MRI Site Prep AD 101 Addendum 1.pdf

PDF 252 KB Posted

Attached to
Z2DA--MRI Site Prep (VA-21-00003189) Federal contract opportunity
Solicitation number
36C25920R0145
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document package includes an addendum to construction drawings and a related federal contract opportunity notice.

The construction drawing addendum provides revisions to demolition plans, floor plans, and construction details for an MRI site preparation project at an Oklahoma City VA medical center. Key changes include revisions to walls in the MRI room and deletion of an RF window on the north wall. The project involves demolishing existing walls and windows to install a new MRI system, magnetic shielding, and RF shielding.

The federal contract opportunity is a presolicitation notice for the same MRI site preparation project. The solicitation will be posted on or after October 21, 2020, with a period of performance of 300 calendar days from notice to proceed. The estimated value is between $1-2 million. The opportunity is a Service-Disabled Veteran-Owned Small Business set-aside issued by the Department of Veterans Affairs Veterans Health Administration VISN 19. The scope involves demolishing and constructing a revised MRI suite and control room while keeping an adjacent MRI suite operational.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--MRI Site Prep (VA-21-00003189), newest first.
File Type Posted
2021-02-01 VENT on third floor mech room.jpg JPG image
RFI 4.pdf PDF
VENT 2.jpg JPG image
VENT FRONT LOCATION.jpg JPG image
36C25920R0145 0013.docx DOCX document
Drawing Vent.pdf PDF
36C25920R0145 PG 2.pdf PDF
36C25920R0145 0012.docx DOCX document
Mag Shield Design Info Siemens.pdf PDF
36C25920R0145 0012.pdf PDF
36C25920R0145 0011.docx DOCX document
RFI 3 Q 68 through 77.pdf PDF
MRI Site Prep 100_ Final Drawings.pdf PDF
36C25920R0145 0010.docx DOCX document
MRI Site Prep 100_ Final Specifications.pdf PDF
36C25920R0145 0009.docx DOCX document
36C25920R0145 0008.docx DOCX document
2020 07 26 100_ Final for Construction OKC MRI Specifications.pdf PDF
General Decision Number OKC Jan 2021.docx DOCX document
RFI 3 1-67.pdf PDF
2020 07 26 100_ Final OKC MRI Drawings.pdf PDF
36C25920R0145 0007.docx DOCX document
36C25920R0145 0006.docx DOCX document
36C25920R0145 0005.docx DOCX document
RFI 1 MRI.pdf PDF
36C25920R0145 0004.docx DOCX document
2020-11-02 Pre-Bid Sign-In Sheet MRI.pdf PDF
36C25920R0145 Revised Pg1.pdf PDF
36C25920R0145 0003.docx DOCX document
RFIs 1.pdf PDF
36C25920R0145 0002.docx DOCX document
36C25920R0145 0001.docx DOCX document
GE MRI Drawings.pdf PDF
Final Combined Drawings.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
Combined Final Specs.pdf PDF
36C25920R0145_1.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

1F114

OFFICE

1F115

OFFICE

1F116

CHASE

F E

MAGNETIC SHIELD SUSPENDED FROM

STRUCTURAL DECK ABOVE. COORDINATE

WITH SYSTEM INSTALLER. REMOVE/REINSTALL

EXISTING ACT SYSTEM AS REQUIRED FOR

INSTALLATION. PROVIDE MODIFICATIONS TO

EXG HVAC AND ELECTRIC THAT MAY BE IN

CONFLICT AS NEEDED FOR INSTALLATION OF

SHIELD.

COORDINATE CENTER

LOCATION OF MAGNETIC

SHIELD WITH CENTER

LOCATION OF MRI.

SEE EQUIPMENT MFR

DRAWINGS.

ROTATE SHIELD AS

REQUIREMENT BY

EQUIPMENT SUPPLIERS

DOCUMENTS.

EQUIPMENT

MRI

CONTROL

G F E D

19' - 7"

REMOVE EXISTING TILE

WAINSCOT AS REQUIRED

FOR NEW CONSTRUCTION.

REMOVE EXISTING RF WINDOW COMPONENT

WITH SYSTEM REMOVAL. INSTALL NEW RF

WINDOW AS SHOWN.

REMOVE EXISTING FRAMING

TO EXPOSE EXISTING WINDOW

ASSEMBLY AS SHOWN. FIELD

VERIFY REQUIRED OPENING.

TOILET

EQUIPMENT

102 MRI

CONTROL

G F E D

BELOW

/4

18' - 11 7/8"

AD.101

SEE DEMO PLAN FOR

CONSTRUCTION ACCESS PORTAL,

INFILL TO MATCH EXISTING.

AD.101

AT WINDOW

SIM

SIM

A

B3' - 0"

NEW MED GAS OUTLET 5' TO

CENTER AND CENTER ON WALL,

SEE MECHANICAL.

SIM

AD.101

Sim

NOTE: TOILET 101 HAS BEEN

SHORTENED AND EQUIPMENT 102 IS

DEEPER DUE TO THE COMMON WALL

OFFSET DEEPER INTO TOILET 101.

/8

/2

1' - 6 3/4" CENTER LOCATION

OF MRI, VERIFY WITH

EQUIPMENT DRAWINGS.

AD.101

AT WINDOW

AD.101

CT WAINSCOT

5/8" TYPE 'X' GYPSUM BOARD

3 5/8" METAL STUDS AT 16"O.C. WITH FULL BATT SOUND INSUL.

5/8" TYPE 'X' GYPSUM BOARD

5/8" GYPSUM BOARD V.I.F.

3 5/8" METAL STUDS V.I.F.

3/4" RC CHANNEL V.I.F.

5/8" TYPE 'X' GYPSUM BOARD V.I.F.

CORRIDOR SIDE

EXG - 5/8" GYPSUM BOARD V.I.F.

EXG - 3 5/8" ALUM STUD (ASSUMED) V.I.F.

NEW - 2" AIR GAP

NEW - RF SHELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

MR1 ROOM SIDE

CONTROL RM,

CORRIDOR SIDE

/4

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL. V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

E X

IS

T

IN

G

W A

L L

V .I .F

N E

W C

O N

S T

R U

C T

IO

N

/8

"INTERIOR FACE

EXTERIOR FACE

F.O. EXG STUD

NEW CONSTRUCTION EXISTING WALL

EQUIPMENT SIDE

RESTROOM SIDE

NOTE: EXTEND WALL TO UNDER SIDE OF

STRUCTURAL DECK ABOVE

A

IR

G A

P

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 3/4" TR PLYWOOD

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

A

IR

G A

P

SEE SPEC FOR MATCHING WALL FINISH

N E

W C

O N

S T

R U

C T

IO

N

/4

DEMOLITION OF EXG WALL

AND RF SYSTEM EXTENDS

TO FACE OF PARENT WALL.

DEMOLITION OF EXG WALL

AND RF SYSTEM EXTENDS

TO FACE OF PARENT WALL

FOR INSTALLATION OF

PLYWOOD PANEL.

EQUIPMENT ROOM SIDE

MRI ROOM SIDE

AT 5 SIM WALL THIS METAL

FRAMING IS NOT REQD.

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

NOTE: EXTEND WALL TO UNDER

SIDE OF STRUCTURAL DECK ABOVE

E

NOTE: AT OTHER COLUMN

ENCLOSURES PROVIDE

CONSTRUCTION SIMILAR

TO THIS DETAIL.

2 1/2" LT GA METAL

FRAMING

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL. V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 15/16" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - ALUMINUM WINDOW

NEW - 5/8" TYPE 'X' GYPSUM BOARD

NEW - 6" METAL STUDS WITH FULL BATT INSUL.

NEW - 3/4" TR PLYWOOD

NEW - VAPOR BARRIER

NEW - STEEL MAGNETIC SHIELDING COORD WITH INSTALLER

NEW - AIR SPACE

NEW - RF SHIELDING SYSTEM COORD WITH INSTALLER

NEW - 1" AIR GAP

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

REMOVE EXISTING MASONRY

AND FRAMING, AS NEEDED

FOR REMOVAL, AND INSTALLATION

OF NEW MRI EQUIPMENT. SHORE

AND BRACE EXISTING STRUCTURE

AS REQUIRED. REINSTALL IN

KIND TO MATCH, WHEN

COMPLETE.

NEW ALUMINUM WINDOW WITH

SPANDREL PANELS, SET IN

ALUMINUM THRESHOLD TO

MATCH EXISTING, CAULK FULL

PERIMETER

PROVIDE DEMOLITION OF

EXISTING WALL SYSTEM AND

SHIELDING TO FACE OF

EXISTING STUD

NEW RF WINDOW SYSTEM COMPONENT INCL GLAZING. SYSTEM INSTALLATION

BY GEN CTR (SHIELDING SUB CONTRACTOR)

(FIELD VERIFY)

17' - 0" M.O.

/4

(F

IE

L D

V E

R

IF

Y

(F

IE

L D

V E

R

IF

Y

A REMOVE EXISTING WINDOW ASSEMBLY; INSTALL NEW ALUMINUM

WINDOW ASSEMBLY.

B

NOTE: ALL GLAZING PANELS TO BE SPANDREL UNITS.

E X

G U

N

IT

V E

R

IF

Y W

IT

H

EXG. UNIT

VERIFY WITH

E X

G U

N

IT

V E

R

IF

Y W

IT

H

INSTALLATION OF NEW

WINDOW ASSEMBLY WILL

MATCH EXG INSTALLATIONS.

STEEL MAGNETIC SHIELD SYSTEM,

COORD WITH INSTALLER.

SEE EQUIPMENT MFR CALCULATIONS

FOR FLOOR, WALL AND SUSPENDED

PANEL REQUIREMENTS. THIS

SYSTEM WILL BE DESIGNED AND

INSTALLED BY THE GEN

CONTRACTOR (SHIELDING

SUBCONTRACTOR).

RF SHIELDING SYSTEM, COORD

WITH INSTALLER.

SEE SPECIFICATIONS FOR WALL,

CEILING, FLOOR AND WINDOW

REQUIREMENTS. THIS SYSTEM

WILL BE DESIGNED AND INSTALLED

BY THE GEN CONTRACTOR

(SHIELDING CONTRACTOR)

1. SEE DRAWINGS BY SIEMENS FOR NEW MRI EQUIPMENT

PROVIDED AND INSTALLED BY OTHERS. COORDINATE

WORK AS OUTLINED IN PREVIOUS DOCUMENT.

2. FOR TOILET 101, SEE ORIGINAL DOCUMENT FOR DETAIL

AND ELEVATION REFERENCES, THIS AREA IS BASICALLY

UNCHANGED. SEE FLOOR PLAN FOR REVISED WALL

LOCATION OF THE COMMON WALL BETWEEN TOILET 101

AND EQUIPMENT 102.

3. FOR EQUIPMENT 102, SEE ORIGINAL DOCUMENT FOR

DETAIL AND ELEVATION REFERENCES, THIS AREA IS

BASICALLY UNCHANGED. SEE FLOOR PLAN FOR REVISED

WALL LOCATION OF THE COMMON WALL BETWEEN TOILET

101 AND EQUIPMENT 102.

4. FOR MRI 103, CHANGES INCLUDE REVISION OF WALLS,

INCLUSION OF AN EXPANDED MAGNETIC SHIELD ON THE

NORTH AND WEST WALLS AND THE DELETION OF THE RF

WINDOW ON THE NORTH WALL. SEE ORIGINAL DOCUMENT

FOR DETAIL AND ELEVATION REFERENCES FOR

UNCHANGED COMPONENTS.

5. FOR CONTROL ROOM 1O4, SEE ORIGINAL DOCUMENT

FOR ALL DETAIL AND ELEVATION REFERENCES, THIS AREA

IS UNCHANGED.

EXG - EXT FACE BRICK V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 1/2" SHEATHING V.I.F.

EXG - 6" METAL STUDS WITH FULL BATT INSUL. V.I.F.

EXG - 1 1/8" AIR SPACE V.I.F.

EXG - 3 5/8" METAL STUDS V.I.F.

EXG - 5/8" GYPSUM BOARD

EXT ALUMINUM WINDOW

EXG - ALUMINUM WINDOW

EXG - AIR SPACE V.I.F.

NEW - 3 5/8" LT GA METAL STUDS @ 16" O.C.

NEW - 5/8" TYPE 'X' GYPSUM BOARD

PROVIDE GYP BOARD RETURN

AT JAMB, HEAD AND SILL.

ROD STOCK

AND SEALAND

AT PERIMETER,

EXTERIOR

AND INTERIOR

FACES

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

/1

/2

:5

:3

A

M

ADDENDUM 1

01/08/2121

DEMO PLAN, FLOOR PLAN AND

DETAILS

AD.101

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE

PREP

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

1/4" = 1'-0"

EXISTING - FIRST FLOOR PLAN

1/4" = 1'-0"

DEMO - SECOND FLOOR PLAN

1/4" = 1'-0"

SECOND FLOOR PLAN

3/4" = 1'-0"

COLUMN DETAIL

1 1/2" = 1'-0"

EXTERIOR WALL DETAIL

1/4" = 1'-0"

WINDOW ELEVATIONS

WALL SHIELDING SYSTEMS

LEGEND (SEE WALL TYPES):

GENERAL NOTES:

DEMOLITION NOTES:

1. THE ONLY REVISION TO THIS PLAN FROM THE

ORIGINAL ARE SLIGHT VARIATIONS IN THE WALLS OF

THE MRI 103 AND NOTES IDENTIFYING REVISED

SCOPE. SEE THE ORIGINAL PLAN FOR NOTE

REFERENCES.

2. SEE WALL TYPES THIS SHEET FOR FURTHER

DEMOLITION NOTES.

THE GEN CTR WILL PROVIDE DEMOLITION OF THIS AREA AS SHOWN

FOR WINDOWS AND HIGHER FRAMING, REMAINING DEMOLITION WILL

BE PROVIDED BY THE GEN CTR AS NEEDED FOR THE SAFE REMOVAL

OF THE EXG MRI EQUIPMENT AND INSTALLATION OF NEW. ALL

BRACING AND SHORING AS REQUIRED WILL BE DESIGNED AND

INSTALLED BY THE GEN CTR. REINSTALL EXG BRICK FACE TO MATCH

EXG WHEN COMPLETE.

SEE NOTE OF CLARIFICATION

NOTE OF CLARIFICATION:

1 1/2" = 1'-0"

EXTERIOR WALL DETAIL

1 1/2" = 1'-0"

JAMB DETAIL

Sheets
AD.101 - DEMO PLAN, FLOOR PLAN AND DETAILS

File details come from the government source that posted it. Updated .