This solicitation notice provides details for an upcoming MRI site preparation project for the Oklahoma City VA Medical Center. The scope of work involves demolishing and constructing a revised MRI Suite 1 and Control Room along with adjoining areas. The contractor must ensure MRI Suite 2 remains operational for staff and patients throughout construction. The period of performance is 300 calendar days from notice to proceed. This opportunity is set aside for Service-Disabled Veteran Owned Small Businesses. The estimated value ranges from $1,000,000 to $2,000,000. The solicitation will be posted on or after October 21, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--MRI Site Prep (VA-21-00003189), newest first.
File Type Posted
RFI 4.pdf PDF
VENT 2.jpg JPG image
VENT FRONT LOCATION.jpg JPG image
36C25920R0145 0013.docx DOCX document
2021-02-01 VENT on third floor mech room.jpg JPG image
Drawing Vent.pdf PDF
36C25920R0145 PG 2.pdf PDF
36C25920R0145 0012.docx DOCX document
36C25920R0145 0012.pdf PDF
Mag Shield Design Info Siemens.pdf PDF
36C25920R0145 0011.docx DOCX document
RFI 3 Q 68 through 77.pdf PDF
36C25920R0145 0010.docx DOCX document
MRI Site Prep 100_ Final Specifications.pdf PDF
36C25920R0145 0009.docx DOCX document
2020 07 26 100_ Final for Construction OKC MRI Specifications.pdf PDF
MRI Site Prep AD 101 Addendum 1.pdf PDF
36C25920R0145 0008.docx DOCX document
General Decision Number OKC Jan 2021.docx DOCX document
RFI 3 1-67.pdf PDF
2020 07 26 100_ Final OKC MRI Drawings.pdf PDF
36C25920R0145 0007.docx DOCX document
36C25920R0145 0006.docx DOCX document
36C25920R0145 0005.docx DOCX document
RFI 1 MRI.pdf PDF
36C25920R0145 0004.docx DOCX document
2020-11-02 Pre-Bid Sign-In Sheet MRI.pdf PDF
36C25920R0145 Revised Pg1.pdf PDF
36C25920R0145 0003.docx DOCX document
RFIs 1.pdf PDF
36C25920R0145 0002.docx DOCX document
36C25920R0145 0001.docx DOCX document
Final Combined Drawings.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
GE MRI Drawings.pdf PDF
Combined Final Specs.pdf PDF
36C25920R0145_1.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C H

A S

E

C H

A S

E

CHASE

C H

A S

E

CHASE

CHASE

(B

LO

C K

E D

PROJECT LOCATION (2ND LEVEL)

(1ST LEVEL WORK DIRECTLY BELOW)

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

/2

/2

:1

:4

A

M

100% CONSTRUCTION DOCUMENTS

01/22/2021

COVER SHEET AND SHEET INDEX

G0-00

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE

PREP

JGCJR

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

NOT TO SCALE

PROJECTION LOCATION PLAN. VA MEDICAL CENTER OKLAHOMA CITY OK. 2ND FLOOR

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

OKLAHOMA CITY VA HEALTH CARE CENTER

DEPARTMENT OF VETERAN'S AFFAIRS

921 NE 13TH STREET,

OKLAHOMA CITY, OK 73104

PROJECT NO. 635-CSI-105

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

SHEET INDEX

ARCHTECTURAL

G0-00 COVER SHEET AND SHEET INDEX

G-001 PHASING AND TEMP WALLS FLOOR PLAN

A-100 DEMO PLAN, FLOOR PLAN, REFLECTED CEILING PLAN AND SCHEDULES

A-101 ELEVATIONS AND DETAILS

MECHANICAL

M 00 MECHANICAL INFO SHEET

M001 MECHANICAL DEMOLITION PLANS

M101 MECHANICAL PLANS

M102 FLOOR PLAN - PLUMBING

M401 QUENCH VENT DETAILS

M501 MECHANICAL SCHEDULES AND DETAILS

ELECTRICAL

E 00 ELECTRICAL INFO SHEET

E101 FLOOR PLANS - ELECTRICAL

E102 FLOOR PLANS - ELECTRICAL

E201 ELECTRICAL DETAILS AND SCHEDULES

MRI EQUIPMENT

DRAWINGS

A - 101 ARCHITECTURAL EQUIPMENT PLAN

A - 102 SAFETY AND SERVICE CLEARANCE PLAN

A - 501 DETAILS

A - 502 DETAILS

S - 101 STRUCTURAL FLOOR PLAN

E - 101 ELECTRICAL RACEWAY PLAN

E - 102 ELECTRICAL DIMENSION PLAN

E - 501 DETAILS

M - 101 MECHANICAL PLAN

M - 501 DETAILS

THESE DRAWINGS ARE INCLUDED IN THE CONSTRUCTION DOCUMENT FOR THE GENERAL CONTRACTORS INFORMATION AND COORDINATION. SEE THE PHASING PLAN NOTES INCLUDED ON THE PHASING PLAN

ATTENTION!

All contractors will be required to comply with the VA provided "MRI PERSONNEL SCREENING FORM" for each individual working on site, in any capacity. This form will be completed, signed and dated by each individual with a copy turned over to the Resident Engineer, and a copy kept on site with the project Superintendent. Individuals not submitting this form will not be allowed on the site. A copy of this form is included in the General Requirements section of the specifications. The project Superintendent will be responsible for verifying daily, all individuals working, or visiting the site are compliant.

ALL CONTRACTORS SHALL BE FAMILIAR WITH THE FOLLOWING

TRAINING VIDEOS:

https://www.youtube.com/watch?v=IZrfDGI1mUO&feature=youtu.be https://www.youtube.com/watch?v=vn5H-6BbesQ&feature=youtu.be https://www.youtube.com/watch?v=C721AzAoNAO&feature=youtu.be

NOTICE:

THESE DOCUMENTS ARE THE CURRENT AND REVISED

DOCUMENTS. THE ORIGINALLY SUBMITTED DOCUMENTS

DATED 07/24/2020 ARE NULL AND VOID.

CHASE

TOILET

EQUIPMENT

MRI

CONTROL

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

GYP. BOARD PARTITION, EXTENDING UP

TO DECK ABOVE, 1HR. CONSTRUCTION.

NO ACCESS THRU THIS PARTITION.

PHASE 1

TOILET

EQUIPMENT

MRI

CONTROL

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

SEAL EXISTING DOOR WITH

PLASTIC SHEET AS REQUIRED

PHASE 2

TOILET

EQUIPMENT

MRI

CONTROL

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

GYP. BOARD PARTITION, EXTENDING UP

TO DECK ABOVE, 1HR. CONSTRUCTION.

PROVIDE ACCESS THRU THIS PARTITION

TO WORK AREA.

PHASE 3

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

/2

/2

:1

:4

A

M

100% CONSTRUCTION DOCUMENTS

01/22/2021

PHASING AND TEMP WALLS FLOOR

PLAN

G-001

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE

PREP

JGCJR

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

1/4" = 1'-0"

PHASE 1 PLAN

1/4" = 1'-0"

PHASE 2 PLAN

1/4" = 1'-0"

PHASE 3 PLAN

GENERAL NOTES:

1. THE MRI EQUIPMENT SUPPLIER (SIEMENS) IS CONTRACTED DIRECTLY TO THE VA AND WILL OPERATE AS

FOLLOWS:

a. SIEMENS WILL PROVIDE THE DESIGN, DELIVERY AND INSTALLATION OF ALL NEW MRI EQUIPMENT, AND

INCLUDING, BUT NOT LIMITED TO: THE EXISTING EQUIPMENT SHUT DOWN, INSTALLATION OF THE

EQUIPMENT CONNECTING TO SERVICES PROVIDED UNDER THIS DOCUMENT, REMOVAL OF OLD

EQUIPMENT, EQUIPMENT START UP, CALIBRATION AND TRAINING OF THE VA STAFF. REVIEW THE

SIEMENS DOCUMENTS TO COORDINATE REQUIREMENTS OF THE INSTALLATION.

b. SIEMENS DRAWINGS ARE INCLUDED WITH THIS CONSTRUCTION DOCUMENT PACKAGE FOR INFORMATION PURPOSES ONLY FOR THE GENERAL CONTRACTOR. THIS GENERAL CONTRACTOR WILL WORK DIRECTLY WITH SIEMENS TO VERIFY ALL WORK WITH THE EQUIPMENT, TO COORDINATE AND SCHEDULE THE WORK

AS A WHOLE.

c. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR THE PROJECT SCHEDULE.

2. THE RF AND MAGNETIC SHIELDING CONTRACTOR (TBD) WILL BE DIRECTLY CONTRACTED TO THE GENERAL

CONTRACTOR AND WILL FUNCTION AS HIS SUBCONTRACTOR.

a. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE TO COORDINATE THE DESIGN (USING CRITERIA

BASED ON THE SIEMENS DOCUMENTS), DELIVERY AND INSTALLATION OF THE NEW RF AND MAGNETIC SHIELDING SYSTEMS, WHICH WILL INCLUDE, BUT NOT LIMITED TO THE REMOVAL OF THE EXISTING RF AND MAGNETIC SHIELDING SYSTEMS, DESIGN, DELIVERY AND INSTALLATION OF THE NEW RF AND MAGNETIC SHIELDING SYSTEM INCLUDING THE WINDOW B COMPONENT, AND THE NEW DOOR 103A COMPONENT (PNEUMATIC AND FERROMAGNETIC SYSTEMS), INCLUDING THE FINAL TESTING OF THE

SYSTEMS.

PHASING NOTES:

THE PROVIDED PHASING PLAN AND NOTES ARE GENERAL IN NATURE BUT REFLECT THE VA REQUIREMENTS FOR THE PROJECT. THE GENERAL CONTRACTOR WILL PROVIDE THE FINAL PHASING PLAN, CPM SCHEDULE AND ICRA DOCUMENTS, PROCURE THE VA’S AGREEMENT OF THOSE PLANS, AND BE RESPONSIBLE FOR

RECOGNIZING AND SCHEDULING ALL ASPECTS OF THE WORK.

THE GC WILL MAINTAIN RESPONSIBILITY FOR THE WORK, SCHEDULE AND PHASING. IF ADJUSTMENTS TO THE WORK, SCHEDULE AND PHASING DESCRIBED BELOW ARE REQUIRED FOR THE WORK, COORDINATE WITH THE RESIDENT ENGINEER WHEN SCHEDULING TO ACHIEVE HIS APPROVAL. COORDINATE REQUIREMENTS TO TEST

THE NEW RF AND MAGNETIC SHIELDING SYSTEMS.

NOTE: DURING THE DURATION OF THE WORK, AND IN THE EVENT OF AN EMERGENCY PROCEDURE TAKING PLACE. THE GENERAL CONTRACTOR WILL IMMEDIATELY LEAVE THE SITE IF DIRECTED BY A VA MRI STAFF

MEMBER AND WILL RETURN ONCE INSTRUCTED IN WRITTING BY THE RESIDENT ENGINEER.

PHASE 1:

1. DURING PHASE 1 THE VA WILL HAVE FULL ACCESS TO THE CONTROL 104 AND MRI 2 105 IN ORDER TO

CONTINUE TO PROVIDE HEALTH CARE TO THE VA PATIENT. UNLESS APPROVED, THE GENERAL

CONTRACTOR WILL NOT ACCESS THIS AREA.

2. THE PHASE 1 PLAN SHOWS THE PERIMETER OF THE PHASE 1 WORK ANTICIPATED.

3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE

PLAN:

a. GYP BD ENCLOSURE TO THE STRUCTURAL DECK, 1 HOUR RATED ASSEMBLY PROVIDING WORKSPACE TO

INSTALL THE NEW MRI DOOR AND RAMP IN CONTROL 104. NO ACCESS THROUGH THIS BARRIER WILL BE ALLOWED. THE GENERAL CONTRACTOR WILL PROVIDE PROTECTIVE MEASURES AND ENCLOSURES, AS APPROVED BY THE VA, TO SAFEGUARD CONTROL 104 DURING THE CONSTRUCTION OF THIS BARRIER.

b. GYP BD ENCLOSURE WITH ACCESS, WILL PROTECT THE DOORS TO TOILET 101, EQUIPMENT 102 AND THE

TEMPORARY CONSTRUCTION ACCESS DOOR TO MRI 1 103.

4. WORK SCHEDULED FOR THIS PHASE 1:

a. TOILET 101 WILL BE COMPLETED, FINALED AND TURNED OVER TO THE VA. THE GC CAN ASSUME THAT

THE WARRANTY PERIOD FOR THE TOILET 101 CAN BEGIN UPON ACCEPTANCE. REFLECT ANTICIPATED

PROGRESS IN DETAIL IN THE CPM SCHEDULE.

b. EQUIPMENT 102 WILL PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS AS THEY

DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK.

c. MRI 1 WILL PROGRESS, INCLUDING THE DEMOLITION OF THE EXTERIOR WALL AS REQUIRED FOR THE TRANSFER OF ALL EXISTING AND NEW MRI EQUIPMENT. DEMOLITION AND RECONSTRUCTION OF ALL FINISHES INCLUDING THE RF AND MAGNETIC SYSTEMS AS ALLOWABLE, AND THE INSTALLATION OF THE NEW MRI DOOR AND RAMP. THE GENERAL CONTRACTOR WILL PROVIDE TEMPORARY ENCLOSURE AT THE EXTERIOR WALL OF THE MRI SPACE, PROVIDING A TIGHTLY SEALED, WEATHERPROOF, THERMALLY

INSULATED STRUCTURE. PROVIDE ADDITIONAL HEATING AND COOLING AS REQUIRED. REFLECT

ANTICIPATED PROGRESS IN DETAIL IN THE CPM SCHEDULE.

d. THE GC WILL BE RESPONSIBLE FOR THE DEMOLITION PROCESS, VERIFYING REQUIRED DEMOLITION OPENING FOR THE TRANSFER OF ALL EQUIPMENT, STRUCTURAL STABILIZATION OF THE STRUCTURE AS IT RELATES TO THIS WORK AND THE MAINTENANCE AND PROTECTION TO THE BUILDING WHILE THIS

STRUCTURE IS OPEN.

5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, PHASE 2 CAN PROCEED:

PHASE 2:

1. DURING THIS PHASE 2 THE VA WILL VACATE THE MRI AREA AND THE GENERAL CONTRACTOR WILL HAVE 24/7

ACCESS FOR 3 DAYS TO FINISH THE CONSTRUCTION OF THE CONTROL 104 AND WORK NEEDING

COMPLETION IN EQUIPMENT 102 AND MRI 1 103. WORK IN THIS AREA WILL BE SCHEDULED IN ADVANCE THROUGH THE RESIDENT ENGINEER SO VA CAN MAKE ARRANGEMENTS FOR THEIR RESPONSIBILITY TO THE

VA PATIENTS.

2. THE PHASE 2 PLAN SHOWS THE PERIMETER FOR THE PHASE 2 WORK ANTICIPATED.

3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE

PLAN:

a. GYP BD ENCLOSURE WITH ACCESS, WILL PROTECT THE DOORS TO EQUIPMENT 102 AND THE

TEMPORARY CONSTRUCTION ACCESS DOOR TO MRI 1 104.

b. PLASTIC SHEET BARRIERS WILL PROTECT INFILTRATION AT DOOR TO MRI 2 105 AND THE PAIR OF DOORS

TO CONTROL 104.

4. WORK SCHEDULED FOR THIS PHASE 2:

a. CONTROL 104 WILL BE COMPLETED, FINALED AND TURNED OVER TO THE VA.

b. EQUIPMENT 102 WILL BE PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS AS THEY

DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK. REFLECTED ANTICIPATED PROGRESS

IN DETAIL IN THE CPM SCHEDULE.

c. MRI 1 WILL PROGRESS AS FAR AS THE GENERAL CONTRACTOR AND SIEMENS DETERMINE, PENDING COORDINATION WITH THE OVERALL WORK. REFLECTED ANTICIPATED PROGRESS IN DETAIL IN THE CPM

SCHEDULE.

5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, PHASE 3 CAN PROCEED.

6. AT THE COMPLETION OF THIS PHASE 2, THE VA WILL BE ABLE TO RESUME WORKING IN CONTROL 104 AND

MRI 103.

PHASE 3:

1. DURING THIS PHASE 3, THE VA WILL RESUME WORKING IN THE CONTROL 104 AND MRI 2 105, AND THE

GENERAL CONTRACTOR WILL COMPLETE THE PROJECT.

2. THE PHASE 3 PLAN SHOWS THE PERIMETER OF THE PHASE 3 WORK ANTICIPATED.

3. APPROVED BARRIERS AND ICRA PLAN WILL BE MAINTAINED. BARRIERS WILL INCLUDE AS SHOWN ON THE

PLAN:

a. POLY BARRIERS WITH ZIPPERED DOORS 103A TO MRI 1 103 AS REQUIRED, PROTECTING THE CONTROL

104. CONTRACTOR ACCESS THROUGH THIS BARRIER IS PROVIDED TO COMPLETE THE WORK.

4. WORK SCHEDULED FOR THIS PHASE 3:

a. DELIVERY, INSTALLATION AND CALIBRATION OF THE NEW MRI UNIT. INCLUDING REMAINING

INSTALLATION OF RELATED EQUIPMENT FOR THE COMPLETE OPERATION OF THIS SYSTEM.

b. RECONSTRUCTION OF THE EXTERIOR WALL, INCLUDING NEW ALUMINUM WINDOW AND THE RF WINDOW

COMPONENT OF THE NEW RF SYSTEM COMPLETION OF THE MAGNETIC SHIELDING SYSTEM AND

EXTERIOR WALL ENCLOSURE, INCLUDING FINAL TESTING OF THE SYSTEM.

c. REMAINING WORK REQUIRED TO COMPLETE THE PROJECT.

5. WHEN COMPLETED, CLEANED AND APPROVED BY THE RESIDENT ENGINEER, THE PROJECT WILL BE FINALED

AND DELIVERED TO THE VA FOR A COMPLETE OPERATIONAL DEPARTMENT, INCLUDING STAFF TRAINING.

6. THE CONTRACTOR WILL ASSUME THAT THE WARRANTY PERIOD FOR THE REMAINDER OF THE WORK WILL

BEGIN ONCE ACCEPTED.

1ST FLOOR WORK (MAGNETIC SHIELDING):

1. PROVIDE WORK FOR THE FIRST FLOOR MAGNETIC SHIELDING AT THE DISCRETION OF THE GENERAL CONTRACTOR, AND APPROVAL OF THE RESIDENT ENGINEER. THE GENERAL CONTRACTOR WILL INCLUDE THIS

AREA IN HIS SCHEDULE, PHASING AND ICRA PLANS AS NEEDED.

OFFICE

1F114

OFFICE

1F115

OFFICE

1F116

CHASE

F E

MAGNETIC SHIELD SUSPENDED FROM

STRUCTURAL DECK ABOVE. COORDINATE

WITH SYSTEM INSTALLER. REMOVE/REINSTALL

EXISTING ACT SYSTEM AS REQUIRED FOR

INSTALLATION. PROVIDE MODIFICATIONS TO

EXG HVAC AND ELECTRIC THAT MAY BE IN

CONFLICT AS NEEDED FOR INSTALLATION OF

SHIELD.

COORDINATE CENTER LOCATION

OF MAGNETIC SHIELD WITH

CENTER LOCATION OF MRI.

SEE EQUIPMENT MFR DRAWINGS.

ROTATE SHIELD AS REQUIREMENT

BYEQUIPMENT SUPPLIERS

DOCUMENTS.

CORRIDOR

C1F6-1

GEN CONTRACTOR TO

PROVIDE ICRA PLAN AND

BARRIER AS APPROVED

BY THE RESIDENT ENGINEER.

MAINTAIN STAFF EGRESS

WIDTHS AT ALL TIME.

EQUIPMENT

MRI

CONTROL

G F E D

02-07

02-03

02-04

02-1702-17

02-02

02-01

02-18

PARTIAL

PARTIAL

02-08

02-07

02-04 02-16 02-17

02-15 02-0502-05

02-13

02-0902-09

02-1402-14

02-0702-07

02-12 02-14

RAMP

02-06

02-11

02-10

02-0902-09

02-0802-08

02-0702-07

02-19

02-20

02-23

02-21

02-22

THE GEN CTR WILL PROVIDE DEMOLITION OF THIS AREA AS SHOWN

FOR WINDOWS AND HIGHER FRAMING, REMAINING DEMOLITION WILL

BE PROVIDED BY THE GEN CTR AS NEEDED FOR THE SAFE REMOVAL

OF THE EXG MRI EQUIPMENT AND INSTALLATION OF NEW. ALL

BRACING AND SHORING AS REQUIRED WILL BE DESIGNED AND

INSTALLED BY THE GEN CTR. REINSTALL EXG BRICK FACE TO MATCH

EXG WHEN COMPLETE.

NOTE OF CLARIFICATION:

02-13

TOILET

EQUIPMENT

MRI

CONTROL

G F E D

BELOW

/4

18' - 11 7/8"

A-101

SEE DEMO PLAN FOR

CONSTRUCTION ACCESS PORTAL,

INFILL TO MATCH EXISTING.

A-101

AT WINDOW

SIM

SIM

A

B3' - 0"

NEW MED GAS OUTLET 5' TO

CENTER AND CENTER ON WALL,

SEE MECHANICAL.

SIM

A-101

Sim

/8

/2

1' - 6 3/4" CENTER LOCATION

OF MRI, VERIFY WITH

EQUIPMENT DRAWINGS.

A-101 A-101

E.Q. 6' - 0" E.Q.

101A

103A

105A

104A

A-10111

A-101

A-101 13

A-101

A-101 14

CORRIDOR

102A

NEW HANDRAIL

NEW HANDRAIL

A-10116

MODIFIED HANDRAIL

EXG HANDRAIL TO

REMAIN.

EXG VA CONTROL

DESK

STEEL MAGNETIC SHIELD SYSTEM,

COORD WITH INSTALLER.

SEE EQUIPMENT MFR CALCULATIONS

FOR FLOOR, WALL AND SUSPENDED

PANEL REQUIREMENTS. THIS

SYSTEM WILL BE DESIGNED AND

INSTALLED BY THE GEN

CONTRACTOR (SHIELDING

SUBCONTRACTOR).

RF SHIELDING SYSTEM, COORD

WITH INSTALLER.

SEE SPECIFICATIONS FOR WALL,

CEILING, FLOOR, DOOR AND

WINDOW REQUIREMENTS. THIS

SYSTEM WILL BE DESIGNED AND

INSTALLED BY THE GEN

CONTRACTOR (SHIELDING

CONTRACTOR)

1. RELOCATE EXG. SPRINKLER HEAD PER ORIGINAL

LOCATON.

TOILET

EQUIPMENT

MRI

CONTROL

REMOVE/REINSTALL ACT AT

NEW WALL TO FINISH AS

REQUIRED.

NO ACT; OPEN FOR MRI

EQUIPMENT ACCESS

OPEN TOP WALL CABINET

FOR FILTER ACCESS FROM

ABOVE.

NEW RF WINDOW SYSTEM COMPONENT INCL GLAZING. SYSTEM INSTALLATION

BY GEN CTR (SHIELDING SUB CONTRACTOR)

(FIELD VERIFY)

17' - 0" M.O.

/4

(F

IE

L D

V E

R

IF

Y

(F

IE

L D

V E

R

IF

Y

A REMOVE EXISTING WINDOW ASSEMBLY; INSTALL NEW ALUMINUM

WINDOW ASSEMBLY.

B

NOTE: ALL GLAZING PANELS TO BE SPANDREL UNITS.

E X

G U

N

IT

V E

R

IF

Y W

IT

H

EXG. UNIT

VERIFY WITH

E X

G U

N

IT

V E

R

IF

Y W

IT

H

INSTALLATION OF NEW

WINDOW ASSEMBLY WILL

MATCH EXG INSTALLATIONS.

VINYL CAP

FILLER SHEET VINYL FLOOR

AND BASE

HM FRAME - HM001

DOOR 103A - 3'-10"

DOOR 102A - 4'-0"

2" 2"

WOOD DOOR - PFWD

DOOR 103A - 3'-10"

DOOR 102A - 4'-0"

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

/2

/2

:1

:4

A

M

100% CONSTRUCTION DOCUMENTS

01/22/2021

DEMO PLAN, FLOOR PLAN, REFLECTED

CEILING PLAN AND SCHEDULES

A-100

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE

PREP

JGCJR

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

1/4" = 1'-0"

EXISTING - FIRST FLOOR PLAN

1/4" = 1'-0"

DEMO - SECOND FLOOR PLAN

1/4" = 1'-0"

SECOND FLOOR PLAN

WALL SHIELDING SYSTEMS

LEGEND (SEE WALL TYPES):

GENERAL NOTES:

DEMOLITION NOTES:

1. ALL DEMOLITION WILL BE COORDINATED WITH

PHASING PLAN AND STAFF / PATIENT ACCESS TO

MRI.

SEE NOTE OF CLARIFICATION

02-01 REMOVE EXG. WALL AS SHOWN FOR ENLARGED EQUIPMENT ROOM.

02-02 REMOVE EXG. FLOOR AND WALL TILE AND ACT CEILING AND GRID AS

REQUIRED FOR ENLARGED EQUIPMENT ROOM. MODIFY TOILET ACT

CEILING TILE AND GRID AS REQUIRED FOR NEW TOILET SPACE. SEE

FLOOR PLAN.

02-03 RELOCATE EXG. DOOR, FRAME AND HARDWARE AS LOCATED ON FLOOR

PLAN.

02-04 REMOVE EXG. WALL AS REQUIRED FOR RELOCATED DOOR AND NEW

TEMPORARY DOOR. SEE FLOOR PLAN.

02-05 REMOVE AND REINSTALL NEW ALUMINUM WINDOW A ASSEMBLY.

REMOVE RF SHIELDING WINDOW BY SHIELDING CONTRACTOR.

02-06 REMOVE EXG. EQUIPMENT ENCLOSURE, INCLUDING RAISED FLOOR.

EXISTING MRI EQUIPMENT WILL BE DE-ENERGIZED, SHUT DOWN AND

REMOVED BY OTHERS.

02-07 REMOVE EXG. ACT CEILING AND GRID.

02-08 REMOVE EXG. FLOOR TILE. PATCH FLOOR FOR NEW FINISH.

02-09 REMOVE EXG. VINYL BASE.

02-10 MOVEABLE FURNISHINGS, EQUIPMENT AND MRI AFFECTS WILL BE

REMOVED BY OWNER.

02-11 REMOVE EXG. CASEWORK.

02-12 REMOVE EXG. SHIELDING DOOR AND REINSTALL NEW DOOR BY

SHIELDING SYSTEM INSTALLER.

02-13 REMOVE EXG. GYP. BD. AND FRAMING TO EXPOSE EXG. MAGNETIC AND

RF SHIELDING SYSTEMS. SHIELDING SYSTEMS TO BE REMOVED AND

REPLACED BY SHIELDING INSTALLER IN ITS ENTIRETY.

02-14 REMOVE EXG. FLOORING TO EXPOSE SHIELDING SYSTEMS. SHIELDING

SYSTEMS TO BE REMOVED IN ITS ENTIRETY BY SHIELDING CONTRACTOR.

02-15 REMOVE EXISTING BENCH STRUCTURE IN ITS ENTIRETY.

02-16 EXG. CLG. HUNG MED. GAS TO BE RELOCATED. SEE MECHANICAL.

02-17 MODIFY EXG. HANDRAIL AS REQUIRED FOR NEW OPENING.

02-18 PROVIDE DEMOLITION AS REQUIRED FOR INSTALLATION OF NEW FLOOR

SINK. SEE MECHANICAL.

02-19 REMOVE EXG. WALL AS REQUIRED FOR NEW DOOR. SEE FLOOR PLAN.

02-20 REMOVE EXG. DOOR, FRAME AND HARDWARE TO ITS ENTIRETY.

02-21 REMOVE EXISTING FRAMING TO EXPOSE EXISTING WINDOW ASSEMBLY

AS SHOWN. FIELD VERIFY REQUIRED OPENING.

02-22 REMOVE EXISTING RF WINDOW COMPONENT WITH SYSTEM REMOVAL.

INSTALL NEW RF WINDOW AS SHOWN.

02-23 EXISTING WALL CABINET, THE VA WILL REMOVE THEIR PROPERTY, THE GC

WILL REMOVE THE CABINET AND DELIVER IT TO THE LOCATION THE VA

PROVIDES.

DEMOLITION KEYNOTES:

1/4" = 1'-0"

REFLECTED CEILING PLAN

N

N

PLAN

NORTH

TRUE

NORTH

N

N

PLAN

NORTH

TRUE

NORTH

N

N

PLAN

NORTH

TRUE

NORTH

DOOR SCHEDULE

MARK WIDTH HEIGHT FRAME DOOR COMMENTS

101A 3' - 0" 7' - 0" HM-001 F RELOCATE DOOR FRAME. DOOR AND HARDWARE.

102A 4' - 0" 7' - 0" HM-001 F SEE GENERAL DOOR NOTE 1.

103A 3' - 10" 7' - 0" HM-001 F DEMO / SUPPLY AND INSTALL BY SHIELDING SYSTEM INSTALLER.

104A 5' - 4" 7' - 0" PROTECT IN PLACE - NO WORK THIS ASSEMBLY

105A 3' - 10" 7' - 0" HM-001 F PROTECT IN PLACE - NO WORK THIS ASSEMBLY

DOOR LEGEND:

HM-001 HOLLOW METAL

PFWD PRE-FINISHED WOOD DOOR

N

N

PLAN

NORTH

TRUE

NORTH

FINISH LEGEND:

ACT ACOUSTICAL CEILING TILE (1,2,3 SUFFIXES IDENTIFY DIFFERING COLOR SELECTIONS)

CB (INTEGRAL) COVE BASE (CONTINUOUS TURNED UP BASE FORM SV WITH CAP)

CT CERAMIC TILE (MOSAIC, BASE, WALL AND CAP AS APPLIES)

EXG EXISTING

GB GYPSUM BOARD

MOD MODIFIED

PT PAINT (1,2,3... SUFFIXES IDENTIFY DIFFERING COLOR SELECTIONS)

SC SEALED CONCRETE

SV SHEET VINYL (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)

VB VINYL BASE (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)

VCT VINYL COMPOSITION TILE (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)

WF WALL FABRIC (1,2,3... SUFFIXES IDENTIFY COLOR SELECTIONS)

WSC WAINSCOT, SEE CT ABOVE.

ROOM FINISH NOTES:

1. FLOOR CT TO BE REMOVED TO THE LINE OF THE NEW WALL, PROTECT EXG ALL CT IN BATHROOM

FROM DAMAGE. SALVAGE/REUSE MINIMAL TILE AT DOOR RELOCATION.

2. RECONSTRUCT CT WAINSCOT (APPROX 4'-4" TO MATCH EXG). USE MATCHING TILE FOR COLOR, SHAPE AND TEXTURE. SUBMIT SAMPLES TO COR. IF CT CAN BE SALVAGED AND REUSED

COORDINATE WITH COR.

3. MODIFY CEILING AS NEEDED FOR NEW WALL.

4. SEE REFLECTED CEILING PLAN FOR PARTIAL CEILING.

5. NEW RAISED FLOOR (RF) SEE DETAIL 9-A101. FINISH IS A SEAMLESS SHEET VINYL AND INTREGAL

COVED BASE AND VINYL CAP.

6. PREPARE EXG WALL SURFACES AND CONC FLOOR FOR NEW FINISHES.

7. MODIFY EXG HANDRAIL ON WEST WALL, SOUTH OF RELOCATED DOOR 101A PROVIDE NEW END IF

WORK REQUIRES. BETWEEN DOORS 101A AND 102A REPLACE IN FULL INCLUDING HAND RAIL

ENDS. BETWEEN DOORS 102A AND 104A REPLACE IN FULL INCLUDING HAND RAIL ENDS. MAINTAIN 18" CLEARANCE ON THE LATCH SIDE OF EACH DOOR. SEE ELEVATION 6/A-101. UPDATE VINYL BASE PER ELEVATION, INSTALL NEW FLOOR TILE AT NEW DOOR THRESHOLD AND AS NEEDED DUE

TO CONSTRUCTION.

8. REPAIR FLOORING AT AREAS OF DEMOLITION AND DOOR THRESHOLDS.

9. PROVIDE THE APPROPRIATE VINYL TRANSITION STRIPS AT ALL FLOOR FINISH CHANGES.

ROOM FINISH SCHEDULE

NUMBER NAME

FLOOR

FINISH

WALL CEILING CEILING

HEIGHT COMMENTSNORTH EAST SOUTH WEST

101 TOILET Mod Exg CT New WSC/PT1 Exg CT/New PT1 Exg CT/New PT1 Exg CT/New PT1 Mod ACT Exg See Notes 1, 2, 3, 6 and 8.

102 EQUIPMENT New VCT New VB/PT1 New VB/PT1 New VB/PT1 New VB/PT1 New ACT 9'-0" See Note 4.

103 MRI New RF New CB/PT1 New CB/PT1 New CB/PT1 New CB/PT1 New ACT 9'-0" See Note 5

104 CONTROL New VCT New VB/PT1 New VB/PT1 New VB/PT1 New VB/PT1 New ACT 8'-0" See Note 6.

106 CORRIDOR Exg - No Work

Exg - No Work Exg - No Work Exg - No Work WF-1 Exg - No Work Exg See Note 7 and 8

NOTE: FOR MATERIAL COLOR SECTIONS SEE SPECIFICATIONS 09 60 00.

GENERAL DOOR NOTES:

1. VERIFY DOOR SWING CLEARS NEW MRI EQUIPMENT AS SHOWN ON THE

FLOOR PLAN WHEN REINSTALLING NEW DOOR.

EXG

EXG

PFWD

PFWD

1/4" = 1'-0"

WINDOW ELEVATIONS

6" = 1'-0"

SHEET VINYL AND BASE DETAIL

1/4" = 1'-0"

DOOR AND FRAME ELEVATIONS

101A 102A

103A

NEW DOOR & HARDWARE TO MRI PER

SHIELDING DESIGN. G.C. PREP NEW

OPENING AS NEEDED FOR NEW RF

FLOOR/RAMP, PAINT FRAME

NEW RF WINDOW

TYPE B

NEW PAINT

SOLID SURFACE TOP

AND APRON

SUPPORT PNL.

BEYOND

NEW RAMP AND FLOORING

BY G.C., SEE 6/A-100

NEW VB, TYP.

5' - 0" V.I.F. 2' - 6"

COORD.

AVAILABLE

WIDTH WITH

MRI

EQUIPMENT

INSTALLATION

A-101

2' - 6" 2' - 6"EQ EQ EQ

NEW PAINT

SOLID SURFACE TOP

AND APRON

SUPPORT PNL.

BEYOND

NEW VB, TYP.

A-101

A-101

A-101

EXG. WINDOW FRAME,

PAINT AS SPECIFIED

EXG. DOOR FRAME

PAINT

NEW VB, TYP.

2' - 6" 5' - 0" V.I.F.

COORD.

AVAILABLE

WIDTH WITH

MRI

EQUIPMENT

INSTALLATION

EXISTING MRI OPERATION

DESK TO REMAIN

PROVIDE POWER UC AND

ABOVE COUNTER, COOR.

WITH ELECTRICAL

SOLID SURFACE COUNTERTOP

AND BACKSPLASH

1" CENTER PARTITION

1" ADJUSTABLE

SHELVES EACH

CABINET SPACE

NEW V.B.

FINISH END

PANELS, TYP.

6' - 0"

PROVIDE POWER UC AND

ABOVE COUNTER, COOR.

WITH ELECTRICAL

SOLID SURFACE COUNTERTOP

AND BACKSPLASH

1" CENTER PARTITION

(2) 1" ADJUSTABLE

SHELVES

NEW V.B.

FINISH END

PANELS, TYP.

5' - 0"

NOTE:

1. EXTEND ALL POWER OUTLET DEVICE BOX

THRU BACK OF BOTH CABINETS.

2. ALL METALLIC HARDWARE TO BE HEAVY DUTY,

STAINLESS STEEL HARDWARE.

DBL 3/4" MDF SUPPORT

PANELS, PLAM FINISH

SIDES AND FRONT END.

FRONT EDGE OF

COUNTER ABOVE

APRON ABOVE

BACK WALL

NEW RF MODULAR

FLOOR SYSTEM

MAGNETIC SHIELD WHERE SHOWN, IN

OTHER AREAS CEMENT BOARD TO FILL

GAP.

EXG CONCRETE FLOOR, PREP

AS REQUIRED FOR NEW FLOOR

SYSTEM

WELDED SEAM SHT

VINYL FLOOR, TYP.

GC. PROVIDE FLOOR

PREP/FILLER AT RF

PANEL JOINTS

JAMB BEYOND

NEW WELDED SHEET

VINYL FLOORING

LEAN CONCRETE FILL

PROVIDE 1:24 SLOPE

NEW RF MODULAR

FLOOR SYSTEM

PREP FLOOR TO RECIEVE

NEW RAMP

EXG CONCRETE FLOOR,

PREP AS REQUIRED FOR

NEW FLOORING

18"

MODIFY EXG VB AS REQUIRED TO

ACCOMMODATE DOOR RELOCATION

REMOVE AND REINSTALL NEW VB THIS RUN

NEW HANDRAIL PROVIDE BLOCKING

AS NEEDED

LOCATION TEMPORARY CONSTRUCTION

ACCESS PORTAL TO MRI 1

PERIMETER OF DOOR

101A DEMOLITION

REMOVE AND INSTALL NEW

WALL COVERING

RELOCATED DOOR 101A

SHORTEN EXG HANDRAIL AS

REQUIRED TO ACCOMMODATE

DOOR RELOCATION. PROVIDE

WALL BLOCKING IF REQUIRED.

6" V.I.F. 1' - 6" 6"

SOLID SURFACE COUNTERTOP

AND APRON.

SEALANT

PLAM SUPPORT PANEL

VINYL BASE

2' - 6"

C L E

A R

I N

S

ID

E

4' - 0"

OPEN CABINET TOP TO

SPACE ABOVE FOR MRI

CABLING CONNECTION

CENTER PARTITION

(4) - 1" ADJUSTABLE/

REMOVABLE SHELVES

EACH SIDE

FINISHED END PANELS,

BOTH SIDES

FINISH FLOOR

TOE KICK

A-101

NOTE: COORDINATE MRI

FILTER LOCATION WITH

LOCATION OF THIS CABINET.

C L E

A R

I N

S

ID

E

CLEAR INSIDE

2' - 7 1/4"

OPEN TOP CABINET TO

SPACE ABOVE FOR MRI

CABLING, ETC...

WIRE PULL HANDLES

(4) - 1" ADJUSTABLE/

REMOVABLE SHELVES

EACH SIDE

NOTE:

ALL METALIC HARDWARE TO

BE HEAVY DUTY, STAINLESS

STEEL HARDWARE.

VINYL BASE

ACT CEILING SUPPORT AND

CHANNEL FROM STRUCTURE

ABOVE NOT CABINET.

OPEN BACK FOR MRI

FILTER EQUIPMENT TO

COME THROUGH WALL.

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - ALUMINUM WINDOW

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - 6" METAL STUDS WITH FULL BATT INSUL.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

REMOVE EXISTING MASONRY

AND FRAMING, AS NEEDED

FOR REMOVAL, AND INSTALLATION

OF NEW MRI EQUIPMENT. SHORE

AND BRACE EXISTING STRUCTURE

AS REQUIRED. REINSTALL IN

KIND TO MATCH, WHEN

COMPLETE.

NEW ALUMINUM WINDOW WITH

SPANDREL PANELS, SET IN

ALUMINUM THRESHOLD TO

MATCH EXISTING, CAULK FULL

PERIMETER

PROVIDE DEMOLITION OF

EXISTING WALL SYSTEM AND

SHIELDING TO FACE OF

EXISTING STUD

NOTE:

DEMOLITION FOR THE REMOVAL/INSTALLATION OF MRI EQUIPMENT WILL REQUIRE SOME

LEVEL OF DEMOLITION ABOVE THE EXISTING WINDOW. THE GENERAL CONTRACT WILL NEED

TO REMOVE THE WINDOW LINTEL TO ACCOMPLISH THE DEMOLITION HEIGHT REQUIRED. THE

GENERAL CONTRACTOR WILL DESIGN, AND BE RESPONSIBLE FOR THE SHORING, BRACING

AND STRUCTURAL INTEGRITY OF THE WALL AND FLOOR SYSTEMS DISTURBED, AND FOR THE

CORRECT REINSTALLATION OF ANY STRUCTURAL MEMBERS DISTURBED, INCLUDING WALL

AND BRICK FACE RECONSTRUCTION.

EXG - ALUMINUM WINDOW

EXG - AIR SPACE V.I.F.

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

PROVIDE GYP BOARD RETURN

AT JAMB AND HEAD

ROD STOCK

AND SEALANT

AT PERIMETER,

EXTERIOR

AND INTERIOR

FACES

E

NOTE: AT OTHER COLUMN

ENCLOSURES PROVIDE

CONSTRUCTION SIMILAR

TO THIS DETAIL.

2 1/2" LT GA METAL

FRAMING

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

EXG - 5/8" GYPSUM BOARD

EXT ALUMINUM WINDOW

SOLID TREATED WOOD

BLOCKING

1/2" SOLID SURFACE

SILL

1/2" PLYWOOD SUB-SILL

SEALANT BEAD

SOLID SURFACE COUNTERTOP

AND APRON.

CT WAINSCOT

5/8" TYPE 'X' GYPSUM BOARD

3 5/8" METAL STUDS AT 16"O.C. WITH FULL BATT SOUND INSUL.

5/8" TYPE 'X' GYPSUM BOARD

5/8" GYPSUM BOARD V.I.F.

3 5/8" METAL STUDS V.I.F.

3/4" RC CHANNEL V.I.F.

5/8" TYPE 'X' GYPSUM BOARD V.I.F.

CORRIDOR SIDE

EXG - 5/8" GYPSUM BOARD V.I.F.

EXG - 3 5/8" ALUM STUD (ASSUMED) V.I.F.

NEW - 2" AIR GAP

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

MR1 ROOM SIDE

CONTROL RM,

CORRIDOR SIDE

/4

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL. V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

E X

IS

T

IN

G

W A

L L

V .I .F

N E

W C

O N

S T

R U

C T

IO

N

/8

"INTERIOR FACE

EXTERIOR FACE

F.O. EXG STUD

NEW CONSTRUCTION EXISTING WALL

EQUIPMENT SIDE

RESTROOM SIDE

NOTE: EXTEND WALL TO UNDER SIDE OF

STRUCTURAL DECK ABOVE

A

IR

G A

P

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 3/4" TR PLYWOOD

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

A

IR

G A

P

SEE SPEC FOR MATCHING WALL FINISH

N E

W C

O N

S T

R U

C T

IO

N

/4

DEMOLITION OF EXG WALL

AND RF SYSTEM EXTENDS

TO FACE OF PARENT WALL.

DEMOLITION OF EXG WALL AND

SHIELDING SYSTEM EXTENDS

TO FACE OF PARENT WALL FOR

INSTALLATION OF PLYWOOD

PANEL.

EQUIPMENT ROOM SIDE

MRI ROOM SIDE

AT 5 SIM WALL THIS METAL

FRAMING IS NOT REQD.

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

/2

/2

:1

:4

A

M

100% CONSTRUCTION DOCUMENTS

01/22/2021

ELEVATIONS AND DETAILS

A-101

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE

PREP

JGCJR

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

1/4" = 1'-0"

ELEVATION

1/4" = 1'-0"

ELEVATION

1/4" = 1'-0"

ELEVATION

1/4" = 1'-0"

ELEVATION

1/4" = 1'-0"

ELEVATION

3/4" = 1'-0"

DETAIL

3" = 1'-0"

TYP RF MODULAR FLOORING DETAIL

3" = 1'-0"

DOOR THRESHOLD/RAMP SECTION

1/4" = 1'-0"

PARTIAL WALL ELEVATION

3/4" = 1'-0"

COUNTER SECTION

1/4" = 1'-0"

CABINET ELEVATION

1/2" = 1'-0"

CABINET SECTON

1 1/2" = 1'-0"

EXTERIOR WALL DETAIL

1 1/2" = 1'-0"

JAMB DETAIL

3/4" = 1'-0"

COLUMN DETAIL

1 1/2" = 1'-0"

EXTERIOR WALL DETAIL

1 1/2" = 1'-0"

WALL TYPES

A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY

THE OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR

SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS

AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES

OR VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO

ADDITIONAL EXPENSE TO THE OWNER.

B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE

SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.

CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO

FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.

C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND

BE RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR

ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO

OWNER. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL

OTHER TRADES AFFECTED.

D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION

TO REMAIN. FULL-TONE LINES INDICATED NEW OR RELOCATED

CONSTRUCTION.

E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL

DUCTWORK WITH STRUCTURE, CEILING, LIGHTING, AND PIPING.

F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL

EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.

G. ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT

RIGHT ANGLES AND PARALLEL TO BUILDING WALLS UNLESS

OTHERWISE INDICATED.

H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL

PANELS. MAINTAIN ALL CODE REQUIRED CLEARANCES.

I. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE,

MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED

PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT

BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL

IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT

THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE

WORK IN THE AFFECTED AREA SHALL NOT THEREAFTER BE

RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE OWNER AND

CONTRACTOR.

J. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING

CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND

GENERAL CONTRACTOR.

A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL

DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.

DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR

SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED

TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS SOLID, FULL-

TONE LINES. ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND

ARE SHOWN AS HALF-TONE.

B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED

BELOW OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL

REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING

BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED

AND AS LISTED BELOW.

C. THE REMOVAL OF HVAC AND PLUMBING EQUIPMENT FROM FINISHED AREAS

AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE

MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS

MADE TO THE BUILDING.

D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND

REMOVAL OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND

APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR

ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER HAVING FIRST

RIGHT OF REFUSAL ON ALL ITEMS.

E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE

CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND

STORED OR REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR

SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER.

F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND

CONTROLS WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL

REMOVALS.

G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL

REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY

OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED

HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE

AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND

ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT

THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE

OWNER AND ARCHITECT.

H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION

SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

/2

/2

:1 :1

P

M

07/24/20

MECHANICAL INFO SHEET

M 00

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24507868.001

TRUE

NORTH

PLAN

NORTH

NORTH

NORTH

ARROW

SYMBOL LEGEND

MATCHLINE

AREA A

AREA B

EXISTING

COLUMN

NEW

COLUMN

X

X

X

XX-XX

SIM

X

XX-XX

XXXX

DX

X

SECTION/

DETAIL

PLAN

DETAIL

REFERENCE

NOTE

REFERENCE

DEMOLITION

NOTE

EQUIPMENT

NUMBER

ROOM / SPACE

NUMBER

LETTER INDICATES

NEW COLUMN LINE

LETTER INDICATES

EXISTING COLUMN LINE

SECTION/DETAIL NUMBER

SHEET NUMBER

INDICATES DIRECTION

OF VIEW

DETAIL NUMBER

SHEET NUMBER

REFERENCE

DESIGNATION

DEMOLITION

DESIGNATION

EQUIPMENT

NUMBER

REFERENCE LEGEND

NAME

ELEVATION

LEVEL

TITLE

MARKER

VIEW NAME

SCALE: 1/8" = 1'-0"

DETAIL NUMBER

LEVEL CALLOUT

DESIGNATION

ELEVATION

DESIGNATION

GRAPHIC AREA FOR

DRAWING

TITLE

SCALE OF THE DRAWING

RECIRCULATING DOMESTIC

HOT WATER (RDHW)

DOMESTIC COLD WATER (DCW)

DOMESTIC HOT WATER (DHW)

PIPE GUIDE

HOSE BIBB

THERMOMETER

PIPE ANCHOR

HB

STEAM TRAP

PH

WH

YH

SIGHT GLASS-REFRIGERANT

POST HYDRANT

YARD HYDRANT

WALL HYDRANT

PRESSURE GAUGE

CA

PN

CONTROL AIR SUPPLY

NEW TO EXISTING CONNECTION

PNEUMATIC TUBE

FIRE WATER (BURIED)

SPRINKLER DRAIN

FIRE SPRINKLER MAIN

TAMPER SWITCH

FLOW SWITCH

FIRE DEPARTMENT CONNECTION

MISCELLANEOUS SYMBOLS

FLOOR SINK

AREA DRAIN

FLOOR DRAIN

GRADE CLEANOUT

PLUMBING VENT THRU ROOF

CLEANOUT / WALL CLEANOUT

MANHOLE

TRENCH DRAIN

OVERFLOW ROOF DRAIN

RUNNING TRAP

OXYGEN OUTLET

PIPE CAP

ELBOW UP

AIR OUTLET

TEE

ELBOW DOWN

VACUUM OUTLET

RUNNING TRAP WITH CLEANOUTS

ROOF DRAIN

UNION

TEE DOWN

STRAINER

DIELECTRIC UNION

THERMOMETER WELL

CONCENTRIC REDUCER

EXPANSION JOINT

FLEXIBLE PIPE CONNECTION

ECCENTRIC REDUCER

AIR VENT (MANUAL UNLESS

NOTED)

PITCH PIPE DOWN IN DIR OF

ARROW

TEE UP

SM

FW

D

TS

FS

LPC

HPS

MPC

MPS

LPS

HVAC PIPING

GHWR

GHWS

HWR

HWS

PC

HPC

ES

BBD BOILER BLOW DOWN

EXHAUST STEAM

PUMPED CONDENSATE

HIGH PRESSURE CONDENSATE

HIGH PRESSURE STEAM

MEDIUM PRESSURE CONDENSATE

MEDIUM PRESSURE STEAM

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

GLYCOL HOT WATER RETURN

GLYCOL HOT WATER SUPPLY

HOT WATER RETURN

HOT WATER SUPPLY

_"FS-_

_"AD-_

_"FD-_

CO

VTR

GCO

_"OD-_

MH

X

A

V

_"RD-_

RD

SAN

SAN

PLUMBING PIPING

ACID VENT

TW

AV

AW

W

DS

LS

SCW

RTW

SHW

V SANITARY VENT

BURIED EXTERIOR WATER

RECIRCULATING TEMPERED

WATER

TEMPERED WATER

DISTILLED WATER

LAWN SPRINKLER

SOFTENED HOT WATER

SOFTENED COLD WATER

ACID WASTE

SUBSOIL OR FOUNDATION DRAIN

STORM DRAIN (BELOW FLOOR)

STORM DRAIN (ABOVE FLOOR)

SANITARY DRAIN (BELOW FLOOR)

SANITARY DRAIN (ABOVE FLOOR)

OXYGEN

GASOLINE

VACUUM

OX

GS

G

VAC

RO

A

FOF

FOG

LPG

FOV

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL GAGE

FUEL OIL FILL

FUEL OIL VENT

REVERSE OSMOSIS PROCESSED

WATER

COMPRESSED AIR

NATURAL GAS

LIQUEFIED PETROLEUM GAS

DEIONIZED WATERDI

PIPING SPECIALTIES AND FITTINGS

WCO

FIRE PROTECTION

XXX

PLUMBING

FIXTURES PLUMBING FIXTURE

DESIGNATION

X"PIPE

SIZE

PIPE SIZE (DIAMETER)

X"/X"

DUCT

SIZE

WIDTH / HEIGHT

REF. DEMO NOTES ( ) XX

CWS

GCWS

CWR

GCS

CR

CS

RL

RD

RS

GCWR

GLYCOL CONDENSER WATER

SUPPLY

GLYCOL CHILLED WATER RETURN

GLYCOL CHILLED WATER SUPPLY

REFRIGERANT LIQUID LINE

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION LINE

GHCS

GHCR

CD

HCS

HCR

GCR

HOT/CHILLED WATER SUPPLY

HOT/CHILLED WATER RETURN

GLYCOL CONDENSER WATER

RETURN

GLYCOL HOT/CHILLED WATER

RETURN

GLYCOL HOT/CHILLED WATER

SUPPLY

CONDENSATE DRAIN

REF. NOTES ( )ABBREVIATIONS

ROOM NAME

150 SF

ROOM NAME

DESIGNATION

ROOM NUMBER

DESIGNATION

ROOM AREA

DESIGNATION

TSTAT THERMOSTAT

TWU TROUGH WALL AIR CONDITIONER

UH UNIT HEATER

UR URINAL

US UTILITY SINK

V VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

WB WET BULB

WC WATER CLOSETS

WCO WALL CLEANOUT

WF WASH FOUNTAINS

WFU WATER FIXTURE UNITS

WH WALL HYDRANT

WPD WATER PRESSURE DROP

WS WATER SOFTENER

WSHP WATER SOURCE HEAT PUMP

WWHP WATER TO WATER HEAT PUMP

YH YARD HYDRANT

GPH GALLONS PER HOUR

GRV GRAVITY RELIEF VENTILATOR

GPM GALLONS PER MINUTE

GV GAS VENT

GWH GAS WATER HEATER

H HYDRANTS

HB HOSE BIBB

HC HEATING COIL

HCR HOT/COLD WATER RETURN

HCS HOT/COLD WATER SUPPLY

HG GAS: HIGH-PRESSURE

HP HEAT PUMP (AIR SOURCE)

HP HORSEPOWER

HPC HIGH PRESSURE CONDENSTATE

HPS HIGH PRESURE STEAM

HRC HEAT RECOVERY COIL

HU HUMIDIFIER

HWR HOT WATER RETURN (HEATING)

HWS HOT WATER SUPPLY (HEATING)

HX HEAT EXCHANGER

IH INTAKE HOOD

IRH INFRARED RADIANT HEATER

KDH KITCHEN DISHWASHING HOOD

KH KITCHEN HOOD

KW KILOWATT

KWH KILOWATT HOURS

L LAVATORY

LAT LEAVING AIR TEMPERATURE

LH LAB HOOD

LPC LOW PRESSURE CONDENSATE

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPS

LS LAUNDRY SINK

LSS LAWN SPRINKLER DESIGN

LV LOUVER

LWT LEAVING WATER TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MB MACHINE BOLT

MBH 1000 BTUH

MCA MINIMUM CIRCUIT AMPS

MD MOTORIZED DAMPER

MG GAS: MEDIUM-PRESSURE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT

PROTECTION

MPC MEDIUM PRESSURE

CONDENSATE

MPS MEDIUM PRESSURE STEAM

MS MOP SINK

N NITROGEN

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

NPCW NONPOTABLE COLD WATER

NPHW NONPOTABLE HOT WATER

NPHWR NONPOTABLE HOT WATER

RETURN

OA OUTSIDE AIR

OD OVERFLOW ROOF DRAIN

OX OXYGEN

P PUMP

PC POINT OF CURVATURE

PHC PREHEAT COIL

PIV POST INDICATING VALVE

PRV PRESSURE REGULATING VALVE

PS PLASTER SINKS

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH,

ABSOLUTE

PSIG POUNDS PER SQUARE INCH,

GAUGE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RA RETURN AIR

RCP RADIANT CEILING PANELS

RD ROOF AREA DRAINS

RDL REFRIGERANT DISCHARGE LINE

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RELIEF AIR

RLF RELIEF FAN

RO REVERSE OSMOSIS WATER

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION LINE

RTU ROOF TOP UNIT

RV RELIEF VALVE

S SINKS

SA SUPPLY AIR

SAN SANITARY SEWER

SB SITZ BATH

SD SMOKE DAMPER

SF SUPPLY FAN

SFU SANITARY FIXTURE UNITS

SH SHOWERS

SHB SHAMPOO BOWLS

SP STATIC PRESSURE

SS SERVICE SINK

SSCU DUSTLESS SPLIT SYSTEM

CONDENSING UNIT

SSFC DUCTLESS SPLIT SYSTEM

SSS SURGEON SCRUB SINKS

ST STORAGE TANK

SUP SUMP PUMP

SW STORM WATER

TD TRENCH DRAIN

TMV THERMOSTATIC MIXING VALVES

TONS TONS OF REFRIGERATION

TSP TOTAL STATIC PRESSURE

APD AIR PRESSURE DROP

A COMPRESSED AIR

AFCV AUTO FLOW CONTROL VALVE

AC AIR COMPRESSOR

AD AIR DOOR

AW ACID WASTE

AV ACID VENT

AS AIR SEPARATOR

AW AREA DRAIN

ARD AIR PRESSURE DROP

AMP AMPERE

AHU AIR HANDLING UNIT

BW BEDPAN WASHERS

BV BALL VALVE

BT BATHTUBS

BLV BALANCING VALVE

BLKG BLOCKING

BHP BREAK HORSEPOWER

BFV BUTTERFLY VALVE

BF BACKFLOW PREVENTER

BD BIDET

BC BLOWER COIL

B BOILER

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CU AIR COOLED CONDENSING UNIT

CT COOLING TOWER

CSS CLINICAL SERVICE SINKS

CS CONDENSER WATER SUPPLY

CRAC COMPUTER ROOM AIR

CONDITIONER

CR CONDENSER WATER RETURN

CMU COMBINATION UNITS

CI CAST IRON

CHV CHECK VALVE

CHIU CABINET HEATER

CFM CUBIC FEET PER MINUTE

CF CEILING FANS

CD CONDENSATE DRAIN

CC COOLING COIL

C CHILLER

D DIFFUSER

DB DRY-BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DEG DEGREE

DF DRINKING FOUNTAIN

DGCO DOUBLE GRADE CLEANOUT

DH EMERGENCY DRENCH HOSES

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RECIRC

DI DEIONIZED WATER

DOA DEDICATED OUTDOOR AIR UNIT

DP DOMESTIC PUMP

DS DISTILLED WATER

DSA DUCT SOUND ATTENUATORS

DSCW DOMESTIC SOF COLD WATER

DSHW DOMESTIC SOFT HOT WATER

DSHWR DOMESTIC SOFT HOT WATER

RETURN

DST DOMESTIC STORAGE TANK

DTW DOMESTIC TEMPERED WATER

DTWR DOMESTIC TEMPERED WATER

RETURN

DXT DOMESTIC EXPANSION TANK

EA EACH

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EEW EMERGENCY EYE WASH

EEWS EMERGENCY EYE

WASH/SHOWERS

EF EXHAUST FAN

EFF EFFICIENCY

EFW EMERGENCY FACE WASH

EH EXHAUST HOOD

ERV ENERGY RECOVERY

VENTILATOR

ES EMERGENCY SHOWER

ESP EXTERNAL STATIC PRESSURE

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER

TEMPERATURE

EX EXPANSION TANK

F FIRE PROTECTION WATER

SUPPLY

F FURNACE

FCO FOOT CANDLE

FCT FLUID COOLER TOWERS

FCU FAN COIL UNIT

FD FIRE DAMPER

FLA FULL LOAD AMPS

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FLOOR SINKS

FSD FIRE/SMOKE DAMPER

FTR FINNED TUBE RADIATION

G GAS: LOW-PRESSURE

GCR GLYCOL CONDENSER WATER

RETURN

GCS GLYCOL CONDENSER WATER

SUPPLY

GCWR GLYCOL CHILLED WATER

RETURN

GCWS GLYCOL CHILLED WATER

SUPPLY

GD GARBAGE DISPOSAL

GD GRAVITY DAMPER

GDH GAS DUCT HEATER

GHCR GLYCOL HOT/COLD WATER

RETURN

GHCS GLYCOL HOT/COLD WATER

SUPPLY

GHWR GLYCOL HOT WATER RETURN

GHWS GLYCOL HOT WATER SUPPLY

GI GREASE INTERCEPTOR

GIV GRAVITY INTAKE VENTILATOR

GPD GALLONS PER DAY

18 Ø

18x10

18/10

ROUND DUCT

VD

FLAT OVAL DUCT-1ST FIG IS

SIDE SHOWN

FLEXIBLE DUCTWORK CONNECTION

RECT DUCT-1ST FIG IS SIDE SHOWN

ACOUSTICAL DUCT LINER

VOLUME DAMPER

MANUAL BALANCING VALVE

CONTROL VALVE (3 WAY)

CONTROL VALVE (2 WAY)

HOSE END DRAIN VALVE

PRESSURE REDUCING VALVE

AUTO FLOW CONTROL VALVE

VALVE

CHECK VALVE

HVAC DUCTWORK AND SPECIALTIES

EXTRACTOR

SIZE/TYPE

RETURN OR EXHAUST DUCT DOWN

RETURN OR EXHAUST REGISTER

OR GRILLE (VERTICAL MOUNTING)

SUPPLY REGISTER OR GRILLE

ROUND DUCT UP / DOUBLE LINE PIPE

ROUND DUCT DOWN / DOUBLE

LINE PIPE

RETURN OR EXHAUST DUCT UP

(R OR G) (VERTICAL MOUNTING)

TURNING VANES

SUPPLY AND FRESH AIR DUCT DOWN

SUPPLY AND FRESH AIR DUCT

SIZE/TYPE

SIZE/TYPE

FLOW

FLOW

SIZE/TYPE

FLOW

FLOW

SMOKE DAMPER - FIRE SEPARATION

FIRE DAMPER - FIRE SEPARATION

MOTORIZED DAMPER-OPPOSED BLADE

MOTORIZED DAMPER-PARALLEL BLADE

ROUND CEILING SUPPLY DIFFUSER

(HORIZONTAL MOUNTING)

GRAVITY DAMPER

(OR) SAFETY VALVE-STEAM

TEMP & PRESS RELIEF

THERMOSTATIC MIXING VALVE

SIZE/TYPE

FLOW

HUMIDISTAT

THERMOSTAT

FLEXIBLE DUCT

S

H

T

TEMPERATURE SENSOR

FIRE/SMOKE DAMPER - FIRE

SEPARATION

RECTANGULAR RETURN REG OR

GRILLE (HORIZONTAL MOUNTING)

RECTANGULAR SUPPLY DIFF, REG

OR GRILLE (HORIZONTAL

MOUNTING)

VALVES

M

M SIZE/TYPE

FLOW

RECTANGULAR EXHAUST REG OR

GRILLE (HORIZONTAL MOUNTING)

M

VOLUME DAMPER

M

F

S

FS

DEMOLITION GENERAL NOTES GENERAL NOTES

SEE INDIVIDUAL SHEET FOR REFERENCE DEMO NOTES SEE INDIVIDUAL SHEET FOR REFERENCE NOTES

MECHANICAL SHEET LIST

M 00 MECHANICAL INFO SHEET

M001 MECHANICAL DEMOLITION PLANS

M101 MECHANICAL PLANS

M102 FLOOR PLAN - PLUMBING

M401 QUENCH VENT DETAILS

M501 MECHANICAL SCHEDULES & DETAILS

1/22/21

01/08/2021

T

CONTROL

MRI 1

MRI 2

EQUIPMENT

TOILET

CORRIDOR

VTR (E)

SAN

V

V

V

V S

A N

4" SAN DN

VAC

O

(E) VAV(E) VAV

(E) VAV

3 3

2 2

(E) AHU

(E

C

(E

C U

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

M R

I

KEY PLAN

NOT TO SCALE

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

ROOF

/2

/2

:1 :1

P

M

07/24/20

MECHANICAL DEMOLITION PLANS

M001

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24607868.001

REF. DEMO NOTES ( ):X

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - MECHANICAL & PLUMBING DEMOLITION

SCALE: 1/8" = 1'-0"

THIRD FLOOR ROOF PLAN - MECHANICAL DEMOLITION

1 REMOVE ANY GRILLES OR DIFFUSERS SERVING EQUIPMENT 102.

DEMO ASSOCIATED DUCTWORK BACK TO MAIN AND CAP. REPAIR

INSULATION TO MATCH ADJACENT CONDITION WITH PROPER VAPOR

BARRIER.

2 EXISTING EQUIPMENT TO REMAIN.

3 EXISTING VAV BOX AND ASSOCIATED DUCTWORK, ACCESSORIES,

GRILLES, AND DIFFUSERS ARE TO REMAIN.

4 DEMO EXISTING FAN COIL SYSTEM. FAN COIL IS LOCATED ON THIRD

FLOOR. REMOVE ALL ASSOCIATED DUCTWORK, DIFFUSERS, GRILLES,

AND DUCT ACCESSORIES. REMOVE ASSOCIATED PIPING AND

SPECIALTIES BACK TO MAIN AND CAP. SEAL ALL FLOOR

PENETRATIONS.

5 EXISTING SUPPLY GRILLE TO BE RELOCATED TO NEW CEILING GRID IN

TOILET 101. SEE M101 FOR RELOCATION.

6 DEMO MEDICAL GAS OUTLETS AND ASSOCIATED PIPING BACK TO

ISOLATION VALVE AND PREPARE FOR CONNECTION TO NEW PIPING.

SEE PLANS ON M101.

7 CONTRACTOR TO COORDINATE WITH THE OWNER ON THE REMOVAL

OF ANY ASSOCIATED MECHANICAL COMPONENTS SERVING THE MRI

MACHINE BEING REMOVED. DISCONNECT ANY ASSOCIATED PIPING

AND REMOVE BACK TO MAINS AND CAP. REPAIR INSULATION TO MATCH

ADJACENT CONDITION WITH PROPER VAPOR BARRIER. CONTRACTOR

TO SEAL ALL WALL OR FLOOR OPENINGS TO MATCH ADJACENT

CONDITIONS.

8 CONTRACTOR TO REMOVE EXISTING CRYOGEN VENT SYSTEM AND

ANY ASSOCIATED ACCESSORIES. CONTRACTOR TO SEAL ALL WALL

OR FLOOR OPENINGS TO MATCH ADJACENT CONDITIONS.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

NORTH

NORTH

CONTROL

MRI 1

MRI 2

EQUIPMENT

TOILET

CORRIDOR

SS-1

QUENCH

VENT

10x10 R-1

10 Ø S-1

30010 Ø SA

10x8 RA

VAV-104

6 Ø SA

3/4" HWR

3/4" HWS

RS/RLRS/RL

3/4" CD

2" CWS

2" CWR

8 Ø

(E

V A

V

(E

V A

V

(E) VAV

11 11

SSCU-1

RS/RLRS/RL

1 2" CWS

2" CWR

M R

I C

H

IL

L E

R

(E

C

(E

C U

(E) AHU

EQUIPMENT

V

V V

SAN

S A

N

V

O

VAC

141414

2" DCW

2"

3"

2"

V

SAN

VTR (E)

FS-1

TOILET

MRI 1

CONTROL

MRI 2

CORRIDOR

106CORRIDOR

4" SAN DN

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

M R

I

KEY PLAN

NOT TO SCALE

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

ROOF

/2

/2

:1 :1

P

M

07/24/20

MECHANICAL PLANS

M101

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24707868.001

REF. NOTES ( ):X

16 EXTEND EXISTING OXYGEN AND VACUUM PIPING TO WALL OUTLET.

FIELD VERIFY EXACT LOCATION OF PIPING MAINS AND VALVES. IF

EXISTING ISOLATION VALVE IS NOT ABOVE THE CEILING OF THE

ADJACENT CORRIDOR, CONTRACTOR SHALL RELOCATE EXISTING

VALVE IN AN ACCESSIBLE SPACE IN THE CEILING OF THE ADJACENT

CORRIDOR. COORDINATE PIPE ROUTING WITH MRI SHIELDING.

17 CONTRACTOR TO PROVIDE KOOLANT KOOLERS MANUAL

SWITCH-OVER PANEL. INSTALL A 50 MICRON STRAINER OR FILTER

BETWEEN DOMESTIC WATER SUPPLY AND MANUAL SWITCH-OVER

PANEL.

18 CONDENSATE PIPING TO DISCHARGE TO FLOOR SINK.

19 RS/RL PIPING BETWEEN SS-1 AND SSCU-1 TO BE ROUTED THROUGH

THE THIRD FLOOR MECHANICAL SPACE. PROVIDE FIRE CAULKING

AROUND ANY PENETRATIONS THROUGH RATED WALLS AND FLOORS.

20 PROVIDE FIRE CAULKING AROUND ANY PIPE PENETRATIONS

THROUGH RATED WALLS AND FLOORS. (TYP.)

21 CONNECT 3" SANITARY LINE TO EXISTING 4" VERTICAL SANITARY MAIN

LOCATED IN CHASE. CONTRACTOR TO FIELD VERIFY EXACT LOCATION

OF SANITARY MAIN IN CHASE.

22 CONTRACTOR IS TO INSTALL QUENCH LINE PER MANUFACTURER

GUIDELINES. SEE DETAILS ON M401 FOR CONSTRUCTION TYPES,

MATERIALS, AND GUIDELINES. QUENCH LINE IS TO CONSIST OF THE

FOLLOWING COMPONENTS: (1) VIBRATION DECOUPLER, 25 FEET OF

SMOOTH STRAIGHT RUN, (4) 90 DEGREE SMOOTH ELBOW, (2) 45

DEGREE SMOOTH ELBOWS, AND MANUFACTURER APPROVED

HORIZONTAL OUTLET. ALL COMPONENTS ARE TO BE 8" DIAMETER

SIZE. THE DESIGN SHOWN ON PLANS ONLY REQUIRES (2) 90 DEGREE

ELBOWS, THE ADDITIONAL (2) 90 DEGREE…