ARES III - Final RFP Cover Sheet amendment 02.pdf
PDF 26 KB Posted
- Attached to
- Advanced Research and Engineering Services (ARES) III Federal contract opportunity
- Solicitation number
- FA9300-11-R-0002
About this file
ARES III Final RFP Cover Sheet amendment 02
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFFTC/PKTB CODE FA9300 7. ADMINISTERED BY (If other than Item 6) CODE
DIRECTORATE OF CONTRACTING
5 SOUTH WOLFE AVE, BLDG 2800
EDWARDS AFB CA 93524-1185
TOM J. SHEA 661-277-8592
thomas.shea@edwards.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA930011R000201
X 9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ARES 3 Source Selection
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.13.1 FAR (48 CFR) 53.243 Created 29 Sep 2011 1:12 PM
SCHEDULE OF CHANGES
FA9300-11-R-0002 01
A. The purpose of this modification is to make changes to sections of the ARES III - Final RFP posted on FedBizOpps on 5-Oct-2011.
B. This amended RFP, posted on FedBizOpps as 'ARES III - Final RFP amendment 02' supercedes the original RFP and amendment 01 posted.
C. Changes made from the ARES III – Final RFP amendment 01 are as follows:
1. Page 2, 5 and 7, Section B: “Subcontractor Labor Utilizes Fixed Fee, but no performance incentive” was removed from CLINs 0003, 1003 and 2003.
2. Page 108, Section L Table 2-2: The wording “Oral presentation charts are not included in the page limit. (Ref paragraph 2.1.5)” was added to the page limit cell under Volume II.
2. Page 119, Section L-16 of 27: Para 7.1.5 was changed to “7.1.5 Organizational Conflicts of Interest (OCI) Mitigation Plan (MP) -- Offerors are required to submit an OCIMP in accordance with AFFARS 5352.209-9001 as part of the Contract Documentation Volume.”
3. Page 120, Section L-17 of 27: Para 7.3.5.2 Non-Disclsosure Agreements is now held in reserve.
4. Page 123, Section L-20 of 27:
On item no.32 of Amendment 01, it was noted that the following Statements 'G' and 'J' were removed from this page, relabled 'M' and 'N' and placed at the end of Section L, Attachment L-3.
Please note that the statements ‘H’ and ‘J’ were removed and relabeled ‘M’ and ‘N’ and placed at the end of Section L, Attachment L-3.
H (now M). Illustrate how your experience on this program applies to the scope, magnitude/complexity, contract type, and contract environment of the ARES III requirement. Describe the functions performed under the submitted contract and how they apply to your proposed portion of the ARES III SOW requirement.
J (now N). Pursuant to Voluntary Protection Program (VPP) requirements, include your Total Case Incident Rate (TCIR) and Days Away, Restricted or Transferred (DART) rate for the three most recently reported years of each contract submitted for consideration. Explain in detail any submitted rates that exceed industry averages as defined by the Bureau of Labor Statistics (http://www.bls.gov/iif/) according to the applicable contract NAICS code (e.g. for contracts with NAICS codes beginning with 541, rates exceeding 1.1 for TCIR and 0.5 for DART, based on the most recent reported year of data, 2008).
At the end of Attachment L-3, the following paragraphs were changed to the following:
H. For each of subfactors 2-4 under the Technical / Risk factor in Section M, illustrate how your experience on this program applies to that subfactor. In addition, include the offeror’s ability to overcome past problems and the effect of those actions, in terms of improvements achieved or problems rectified as they pertain to the ARES III requirement.
M. Illustrate how your experience on this program applies to the scope, magnitude/complexity, contract type, and contract environment of the ARES III requirement. Describe the functions performed under the submitted contract and how they apply to your proposed portion of the ARES III SOW requirement.
5. Page 130, Section L-27 of 27: Attachment L-8 made the following changes:
FROM:
Mid Level Engineer/Scientist: PHD in Sci Eng 4 year, MS in Sci Eng 1 Years, BS in Sci Eng 1+ Years Basic Level Engineer/Scientist: MS in Sci Eng 1 year, BS in Sci Eng 0 years
TO:
Mid Level Engineer/Scientist: PHD in Sci Eng 1 year, MS in Sci Eng 1+ Years, BS in Sci Eng 4+ Years Basic Level Engineer/Scientist: MS in Sci Eng 0 years, BS in Sci Eng 1 year
File details come from the government source that posted it. Updated .