Attachment_7a_-_RDIF_Live_Task_PWS.docx

DOCX document 40 KB Posted

Attached to
Rapid Development Integration Facility (RDIF) Support Federal contract opportunity
Solicitation number
FA8629-14-R-2408
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attachment 7a - RDIF Live Task PWS. This Document Replaces the Original Attachment 7a - RDIF Live Task PWS Posted 11 Aug 14.

View the file

Other files for this federal contract opportunity

Other files attached to Rapid Development Integration Facility (RDIF) Support, newest first.
File Type Posted
SF_33_Request_for_Proposal_Amendment_0002.pdf PDF
Summary_of_Changes_Amendment_0002.docx DOCX document
Questions_and_Answers_as_of_28_Aug_14.xlsx XLSX spreadsheet
Questions_and_Answers_as_of_26_Aug_14.xlsx XLSX spreadsheet
Questions_and_Answers_as_of_18_Aug_14.xlsx XLSX spreadsheet
Attachment_10_-_Instructions_to_Offerors_RFP_Section_L_Amendment_0001.docx DOCX document
Summary_of_Changes_Amendment_0001.docx DOCX document
SF_33_Request_for_Proposal_Amendment_0001.pdf PDF
Attachment_6a_-_RDIF_Sample_Task_PWS.docx DOCX document
Attachment_11_-_Evaluation_Criteria_Section_M.docx DOCX document
Attachment_4_-_RDIF_Past_Performance_Information_Tool.docx DOCX document
ppi_tool.accdb —
Performance_Work_Statement_Dated_7_Jul_14.doc DOC document
Attachment_8_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_6b_-_JCO_Certification_Requirement.docx DOCX document
Attachment_7d_-_Live_Task_Drawing_5201902014-15.PDF PDF
Attachment_7b_-_Live_Task_Drawing_52001902014-10.PDF PDF
Attachment_3_-_RDIF_Price_Matrix_v3.xlsx XLSX spreadsheet
RDIF_Labor_Category_Qualifications.xlsx XLSX spreadsheet
SF_33_Request_for_Proposal.pdf PDF
Attachment_7c_-_Live_Task_Drawing_52001902014-13.PDF PDF
Attachment_6a_-_RDIF_Sample_Task_PWS.docx DOCX document
RDIF_Equipment_List.xlsx XLSX spreadsheet
Attachment_5_-_RDIF_Past_Performance_Questionnaire.docx DOCX document
Attachment_9_-_DD254.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
Attachment_2_-_Service_Contract_Act_Wage_Determination.pdf PDF
Attachment_10_-_Instructions_to_Offerors_RFP_Section_L.docx DOCX document
Attachment_7a_-_RDIF_Live_Task_PWS.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7a - PWS

FA8629-14-R-2408 0001

1 July14

Performance Work Statement (PWS) Rapid Development Integration Facility (RDIF) 30MM Dummy Round Fabrication Task Order 0001

1.0Description of Services: The Contractor shall provide sheet metal labor, materials, program management labor, and quality assurance expertise for the 30MM Dummy Round project. These individuals will perform to the standards and specifications contained in the RDIF IDIQ PWS.
2.0Background: The RDIF has been tasked by the AC-130 Gunship program office (AFLCMC/WISS) to produce 10 30MM dummy rounds, both casing and projectile as a solid piece, with all 10 made out of stainless steel (Type 416).

2.1. The contractor shall purchase material IAW with attached documentation. Once received the contractor shall produce 10 30MM dummy rounds (both casing and projectile as a solid piece) made out of stainless steel (Type 416) IAW with attached documentation.

3.0 Scope:

3.1 The contractor shall provide the sheet metal labor, materials, program management labor and quality assurance expertise to produce the 10 30MM dummy rounds (both casing and projectile as a solid piece) made out of stainless steel (Type 416). The rounds will be bored (boring bars are available in the RDIF tool kits) out from the primer end of the round and then capped and sealed. The cap shall include a small indentation in the center to prevent a firing pin from striking the cap. Max allowable weight of the entire round is 1.6 lbs (+ 0.05 lbs or - 0.10 lbs), center of gravity is at 5.55 inches (± 0.15 inches) from the primer end of the round and max allowable length is 11.416 inches (+ 0.00 inches or – 0.05 inches). The attached drawings are to be used for dimensioning of the dummy round, include the two bands on the projectile portion as shown in Drawing #’s 52001902014-10, 52001902014-13, and 52001902014-15.

4.0 Program Management: The Contractor shall plan, organize, coordinate, and control all task order activities to ensure compliance with contract requirements, and the timely delivery of the required services. The Contractor shall designate a Program Manager who will be the primary point of contact for interface with the Government for all issues regarding this task order.

5.0 Specific Tasks/Objectives:

The contractor shall provide:

1) Materials

2) Labor

3) Program Management oversight

4) Quality Assurance The RDIF shall provide:

1) AFLCMC/WISS PO functional involvement.

2) Program funding.

3) Documentation (see attached drawings).

6.0 Principal Place of Performance / Hours of Operation: Work in support of this task order shall be primarily performed at Building 148, WPAFB, OH and at various Temporary Duty (TDY) locations as directed. Normal work days are Monday through Friday, except United States (U.S.) Federal holidays. Workers normally work eight (8) hours per day, 40 hours per week, or as otherwise specified. Normal work hours are based on flex time. Flex time workers shall start no earlier than 0600 and no later than 0900. Core hours of work are from 0900 to 1500 daily. All employees are expected to be available during core hours.

7.0 Overtime: N/A

8.0 Security Requirements: N/A

9.0 Travel Requirements: N/A

10.0 Government Furnished Items: The Contractor will have access to and shall use the Government supplied facilities, supplies, and equipment required to accomplish the efforts described above (i.e., work space, test equipment, tools, machinery, office supplies, etc).

11.0 Required reports: N/A

12.0Period of Performance: 100 days after date of contract.
13.0Constraints: N/A
14.0Performance Standards: The following Performance Objectives, Thresholds, and Surveillance Methods specified in the Quality Assurance Surveillance Plan (QASP) of the basic contract apply to this task order.
Performance Objective
IDIQ PWS Paragraph
Performance Threshold
Surveillance Method
Program Management
5.4.12
Keep customer informed. Timely and accurate reporting.
100% Inspection
Sheet Metal Components and Assembly
5.2.5
Capability to perform these tasks IAW industry standards
100% Inspection
Quality assurance/In-process inspection/FAA certification
5.4.5
100% detection of poor workmanship
100% Inspection

15.0 Mission Essential Services: Contractor personnel performing this task order are not considered mission essential.

16.0 Schedule: Rounds are to be completed within 60 days of Contract Award.

17.0 Attachments:

17.1Drawing No. 52001902014-10
17.2Drawing No. 52001902014-13
17.3Drawing No. 52001902014-15