2020 07 26 100_ Final OKC MRI Drawings.pdf

PDF 8 MB Posted

Attached to
Z2DA--MRI Site Prep (VA-21-00003189) Federal contract opportunity
Solicitation number
36C25920R0145
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This solicitation notice is for a construction project to prepare an MRI site at the Oklahoma City VA Medical Center. The scope of work includes demolishing and constructing a revised MRI Suite 1 and Control Room along with adjoining areas. The project has a period of performance of 300 calendar days from notice to proceed and a magnitude between $1,000,000 to $2,000,000. This solicitation will be a Service-Disabled Veteran Owned Small Business set-aside. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is the agency overseeing this project.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--MRI Site Prep (VA-21-00003189), newest first.
File Type Posted
Drawing Vent.pdf PDF
36C25920R0145 PG 2.pdf PDF
RFI 4.pdf PDF
VENT 2.jpg JPG image
VENT FRONT LOCATION.jpg JPG image
36C25920R0145 0013.docx DOCX document
2021-02-01 VENT on third floor mech room.jpg JPG image
36C25920R0145 0012.docx DOCX document
36C25920R0145 0012.pdf PDF
Mag Shield Design Info Siemens.pdf PDF
36C25920R0145 0011.docx DOCX document
MRI Site Prep 100_ Final Specifications.pdf PDF
RFI 3 Q 68 through 77.pdf PDF
MRI Site Prep 100_ Final Drawings.pdf PDF
36C25920R0145 0010.docx DOCX document
36C25920R0145 0009.docx DOCX document
General Decision Number OKC Jan 2021.docx DOCX document
RFI 3 1-67.pdf PDF
2020 07 26 100_ Final for Construction OKC MRI Specifications.pdf PDF
MRI Site Prep AD 101 Addendum 1.pdf PDF
36C25920R0145 0008.docx DOCX document
36C25920R0145 0007.docx DOCX document
36C25920R0145 0006.docx DOCX document
36C25920R0145 0005.docx DOCX document
RFI 1 MRI.pdf PDF
36C25920R0145 0004.docx DOCX document
2020-11-02 Pre-Bid Sign-In Sheet MRI.pdf PDF
36C25920R0145 Revised Pg1.pdf PDF
36C25920R0145 0003.docx DOCX document
RFIs 1.pdf PDF
36C25920R0145 0002.docx DOCX document
36C25920R0145 0001.docx DOCX document
Combined Final Specs.pdf PDF
36C25920R0145_1.docx DOCX document
Final Combined Drawings.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
GE MRI Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA CITY VA HEALTH CARE CENTER

JULY 24, 2020

OKLAHOMA CITY, OKLAHOMA

PROJECT NO. 635-CSI-105

Architectural

Sheet Index:

FourFront Design

517 7th Street

Rapid City, South Dakota 57701

Architectural

G-000 COVER SHEET

G-001 PHASING PLAN

A-100 FLOOR PLANS

A-101 SCHEDULES AND DETAILS

Mechanical

Electrical

E000 ELECTRICAL INFORMATION SHEET

E101 FLOOR PLANS - ELECTRICAL

E102 FLOOR PLANS - ELECTRICAL

M000 MECHANICAL INFORMATION SHEET

M001 MECHANICAL DEMOLITION PLANS

MRI SITE PREPARATION

M101 MECHANICAL PLANS

MRI EQUIPMENT DRAWINGS

A-101 ARCHITECTURAL EQUIPMENT PLAN

A-102 SAFETY AND SERVICE CLEARANCE PLAN

A-501 DETAILS

PROJECT

LOCATION

M102 FLOOR PLAN - PLUMBING

M401 QUENCH VENT DETAILS

M501 MECHANICAL SCHEDULES AND DETAILS

E201 ELECTRICAL DETAILS AND SCHEDULES

(THESE DRAWINGS ARE INCLUDED IN THE CONSTRUCTION

DOCUMENT FOR THE GENERAL CONTRACTORS INFORMATION

AND COORDINATION. SEE THE PHASING PLAN NOTES

INCLUDED ON THE PHASING PLAN)

A-502 DETAILS

S-101 STRUCTURAL FLOOR PLAN

E-101 ELECTRICAL RACEWAY PLAN

E-102 ELECTRICAL DIMENSION PLAN

E-501 DETAIL

M-101 MECHANICAL PLAN

M-501 DETAIL

ATTENTION!

All contractors will be required to comply with the VA provided "MRI

PERSONNEL SCREENING FORM" for each individual working on site, in any capacity. This form will be completed, signed and dated by each individual with a copy turned over to the Resident Engineer, and a copy kept on site with the project Superintendent. Individuals not submitting this form will not be allowed on the site. A copy of this form is included in the

General Requirements section of the specifications. The project

Superintendent will be responsible for verifying daily, all individuals working, or visiting the site are compliant.

ALL CONTRACTORS SHALL BE FAMILIAR WITH THE FOLLOWING

TRAINING VIDEOS:

https://www.youtube.com/watch?v=IZrfDGI1mUO&feature=youtu.be https://www.youtube.com/watch?v=vn5H-6BbesQ&feature=youtu.be https://www.youtube.com/watch?v=C721AzAoNAO&feature=youtu.be

Office of

Construction and Facilities

Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: FMS Project Manager/COR

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairs of

100% CONSTRUCTION

07/24/2020

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

517 Seventh Street

Rapid City, SD 57701

(605) 342-9470

(605) 348-0571 (fax)

DOCUMENTS

OKLAHOMA CITY OK. 2ND FLOOR.1

G-000

PROJECT LOCATION PLAN. VA MEDICAL CENTER

AutoCAD SHX Text

FOURFRONTFRONTT

AutoCAD SHX Text

DESIGN INC.C.

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

(BLOCKED)

AutoCAD SHX Text Cover Sheet and Sheet Index

AutoCAD SHX Text G-000

AutoCAD SHX Text

FOURFRONTFRONTT

AutoCAD SHX Text

DESIGN INC.C.

jeff.reuppel Highlight

CONTROL

MRI 1

EQUIPMENT

TOILET

MRI 2

CONTROL

MRI 1

EQUIPMENT

TOILET

MRI 2

CONTROL

MRI 1

EQUIPMENT

TOILET

MRI 2

Phase 1 Plan 1/4"=1'-0"

Phase 2 Plan 1/4"=1'-0"

Phase 3 Plan 1/4"=1'-0"G-001

G-001

G-001

GYP. BOARD PARTITION, EXTENDING UP

TO DECK ABOVE, 1HR. CONSTRUCTION.

NO ACCESS THRU THIS PARTITION.

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

SEAL EXISTING DOOR WITH

PLASTIC SHEET AS REQUIRED

GYP. BOARD PARTITION, EXTENDING UP

TO DECK ABOVE, 1HR. CONSTRUCTION.

PROVIDE ACCESS THRU THIS PARTITION

TO WORK AREA.

PHASE 1

PHASE 2

PHASE 3

GYP. BOARD PARTITION FOR INFECTION

CONTROL ACCESS TO WORK AREAS.

Office of

Construction and Facilities

Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: FMS Project Manager/COR

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairs of

100% CONSTRUCTION

07/24/2020

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

517 Seventh Street

Rapid City, SD 57701

(605) 342-9470

(605) 348-0571 (fax)

DOCUMENTS

AutoCAD SHX Text Phasing and Temp Walls Floor Plan

AutoCAD SHX Text G-001

AutoCAD SHX Text

FOURFRONTFRONTT

AutoCAD SHX Text

DESIGN INC.C.

MRI 1

EQUIPMENT

CHASE

TOILET

MRI 2

D4

COORIDOR

D3

D2

D1 D7

D8

D9

D5

D6

D8

D7

D11

D10

D1 As needed for new equipment

D13

D12D7

D14 D9

D7

Partial

Partial

D17

D16

D14 (Ramp)

D15

D18

REMOVE & REINSTALL EXTERIOR WALL

AS REQUIRED FOR EQUIPMENT INSTALLATION

D4 D17

Remove exg. wall as shown for enlarged EQUIPMENT Room. Salvage exg. CT for reinstallation. See Floor Plan.

D2

D1

DEMOLITION KEY NOTES:

Remove exg. floor and wall tile and ACT ceiling and grid as required for enlarged EQUIPMENT Room. Modify toilet ACT ceiling tile and grid as required for new toilet space. See Floor Plan.

D3 Relocate exg. door, frame and hardware as located on floor plan.

D4 Remove exg. wall as required for relocated door and new temporary door. See Floor Plan.

D5 Remove and reinstall new aluminum window A assembly. Remove and reinstall new RF shielding window A by shielding contractor.

D6 Remove exg. equipment enclosure, including raised floor. Existing MRI equipment will be de-energized, shut down and removed by others.

D7 Remove exg. ACT ceiling and grid.

D8 Remove exg. floor tile. Patch floor for new finish.

D9 Remove exg. Vinyl Base.

Moveable furnishings, equipment and MRI affects will be removed by owner in coordination with general contractors schedule. During construction of temporary construction walls provide temporary tenting of remaining MRI affects.

D11

D10

Remove exg. casework.

All demolition will be coordinated with Phasing Plan and staff / Patient access to MRI rooms.

DEMOLITION NOTES:

1.

D12 Remove exg. shielding door and reinstall new door by shielding system installer.

D13 Remove exg. gyp. bd. and framing to expose exg. shielding system. Shielding system to be removed and replaced by shielding Installer in its entirety.

D14 Remove exg. flooring to expose shielding system. Shielding system to be removed in its entirety by shielding contractor.

D15 Remove existing bench structure in its entirety.

D16 Exg. Clg. Hung Med. Gas to be relocated. See Mechanical.

D17 Modify Exg. Handrail as required for new opening.

D18 Provide demolition as required for installation of new floor sink. See Mechanical.

CHASE

CONTROL

MRI 1

EQUIPMENT

TOILET

COORIDOR

101A 102A 104A 104B

103A

105A

2'-0"

WALL TYPE 2

Match exg. wall structure and finish. Install 3 1/2" sound batt.

A-101

A-101

A-101

V I F

18'-9"

V.I.F.

18'-7

A-101

A-101

A-101

New Ramp by G.C.

See B on A-100

New Med Gas Outlet 5' to center and center on wall, See Mechanical

A-100 B

Note:

All MRI equipment provided by owner under the Seimens contract, Coordinate installation with provider.

V I F

V I F

8'-0

V.I.F.

1'-6

V.I.F.

V I F

V I F

6'-0"

A

UP

9'-7" V.I.F.

B

A-101

Restructure handrails as needed for door 101A relocation, see detail 6/A-100

Exg. MRI Operations Desk

INTREGAL BASE.

SEE DETAIL 8/A-101

TYPICAL

See Phasing Plan sheet G-001.

GENERAL NOTES:

1.

Relocate exg. sprinkler heads per original location.2.

CHASE

CONTROL

MRI 1

MRI 2

COORIDOR

TOILET

EQUIPMENT

Reinstall remove ACT at new wall to finish as required.

New RF Modular Floor System

1/4" Magnetic Shielding where shown, in other areas 1/4" Cement Board.

Exg Concrete Floor, prep as required for new floor system.

GC. provide floor prep/filler at RF panel joints

Welded Seam Sht Vinyl Floor, Typ.

New RF Modular Floor System

Prep floor to recieve new ramp.

Exg Concrete Floor, prep as required for new flooring.

New Welded Sheet Vinyl Flooring.

Jamb beyond

Lean concrete fill.

Provide 1:24 slope.

18"

101A 102A

Relocated Door 101A

Shorten exg handrail as required to accommodate door relocation.

Provide wall blocking if required.

Modify Exg VB as required to accommodate door relocation.

Perimeter of door

101A Demolition

New handrail provide blocking as needed.

Remove and reinstall new VB this run.

Remove and install new wall covering

Location temporary door to MRI 1

Demo Plan 1/4"=1'-0"A-100

Office of

Construction and Facilities

Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: FMS Project Manager/COR

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairs of

100% CONSTRUCTION

07/24/2020

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

517 Seventh Street

Rapid City, SD 57701

(605) 342-9470

(605) 348-0571 (fax)

DOCUMENTS

Floor Plan 1/4"=1'-0"A-100

Reflected Ceiling Plan 1/4"=1'-0"A-100

Typ RF Modular Flooring Detail 3/4"=1'-0"A-100

4 Door Threshold/Ramp Section 3/4"=1'-0"A-100

Partial Wall Elevation 1/4"=1'-0"A-100

AutoCAD SHX Text

NORTH

AutoCAD SHX Text Demo Plan, Floor Plan and Reflected Ceiling Plan

AutoCAD SHX Text A-100

AutoCAD SHX Text

FOURFRONTFRONTT

5/8" TYPE 'X' GYP. BD.

2x4 @ 16"O.C.

TILE (REUSED)

5/8" TYPE 'X' GYP. BD.

3/4" RCI CHANNEL

3 1/2" SOUND BATT.

EQUIPMENT

TOILET

FRAME

101A 102A 103A 104A 104B 105A

EXG 3'-0"x7'-0" EXG 3'-0"x7'-0" NEW 3'-10"x7'-0" EXG 2'-0"x7'-0" EXG 3'-0"x7'-0" EXG 3'-10"x7'-0"

DOOR SCHEDULE

DOOR

HM

HM

HM

HM

HM

HM

PFWD

PFWD

PFWD

PFWD

PFWD

PFWD

RELOCATE DOOR FRAME. DOOR AND HARDWARE.

PROTECT IN PLACE

DEMO / SUPPLY AND INSTALL BY SHIELDING SYSTEM INSTALLER.

PROTECT IN PLACE

PROTECT IN PLACE

PROTECT IN PLACE

DOOR LEGEND:

HM

PFWD

HOLLOW METAL

PRE-FINISHED WOOD DOOR

30"V.I.F.

SUPPORT PNL.

BEYOND

NEW DOOR & HARDWARE TO MRI PER

SHIELDING DESIGN. G.C. PREP NEW

OPENING AS NEEDED FOR

NEW RF FLOOR/RAMP,

PAINT FRAME

NEW RAMP AND FLOORING

BY G.C., SEE B/A-100

EXISTING WINDOW, PAINT

FRAME PER SPECIFICATIONS

SOLID SURFACE TOP

AND BACKSPLASH.

NEW VB, TYP.

NEW GYP. BD.

PAINT

COORD. AVAILABLE

WIDTH WITH MRI

EQUIPMENT

INSTALLATION

30"EQ.EQ.EQ.30"

SUPPORT PNL.

TYP.

SOLID SURFACE TOP

AND BACKSPLASH

3'-0

NEW V.B.

NEW GYP. BD.

PAINT

30"

3'-0

EXG. WINDOW FRAME,

PAINT AS SPECIFIED

EXG. DOOR FRAME,

PAINT AS SPECIFIED

NEW V.B.EXISTING MRI OPERATION

DESK TO REMAIN

COORD. AVAILABLE WIDTH

WITH MRI EQUIPMENT

INSTALLATION

MRI

2x4 WOOD FRAMING @ 16"O.C.

5/8" TYPE 'X' GYP. BD.

VB

NEW RF SHIELDING SYSTEM

EXISTING WALL

3 1/2" SOUND BATT.

INSTALL 5/8" GYP. BD. @ EQUIP. ROOM WALL

6'-0"

SOLID SURFACE COUNTERTOP

AND BACKSPLASH

3'-0

PROVIDE POWER UC AND

ABOVE COUNTER, COOR.

WITH ELECTRICAL

1" CENTER PARTITION

(2) 1" ADJUSTABLE

SHELVES

5'-0"

SOLID SURFACE COUNTERTOP

AND BACKSPLASH

3'-0

1" CENTER PARTITION

(2) 1" ADJUSTABLE

SHELVES

FINISHED END

PANELS, TYP.

NEW V.B.

PROVIDE POWER UC AND

ABOVE COUNTER, COOR.

WITH ELECTRICAL

NOTE:

TYP. BOTH CABINETS, ALL METALIC

HARDWARE TO BE HD, STAINLESS

STEEL HARDWARE.

FINISHED END

PANELS, TYP.

NEW V.B.

NOTE:

CABINETS TYP. 24" DEEP.

ALL METALIC HARDWARE TO

BE BRASS.

NOTE:

EXTEND ALL POWER OUTLET DEVICE BOX

THRU BACK OF BOTH CABINETS.

1/4

7'-0

17'-101 2" M.O.

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

(FIELD VERIFY)

WINDOW ELEVATIONS

B Remove and reinstall new RF shielding window.

Surface mounted window shade, provided and installed by V.A.

A-101

A Remove and reinstall new aluminum window assembly.

1/4

7'-0

10'-83

8" FRAMED OPENING

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

(FIELD VERIFY)

Surface mounted window shade, provided and installed by V.A.

A-101

1" Spandrel Panels 1" Insulated Glazing

Glazing as designed by RF Shielding

A B

SOLID SURFACE MID-SILL. PROVIDE SEALANT AT PERIMETER

SHIELDING WINDOW BY RF DESIGN

SEALANT AT PERIMETER

SOLID SURFACE SILL AND APRON

RF SHIELDING SYSTEM

5/8" TYPE X GYP. BD.

TYP.

2x4 STUD WALL, FULL BATT INSULATION

NOTE:

PROVIDE GYP. BD. RETURN AT JAMBS

AND HEAD CONDITIONS.

SHIELDING SYSTEM AND SHIELDING WINDOW

CONNECTION BY RF DESIGN.

EXISTING STRUCTURE

SEALANT AT PERIMETER

SHIM AS REQUIRED

NEW ALUMINUM WINDOW FRAME AND

IG PANEL. SET IN ORIGINAL LOCATION

SPACE

REPAIR IN PLACE THE INTERSITIAL JAMB

AND HEAD GYP. BD. AND FINISHES

4"

VINYL

CAP

FILLER

SHEET VINYL FLOOR

& BASE

WALL TYPE 1

1 1/2"=1'-0"

A-101 ELEVATION

1/4"=1'-0"

A-101

ELEVATION

1/4"=1'-0"

A-101

ELEVATION

1/4"=1'-0"

A-101

Office of

Construction and Facilities

Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: FMS Project Manager/COR

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairs of

100% CONSTRUCTION

07/24/2020

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

635-CSI-105

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

SCHEMMER

1044 NORTH 115TH STREET SUITE 300

OMAHA, NE 68154

517 Seventh Street

Rapid City, SD 57701

(605) 342-9470

(605) 348-0571 (fax)

DOCUMENTS

WALL TYPE 3

1 1/2"=1'-0"

1A A-101

ELEVATION

1/4"=1'-0"

A-101

ELEVATION

1/4"=1'-0"

A-101

EXTERIOR WINDOW DETAIL

3/4"=1'-0"

A-101

SHEET VINYL & BASE DETAIL

NONE

A-101

AutoCAD SHX Text Details and Schedules

AutoCAD SHX Text A-101

AutoCAD SHX Text

FOURFRONTFRONTT

A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY

THE OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR

SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS

AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES

OR VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO

ADDITIONAL EXPENSE TO THE OWNER.

B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE

SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.

CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO

FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.

C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND

BE RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR

ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO

OWNER. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL

OTHER TRADES AFFECTED.

D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION

TO REMAIN. FULL-TONE LINES INDICATED NEW OR RELOCATED

CONSTRUCTION.

E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL

DUCTWORK WITH STRUCTURE, CEILING, LIGHTING, AND PIPING.

F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL

EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.

G. ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT

RIGHT ANGLES AND PARALLEL TO BUILDING WALLS UNLESS

OTHERWISE INDICATED.

H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL

PANELS. MAINTAIN ALL CODE REQUIRED CLEARANCES.

I. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE,

MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED

PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT

BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL

IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT

THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE

WORK IN THE AFFECTED AREA SHALL NOT THEREAFTER BE

RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE OWNER AND

CONTRACTOR.

J. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING

CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND

GENERAL CONTRACTOR.

A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL

DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.

DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR

SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED

TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS SOLID, FULL-

TONE LINES. ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND

ARE SHOWN AS HALF-TONE.

B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED

BELOW OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL

REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING

BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED

AND AS LISTED BELOW.

C. THE REMOVAL OF HVAC AND PLUMBING EQUIPMENT FROM FINISHED AREAS

AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE

MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS

MADE TO THE BUILDING.

D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND

REMOVAL OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND

APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR

ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER HAVING FIRST

RIGHT OF REFUSAL ON ALL ITEMS.

E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE

CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND

STORED OR REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR

SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER.

F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND

CONTROLS WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL

REMOVALS.

G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL

REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY

OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED

HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE

AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND

ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT

THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE

OWNER AND ARCHITECT.

H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION

SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

/2

/2

:4

:4

P

M

07/24/20

MECHANICAL INFO SHEET

M 00

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24507868.001

TRUE

NORTH

PLAN

NORTH

NORTH

NORTH

ARROW

SYMBOL LEGEND

MATCHLINE

AREA A

AREA B

EXISTING

COLUMN

NEW

COLUMN

X

X

X

XX-XX

SIM

X

XX-XX

XXXX

DX

X

SECTION/

DETAIL

PLAN

DETAIL

REFERENCE

NOTE

REFERENCE

DEMOLITION

NOTE

EQUIPMENT

NUMBER

ROOM / SPACE

NUMBER

LETTER INDICATES

NEW COLUMN LINE

LETTER INDICATES

EXISTING COLUMN LINE

SECTION/DETAIL NUMBER

SHEET NUMBER

INDICATES DIRECTION

OF VIEW

DETAIL NUMBER

SHEET NUMBER

REFERENCE

DESIGNATION

DEMOLITION

DESIGNATION

EQUIPMENT

NUMBER

REFERENCE LEGEND

NAME

ELEVATION

LEVEL

TITLE

MARKER

VIEW NAME

SCALE: 1/8" = 1'-0"

DETAIL NUMBER

LEVEL CALLOUT

DESIGNATION

ELEVATION

DESIGNATION

GRAPHIC AREA FOR

DRAWING

TITLE

SCALE OF THE DRAWING

RECIRCULATING DOMESTIC

HOT WATER (RDHW)

DOMESTIC COLD WATER (DCW)

DOMESTIC HOT WATER (DHW)

PIPE GUIDE

HOSE BIBB

THERMOMETER

PIPE ANCHOR

HB

STEAM TRAP

PH

WH

YH

SIGHT GLASS-REFRIGERANT

POST HYDRANT

YARD HYDRANT

WALL HYDRANT

PRESSURE GAUGE

CA

PN

CONTROL AIR SUPPLY

NEW TO EXISTING CONNECTION

PNEUMATIC TUBE

FIRE WATER (BURIED)

SPRINKLER DRAIN

FIRE SPRINKLER MAIN

TAMPER SWITCH

FLOW SWITCH

FIRE DEPARTMENT CONNECTION

MISCELLANEOUS SYMBOLS

FLOOR SINK

AREA DRAIN

FLOOR DRAIN

GRADE CLEANOUT

PLUMBING VENT THRU ROOF

CLEANOUT / WALL CLEANOUT

MANHOLE

TRENCH DRAIN

OVERFLOW ROOF DRAIN

RUNNING TRAP

OXYGEN OUTLET

PIPE CAP

ELBOW UP

AIR OUTLET

TEE

ELBOW DOWN

VACUUM OUTLET

RUNNING TRAP WITH CLEANOUTS

ROOF DRAIN

UNION

TEE DOWN

STRAINER

DIELECTRIC UNION

THERMOMETER WELL

CONCENTRIC REDUCER

EXPANSION JOINT

FLEXIBLE PIPE CONNECTION

ECCENTRIC REDUCER

AIR VENT (MANUAL UNLESS

NOTED)

PITCH PIPE DOWN IN DIR OF

ARROW

TEE UP

SM

FW

D

TS

FS

LPC

HPS

MPC

MPS

LPS

HVAC PIPING

GHWR

GHWS

HWR

HWS

PC

HPC

ES

BBD BOILER BLOW DOWN

EXHAUST STEAM

PUMPED CONDENSATE

HIGH PRESSURE CONDENSATE

HIGH PRESSURE STEAM

MEDIUM PRESSURE CONDENSATE

MEDIUM PRESSURE STEAM

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

GLYCOL HOT WATER RETURN

GLYCOL HOT WATER SUPPLY

HOT WATER RETURN

HOT WATER SUPPLY

_"FS-_

_"AD-_

_"FD-_

CO

VTR

GCO

_"OD-_

MH

X

A

V

_"RD-_

RD

SAN

SAN

PLUMBING PIPING

ACID VENT

TW

AV

AW

W

DS

LS

SCW

RTW

SHW

V SANITARY VENT

BURIED EXTERIOR WATER

RECIRCULATING TEMPERED

WATER

TEMPERED WATER

DISTILLED WATER

LAWN SPRINKLER

SOFTENED HOT WATER

SOFTENED COLD WATER

ACID WASTE

SUBSOIL OR FOUNDATION DRAIN

STORM DRAIN (BELOW FLOOR)

STORM DRAIN (ABOVE FLOOR)

SANITARY DRAIN (BELOW FLOOR)

SANITARY DRAIN (ABOVE FLOOR)

OXYGEN

GASOLINE

VACUUM

OX

GS

G

VAC

RO

A

FOF

FOG

LPG

FOV

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL GAGE

FUEL OIL FILL

FUEL OIL VENT

REVERSE OSMOSIS PROCESSED

WATER

COMPRESSED AIR

NATURAL GAS

LIQUEFIED PETROLEUM GAS

DEIONIZED WATERDI

PIPING SPECIALTIES AND FITTINGS

WCO

FIRE PROTECTION

XXX

PLUMBING

FIXTURES PLUMBING FIXTURE

DESIGNATION

X"PIPE

SIZE

PIPE SIZE (DIAMETER)

X"/X"

DUCT

SIZE

WIDTH / HEIGHT

REF. DEMO NOTES ( ) XX

CWS

GCWS

CWR

GCS

CR

CS

RL

RD

RS

GCWR

GLYCOL CONDENSER WATER

SUPPLY

GLYCOL CHILLED WATER RETURN

GLYCOL CHILLED WATER SUPPLY

REFRIGERANT LIQUID LINE

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION LINE

GHCS

GHCR

CD

HCS

HCR

GCR

HOT/CHILLED WATER SUPPLY

HOT/CHILLED WATER RETURN

GLYCOL CONDENSER WATER

RETURN

GLYCOL HOT/CHILLED WATER

RETURN

GLYCOL HOT/CHILLED WATER

SUPPLY

CONDENSATE DRAIN

REF. NOTES ( )ABBREVIATIONS

ROOM NAME

150 SF

ROOM NAME

DESIGNATION

ROOM NUMBER

DESIGNATION

ROOM AREA

DESIGNATION

TSTAT THERMOSTAT

TWU TROUGH WALL AIR CONDITIONER

UH UNIT HEATER

UR URINAL

US UTILITY SINK

V VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

WB WET BULB

WC WATER CLOSETS

WCO WALL CLEANOUT

WF WASH FOUNTAINS

WFU WATER FIXTURE UNITS

WH WALL HYDRANT

WPD WATER PRESSURE DROP

WS WATER SOFTENER

WSHP WATER SOURCE HEAT PUMP

WWHP WATER TO WATER HEAT PUMP

YH YARD HYDRANT

GPH GALLONS PER HOUR

GRV GRAVITY RELIEF VENTILATOR

GPM GALLONS PER MINUTE

GV GAS VENT

GWH GAS WATER HEATER

H HYDRANTS

HB HOSE BIBB

HC HEATING COIL

HCR HOT/COLD WATER RETURN

HCS HOT/COLD WATER SUPPLY

HG GAS: HIGH-PRESSURE

HP HEAT PUMP (AIR SOURCE)

HP HORSEPOWER

HPC HIGH PRESSURE CONDENSTATE

HPS HIGH PRESURE STEAM

HRC HEAT RECOVERY COIL

HU HUMIDIFIER

HWR HOT WATER RETURN (HEATING)

HWS HOT WATER SUPPLY (HEATING)

HX HEAT EXCHANGER

IH INTAKE HOOD

IRH INFRARED RADIANT HEATER

KDH KITCHEN DISHWASHING HOOD

KH KITCHEN HOOD

KW KILOWATT

KWH KILOWATT HOURS

L LAVATORY

LAT LEAVING AIR TEMPERATURE

LH LAB HOOD

LPC LOW PRESSURE CONDENSATE

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPS

LS LAUNDRY SINK

LSS LAWN SPRINKLER DESIGN

LV LOUVER

LWT LEAVING WATER TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MB MACHINE BOLT

MBH 1000 BTUH

MCA MINIMUM CIRCUIT AMPS

MD MOTORIZED DAMPER

MG GAS: MEDIUM-PRESSURE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT

PROTECTION

MPC MEDIUM PRESSURE

CONDENSATE

MPS MEDIUM PRESSURE STEAM

MS MOP SINK

N NITROGEN

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

NPCW NONPOTABLE COLD WATER

NPHW NONPOTABLE HOT WATER

NPHWR NONPOTABLE HOT WATER

RETURN

OA OUTSIDE AIR

OD OVERFLOW ROOF DRAIN

OX OXYGEN

P PUMP

PC POINT OF CURVATURE

PHC PREHEAT COIL

PIV POST INDICATING VALVE

PRV PRESSURE REGULATING VALVE

PS PLASTER SINKS

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH,

ABSOLUTE

PSIG POUNDS PER SQUARE INCH,

GAUGE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RA RETURN AIR

RCP RADIANT CEILING PANELS

RD ROOF AREA DRAINS

RDL REFRIGERANT DISCHARGE LINE

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RELIEF AIR

RLF RELIEF FAN

RO REVERSE OSMOSIS WATER

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION LINE

RTU ROOF TOP UNIT

RV RELIEF VALVE

S SINKS

SA SUPPLY AIR

SAN SANITARY SEWER

SB SITZ BATH

SD SMOKE DAMPER

SF SUPPLY FAN

SFU SANITARY FIXTURE UNITS

SH SHOWERS

SHB SHAMPOO BOWLS

SP STATIC PRESSURE

SS SERVICE SINK

SSCU DUSTLESS SPLIT SYSTEM

CONDENSING UNIT

SSFC DUCTLESS SPLIT SYSTEM

SSS SURGEON SCRUB SINKS

ST STORAGE TANK

SUP SUMP PUMP

SW STORM WATER

TD TRENCH DRAIN

TMV THERMOSTATIC MIXING VALVES

TONS TONS OF REFRIGERATION

TSP TOTAL STATIC PRESSURE

APD AIR PRESSURE DROP

A COMPRESSED AIR

AFCV AUTO FLOW CONTROL VALVE

AC AIR COMPRESSOR

AD AIR DOOR

AW ACID WASTE

AV ACID VENT

AS AIR SEPARATOR

AW AREA DRAIN

ARD AIR PRESSURE DROP

AMP AMPERE

AHU AIR HANDLING UNIT

BW BEDPAN WASHERS

BV BALL VALVE

BT BATHTUBS

BLV BALANCING VALVE

BLKG BLOCKING

BHP BREAK HORSEPOWER

BFV BUTTERFLY VALVE

BF BACKFLOW PREVENTER

BD BIDET

BC BLOWER COIL

B BOILER

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CU AIR COOLED CONDENSING UNIT

CT COOLING TOWER

CSS CLINICAL SERVICE SINKS

CS CONDENSER WATER SUPPLY

CRAC COMPUTER ROOM AIR

CONDITIONER

CR CONDENSER WATER RETURN

CMU COMBINATION UNITS

CI CAST IRON

CHV CHECK VALVE

CHIU CABINET HEATER

CFM CUBIC FEET PER MINUTE

CF CEILING FANS

CD CONDENSATE DRAIN

CC COOLING COIL

C CHILLER

D DIFFUSER

DB DRY-BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DEG DEGREE

DF DRINKING FOUNTAIN

DGCO DOUBLE GRADE CLEANOUT

DH EMERGENCY DRENCH HOSES

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RECIRC

DI DEIONIZED WATER

DOA DEDICATED OUTDOOR AIR UNIT

DP DOMESTIC PUMP

DS DISTILLED WATER

DSA DUCT SOUND ATTENUATORS

DSCW DOMESTIC SOF COLD WATER

DSHW DOMESTIC SOFT HOT WATER

DSHWR DOMESTIC SOFT HOT WATER

RETURN

DST DOMESTIC STORAGE TANK

DTW DOMESTIC TEMPERED WATER

DTWR DOMESTIC TEMPERED WATER

RETURN

DXT DOMESTIC EXPANSION TANK

EA EACH

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EEW EMERGENCY EYE WASH

EEWS EMERGENCY EYE

WASH/SHOWERS

EF EXHAUST FAN

EFF EFFICIENCY

EFW EMERGENCY FACE WASH

EH EXHAUST HOOD

ERV ENERGY RECOVERY

VENTILATOR

ES EMERGENCY SHOWER

ESP EXTERNAL STATIC PRESSURE

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER

TEMPERATURE

EX EXPANSION TANK

F FIRE PROTECTION WATER

SUPPLY

F FURNACE

FCO FOOT CANDLE

FCT FLUID COOLER TOWERS

FCU FAN COIL UNIT

FD FIRE DAMPER

FLA FULL LOAD AMPS

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FLOOR SINKS

FSD FIRE/SMOKE DAMPER

FTR FINNED TUBE RADIATION

G GAS: LOW-PRESSURE

GCR GLYCOL CONDENSER WATER

RETURN

GCS GLYCOL CONDENSER WATER

SUPPLY

GCWR GLYCOL CHILLED WATER

RETURN

GCWS GLYCOL CHILLED WATER

SUPPLY

GD GARBAGE DISPOSAL

GD GRAVITY DAMPER

GDH GAS DUCT HEATER

GHCR GLYCOL HOT/COLD WATER

RETURN

GHCS GLYCOL HOT/COLD WATER

SUPPLY

GHWR GLYCOL HOT WATER RETURN

GHWS GLYCOL HOT WATER SUPPLY

GI GREASE INTERCEPTOR

GIV GRAVITY INTAKE VENTILATOR

GPD GALLONS PER DAY

18 Ø

18x10

18/10

ROUND DUCT

VD

FLAT OVAL DUCT-1ST FIG IS

SIDE SHOWN

FLEXIBLE DUCTWORK CONNECTION

RECT DUCT-1ST FIG IS SIDE SHOWN

ACOUSTICAL DUCT LINER

VOLUME DAMPER

MANUAL BALANCING VALVE

CONTROL VALVE (3 WAY)

CONTROL VALVE (2 WAY)

HOSE END DRAIN VALVE

PRESSURE REDUCING VALVE

AUTO FLOW CONTROL VALVE

VALVE

CHECK VALVE

HVAC DUCTWORK AND SPECIALTIES

EXTRACTOR

SIZE/TYPE

RETURN OR EXHAUST DUCT DOWN

RETURN OR EXHAUST REGISTER

OR GRILLE (VERTICAL MOUNTING)

SUPPLY REGISTER OR GRILLE

ROUND DUCT UP / DOUBLE LINE PIPE

ROUND DUCT DOWN / DOUBLE

LINE PIPE

RETURN OR EXHAUST DUCT UP

(R OR G) (VERTICAL MOUNTING)

TURNING VANES

SUPPLY AND FRESH AIR DUCT DOWN

SUPPLY AND FRESH AIR DUCT

SIZE/TYPE

SIZE/TYPE

FLOW

FLOW

SIZE/TYPE

FLOW

FLOW

SMOKE DAMPER - FIRE SEPARATION

FIRE DAMPER - FIRE SEPARATION

MOTORIZED DAMPER-OPPOSED BLADE

MOTORIZED DAMPER-PARALLEL BLADE

ROUND CEILING SUPPLY DIFFUSER

(HORIZONTAL MOUNTING)

GRAVITY DAMPER

(OR) SAFETY VALVE-STEAM

TEMP & PRESS RELIEF

THERMOSTATIC MIXING VALVE

SIZE/TYPE

FLOW

HUMIDISTAT

THERMOSTAT

FLEXIBLE DUCT

S

H

T

TEMPERATURE SENSOR

FIRE/SMOKE DAMPER - FIRE

SEPARATION

RECTANGULAR RETURN REG OR

GRILLE (HORIZONTAL MOUNTING)

RECTANGULAR SUPPLY DIFF, REG

OR GRILLE (HORIZONTAL

MOUNTING)

VALVES

M

M SIZE/TYPE

FLOW

RECTANGULAR EXHAUST REG OR

GRILLE (HORIZONTAL MOUNTING)

M

VOLUME DAMPER

M

F

S

FS

DEMOLITION GENERAL NOTES GENERAL NOTES

SEE INDIVIDUAL SHEET FOR REFERENCE DEMO NOTES SEE INDIVIDUAL SHEET FOR REFERENCE NOTES

MECHANICAL SHEET LIST

M 00 MECHANICAL INFO SHEET

M001 MECHANICAL DEMOLITION PLANS

M101 MECHANICAL PLANS

M102 FLOOR PLAN - PLUMBING

M401 QUENCH VENT DETAILS

M501 MECHANICAL SCHEDULES & DETAILS

7/24/20

T

MRI 1

MRI 2

EQUIPMENT

TOILET

CORRIDOR

VTR (E)

SAN

V

V

V

V S

A N

4" SAN DN

VAC

O

(E) VAV(E) VAV

(E) VAV

3 3

2 2

(E) AHU

(E

C

(E

C U

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

M R

I

KEY PLAN

NOT TO SCALE

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

ROOF

/2

/2

:4

:4

P

M

07/24/20

MECHANICAL DEMOLITION PLANS

M001

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24607868.001

REF. DEMO NOTES ( ):X

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - MECHANICAL & PLUMBING DEMOLITION

SCALE: 1/8" = 1'-0"

THIRD FLOOR ROOF PLAN - MECHANICAL DEMOLITION

1 REMOVE ANY GRILLES OR DIFFUSERS SERVING EQUIPMENT 102.

DEMO ASSOCIATED DUCTWORK BACK TO MAIN AND CAP. REPAIR

INSULATION TO MATCH ADJACENT CONDITION WITH PROPER VAPOR

BARRIER.

2 EXISTING EQUIPMENT TO REMAIN.

3 EXISTING VAV BOX AND ASSOCIATED DUCTWORK, ACCESSORIES,

GRILLES, AND DIFFUSERS ARE TO REMAIN.

4 DEMO EXISTING FAN COIL SYSTEM. FAN COIL IS LOCATED ON THIRD

FLOOR. REMOVE ALL ASSOCIATED DUCTWORK, DIFFUSERS, GRILLES,

AND DUCT ACCESSORIES. REMOVE ASSOCIATED PIPING AND

SPECIALTIES BACK TO MAIN AND CAP. SEAL ALL FLOOR

PENETRATIONS.

5 EXISTING SUPPLY GRILLE TO BE RELOCATED TO NEW CEILING GRID IN

TOILET 101. SEE M101 FOR RELOCATION.

6 DEMO MEDICAL GAS OUTLETS AND ASSOCIATED PIPING BACK TO

ISOLATION VALVE AND PREPARE FOR CONNECTION TO NEW PIPING.

SEE PLANS ON M101.

7 CONTRACTOR TO COORDINATE WITH THE OWNER ON THE REMOVAL

OF ANY ASSOCIATED MECHANICAL COMPONENTS SERVING THE MRI

MACHINE BEING REMOVED. DISCONNECT ANY ASSOCIATED PIPING

AND REMOVE BACK TO MAINS AND CAP. REPAIR INSULATION TO MATCH

ADJACENT CONDITION WITH PROPER VAPOR BARRIER. CONTRACTOR

TO SEAL ALL WALL OR FLOOR OPENINGS TO MATCH ADJACENT

CONDITIONS.

8 CONTRACTOR TO REMOVE EXISTING CRYOGEN VENT SYSTEM AND

ANY ASSOCIATED ACCESSORIES. CONTRACTOR TO SEAL ALL WALL

OR FLOOR OPENINGS TO MATCH ADJACENT CONDITIONS.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

NORTH

NORTH

CONTROL

MRI 1

MRI 2

EQUIPMENT

TOILET

CORRIDOR

SS-1

QUENCH

VENT

10x10 R-1

10 Ø S-1

30010 Ø SA

10x8 RA

VAV-104

6 Ø SA

3/4" HWR

3/4" HWS

RS/RLRS/RL

3/4" CD

2" CWS

2" CWR

8 Ø

(E

V A

V

(E

V A

V

(E) VAV

SSCU-1

RS/RLRS/RL

1 2" CWS

2" CWR

M R

I C

H

IL

L E

R

(E

C

(E

C U

(E) AHU

EQUIPMENT

V

V V

SAN

S A

N

V

O

VAC

141414

2" DCW

2"

3"

2"

V

SAN

VTR (E)

FS-1

TOILET

MRI 1

CONTROL

MRI 2

CORRIDOR

106CORRIDOR

4" SAN DN

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

M R

I

KEY PLAN

NOT TO SCALE

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

ROOF

/2

/2

:4

:4

P

M

07/24/20

MECHANICAL PLANS

M101

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24707868.001

REF. NOTES ( ):X

16 EXTEND EXISTING OXYGEN AND VACUUM PIPING TO WALL OUTLET.

FIELD VERIFY EXACT LOCATION OF PIPING MAINS AND VALVES. IF

EXISTING ISOLATION VALVE IS NOT ABOVE THE CEILING OF THE

ADJACENT CORRIDOR, CONTRACTOR SHALL RELOCATE EXISTING

VALVE IN AN ACCESSIBLE SPACE IN THE CEILING OF THE ADJACENT

CORRIDOR. COORDINATE PIPE ROUTING WITH MRI SHIELDING.

17 CONTRACTOR TO PROVIDE KOOLANT KOOLERS MANUAL

SWITCH-OVER PANEL. INSTALL A 50 MICRON STRAINER OR FILTER

BETWEEN DOMESTIC WATER SUPPLY AND MANUAL SWITCH-OVER

PANEL.

18 CONDENSATE PIPING TO DISCHARGE TO FLOOR SINK.

19 RS/RL PIPING BETWEEN SS-1 AND SSCU-1 TO BE ROUTED THROUGH

THE THIRD FLOOR MECHANICAL SPACE. PROVIDE FIRE CAULKING

AROUND ANY PENETRATIONS THROUGH RATED WALLS AND FLOORS.

20 PROVIDE FIRE CAULKING AROUND ANY PIPE PENETRATIONS

THROUGH RATED WALLS AND FLOORS. (TYP.)

21 CONNECT 3" SANITARY LINE TO EXISTING 4" VERTICAL SANITARY MAIN

LOCATED IN CHASE. CONTRACTOR TO FIELD VERIFY EXACT LOCATION

OF SANITARY MAIN IN CHASE.

22 CONTRACTOR IS TO INSTALL QUENCH LINE PER MANUFACTURER

GUIDELINES. SEE DETAILS ON M401 FOR CONSTRUCTION TYPES,

MATERIALS, AND GUIDELINES. QUENCH LINE IS TO CONSIST OF THE

FOLLOWING COMPONENTS: (1) VIBRATION DECOUPLER, 25 FEET OF

SMOOTH STRAIGHT RUN, (4) 90 DEGREE SMOOTH ELBOW, (2) 45

DEGREE SMOOTH ELBOWS, AND MANUFACTURER APPROVED

HORIZONTAL OUTLET. ALL COMPONENTS ARE TO BE 8" DIAMETER

SIZE. THE DESIGN SHOWN ON PLANS ONLY REQUIRES (2) 90 DEGREE

ELBOWS, THE ADDITIONAL (2) 90 DEGREE ELBOWS AND (2) 45 DEGREE

ELBOWS ARE INCLUDED TO ALLOW CONTRACTOR TO ROUTE QUENCH

VENT AROUND EXISTING EQUIPMENT OR STRUCTURES IF NECESSARY,

CONTRACTOR IS TO REQUEST APPROVAL IF ANY ADDITIONAL

STRAIGHT RUN OR ADDITIONAL ELBOWS ARE REQUIRED. SEE DETAILS

ON M401 FOR ADDITIONAL INFORMATION.

23 QUENCH VENT TO PENETRATE FLOOR ABOVE MRI ROOM AND BE

ROUTED TO EXTERIOR THROUGH EXISTING EXHAUST LOUVER.

DASHED LINE INDICATES PORTION OF QUENCH VENT THAT IS TO BE

ROUTED IN THE THIRD FLOOR MECHANICAL SPACE.

24 PROVIDE OPTION 3 OUTLET TYPE WITH A DEFLECTOR PLATE FOR

QUENCH VENT. SEE OPTION 3 DETAIL ON SHEET M401. MAINTAIN

REQUIRED CLEARANCES AS SHOWN ON SHEET M401.

1 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S

REQUIREMENTS AND THE SPECIFICATIONS. ALL PIPE PENETRATIONS

SHALL BE DONE VIA A CORE DRILL TO BE NEAT AND CLEAN.

2 EXISTING MECHANICAL EQUIPMENT ON ROOF TO REMAIN.

3 CONDENSATE PIPING TO DISCHARGE TO FLOOR SINK. CONDENSATE

PIPING TO BE DRAWN-TEMPER COPPER TUBING, TYPE M AND IS TO

COMPLY WITH ASTM B 88. PROVIDE 3/4" FLEXIBLE ELASTOMERIC

INSULATION. INSULATION IS TO COMPLY WITH ASTM C534.

4 2" CHILLED WATER SUPPLY AND RETURN TO CONNCET TO KOOLANT

KOOLERS MANUAL SWITCH-OVER PANEL. CONTRACTOR TO PROVIDE

KOOLANT KOOLERS MANUAL SWITCH-OVER PANEL.

5 INSTALL CHILLER ON MANUFACTURER RECOMMENDED ROOF CURB.

CURB IS TO BE ANCHORED TO STRUCTURE.

6 EXISTING VAV BOX IS TO REMAIN.

7 INSTALL CONDENSING UNIT ON 12" ROOF CURB. CURB IS TO BE

ANCHORED TO BUILDING STRUCTURE.

8 CONNECT 6" Ø SA DUCT TO EXISTING SUPPLY AIR MAIN LOCATED IN

CORRIDOR.

9 CONNECT 10X8 RA DUCT TO EXISTING RETURN AIR MAIN LOCATED IN

CORRIDOR.

10 CONNECT 3/4" HWS/R TO MAIN. CONTRACTOR TO FIELD VERIFY EXACT

LOCATION.

11 RELOCATE EXISTING DIFFUSER TO NEW CEILING GRID IN TOILET 101.

CONNECT TO EXISTING DUCTWORK AND MATCH EXISTING DUCT SIZE.

CONTRACTOR TO FIELD VERIFY EXISTING DUCT'S EXACT LOCATION.

12 ROUTE CHILLED WATER SUPPLY/RETURN TO CHILLER THROUGH THE

THIRD FLOOR MECHANICAL SPACE. PROVIDE FIRE CAULKING AROUND

ANY PENETRATIONS THROUGH RATED WALLS AND FLOORS.

13 ROUTE CHILLED WATER SUPPLY/RETURN TO MRI EQUIPMENT

THROUGH THE THIRD FLOOR MECHANICAL SPACE AND DOWN

THROUGH THE EQUIPMENT ROOM CEILING. PROVIDE FIRE CAULKING

AROUND ANY PENETRATIONS THROUGH RATED WALLS AND FLOORS.

14 FURNISH AND INSTALL NEW MEDICAL GAS WALL OUTLETS. PROVIDE

(1) OXYGEN OUTLET, (1) MEDICAL VACUUM OUTLET, AND (1) SLIDE

BRACKET. CONTRACTOR TO MATCH CONNECTION TYPE OF OUTLETS

BEING REMOVED. NEW MEDICAL GAS WALL OUTLETS SHALL BE

NON-FERROUS CONSTRUCTION FOR INSTALLATION WITHIN AN MRI

SHIELD. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT AND

PLACEMENT.

15 SEE CONTINUATION ON M102.

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - MECHANICAL

SCALE: 1/8" = 1'-0"

THIRD FLOOR ROOF PLAN - MECHANICAL

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - PLUMBING

STAIR 6

C H

A S

E

ELEVATOR

P-11

STAIR 7

CHASE

C H

A S

E

S T

A

IR

DN

CHASE

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-10

CHASE

STAIR 8

PATIENT

HOLDING

PHLEBOTOMY

DRESSING

ROOM

RADIOLOG

Y

WAITING

SPS

STORAG

E

BONE

DENSITOMETR

Y

EMS

STORAG

E

TELE/DATA

ELECTRICAL EQUIPMENT

PATIENT

HOLDING

E Q

U

IP

M E

N T

EQUIPMENT

CONTROL

WOR

K

AREA

SCRUB

ROOM

H.A.C.

IR STORAGE

FILES

SPS

STORAG

E

TOILET

OFFICE

PHYSICIA

N

OFFICEOFFICEOFFICE

OFFICE

PHYSICIA

N

STAFF

RADIOLOGY P.A.C.U.

TOILET

TRASH LINEN

PATIENT

WAITIN

G

HOLDING ROOM

TOILET

TOILET

80 SLICE CT WORKROOM

64 SLICE CT

TOILETTOILET

TOILET TOILET

FLUOROSCOPY

CONTROL

X-RAY X-RAY

READING ROOM

EXPEDITE

DESKELECTRIC

PROCESSING ALCOVEH.A.C.

OFFICE

X-RAY

FLUOROSCOPY

CONTROL

X-RAYX-RAY

READING ROOM

PATIENT CHECK-IN

ULTRASOUND

TOILET

TOILET

ULTRASOUND

ULTRASOUND

TOILET

TOILET

MALE

TOILET

FEMALE

S T

O R

A G

E

80 SLICE CT

CONTROL

MRI

EQUIPMENT

INTERVENTIONA

L

RADIOLOGY

INTERVENTIONA

L

RADIOLOGY

SOILED

UTILITY

PATIENT

HOLDING

RECEPTION/CHECK IN

TOILET TOILET

RADIOLOGY

CONFERENC

E

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

OFFICE

RN

OFFICE

TECHNICIA

N

OFFICE

AO

OFFICE

CHIEFADPAC

S

OFFICE

COMPUTE

R

STORAGE

TECHNICIA

N

OFFICE

TELE/DATA

ELECT.

COMPUTER

ROOM

TOILET

MALE

TOILET

FEMALE

LOCKER

ROOM

BREAK

ROOM

OFFICE

IV ROOM

M101

2"

2"

DCW

DCW 1

GENERAL NOTES:

1. THIS SHEET IS TO BE USED FOR REFERENCE TO THE TIE-IN LOCATION OF

THE EXISTING DOMESTIC WATER MAIN. THE CONTRACTOR IS TO FIELD

VERIFY EXISTING CONDITIONS AND MAKE ADJUSTMENTS ACCORDINGLY.

2. PIPE IS TO BE ROUTED IN THE CEILING ABOVE CORRIDORS TO THE

INDICATED TIE-IN POINT. CONTRACTOR TO REQUEST APPROVAL IF

ALTERNATE PIPE ROUTING IS REQUIRED.

3. CONTRACTOR TO COORDINATE INSTALLATION WITH FACILITY STAFF.

4. CONTRACTOR TO REQUEST OWNER APPROVAL OF THE TIE-IN METHOD

USED TO CONNECT INTO THE EXISTING PIPING AS WELL AS ANY REQUIRED

DOWNTIME TO THE EXISTING SYSTEM.

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

KEY PLAN

NOT TO SCALE

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

AREA F

/2

/2

:4

:2

P

M

07/24/20

FLOOR PLAN - PLUMBING

M102

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24807868.001

REF. NOTES ( ):X

1 CONNECT 2" DCW TO EXISTING 5" DCW LOCATED IN CHASE. CONTRACTOR

TO VERIFY EXACT LOCATION OF 5" DCW MAIN LOCATED IN CHASE.

SCALE: 3/32" = 1'-0"

SECOND FLOOR PLAN - AREA F - PLUMBING

120°

Deflector plate

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

635-CSI-105

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

/2

/2

:4

:4

P

M

07/24/20

QUENCH VENT DETAILS

M401

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

24907868.001

SCALE: NOT TO SCALE

INTERIOR PIPE SLEEVE DETAILS

CONCRETE OR

MASONRY PARTITION.

GROUT, SEE

SPECIFICATIONS.

1/4" CLEAR AROUND

PIPE OR INSULATION.

CAULKING, SEE

SPECIFICATIONS.

SLEEVE, SEE

SPECIFICATIONS.

NOTE:

1. CAULK FULL PERIMETER OF PIPE AT BOTH INSIDE & OUTSIDE OF WALL.

1/4" CLEAR AROUND

PIPE OR INSULATION

RISER CLAMP

CONCRETE

FLOOR

CAULKING, SEE

SPECIFICATIONS.

NOTE:

1. CAULK FULL PERIMETER OF PIPE AT BOTH TOP AND BOTTOM OF

FLOOR.

DETAIL OF SLEEVE FOR PIPING

PENETRATION OF FLOOR

DETAIL OF SLEEVE FOR PIPING

PENETRATION OF VERTICAL PARTITIONS

SLEEVE, SEE

SPECIFICATIONS.

SLEEVE HEIGHT

SHALL BE 2" HIGH IN

WET LOCATIONS, AT

FLOOR LEVEL IN ALL

OTHER LOCATIONS

RISER

CLAMP LEG

TOTAL

HEIGHT

OF TRAP

TO FLOOR DRAIN

TOTAL HEIGHT OF TRAP:

X + H + (1 1/2 x PIPE DIAMETER)

H = AT LEAST 1 INCH PLUS

CASING STATIC PRESSURE

X = 1/2 "H"

COIL CONDENSATE

DRAIN PAN

SLOPE DOWN

X

H

CLEAN OUT

HOUSEKEEPING PAD,

HEIGHT IS BASED ON

TRAP HEIGHT

SEP GPA EPC

SIEMENS SUPPLIED AND

INSTALLED CABINETS

THE PIPING FROM THE CHILLED WATER SUPPLY

TO THE SEP CABINET MUST MEET THE CHILLER

MANUFACTURER'S GUIDELINES FOR ELBOWS

AND LENGTH SEE MANUFACTURER FOR

MINIMUM REQUIRMENTS.

22 FOOT MAX

HOSE LENGTH

9'-10" MAX HOSE LENGTH

1-1/4" MALE THREAD

PROVIDED BY SIEMENS FOR 60 kW SEP

FULL PORT SHUT OFF VALVES

FOR SERVICING SEP CABINET

1" MINIMUM SYSTEM BYPASS WITH BOILER

DRAIN AND FULL PORT BALL VALVE

PROVIDE FULL PORT SHUT OFF VALVES

INSTALLED ON CHILLER SUPPLY AND

RETURN LINES AT CHILLER

DIMPLEX CHILLER

PRESSURE GAUGE WITH RANGE FROM 40

TO 110 PSI (LOCATED NEAR SEP)

THERMOMETER WITH RANGE FROM 30°F

TO 80°F (LOCATED NEAR SEP)

BALL VALVE

BOILER DRAIN

FILTER - PROVIDED BY DIMPLEX,

INSTALLED BY CONTRACTOR

ALL PIPING AND PLUMBING FIXTURES SHALL BE FURNISHED, INSTALLED, PRESSURE TESTED AND CHARGED BY THE MECHANICAL CONTRACTOR PRIOR TO THE DELIVERY AND INSTALLATION OF THE

SIEMENS SPPLIED AND INSTALLED EQUIPMENT UNLESS SPECIFIED OTHERWISE.

AT THE HIGHEST POINT OF THE WATER SUPPLY PIPE FROM THE CIHLLER AN AUTOMATIC

DEAERATION DEVICE (AIR VENT) WITH BALL VALVE MUST BE INSTALLED BY THE MECHANICAL

CONTRACTOR.

SYSTEM MUST BE PROVEN TO BE FREE OF LEAKAGE.

THE MECHANICAL ENGINEER OF RECORD SHALL BE ULTIMATELY RESPONSIBLE FOR THE SITE SPECIFIC DESIGN AND SPECIFICATION OF THE MECHANICAL AND PIPING SYSTEMS AS SHOWN AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND NATIONAL CODES. ALL WORK SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR AND SHALL BE SUBJECT TO COMPLIANCE WITH ALL

APPLICABLE LOCAL, STATE, AND NATIONAL CODES.

THE SUPPLY AND RETURN PIPES FROM THE CHILLED WATER SUPPLY TO THE SEP MUST BE LABELED TO

SHOW FLOW DIRECTION AND CONTENT (WATER/GLYCOL).

NOTES:

LIQUID AND SUCTION

LINES DOWN TO INDOOR

UNIT

INSULATE REFRIGERANT LINES

CONTINUOUSLY THROUGH

PENETRATION. SEAL

PENETRATION WEATHER TIGHT.

ROOF

CONDSENSING UNIT

METAL CURB CAP

FASTEN CONDENSING UNIT

SECURELY TO CURB CAP

PREFRABRIACTED ROOF

CURB

REHEAT COIL

CONTROL

VALVE

UNION

(TYP.)

STRAINER

VALVE

(TYP.)

AUTOFLOW

VALVE

HWS

HWR

MANUAL AIR VENT

HOSE END DRAIN WITH CAP

NOTE: SEE PLANS FOR PIPE SIZE, MINIMUM 3/4".

SHEET METAL 90° ELBOW

DIFFUSER NECK

TRANSITION

(AS REQUIRED)

CEILING

SUPPLY DUCT-

SEE PLANS FOR

SIZES

SUPPLY DIFFUSER

DUCT INSULATION

FLEX DUCT

INSULATE BACKPAN

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

635-CSI-105

SCHEMMER

1044 NORTH 115TH STREET, SUITE 3300

OMAHA, NEBRASKA 68154

/2

/2

:4

:4

P

M

07/24/20

MECHANICAL SCHEDULES & DETAILS

M501

OKLAHOMA CITY VA HEALTH

CARE SYSTEM MRI SITE PREP

AJPJEK

OKLAHOMA CITY, OKLAHOMA

JOHN WILSON

241007868.001

2. 24"x24" FACE FRAME WITH 1"x1"x1" EGG CRATE OPENING AS SHOWN ON THE PLANS.

NOTES: 1. PROVIDE WITH STRAIGHTENING GRID.

R-1 RETURN AIR LAY-IN 24x24 SEE PLANS WHITE 0.1 25 EGC10 50F 80 2

S-1 SUPPLY AIR LAY-IN 24x24 SEE PLANS WHITE 0.1 25 PLQ OMNI SPD 1

MARK SERVES TYPE

FACE SIZE

(IN.) NECK SIZE (IN.) FINISH

MAX PD (IN

WG)

MAX NC AT

PD SHOWN

KRUEGER

MODEL

NUMBER

TITUS MODEL

NUMBER

PRICE

MODEL

NUMBER REMARKS

DIFFUSER, REGISTER AND GRILLE SCHEDULE

2. PROVIDE UNIT WITH ADVANCED WIND BAFFLE KIT FOR OPERATION DOWN TO -20 °F.

NOTES: 1. PROVIDE REFRIGERANT LINESETS SIZED AND INSTALLED PER MANUFACTURER REQUIREMENTS. PROVIDE LONG LINE LENGTH ACCESSORIES AS REQUIRED.

SS-1 SEE PLANS 705 80 67 24.0 208 1 60 MITSUBISHI PKA-A24KA7 SSCU-1 WALL 21.4 95 R410A MITSUBISHI PUY-A24NHA7 19 26 208 1 60 1,2

DB WB

AIRSIDE DATA EAT (°F)

MIN CAP

(MBH) VOLTS PH HZ MCA MOCP VOLTS PH HZLOCATION CFM

COOLING COIL DATA ELECTRICAL DATA

MANUFACTURER AND

MODEL NUMBER MARK LOCATION

COOLING

EFFICIENCY

(SEER)

AMB

TEMP (°F)

REFER

TYPE

MANUFACTURER AND

MODEL NUMBER

ELECTRICAL DATA

MARK

INDOOR UNIT DATA OUTDOOR UNIT DATA

REMARKS

SYSTEM AIR CONDITIONING SCHEDULE

2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING LEFT OR RIGHT HAND CONFIGURATION.

NOTES: 1. PROVIDE WITH 1/2" FIBER-FREE LINER AND CONTROL ENCLOSURE.

VAV-104 CONTROL 104 300 90 6 0.12 1 16 18 90 55 100 4.4 1 0.06 0.5 180 160 0.14 KRUEGER LMHS 1,2

MAX MIN MIN INLET CFM EAT (°F) LAT (°F) CAP (MBH) NO ROWS MAX PD GPM EWT (°F) LWT (°F)

PRESS DROP

FT WATMARK SERVES

CFM

INLET SIZE

(IN)

OP PRESS (IN WG)

MAX RAD NC @ TOTAL

INLET PRESS SHOWN

REHEAT COIL DATA WATER DATA

MANUFACTURER AND

MODEL NUMBER REMARKS

AIR TERMINAL UNIT SCHEDULE

SCALE: NOT TO SCALE

INTERIOR PIPE SLEEVE DETAILS

SCALE: NOT TO SCALE

CONDENSATE DRAIN TRAP NEGATIVE STATIC PRESSURE

SCALE: NOT TO SCALE

PIPING SCHEMATIC FOR CHILLED WATER - DIMPLEX CHILLER

SCALE: NOT TO SCALE

CONDENSING UNIT SUPPORT/ PIPING THROUGH ROOF DETAIL

NOTES: 1. PROVIDE WITH ALUMINUM STRAINER AND NICKEL BRONZE RIM AND GRATE WITH 2-1/2" SQU CENTER HOLE.

FS-1 FLOOR SINK --- --- 3" 2" --- --- --- JAY R. SMITH 3100 --- --- --- 1

HOT

WATER

COLD

WATER WASTE VENT OTHER FIXTURE FAUCET/FLUSH VALVE ACCESSORY #1 ACCESSORY #2 REMARKSMARK DESCRIPTION

FIXTURE CONNECTIONS

MOUNTING HEIGHT FLOW RATE

MANUFACTURER AND MODEL NUMBER

PLUMBING FIXTURE SCHEDULE

SCALE: NOT TO SCALE

REHEAT COIL PIPING DETAIL

SCALE: NOT TO SCALE

SUPPLY DIFFUSER/ DUCT CONNECTION DETAIL

A. SEE ARCHITECTURAL SHEETS FOR EXACT AREAS AND WALLS AFFECTED BY THE DEMOLITION AND

REMODEL.

B. DEMOLITION SHOWN IS AS REQUIRED FOR THE COMPLETE PROJECT. THE CONTRACTOR SHALL COORDINATE THE DEMOLITION EFFORT PER THE PHASING PLANS. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTS AS REQUIRED TO ALLOW

THE WORK OF OTHER TRADES TO PROCEED OR AS REQUIRED TO ALLOW THE OWNER TO OCCUPY

THE SPACE.

C. ALL OF THE EQUIPMENT AND DEVICES SHOWN ON THIS DRAWING ARE EXISTING. THE LOCATIONS OF

THE EQUIPMENT AND DEVICES WERE OBTAINED FROM EXISTING DRAWING AND FIELD

INVESTIGATION. THE LOCATIONS OF THE EXISTING EQUIPMENT AND DEVICES ARE SHOWN FOR THE

CONVENIENCE OF THE CONTRACTOR. ACCURACY OF THE INFORMATION SHOWN IS NOT

GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR THE VERIFICATIONS OF ALL EXISTING

CONDITIONS PRIOR TO SUBMITTING BIDS. SITE VISITS PRIOR TO SUBMISSION OF BIDS NEED TO BE

FULLY COORDINATED WITH THE OWNER.

D. CIRCUIT INFORMATION FOR ALL AFFECTED CIRCUITS SHALL BE VERIFIED PRIOR TO COMMENCING WORK. ACCURACY OF THE INFORMATION SHOWN AND INCLUDED ON THE PANEL SCHEDULES IS NOT

GUARANTEED.

E. LUMINAIRES AND DEVICES INDICATED TO BE REMOVED, WHICH ARE LOCATED ON CEILINGS OR WALLS, SHALL HAVE LUMINAIRES, DEVICE AND ALL ASSOCIATED CIRCUIT WIRING AND CONDUIT REMOVED BACK TO NEAREST JUNCTION BOX, OR DEVICE NOT INDICATED TO BE REMOVED. ACTUAL

CIRCUITING MUST BE DETERMINED IN THE FIELD. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY WIRE, CONDUIT, DEVICES AND CONNECTIONS NECESSARY TO ENSURE CIRCUIT

CONTINUITY OF THE REMAINING DEVICES.

F. THE OWNER HAS THE RIGHT TO RETAIN ALL SALVAGEABLE MATERIAL. ANY MATERIAL THE OWNER

CHOOSES NOT TO ACCEPT SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY

THE CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF ANY PCB BALLAST OR

HAZARDOUS LAMPS.

G. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE LABELING OF SPARE OR ABANDONED

CIRCUITS AND/OR CIRCUIT BREAKERS IN ALL PANELS AFFECTED BY THE DEMOLITION. SPARE

CIRCUITS AND/OR CIRCUIT BREAKERS MAY BE REUSED FOR THE CIRCUITING OF THE NEW OR

REMODELED AREA AS SPACE AND PANEL LOADING WILL ALLOW.

H. THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING PATCHING, PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO

THE DEMOLITION WORK DONE BY THE ELECTRICAL CONTRACTOR, UNDER THE TERMS OF THIS

SPECIFICATION. CLOSE AND SEAL ALL OPENINGS, REPAIR ALL SURFACES, ETC., AS REQUIRED.

I. EXISTING FIRE ALARM DEVICES, EMERGENCY LIGHTS AND EXIT SIGNS SHALL BE COMPLETE AND OPERABLE AT ALL TIMES. PROVIDE TEMPORARY DEVICES IN AREAS BEING WORKED ON TO ALLOW

FOR A WORKABLE SYSTEM DURING CONSTRUCTION.

J. PROVIDE MINIMUM [2] DAYS ADVANCE NOTICE OF OUTAGES. COORDINATE WITH OWNER FOR ALL ANTICIPATED OUTAGES. OWNER HAS FINAL APPROVAL ON TIME AND EXTENT OF POWER OUTAGE.

K. PROTECT EXISTING FURNITURE, CARPET AND OTHER APPURTENANCES FROM DAMAGE DURING THE

COURSE OF CONSTRUCTION. REPLACE DAMAGED ITEMS FREE OF COST TO THE OWNER.

L. ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL- TONE LINES ON DEMO PLANS. ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE

SHOWN AS HALF-TONE.

A. DRAWINGS DO NOT SHOW TOTAL NUMBER OF CONDUCTORS FOR CIRCUITS REQUIRED. PROVIDE

THE NUMBER OF CONDUCTORS NEEDED TO COMPLETE INSTALLATION OF SPECIFIC EQUIPMENT

FURNISHED. A GREEN GROUND CONDUCTOR, SIZED PER NEC,…