNETIC SHIELDING SYSTEMS, WHICH WILL INCLUDE, BUT NOT LIMITED TO THE REMOVAL OF THE EXISTING RF AND MAGNETIC SHIELDING SYSTEMS, DESIGN, DELIVERY AND INSTALLATION OF THE NEW RF AND MAGNETIC SHIELDING SYSTEM INCLUDING THE WINDOW B COMPONENT, AND THE NEW DOOR 103A COMPONENT (PNEUMATIC AND FERROMAGNETIC SYSTEMS), INCLUDING THE FINAL TESTING OF THE
SYSTEMS.
PHASING NOTES:
THE PROVIDED PHASING PLAN AND NOTES ARE GENERAL IN NATURE BUT REFLECT THE VA REQUIREMENTS FOR THE PROJECT. THE GENERAL CONTRACTOR WILL PROVIDE THE FINAL PHASING PLAN, CPM SCHEDULE AND ICRA DOCUMENTS, PROCURE THE VA’S AGREEMENT OF THOSE PLANS, AND BE RESPONSIBLE FOR
RECOGNIZING AND SCHEDULING ALL ASPECTS OF THE WORK.
THE GC WILL MAINTAIN RESPONSIBILITY FOR THE WORK, SCHEDULE AND PHASING. IF ADJUSTMENTS TO THE WORK, SCHEDULE AND PHASING DESCRIBED BELOW ARE REQUIRED FOR THE WORK, COORDINATE WITH THE RESIDENT ENGINEER WHEN SCHEDULING TO ACHIEVE HIS APPROVAL. COORDINATE REQUIREMENTS TO TEST
THE NEW RF AND MAGNETIC SHIELDING SYSTEMS.
NOTE: DURING THE DURATION OF THE WORK, AND IN THE EVENT OF AN EMERGENCY PROCEDURE TAKING PLACE. THE GENERAL CONTRACTOR WILL IMMEDIATELY LEAVE THE SITE IF DIRECTED BY A VA MRI STAFF
MEMBER AND WILL RETURN ONCE INSTRUCTED IN WRITTING BY THE RESIDENT ENGINEER.
PHASE 1:
1. DURING PHASE 1 THE VA WILL HAVE FULL ACCESS TO THE CONTROL 104 AND MRI 2 105 IN ORDER TO
CONTINUE TO PROVIDE HEALTH CARE TO THE VA PATIENT. UNLESS APPROVED, THE GENERAL
CONTRACTOR WILL NOT ACCESS THIS AREA.
2. THE PHASE 1 PLAN SHOWS THE PERIMETER OF THE PHASE 1 WORK ANTICIPATED.
3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE
PLAN:
a. GYP BD ENCLOSURE TO THE STRUCTURAL DECK, 1 HOUR RATED ASSEMBLY PROVIDING WORKSPACE TO
INSTALL THE NEW MRI DOOR AND RAMP IN CONTROL 104. NO ACCESS THROUGH THIS BARRIER WILL BE ALLOWED. THE GENERAL CONTRACTOR WILL PROVIDE PROTECTIVE MEASURES AND ENCLOSURES, AS APPROVED BY THE VA, TO SAFEGUARD CONTROL 104 DURING THE CONSTRUCTION OF THIS BARRIER.
b. GYP BD ENCLOSURE WITH ACCESS, WILL PROTECT THE DOORS TO TOILET 101, EQUIPMENT 102 AND THE
TEMPORARY CONSTRUCTION ACCESS DOOR TO MRI 1 103.
4. WORK SCHEDULED FOR THIS PHASE 1:
a. TOILET 101 WILL BE COMPLETED, FINALED AND TURNED OVER TO THE VA. THE GC CAN ASSUME THAT
THE WARRANTY PERIOD FOR THE TOILET 101 CAN BEGIN UPON ACCEPTANCE. REFLECT ANTICIPATED
PROGRESS IN DETAIL IN THE CPM SCHEDULE.
b. EQUIPMENT 102 WILL PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS AS THEY
DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK.
c. MRI 1 WILL PROGRESS, INCLUDING THE DEMOLITION OF THE EXTERIOR WALL AS REQUIRED FOR THE TRANSFER OF ALL EXISTING AND NEW MRI EQUIPMENT. DEMOLITION AND RECONSTRUCTION OF ALL FINISHES INCLUDING THE RF AND MAGNETIC SYSTEMS AS ALLOWABLE, AND THE INSTALLATION OF THE NEW MRI DOOR AND RAMP. THE GENERAL CONTRACTOR WILL PROVIDE TEMPORARY ENCLOSURE AT THE EXTERIOR WALL OF THE MRI SPACE, PROVIDING A TIGHTLY SEALED, WEATHERPROOF, THERMALLY
INSULATED STRUCTURE. PROVIDE ADDITIONAL HEATING AND COOLING AS REQUIRED. REFLECT
ANTICIPATED PROGRESS IN DETAIL IN THE CPM SCHEDULE.
d. THE GC WILL BE RESPONSIBLE FOR THE DEMOLITION PROCESS, VERIFYING REQUIRED DEMOLITION OPENING FOR THE TRANSFER OF ALL EQUIPMENT, STRUCTURAL STABILIZATION OF THE STRUCTURE AS IT RELATES TO THIS WORK AND THE MAINTENANCE AND PROTECTION TO THE BUILDING WHILE THIS
STRUCTURE IS OPEN.
5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, PHASE 2 CAN PROCEED:
PHASE 2:
1. DURING THIS PHASE 2 THE VA WILL VACATE THE MRI AREA AND THE GENERAL CONTRACTOR WILL HAVE 24/7
ACCESS FOR 3 DAYS TO FINISH THE CONSTRUCTION OF THE CONTROL 104 AND WORK NEEDING
COMPLETION IN EQUIPMENT 102 AND MRI 1 103. WORK IN THIS AREA WILL BE SCHEDULED IN ADVANCE THROUGH THE RESIDENT ENGINEER SO VA CAN MAKE ARRANGEMENTS FOR THEIR RESPONSIBILITY TO THE
VA PATIENTS.
2. THE PHASE 2 PLAN SHOWS THE PERIMETER FOR THE PHASE 2 WORK ANTICIPATED.
3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE
PLAN:
a. GYP BD ENCLOSURE WITH ACCESS, WILL PROTECT THE DOORS TO EQUIPMENT 102 AND THE
TEMPORARY CONSTRUCTION ACCESS DOOR TO MRI 1 104.
b. PLASTIC SHEET BARRIERS WILL PROTECT INFILTRATION AT DOOR TO MRI 2 105 AND THE PAIR OF DOORS
TO CONTROL 104.
4. WORK SCHEDULED FOR THIS PHASE 2:
a. CONTROL 104 WILL BE COMPLETED, FINALED AND TURNED OVER TO THE VA.
b. EQUIPMENT 102 WILL BE PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS AS THEY
DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK. REFLECTED ANTICIPATED PROGRESS
IN DETAIL IN THE CPM SCHEDULE.
c. MRI 1 WILL PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK. REFLECTED ANTICIPATED PROGRESS IN DETAIL IN THE CPM
SCHEDULE.
5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, PHASE 3 CAN PROCEED.
6. AT THE COMPLETION OF THIS PHASE 2, THE VA WILL BE ABLE TO RESUME WORKING IN CONTROL 104 AND
MRI 103.
PHASE 3:
1. DURING THIS PHASE 3, THE VA WILL RESUME WORKING IN THE CONTROL 104 AND MRI 2 105, AND THE
GENERAL CONTRACTOR WILL COMPLETE THE PROJECT.
2. THE PHASE 3 PLAN SHOWS THE PERIMETER OF THE PHASE 3 WORK ANTICIPATED.
3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE
PLAN:
a. POLY BARRIERS WITH ZIPPERED DOORS 103A TO MRI 1 103 AS REQUIRED, PROTECTING THE CONTROL
104. CONTRACTOR ACCESS THROUGH THIS BARRIER IS PROVIDED TO COMPLETE THE WORK.
4. WORK SCHEDULED FOR THIS PHASE 3:
a. DELIVERY, INSTALLATION AND CALIBRATION OF THE NEW MRI UNIT. INCLUDING REMAINING
INSTALLATION OF RELATED EQUIPMENT FOR THE COMPLETE OPERATION OF THIS SYSTEM.
b. RECONSTRUCTION OF THE EXTERIOR WALL, INCLUDING NEW ALUMINUM WINDOW AND THE RF WINDOW
COMPONENT OF THE NEW RF SYSTEM COMPLETION OF THE MAGNETIC SHIELDING SYSTEM AND
EXTERIOR WALL ENCLOSURE, INCLUDING FINAL TESTING OF THE SYSTEM.
c. REMAINING WORK REQUIRED TO COMPLETE THE PROJECT.
5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, THE PROJECT WILL BE FINALED
AND DELIVERED TO THE VA FOR A COMPLETE OPERATIONAL DEPARTMENT, INCLUDING STAFF TRAINING.
6. THE CONTRACTOR WILL ASSUME THAT THE WARRANTY PERIOD FOR THE REMAINDER OF THE WORK WILL
BEGIN ONCE ACCEPTED.
1ST FLOOR WORK (MAGNETIC SHIELDING):
1. PROVIDE WORK FOR THE FIRST FLOOR MAGNETIC SHIELDING AT THE DISCRETION OF THE GENERAL CONTRACTOR, AND APPROVAL OF THE RESIDENT ENGINEER. THE GENERAL CONTRACTOR WILL INCLUDE THIS
AREA IN HIS SCHEDULE, PHASING AND ICRA PLANS AS NEEDED.
OFFICE
1F114
OFFICE
1F115
OFFICE
1F116
CHASE
F E
MAGNETIC SHIELD SUSPENDED FROM
STRUCTURAL DECK ABOVE. COORDINATE
WITH SYSTEM INSTALLER. REMOVE/REINSTALL
EXISTING ACT SYSTEM AS REQUIRED FOR
INSTALLATION. PROVIDE MODIFICATIONS TO
EXG HVAC AND ELECTRIC THAT MAY BE IN
CONFLICT AS NEEDED FOR INSTALLATION OF
SHIELD.
COORDINATE CENTER LOCATION
OF MAGNETIC SHIELD WITH
CENTER LOCATION OF MRI.
SEE EQUIPMENT MFR DRAWINGS.
ROTATE SHIELD AS REQUIREMENT
BYEQUIPMENT SUPPLIERS
DOCUMENTS.
CORRIDOR
C1F6-1
GEN CONTRACTOR TO
PROVIDE ICRA PLAN AND
BARRIER AS APPROVED
BY THE RESIDENT ENGINEER.
MAINTAIN STAFF EGRESS
WIDTHS AT ALL TIME.
EQUIPMENT
MRI
CONTROL
G F E D
02-07
02-03
02-04
02-1702-17
02-02
02-01
02-18
PARTIAL
PARTIAL
02-08
02-07
02-04 02-16 02-17
02-15 02-0502-05
02-13
02-0902-09
02-1402-14
02-0702-07
02-12 02-14
RAMP
02-06
02-11
02-10
02-0902-09
02-0802-08
02-0702-07
02-19
02-20
02-23
02-21
02-22
THE GEN CTR WILL PROVIDE DEMOLITION OF THIS AREA AS SHOWN
FOR WINDOWS AND HIGHER FRAMING, REMAINING DEMOLITION WILL
BE PROVIDED BY THE GEN CTR AS NEEDED FOR THE SAFE REMOVAL
OF THE EXG MRI EQUIPMENT AND INSTALLATION OF NEW. ALL
BRACING AND SHORING AS REQUIRED WILL BE DESIGNED AND
INSTALLED BY THE GEN CTR. REINSTALL EXG BRICK FACE TO MATCH
EXG WHEN COMPLETE.
NOTE OF CLARIFICATION:
02-13
TOILET
EQUIPMENT
MRI
CONTROL
G F E D
BELOW
/4
18' - 11 7/8"
A-101
SEE DEMO PLAN FOR
CONSTRUCTION ACCESS PORTAL,
INFILL TO MATCH EXISTING.
A-101
AT WINDOW
SIM
SIM
A
B3' - 0"
NEW MED GAS OUTLET 5' TO
CENTER AND CENTER ON WALL,
SEE MECHANICAL.
SIM
A-101
Sim
/8
/2
1' - 6 3/4" CENTER LOCATION
OF MRI, VERIFY WITH
EQUIPMENT DRAWINGS.
A-101 A-101
E.Q. 6' - 0" E.Q.
101A
103A
105A
104A
A-10111
A-101
A-101 13
A-101
A-101 14
CORRIDOR
102A
NEW HANDRAIL
NEW HANDRAIL
A-10116
MODIFIED HANDRAIL
EXG HANDRAIL TO
REMAIN.
EXG VA CONTROL
DESK
STEEL MAGNETIC SHIELD SYSTEM,
COORD WITH INSTALLER.
SEE EQUIPMENT MFR CALCULATIONS
FOR FLOOR, WALL AND SUSPENDED
PANEL REQUIREMENTS. THIS
SYSTEM WILL BE DESIGNED AND
INSTALLED BY THE GEN
CONTRACTOR (SHIELDING
SUBCONTRACTOR).
RF SHIELDING SYSTEM, COORD
WITH INSTALLER.
SEE SPECIFICATIONS FOR WALL,
CEILING, FLOOR, DOOR AND
WINDOW REQUIREMENTS. THIS
SYSTEM WILL BE DESIGNED AND
INSTALLED BY THE GEN
CONTRACTOR (SHIELDING
CONTRACTOR)
1. RELOCATE EXG. SPRINKLER HEAD PER ORIGINAL
LOCATON.
TOILET
EQUIPMENT
MRI
CONTROL
REMOVE/REINSTALL ACT AT
NEW WALL TO FINISH AS
REQUIRED.
NO ACT; OPEN FOR MRI
EQUIPMENT ACCESS
OPEN TOP WALL CABINET
FOR FILTER ACCESS FROM
ABOVE.
NEW RF WINDOW SYSTEM COMPONENT INCL GLAZING. SYSTEM INSTALLATION
BY GEN CTR (SHIELDING SUB CONTRACTOR)
(FIELD VERIFY)
17' - 0" M.O.
/4
(F
IE
L D
V E
R
IF
Y
(F
IE
L D
V E
R
IF
Y
A REMOVE EXISTING WINDOW ASSEMBLY; INSTALL NEW ALUMINUM
WINDOW ASSEMBLY.
B
NOTE: ALL GLAZING PANELS TO BE SPANDREL UNITS.
E X
G U
N
IT
V E
R
IF
Y W
IT
H
EXG. UNIT
VERIFY WITH
E X
G U
N
IT
V E
R
IF
Y W
IT
H
INSTALLATION OF NEW
WINDOW ASSEMBLY WILL
MATCH EXG INSTALLATIONS.
VINYL CAP
FILLER SHEET VINYL FLOOR
AND BASE
HM FRAME - HM001
DOOR 103A - 3'-10"
DOOR 102A - 4'-0"
2" 2"
WOOD DOOR - PFWD
DOOR 103A - 3'-10"
DOOR 102A - 4'-0"
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
SCHEMMER
1044 NORTH 115TH STREET SUITE 300
OMAHA, NE 68154
/2
/2
:1
:4
A
M
100% CONSTRUCTION DOCUMENTS
01/22/2021
DEMO PLAN, FLOOR PLAN, REFLECTED
CEILING PLAN AND SCHEDULES
A-100
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE
PREP
JGCJR
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
635-CSI-105
1/4" = 1'-0"
EXISTING - FIRST FLOOR PLAN
1/4" = 1'-0"
DEMO - SECOND FLOOR PLAN
1/4" = 1'-0"
SECOND FLOOR PLAN
WALL SHIELDING SYSTEMS
LEGEND (SEE WALL TYPES):
GENERAL NOTES:
DEMOLITION NOTES:
1. ALL DEMOLITION WILL BE COORDINATED WITH
PHASING PLAN AND STAFF / PATIENT ACCESS TO
MRI.
SEE NOTE OF CLARIFICATION
02-01 REMOVE EXG. WALL AS SHOWN FOR ENLARGED EQUIPMENT ROOM.
02-02 REMOVE EXG. FLOOR AND WALL TILE AND ACT CEILING AND GRID AS
REQUIRED FOR ENLARGED EQUIPMENT ROOM. MODIFY TOILET ACT
CEILING TILE AND GRID AS REQUIRED FOR NEW TOILET SPACE. SEE
FLOOR PLAN.
02-03 RELOCATE EXG. DOOR, FRAME AND HARDWARE AS LOCATED ON FLOOR
PLAN.
02-04 REMOVE EXG. WALL AS REQUIRED FOR RELOCATED DOOR AND NEW
TEMPORARY DOOR. SEE FLOOR PLAN.
02-05 REMOVE AND REINSTALL NEW ALUMINUM WINDOW A ASSEMBLY.
REMOVE RF SHIELDING WINDOW BY SHIELDING CONTRACTOR.
02-06 REMOVE EXG. EQUIPMENT ENCLOSURE, INCLUDING RAISED FLOOR.
EXISTING MRI EQUIPMENT WILL BE DE-ENERGIZED, SHUT DOWN AND
REMOVED BY OTHERS.
02-07 REMOVE EXG. ACT CEILING AND GRID.
02-08 REMOVE EXG. FLOOR TILE. PATCH FLOOR FOR NEW FINISH.
02-09 REMOVE EXG. VINYL BASE.
02-10 MOVEABLE FURNISHINGS, EQUIPMENT AND MRI AFFECTS WILL BE
REMOVED BY OWNER.
02-11 REMOVE EXG. CASEWORK.
02-12 REMOVE EXG. SHIELDING DOOR AND REINSTALL NEW DOOR BY
SHIELDING SYSTEM INSTALLER.
02-13 REMOVE EXG. GYP. BD. AND FRAMING TO EXPOSE EXG. MAGNETIC AND
RF SHIELDING SYSTEMS. SHIELDING SYSTEMS TO BE REMOVED AND
REPLACED BY SHIELDING INSTALLER IN ITS ENTIRETY.
02-14 REMOVE EXG. FLOORING TO EXPOSE SHIELDING SYSTEMS. SHIELDING
SYSTEMS TO BE REMOVED IN ITS ENTIRETY BY SHIELDING CONTRACTOR.
02-15 REMOVE EXISTING BENCH STRUCTURE IN ITS ENTIRETY.
02-16 EXG. CLG. HUNG MED. GAS TO BE RELOCATED. SEE MECHANICAL.
02-17 MODIFY EXG. HANDRAIL AS REQUIRED FOR NEW OPENING.
02-18 PROVIDE DEMOLITION AS REQUIRED FOR INSTALLATION OF NEW FLOOR
SINK. SEE MECHANICAL.
02-19 REMOVE EXG. WALL AS REQUIRED FOR NEW DOOR. SEE FLOOR PLAN.
02-20 REMOVE EXG. DOOR, FRAME AND HARDWARE TO ITS ENTIRETY.
02-21 REMOVE EXISTING FRAMING TO EXPOSE EXISTING WINDOW ASSEMBLY
AS SHOWN. FIELD VERIFY REQUIRED OPENING.
02-22 REMOVE EXISTING RF WINDOW COMPONENT WITH SYSTEM REMOVAL.
INSTALL NEW RF WINDOW AS SHOWN.
02-23 EXISTING WALL CABINET, THE VA WILL REMOVE THEIR PROPERTY, THE GC
WILL REMOVE THE CABINET AND DELIVER IT TO THE LOCATION THE VA
PROVIDES.
DEMOLITION KEYNOTES:
1/4" = 1'-0"
REFLECTED CEILING PLAN
N
N
PLAN
NORTH
TRUE
NORTH
N
N
PLAN
NORTH
TRUE
NORTH
N
N
PLAN
NORTH
TRUE
NORTH
DOOR SCHEDULE
MARK WIDTH HEIGHT FRAME DOOR COMMENTS
101A 3' - 0" 7' - 0" HM-001 F RELOCATE DOOR FRAME. DOOR AND HARDWARE.
102A 4' - 0" 7' - 0" HM-001 F SEE GENERAL DOOR NOTE 1.
103A 3' - 10" 7' - 0" HM-001 F DEMO / SUPPLY AND INSTALL BY SHIELDING SYSTEM INSTALLER.
104A 5' - 4" 7' - 0" PROTECT IN PLACE - NO WORK THIS ASSEMBLY
105A 3' - 10" 7' - 0" HM-001 F PROTECT IN PLACE - NO WORK THIS ASSEMBLY
DOOR LEGEND:
HM-001 HOLLOW METAL
PFWD PRE-FINISHED WOOD DOOR
N
N
PLAN
NORTH
TRUE
NORTH
FINISH LEGEND:
ACT ACOUSTICAL CEILING TILE (1,2,3 SUFFIXES IDENTIFY DIFFERING COLOR SELECTIONS)
CB (INTEGRAL) COVE BASE (CONTINUOUS TURNED UP BASE FORM SV WITH CAP)
CT CERAMIC TILE (MOSAIC, BASE, WALL AND CAP AS APPLIES)
EXG EXISTING
GB GYPSUM BOARD
MOD MODIFIED
PT PAINT (1,2,3... SUFFIXES IDENTIFY DIFFERING COLOR SELECTIONS)
SC SEALED CONCRETE
SV SHEET VINYL (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)
VB VINYL BASE (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)
VCT VINYL COMPOSITION TILE (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)
WF WALL FABRIC (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)
WSC WAINSCOT, SEE CT ABOVE.
ROOM FINISH NOTES:
1. FLOOR CT TO BE REMOVED TO THE LINE OF THE NEW WALL, PROTECT EXG ALL CT IN BATHROOM
FROM DAMAGE. SALVAGE/REUSE MINIMAL TILE AT DOOR RELOCATION.
2. RECONSTRUCT CT WAINSCOT (APPROX 4'-4" TO MATCH EXG). USE MATCHING TILE FOR COLOR, SHAPE AND TEXTURE. SUBMIT SAMPLES TO COR. IF CT CAN BE SALVAGED AND REUSED
COORDINATE WITH COR.
3. MODIFY CEILING AS NEEDED FOR NEW WALL.
4. SEE REFLECTED CEILING PLAN FOR PARTIAL CEILING.
5. NEW RAISED FLOOR (RF) SEE DETAIL 9-A101. FINISH IS A SEAMLESS SHEET VINYL AND INTREGAL
COVED BASE AND VINYL CAP.
6. PREPARE EXG WALL SURFACES AND CONC FLOOR FOR NEW FINISHES.
7. MODIFY EXG HANDRAIL ON WEST WALL, SOUTH OF RELOCATED DOOR 101A PROVIDE NEW END IF
WORK REQUIRES. BETWEEN DOORS 101A AND 102A REPLACE IN FULL INCLUDING HAND RAIL
ENDS. BETWEEN DOORS 102A AND 104A REPLACE IN FULL INCLUDING HAND RAIL ENDS. MAINTAIN 18" CLEARANCE ON THE LATCH SIDE OF EACH DOOR. SEE ELEVATION 6/A-101. UPDATE VINYL BASE PER ELEVATION, INSTALL NEW FLOOR TILE AT NEW DOOR THRESHOLD AND AS NEEDED DUE
TO CONSTRUCTION.
8. REPAIR FLOORING AT AREAS OF DEMOLITION AND DOOR THRESHOLDS.
9. PROVIDE THE APPROPRIATE VINYL TRANSITION STRIPS AT ALL FLOOR FINISH CHANGES.
ROOM FINISH SCHEDULE
NUMBER NAME
FLOOR
FINISH
WALL CEILING CEILING
HEIGHT COMMENTSNORTH EAST SOUTH WEST
101 TOILET Mod Exg CT New WSC/PT1 Exg CT/New PT1 Exg CT/New PT1 Exg CT/New PT1 Mod ACT Exg See Notes 1, 2, 3, 6 and 8.
102 EQUIPMENT New VCT New VB/PT1 New VB/PT1 New VB/PT1 New VB/PT1 New ACT 9'-0" See Note 4.
103 MRI New RF New CB/PT1 New CB/PT1 New CB/PT1 New CB/PT1 New ACT 9'-0" See Note 5
104 CONTROL New VCT New VB/PT1 New VB/PT1 New VB/PT1 New VB/PT1 New ACT 8'-0" See Note 6.
106 CORRIDOR Exg - No Work
Exg - No Work Exg - No Work Exg - No Work WF-1 Exg - No Work Exg See Note 7 and 8
NOTE: FOR MATERIAL COLOR SECTIONS SEE SPECIFICATIONS 09 60 00.
GENERAL DOOR NOTES:
1. VERIFY DOOR SWING CLEARS NEW MRI EQUIPMENT AS SHOWN ON THE
FLOOR PLAN WHEN REINSTALLING NEW DOOR.
EXG
EXG
PFWD
PFWD
1/4" = 1'-0"
WINDOW ELEVATIONS
6" = 1'-0"
SHEET VINYL AND BASE DETAIL
1/4" = 1'-0"
DOOR AND FRAME ELEVATIONS
101A 102A
103A
NEW DOOR & HARDWARE TO MRI PER
SHIELDING DESIGN. G.C. PREP NEW
OPENING AS NEEDED FOR NEW RF
FLOOR/RAMP, PAINT FRAME
NEW RF WINDOW
TYPE B
NEW PAINT
SOLID SURFACE TOP
AND APRON
SUPPORT PNL.
BEYOND
NEW RAMP AND FLOORING
BY G.C., SEE 6/A-100
NEW VB, TYP.
5' - 0" V.I.F. 2' - 6"
COORD.
AVAILABLE
WIDTH WITH
MRI
EQUIPMENT
INSTALLATION
A-101
2' - 6" 2' - 6"EQ EQ EQ
NEW PAINT
SOLID SURFACE TOP
AND APRON
SUPPORT PNL.
BEYOND
NEW VB, TYP.
A-101
A-101
A-101
EXG. WINDOW FRAME,
PAINT AS SPECIFIED
EXG. DOOR FRAME
PAINT
NEW VB, TYP.
2' - 6" 5' - 0" V.I.F.
COORD.
AVAILABLE
WIDTH WITH
MRI
EQUIPMENT
INSTALLATION
EXISTING MRI OPERATION
DESK TO REMAIN
PROVIDE POWER UC AND
ABOVE COUNTER, COOR.
WITH ELECTRICAL
SOLID SURFACE COUNTERTOP
AND BACKSPLASH
1" CENTER PARTITION
1" ADJUSTABLE
SHELVES EACH
CABINET SPACE
NEW V.B.
FINISH END
PANELS, TYP.
6' - 0"
PROVIDE POWER UC AND
ABOVE COUNTER, COOR.
WITH ELECTRICAL
SOLID SURFACE COUNTERTOP
AND BACKSPLASH
1" CENTER PARTITION
(2) 1" ADJUSTABLE
SHELVES
NEW V.B.
FINISH END
PANELS, TYP.
5' - 0"
NOTE:
1. EXTEND ALL POWER OUTLET DEVICE BOX
THRU BACK OF BOTH CABINETS.
2. ALL METALLIC HARDWARE TO BE HEAVY DUTY,
STAINLESS STEEL HARDWARE.
DBL 3/4" MDF SUPPORT
PANELS, PLAM FINISH
SIDES AND FRONT END.
FRONT EDGE OF
COUNTER ABOVE
APRON ABOVE
BACK WALL
NEW RF MODULAR
FLOOR SYSTEM
MAGNETIC SHIELD WHERE SHOWN, IN
OTHER AREAS CEMENT BOARD TO FILL
GAP.
EXG CONCRETE FLOOR, PREP
AS REQUIRED FOR NEW FLOOR
SYSTEM
WELDED SEAM SHT
VINYL FLOOR, TYP.
GC. PROVIDE FLOOR
PREP/FILLER AT RF
PANEL JOINTS
JAMB BEYOND
NEW WELDED SHEET
VINYL FLOORING
LEAN CONCRETE FILL
PROVIDE 1:24 SLOPE
NEW RF MODULAR
FLOOR SYSTEM
PREP FLOOR TO RECIEVE
NEW RAMP
EXG CONCRETE FLOOR,
PREP AS REQUIRED FOR
NEW FLOORING
18"
MODIFY EXG VB AS REQUIRED TO
ACCOMMODATE DOOR RELOCATION
REMOVE AND REINSTALL NEW VB THIS RUN
NEW HANDRAIL PROVIDE BLOCKING
AS NEEDED
LOCATION TEMPORARY CONSTRUCTION
ACCESS PORTAL TO MRI 1
PERIMETER OF DOOR
101A DEMOLITION
REMOVE AND INSTALL NEW
WALL COVERING
RELOCATED DOOR 101A
SHORTEN EXG HANDRAIL AS
REQUIRED TO ACCOMMODATE
DOOR RELOCATION. PROVIDE
WALL BLOCKING IF REQUIRED.
6" V.I.F. 1' - 6" 6"
SOLID SURFACE COUNTERTOP
AND APRON.
SEALANT
PLAM SUPPORT PANEL
VINYL BASE
2' - 6"
C L E
A R
I N
S
ID
E
4' - 0"
OPEN CABINET TOP TO
SPACE ABOVE FOR MRI
CABLING CONNECTION
CENTER PARTITION
(4) - 1" ADJUSTABLE/
REMOVABLE SHELVES
EACH SIDE
FINISHED END PANELS,
BOTH SIDES
FINISH FLOOR
TOE KICK
A-101
NOTE: COORDINATE MRI
FILTER LOCATION WITH
LOCATION OF THIS CABINET.
C L E
A R
I N
S
ID
E
CLEAR INSIDE
2' - 7 1/4"
OPEN TOP CABINET TO
SPACE ABOVE FOR MRI
CABLING, ETC...
WIRE PULL HANDLES
(4) - 1" ADJUSTABLE/
REMOVABLE SHELVES
EACH SIDE
NOTE:
ALL METALIC HARDWARE TO
BE HEAVY DUTY, STAINLESS
STEEL HARDWARE.
VINYL BASE
ACT CEILING SUPPORT AND
CHANNEL FROM STRUCTURE
ABOVE NOT CABINET.
OPEN BACK FOR MRI
FILTER EQUIPMENT TO
COME THROUGH WALL.
EXG - EXT FACE BRICK V.I.F.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 1/2" SHEATHING V.I.F.
EXG - 6" METAL STUDS WITH FULL BATT INSUL.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 3 5/8" METAL STUDS V.I.F.
NEW - 3/4" TR PLYWOOD
NEW - VAPOR BARRIER
NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER
NEW - AIR SPACE
NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER
NEW - 1" AIR GAP
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
NEW - ALUMINUM WINDOW
NEW - 5/8" TYPE 'X' GYPSUM BOARD
NEW - 6" METAL STUDS WITH FULL BATT INSUL.
NEW - 3/4" TR PLYWOOD
NEW - VAPOR BARRIER
NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER
NEW - AIR SPACE
NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER
NEW - 1" AIR GAP
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
REMOVE EXISTING MASONRY
AND FRAMING, AS NEEDED
FOR REMOVAL, AND INSTALLATION
OF NEW MRI EQUIPMENT. SHORE
AND BRACE EXISTING STRUCTURE
AS REQUIRED. REINSTALL IN
KIND TO MATCH, WHEN
COMPLETE.
NEW ALUMINUM WINDOW WITH
SPANDREL PANELS, SET IN
ALUMINUM THRESHOLD TO
MATCH EXISTING, CAULK FULL
PERIMETER
PROVIDE DEMOLITION OF
EXISTING WALL SYSTEM AND
SHIELDING TO FACE OF
EXISTING STUD
NOTE:
DEMOLITION FOR THE REMOVAL/INSTALLATION OF MRI EQUIPMENT WILL REQUIRE SOME
LEVEL OF DEMOLITION ABOVE THE EXISTING WINDOW. THE GENERAL CONTRACT WILL NEED
TO REMOVE THE WINDOW LINTEL TO ACCOMPLISH THE DEMOLITION HEIGHT REQUIRED. THE
GENERAL CONTRACTOR WILL DESIGN, AND BE RESPONSIBLE FOR THE SHORING, BRACING
AND STRUCTURAL INTEGRITY OF THE WALL AND FLOOR SYSTEMS DISTURBED, AND FOR THE
CORRECT REINSTALLATION OF ANY STRUCTURAL MEMBERS DISTURBED, INCLUDING WALL
AND BRICK FACE RECONSTRUCTION.
EXG - ALUMINUM WINDOW
EXG - AIR SPACE V.I.F.
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
PROVIDE GYP BOARD RETURN
AT JAMB AND HEAD
ROD STOCK
AND SEALANT
AT PERIMETER,
EXTERIOR
AND INTERIOR
FACES
E
NOTE: AT OTHER COLUMN
ENCLOSURES PROVIDE
CONSTRUCTION SIMILAR
TO THIS DETAIL.
2 1/2" LT GA METAL
FRAMING
EXG - EXT FACE BRICK V.I.F.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 1/2" SHEATHING V.I.F.
EXG - 6" METAL STUDS WITH FULL BATT INSUL.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 3 5/8" METAL STUDS V.I.F.
EXG - 5/8" GYPSUM BOARD
EXT ALUMINUM WINDOW
SOLID TREATED WOOD
BLOCKING
1/2" SOLID SURFACE
SILL
1/2" PLYWOOD SUB-SILL
SEALANT BEAD
SOLID SURFACE COUNTERTOP
AND APRON.
CT WAINSCOT
5/8" TYPE 'X' GYPSUM BOARD
3 5/8" METAL STUDS AT 16"O.C. WITH FULL BATT SOUND INSUL.
5/8" TYPE 'X' GYPSUM BOARD
5/8" GYPSUM BOARD V.I.F.
3 5/8" METAL STUDS V.I.F.
3/4" RC CHANNEL V.I.F.
5/8" TYPE 'X' GYPSUM BOARD V.I.F.
CORRIDOR SIDE
EXG - 5/8" GYPSUM BOARD V.I.F.
EXG - 3 5/8" ALUM STUD (ASSUMED) V.I.F.
NEW - 2" AIR GAP
NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER
NEW - 1" AIR GAP
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
MR1 ROOM SIDE
CONTROL RM,
CORRIDOR SIDE
/4
EXG - EXT FACE BRICK V.I.F.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 1/2" SHEATHING V.I.F.
EXG - 6" METAL STUDS WITH FULL BATT INSUL. V.I.F.
EXG - 1 1/8" AIR SPACE V.I.F.
EXG - 3 5/8" METAL STUDS V.I.F.
NEW - 3/4" TR PLYWOOD
NEW - VAPOR BARRIER
NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER
NEW - AIR SPACE
NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER
NEW - 1" AIR GAP
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
E X
IS
T
IN
G
W A
L L
V .I .F
N E
W C
O N
S T
R U
C T
IO
N
/8
"INTERIOR FACE
EXTERIOR FACE
F.O. EXG STUD
NEW CONSTRUCTION EXISTING WALL
EQUIPMENT SIDE
RESTROOM SIDE
NOTE: EXTEND WALL TO UNDER SIDE OF
STRUCTURAL DECK ABOVE
A
IR
G A
P
NEW - 5/8" TYPE 'X' GYPSUM BOARD
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 3/4" TR PLYWOOD
NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER
NEW - AIR SPACE
NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER
NEW - 1" AIR GAP
NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.
NEW - 5/8" TYPE 'X' GYPSUM BOARD
A
IR
G A
P
SEE SPEC FOR MATCHING WALL FINISH
N E
W C
O N
S T
R U
C T
IO
N
/4
DEMOLITION OF EXG WALL
AND RF SYSTEM EXTENDS
TO FACE OF PARENT WALL.
DEMOLITION OF EXG WALL AND
SHIELDING SYSTEM EXTENDS
TO FACE OF PARENT WALL FOR
INSTALLATION OF PLYWOOD
PANEL.
EQUIPMENT ROOM SIDE
MRI ROOM SIDE
AT 5 SIM WALL THIS METAL
FRAMING IS NOT REQD.
NOTE: EXTEND WALL TO UNDER
SIDE OF STRUCTURAL DECK ABOVE
NOTE: EXTEND WALL TO UNDER
SIDE OF STRUCTURAL DECK ABOVE
NOTE: EXTEND WALL TO UNDER
SIDE OF STRUCTURAL DECK ABOVE
NOTE: EXTEND WALL TO UNDER
SIDE OF STRUCTURAL DECK ABOVE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
SCHEMMER
1044 NORTH 115TH STREET SUITE 300
OMAHA, NE 68154
/2
/2
:1
:4
A
M
100% CONSTRUCTION DOCUMENTS
01/22/2021
ELEVATIONS AND DETAILS
A-101
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE
PREP
JGCJR
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
635-CSI-105
1/4" = 1'-0"
ELEVATION
1/4" = 1'-0"
ELEVATION
1/4" = 1'-0"
ELEVATION
1/4" = 1'-0"
ELEVATION
1/4" = 1'-0"
ELEVATION
3/4" = 1'-0"
DETAIL
3" = 1'-0"
TYP RF MODULAR FLOORING DETAIL
3" = 1'-0"
DOOR THRESHOLD/RAMP SECTION
1/4" = 1'-0"
PARTIAL WALL ELEVATION
3/4" = 1'-0"
COUNTER SECTION
1/4" = 1'-0"
CABINET ELEVATION
1/2" = 1'-0"
CABINET SECTON
1 1/2" = 1'-0"
EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
JAMB DETAIL
3/4" = 1'-0"
COLUMN DETAIL
1 1/2" = 1'-0"
EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
WALL TYPES
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY
THE OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS
AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES
OR VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO
ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE
SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO
FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND
BE RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO
OWNER. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL
OTHER TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION
TO REMAIN. FULL-TONE LINES INDICATED NEW OR RELOCATED
CONSTRUCTION.
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL
DUCTWORK WITH STRUCTURE, CEILING, LIGHTING, AND PIPING.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
G. ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT
RIGHT ANGLES AND PARALLEL TO BUILDING WALLS UNLESS
OTHERWISE INDICATED.
H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL
PANELS. MAINTAIN ALL CODE REQUIRED CLEARANCES.
I. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE,
MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED
PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT
BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL
IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT
THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE
WORK IN THE AFFECTED AREA SHALL NOT THEREAFTER BE
RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE OWNER AND
CONTRACTOR.
J. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND
GENERAL CONTRACTOR.
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.
DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED
TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS SOLID, FULL-
TONE LINES. ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND
ARE SHOWN AS HALF-TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED
BELOW OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL
REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING
BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED
AND AS LISTED BELOW.
C. THE REMOVAL OF HVAC AND PLUMBING EQUIPMENT FROM FINISHED AREAS
AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED WITH
ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE
MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS
MADE TO THE BUILDING.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND
REMOVAL OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND
APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR
ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER HAVING FIRST
RIGHT OF REFUSAL ON ALL ITEMS.
E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE
CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND
STORED OR REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR
SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER.
F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND
CONTROLS WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL
REMOVALS.
G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND ARCHITECT.
H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION
SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
635-CSI-105
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
/2
/2
:1 :1
P
M
07/24/20
MECHANICAL INFO SHEET
M 00
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE PREP
AJPJEK
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
24507868.001
TRUE
NORTH
PLAN
NORTH
NORTH
NORTH
ARROW
SYMBOL LEGEND
MATCHLINE
AREA A
AREA B
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XX-XX
SIM
X
XX-XX
XXXX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM / SPACE
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES
EXISTING COLUMN LINE
SECTION/DETAIL NUMBER
SHEET NUMBER
INDICATES DIRECTION
OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
REFERENCE LEGEND
NAME
ELEVATION
LEVEL
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE DRAWING
RECIRCULATING DOMESTIC
HOT WATER (RDHW)
DOMESTIC COLD WATER (DCW)
DOMESTIC HOT WATER (DHW)
PIPE GUIDE
HOSE BIBB
THERMOMETER
PIPE ANCHOR
HB
STEAM TRAP
PH
WH
YH
SIGHT GLASS-REFRIGERANT
POST HYDRANT
YARD HYDRANT
WALL HYDRANT
PRESSURE GAUGE
CA
PN
CONTROL AIR SUPPLY
NEW TO EXISTING CONNECTION
PNEUMATIC TUBE
FIRE WATER (BURIED)
SPRINKLER DRAIN
FIRE SPRINKLER MAIN
TAMPER SWITCH
FLOW SWITCH
FIRE DEPARTMENT CONNECTION
MISCELLANEOUS SYMBOLS
FLOOR SINK
AREA DRAIN
FLOOR DRAIN
GRADE CLEANOUT
PLUMBING VENT THRU ROOF
CLEANOUT / WALL CLEANOUT
MANHOLE
TRENCH DRAIN
OVERFLOW ROOF DRAIN
RUNNING TRAP
OXYGEN OUTLET
PIPE CAP
ELBOW UP
AIR OUTLET
TEE
ELBOW DOWN
VACUUM OUTLET
RUNNING TRAP WITH CLEANOUTS
ROOF DRAIN
UNION
TEE DOWN
STRAINER
DIELECTRIC UNION
THERMOMETER WELL
CONCENTRIC REDUCER
EXPANSION JOINT
FLEXIBLE PIPE CONNECTION
ECCENTRIC REDUCER
AIR VENT (MANUAL UNLESS
NOTED)
PITCH PIPE DOWN IN DIR OF
ARROW
TEE UP
SM
FW
D
TS
FS
LPC
HPS
MPC
MPS
LPS
HVAC PIPING
GHWR
GHWS
HWR
HWS
PC
HPC
ES
BBD BOILER BLOW DOWN
EXHAUST STEAM
PUMPED CONDENSATE
HIGH PRESSURE CONDENSATE
HIGH PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
LOW PRESSURE CONDENSATE
LOW PRESSURE STEAM
GLYCOL HOT WATER RETURN
GLYCOL HOT WATER SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
_"FS-_
_"AD-_
_"FD-_
CO
VTR
GCO
_"OD-_
MH
X
A
V
_"RD-_
RD
SAN
SAN
PLUMBING PIPING
ACID VENT
TW
AV
AW
W
DS
LS
SCW
RTW
SHW
V SANITARY VENT
BURIED EXTERIOR WATER
RECIRCULATING TEMPERED
WATER
TEMPERED WATER
DISTILLED WATER
LAWN SPRINKLER
SOFTENED HOT WATER
SOFTENED COLD WATER
ACID WASTE
SUBSOIL OR FOUNDATION DRAIN
STORM DRAIN (BELOW FLOOR)
STORM DRAIN (ABOVE FLOOR)
SANITARY DRAIN (BELOW FLOOR)
SANITARY DRAIN (ABOVE FLOOR)
OXYGEN
GASOLINE
VACUUM
OX
GS
G
VAC
RO
A
FOF
FOG
LPG
FOV
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL GAGE
FUEL OIL FILL
FUEL OIL VENT
REVERSE OSMOSIS PROCESSED
WATER
COMPRESSED AIR
NATURAL GAS
LIQUEFIED PETROLEUM GAS
DEIONIZED WATERDI
PIPING SPECIALTIES AND FITTINGS
WCO
FIRE PROTECTION
XXX
PLUMBING
FIXTURES PLUMBING FIXTURE
DESIGNATION
X"PIPE
SIZE
PIPE SIZE (DIAMETER)
X"/X"
DUCT
SIZE
WIDTH / HEIGHT
REF. DEMO NOTES ( ) XX
CWS
GCWS
CWR
GCS
CR
CS
RL
RD
RS
GCWR
GLYCOL CONDENSER WATER
SUPPLY
GLYCOL CHILLED WATER RETURN
GLYCOL CHILLED WATER SUPPLY
REFRIGERANT LIQUID LINE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION LINE
GHCS
GHCR
CD
HCS
HCR
GCR
HOT/CHILLED WATER SUPPLY
HOT/CHILLED WATER RETURN
GLYCOL CONDENSER WATER
RETURN
GLYCOL HOT/CHILLED WATER
RETURN
GLYCOL HOT/CHILLED WATER
SUPPLY
CONDENSATE DRAIN
REF. NOTES ( )ABBREVIATIONS
ROOM NAME
150 SF
ROOM NAME
DESIGNATION
ROOM NUMBER
DESIGNATION
ROOM AREA
DESIGNATION
TSTAT THERMOSTAT
TWU TROUGH WALL AIR CONDITIONER
UH UNIT HEATER
UR URINAL
US UTILITY SINK
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
WB WET BULB
WC WATER CLOSETS
WCO WALL CLEANOUT
WF WASH FOUNTAINS
WFU WATER FIXTURE UNITS
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WS WATER SOFTENER
WSHP WATER SOURCE HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
YH YARD HYDRANT
GPH GALLONS PER HOUR
GRV GRAVITY RELIEF VENTILATOR
GPM GALLONS PER MINUTE
GV GAS VENT
GWH GAS WATER HEATER
H HYDRANTS
HB HOSE BIBB
HC HEATING COIL
HCR HOT/COLD WATER RETURN
HCS HOT/COLD WATER SUPPLY
HG GAS: HIGH-PRESSURE
HP HEAT PUMP (AIR SOURCE)
HP HORSEPOWER
HPC HIGH PRESSURE CONDENSTATE
HPS HIGH PRESURE STEAM
HRC HEAT RECOVERY COIL
HU HUMIDIFIER
HWR HOT WATER RETURN (HEATING)
HWS HOT WATER SUPPLY (HEATING)
HX HEAT EXCHANGER
IH INTAKE HOOD
IRH INFRARED RADIANT HEATER
KDH KITCHEN DISHWASHING HOOD
KH KITCHEN HOOD
KW KILOWATT
KWH KILOWATT HOURS
L LAVATORY
LAT LEAVING AIR TEMPERATURE
LH LAB HOOD
LPC LOW PRESSURE CONDENSATE
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM
LRA LOCKED ROTOR AMPS
LS LAUNDRY SINK
LSS LAWN SPRINKLER DESIGN
LV LOUVER
LWT LEAVING WATER TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MACHINE BOLT
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPS
MD MOTORIZED DAMPER
MG GAS: MEDIUM-PRESSURE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT
PROTECTION
MPC MEDIUM PRESSURE
CONDENSATE
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
N NITROGEN
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
NPCW NONPOTABLE COLD WATER
NPHW NONPOTABLE HOT WATER
NPHWR NONPOTABLE HOT WATER
RETURN
OA OUTSIDE AIR
OD OVERFLOW ROOF DRAIN
OX OXYGEN
P PUMP
PC POINT OF CURVATURE
PHC PREHEAT COIL
PIV POST INDICATING VALVE
PRV PRESSURE REGULATING VALVE
PS PLASTER SINKS
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH,
ABSOLUTE
PSIG POUNDS PER SQUARE INCH,
GAUGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA RETURN AIR
RCP RADIANT CEILING PANELS
RD ROOF AREA DRAINS
RDL REFRIGERANT DISCHARGE LINE
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RELIEF AIR
RLF RELIEF FAN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
S SINKS
SA SUPPLY AIR
SAN SANITARY SEWER
SB SITZ BATH
SD SMOKE DAMPER
SF SUPPLY FAN
SFU SANITARY FIXTURE UNITS
SH SHOWERS
SHB SHAMPOO BOWLS
SP STATIC PRESSURE
SS SERVICE SINK
SSCU DUSTLESS SPLIT SYSTEM
CONDENSING UNIT
SSFC DUCTLESS SPLIT SYSTEM
SSS SURGEON SCRUB SINKS
ST STORAGE TANK
SUP SUMP PUMP
SW STORM WATER
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVES
TONS TONS OF REFRIGERATION
TSP TOTAL STATIC PRESSURE
APD AIR PRESSURE DROP
A COMPRESSED AIR
AFCV AUTO FLOW CONTROL VALVE
AC AIR COMPRESSOR
AD AIR DOOR
AW ACID WASTE
AV ACID VENT
AS AIR SEPARATOR
AW AREA DRAIN
ARD AIR PRESSURE DROP
AMP AMPERE
AHU AIR HANDLING UNIT
BW BEDPAN WASHERS
BV BALL VALVE
BT BATHTUBS
BLV BALANCING VALVE
BLKG BLOCKING
BHP BREAK HORSEPOWER
BFV BUTTERFLY VALVE
BF BACKFLOW PREVENTER
BD BIDET
BC BLOWER COIL
B BOILER
CWS CHILLED WATER SUPPLY
CWR CHILLED WATER RETURN
CU AIR COOLED CONDENSING UNIT
CT COOLING TOWER
CSS CLINICAL SERVICE SINKS
CS CONDENSER WATER SUPPLY
CRAC COMPUTER ROOM AIR
CONDITIONER
CR CONDENSER WATER RETURN
CMU COMBINATION UNITS
CI CAST IRON
CHV CHECK VALVE
CHIU CABINET HEATER
CFM CUBIC FEET PER MINUTE
CF CEILING FANS
CD CONDENSATE DRAIN
CC COOLING COIL
C CHILLER
D DIFFUSER
DB DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DEG DEGREE
DF DRINKING FOUNTAIN
DGCO DOUBLE GRADE CLEANOUT
DH EMERGENCY DRENCH HOSES
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRC
DI DEIONIZED WATER
DOA DEDICATED OUTDOOR AIR UNIT
DP DOMESTIC PUMP
DS DISTILLED WATER
DSA DUCT SOUND ATTENUATORS
DSCW DOMESTIC SOF COLD WATER
DSHW DOMESTIC SOFT HOT WATER
DSHWR DOMESTIC SOFT HOT WATER
RETURN
DST DOMESTIC STORAGE TANK
DTW DOMESTIC TEMPERED WATER
DTWR DOMESTIC TEMPERED WATER
RETURN
DXT DOMESTIC EXPANSION TANK
EA EACH
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE
WASH/SHOWERS
EF EXHAUST FAN
EFF EFFICIENCY
EFW EMERGENCY FACE WASH
EH EXHAUST HOOD
ERV ENERGY RECOVERY
VENTILATOR
ES EMERGENCY SHOWER
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER
TEMPERATURE
EX EXPANSION TANK
F FIRE PROTECTION WATER
SUPPLY
F FURNACE
FCO FOOT CANDLE
FCT FLUID COOLER TOWERS
FCU FAN COIL UNIT
FD FIRE DAMPER
FLA FULL LOAD AMPS
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR SINKS
FSD FIRE/SMOKE DAMPER
FTR FINNED TUBE RADIATION
G GAS: LOW-PRESSURE
GCR GLYCOL CONDENSER WATER
RETURN
GCS GLYCOL CONDENSER WATER
SUPPLY
GCWR GLYCOL CHILLED WATER
RETURN
GCWS GLYCOL CHILLED WATER
SUPPLY
GD GARBAGE DISPOSAL
GD GRAVITY DAMPER
GDH GAS DUCT HEATER
GHCR GLYCOL HOT/COLD WATER
RETURN
GHCS GLYCOL HOT/COLD WATER
SUPPLY
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GI GREASE INTERCEPTOR
GIV GRAVITY INTAKE VENTILATOR
GPD GALLONS PER DAY
18 Ø
18x10
18/10
ROUND DUCT
VD
FLAT OVAL DUCT-1ST FIG IS
SIDE SHOWN
FLEXIBLE DUCTWORK CONNECTION
RECT DUCT-1ST FIG IS SIDE SHOWN
ACOUSTICAL DUCT LINER
VOLUME DAMPER
MANUAL BALANCING VALVE
CONTROL VALVE (3 WAY)
CONTROL VALVE (2 WAY)
HOSE END DRAIN VALVE
PRESSURE REDUCING VALVE
AUTO FLOW CONTROL VALVE
VALVE
CHECK VALVE
HVAC DUCTWORK AND SPECIALTIES
EXTRACTOR
SIZE/TYPE
RETURN OR EXHAUST DUCT DOWN
RETURN OR EXHAUST REGISTER
OR GRILLE (VERTICAL MOUNTING)
SUPPLY REGISTER OR GRILLE
ROUND DUCT UP / DOUBLE LINE PIPE
ROUND DUCT DOWN / DOUBLE
LINE PIPE
RETURN OR EXHAUST DUCT UP
(R OR G) (VERTICAL MOUNTING)
TURNING VANES
SUPPLY AND FRESH AIR DUCT DOWN
SUPPLY AND FRESH AIR DUCT
SIZE/TYPE
SIZE/TYPE
FLOW
FLOW
SIZE/TYPE
FLOW
FLOW
SMOKE DAMPER - FIRE SEPARATION
FIRE DAMPER - FIRE SEPARATION
MOTORIZED DAMPER-OPPOSED BLADE
MOTORIZED DAMPER-PARALLEL BLADE
ROUND CEILING SUPPLY DIFFUSER
(HORIZONTAL MOUNTING)
GRAVITY DAMPER
(OR) SAFETY VALVE-STEAM
TEMP & PRESS RELIEF
THERMOSTATIC MIXING VALVE
SIZE/TYPE
FLOW
HUMIDISTAT
THERMOSTAT
FLEXIBLE DUCT
S
H
T
TEMPERATURE SENSOR
FIRE/SMOKE DAMPER - FIRE
SEPARATION
RECTANGULAR RETURN REG OR
GRILLE (HORIZONTAL MOUNTING)
RECTANGULAR SUPPLY DIFF, REG
OR GRILLE (HORIZONTAL
MOUNTING)
VALVES
M
M SIZE/TYPE
FLOW
RECTANGULAR EXHAUST REG OR
GRILLE (HORIZONTAL MOUNTING)
M
VOLUME DAMPER
M
F
S
FS
DEMOLITION GENERAL NOTES GENERAL NOTES
SEE INDIVIDUAL SHEET FOR REFERENCE DEMO NOTES SEE INDIVIDUAL SHEET FOR REFERENCE NOTES
MECHANICAL SHEET LIST
M 00 MECHANICAL INFO SHEET
M001 MECHANICAL DEMOLITION PLANS
M101 MECHANICAL PLANS
M102 FLOOR PLAN - PLUMBING
M401 QUENCH VENT DETAILS
M501 MECHANICAL SCHEDULES & DETAILS
1/22/21
01/08/2021
T
CONTROL
MRI 1
MRI 2
EQUIPMENT
TOILET
CORRIDOR
VTR (E)
SAN
V
V
V
V S
A N
4" SAN DN
VAC
O
(E) VAV(E) VAV
(E) VAV
3 3
2 2
(E) AHU
(E
C
(E
C U
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
635-CSI-105
M R
I
KEY PLAN
NOT TO SCALE
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
ROOF
/2
/2
:1 :1
P
M
07/24/20
MECHANICAL DEMOLITION PLANS
M001
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE PREP
AJPJEK
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
24607868.001
REF. DEMO NOTES ( ):X
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN - MECHANICAL & PLUMBING DEMOLITION
SCALE: 1/8" = 1'-0"
THIRD FLOOR ROOF PLAN - MECHANICAL DEMOLITION
1 REMOVE ANY GRILLES OR DIFFUSERS SERVING EQUIPMENT 102.
DEMO ASSOCIATED DUCTWORK BACK TO MAIN AND CAP. REPAIR
INSULATION TO MATCH ADJACENT CONDITION WITH PROPER VAPOR
BARRIER.
2 EXISTING EQUIPMENT TO REMAIN.
3 EXISTING VAV BOX AND ASSOCIATED DUCTWORK, ACCESSORIES,
GRILLES, AND DIFFUSERS ARE TO REMAIN.
4 DEMO EXISTING FAN COIL SYSTEM. FAN COIL IS LOCATED ON THIRD
FLOOR. REMOVE ALL ASSOCIATED DUCTWORK, DIFFUSERS, GRILLES,
AND DUCT ACCESSORIES. REMOVE ASSOCIATED PIPING AND
SPECIALTIES BACK TO MAIN AND CAP. SEAL ALL FLOOR
PENETRATIONS.
5 EXISTING SUPPLY GRILLE TO BE RELOCATED TO NEW CEILING GRID IN
TOILET 101. SEE M101 FOR RELOCATION.
6 DEMO MEDICAL GAS OUTLETS AND ASSOCIATED PIPING BACK TO
ISOLATION VALVE AND PREPARE FOR CONNECTION TO NEW PIPING.
SEE PLANS ON M101.
7 CONTRACTOR TO COORDINATE WITH THE OWNER ON THE REMOVAL
OF ANY ASSOCIATED MECHANICAL COMPONENTS SERVING THE MRI
MACHINE BEING REMOVED. DISCONNECT ANY ASSOCIATED PIPING
AND REMOVE BACK TO MAINS AND CAP. REPAIR INSULATION TO MATCH
ADJACENT CONDITION WITH PROPER VAPOR BARRIER. CONTRACTOR
TO SEAL ALL WALL OR FLOOR OPENINGS TO MATCH ADJACENT
CONDITIONS.
8 CONTRACTOR TO REMOVE EXISTING CRYOGEN VENT SYSTEM AND
ANY ASSOCIATED ACCESSORIES. CONTRACTOR TO SEAL ALL WALL
OR FLOOR OPENINGS TO MATCH ADJACENT CONDITIONS.
CONTRACTOR TO FIELD VERIFY EXACT LOCATION.
NORTH
NORTH
CONTROL
MRI 1
MRI 2
EQUIPMENT
TOILET
CORRIDOR
SS-1
QUENCH
VENT
10x10 R-1
10 Ø S-1
30010 Ø SA
10x8 RA
VAV-104
6 Ø SA
3/4" HWR
3/4" HWS
RS/RLRS/RL
3/4" CD
2" CWS
2" CWR
8 Ø
(E
V A
V
(E
V A
V
(E) VAV
11 11
SSCU-1
RS/RLRS/RL
1 2" CWS
2" CWR
M R
I C
H
IL
L E
R
(E
C
(E
C U
(E) AHU
EQUIPMENT
V
V V
SAN
S A
N
V
O
VAC
141414
2" DCW
2"
3"
2"
V
SAN
VTR (E)
FS-1
TOILET
MRI 1
CONTROL
MRI 2
CORRIDOR
106CORRIDOR
4" SAN DN
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
635-CSI-105
M R
I
KEY PLAN
NOT TO SCALE
SCHEMMER
1044 NORTH 115TH STREET, SUITE 3300
OMAHA, NEBRASKA 68154
ROOF
/2
/2
:1 :1
P
M
07/24/20
MECHANICAL PLANS
M101
OKLAHOMA CITY VA HEALTH
CARE SYSTEM MRI SITE PREP
AJPJEK
OKLAHOMA CITY, OKLAHOMA
JOHN WILSON
24707868.001
REF. NOTES ( ):X
16 EXTEND EXISTING OXYGEN AND VACUUM PIPING TO WALL OUTLET.
FIELD VERIFY EXACT LOCATION OF PIPING MAINS AND VALVES. IF
EXISTING ISOLATION VALVE IS NOT ABOVE THE CEILING OF THE
ADJACENT CORRIDOR, CONTRACTOR SHALL RELOCATE EXISTING
VALVE IN AN ACCESSIBLE SPACE IN THE CEILING OF THE ADJACENT
CORRIDOR. COORDINATE PIPE ROUTING WITH MRI SHIELDING.
17 CONTRACTOR TO PROVIDE KOOLANT KOOLERS MANUAL
SWITCH-OVER PANEL. INSTALL A 50 MICRON STRAINER OR FILTER
BETWEEN DOMESTIC WATER SUPPLY AND MANUAL SWITCH-OVER
PANEL.
18 CONDENSATE PIPING TO DISCHARGE TO FLOOR SINK.
19 RS/RL PIPING BETWEEN SS-1 AND SSCU-1 TO BE ROUTED THROUGH
THE THIRD FLOOR MECHANICAL SPACE. PROVIDE FIRE CAULKING
AROUND ANY PENETRATIONS THROUGH RATED WALLS AND FLOORS.
20 PROVIDE FIRE CAULKING AROUND ANY PIPE PENETRATIONS
THROUGH RATED WALLS AND FLOORS. (TYP.)
21 CONNECT 3" SANITARY LINE TO EXISTING 4" VERTICAL SANITARY MAIN
LOCATED IN CHASE. CONTRACTOR TO FIELD VERIFY EXACT LOCATION
OF SANITARY MAIN IN CHASE.
22 CONTRACTOR IS TO INSTALL QUENCH LINE PER MANUFACTURER
GUIDELINES. SEE DETAILS ON M401 FOR CONSTRUCTION TYPES,
MATERIALS, AND GUIDELINES. QUENCH LINE IS TO CONSIST OF THE
FOLLOWING COMPONENTS: (1) VIBRATION DECOUPLER, 25 FEET OF
SMOOTH STRAIGHT RUN, (4) 90 DEGREE SMOOTH ELBOW, (2) 45
DEGREE SMOOTH ELBOWS, AND MANUFACTURER APPROVED
HORIZONTAL OUTLET. ALL COMPONENTS ARE TO BE 8" DIAMETER
SIZE. THE DESIGN SHOWN ON PLANS ONLY REQUIRES (2) 90 DEGREE
ELBOWS, THE ADDITIONAL (2) 90 DEGREE…