BATMAn_Pre-Proposal_Conference_-_Final.pdf
PDF 201 KB Posted
- Attached to
- Solicitation Extension
- Solicitation number
- FA9451-15-R-0029
About this file
BATMAn Pre-Proposal Conference Presentation Slides
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integrity Service Excellence
Air Force Research Laboratory
Place Proper DISTRIBUTION STATEMENT Here
23 Feb 2017
Katherine M. Dorn Contract Specialist
AFRL/RVKDT
Pre-Proposal Conference Business and Technology
Management Administration (BATMAn)
2Place Proper DISTRIBUTION STATEMENT Here
UNCLASSIFIED
Overview
• Contracting Team
• Acquisition Description
• Disclaimer
• Instructions to Offerors
• Evaluation
3Place Proper DISTRIBUTION STATEMENT Here
Overview (cont.)
• What an Offeror Needs to do and How an Offeror Can be Selected for Award
• Volume Contents
• CLIN Structure
• Proposal Due Date
• TS/SCI
• Pending RFP Amendments
• Questions
4Place Proper DISTRIBUTION STATEMENT Here
Contracting Team
• Contracting Officer: Ms. Paulette S.L. Windley
– Phone: (505) 846-0150
– Email: paulette.windley@us.af.mil
• Contract Specialist: Ms. Katherine M. Dorn
– Phone: (505) 846-7616
– Email: katherine.dorn@us.af.mil
• Section Chief: Mr. Christopher L. Keyes
– Phone: (505) 846-2240
– Email: christopher.keyes.2@us.af.mil mailto:paulette.windley@us.af.mil mailto:katherine.dorn@us.af.mil mailto:christopher.keyes.2@us.af.mil
5Place Proper DISTRIBUTION STATEMENT Here
Acquisition Description
• General business, administrative and financial support services
• Supports Philips Research Site (PRS), AFRL/RV and RD, including geographically separated units/locations with an AFRL/RV and AFRL/RD mission
• Single award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with 5 year ordering period
– 1 Dec 2017 through 30 Nov 2022
• Firm-Fixed-Priced Task Orders
– 12 task orders anticipated at time of award
6Place Proper DISTRIBUTION STATEMENT Here
Disclaimer
• THE FOLLOWING IS A BRIEF OVERVIEW OF THE
PROPOSAL REQUIREMENTS
• OFFERORS ARE CAUTIONED TO CAREFULLY READ
THE REQUIREMENTS OF THE SOLICITATION/RFP AND
COMPLY ACCORDINGLY
7Place Proper DISTRIBUTION STATEMENT Here
Instructions to Offerors
• FAR 52.212-1 and addendum (Attachment 8 to RFP)
• Submit proposals no later than 10 Apr 2017 at 1:00pm MDT and hold prices firm for 120 days
– Mailing Address: 3550 Aberdeen Ave. SE, Kirtland
AFB, NM 87117
• Volumes
– Technical (25 page limitation)
– Contract Documentation (No page limitation)
– Price (No page limitation)
8Place Proper DISTRIBUTION STATEMENT Here
Evaluation
• FAR 52.212-2 and addendum (Attachment 9 to RFP)
• Lowest Price Technically Acceptable (LPTA) approach
– Factor 1: Price
– Factor 2: Technical
• Sub-factor 1: Quality Control Plan
• Sub-factor 2: Technical Capability
– Factor 3: Past Performance
• Technical and past performance, when combined, are approximately equal to price
9Place Proper DISTRIBUTION STATEMENT Here
Evaluation (cont.)
• Steps in arriving at LPTA decision
– Step 1: Price evaluation. The Government will rank offers from lowest to highest price
– Step 2: Technical evaluation. At the contract level, technical evaluation on an acceptable or unacceptable basis starting with the lowest priced offeror
– Step 3: Past Performance. The Government will evaluate the lowest priced technically acceptable proposal from Step 2 for past performance on acceptable/unacceptable basis.
10Place Proper DISTRIBUTION STATEMENT Here
Evaluation (cont.)
• If the lowest priced acceptable offeror from Step 2 does not have acceptable past performance, then Steps 2 and 3 will continue (in order by price) until an offeror is both technically acceptable and has acceptable past performance
• Evaluations will end and award will be made on the basis of the lowest priced proposal meeting the acceptability standards for non-cost factors (factors 2 & 3)
• It is possible that not all offerors will be evaluated for technical acceptability or past performance
11Place Proper DISTRIBUTION STATEMENT Here
What an Offeror Needs to do & How an Offeror Can be Selected for Award
• Comply with information required by the Solicitation/RFP in the format requested
• Be the lowest priced, technically acceptable offeror with acceptable past performance
• Refer to FAR 52.212-1 and 52.212.-2 and Addendums for the required information and format for the proposal
• 3 Volumes required
– Volume 1: Technical
– Volume 2: Contract Documentation
– Volume 3: Price
• Failure to furnish a complete proposal may result in elimination from consideration
12Place Proper DISTRIBUTION STATEMENT Here
Volume I – Technical
• Glossary
• Sub-Factor One: Quality Control Plan
– Demonstrates understanding and approach for umbrella PWS sections 3.1.2.1.1 through 3.1.2.1.4
• Sub-Factor Two: Technical Capability
– Addresses the offeror’s security program and personnel to include TS/SCI eligibility at the task order level
– Phase-in transition plan
– PM requirements (Resumes are not requested or required)
• Offeror must receive an acceptable rating in all sub-factors to have an overall acceptable technical rating
• 25 page limit
13Place Proper DISTRIBUTION STATEMENT Here
Volume II – Contract Documentation
• Company information
• Standard Form 1449
• Representations and Certifications
• Required Acknowledgements
• Organizational Conflict of Interest (OCI) Identification
• Past Performance Project Sheets (PPPS) (Attachment 11)
• No page limitation
14Place Proper DISTRIBUTION STATEMENT Here
Volume III – Price
• Tab 1: Table of Contents, Glossary, and Definitions
• Tab 2: Price and Supporting Information
• Tab 3: Task Order Pricing Spreadsheets
– All pricing spreadsheets must be completed for all 12 task orders for the five-year performance periods
• No page limitation
15Place Proper DISTRIBUTION STATEMENT Here
Volume III – Price (cont.)
• Commercial Services Task Order Rate Schedule Template (Attachment 24)
• Commercial Services Task Order Pricing Template (Attachment 25)
• Commercial Services Task Order Non-Exempt Labor Rate Disclosure Template (Attachment 26)
16Place Proper DISTRIBUTION STATEMENT Here
CLIN Structure
• CLIN structure (Basic Contract) CLIN 0001: Labor (RDT&E funds) CLIN 0002: Labor (O&M funds) CLIN 0003: Travel CLIN 0004: Data & Reports
17Place Proper DISTRIBUTION STATEMENT Here
Proposal Due Date
• Proposals due 10 Apr 2017 by 1:00PM MDT
• No facsimile or Electronic Offers will be accepted
18Place Proper DISTRIBUTION STATEMENT Here
Pending RFP Amendments
• Revision to DD 254
– Changes to blocks 10 and 11
• TS/SCI clarification
– FAR 52.212-1 addendum section 5.2.2.2 revised to
“eligible means TS with an adjudicated tier 5 or single scope investigation”
– Revision to Introduction/Background paragraph of combined synopsis/solicitation
19Place Proper DISTRIBUTION STATEMENT Here
TS/SCI
• TS/SCI requirement may be subcontracted. Provide JPAS required information
• Does the prime contractor need to have TS/SCI?
– Not if they propose a subcontractor with TS/SCI to perform the required TS/SCI effort
• Do I need to have TS/SCI clearance at time of proposal submission? Or at time of award?
– An offeror needs to have TS with adjudicated tier 5 or single scope investigation in order to be eligible for TS/SCI facility clearance
• Will the Government sponsor a firm for TS/SCI clearance? And facility clearance?
– Yes, the Government will sponsor the awarded offeror
20Place Proper DISTRIBUTION STATEMENT Here
Questions
• Submit questions to katherine.dorn@us.af.mil NLT 3 Mar 2017. Answers will be posted to FedBizOpps (www.fbo.gov) mailto:katherine.dorn@us.af.mil
| Slide Number 1 |
| Overview |
| Overview (cont.) |
| Contracting Team |
| Acquisition Description |
| Disclaimer |
| Instructions to Offerors |
| Evaluation |
| Evaluation (cont.) |
| Evaluation (cont.) |
| What an Offeror Needs to do & How �an Offeror Can be Selected for Award |
| Volume I – Technical |
| Volume II – Contract Documentation |
| Volume III – Price |
| Volume III – Price (cont.) |
| CLIN Structure |
| Proposal Due Date |
| Pending RFP Amendments |
| TS/SCI |
| Questions |
File details come from the government source that posted it. Updated .