Attachment_6a_-_RDIF_Sample_Task_PWS.docx

DOCX document 38 KB Posted

Attached to
Rapid Development Integration Facility (RDIF) Support Federal contract opportunity
Solicitation number
FA8629-14-R-2408
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attachment 6A - RDIF Samplet Task Order PWS

View the file

Other files for this federal contract opportunity

Other files attached to Rapid Development Integration Facility (RDIF) Support, newest first.
File Type Posted
SF_33_Request_for_Proposal_Amendment_0002.pdf PDF
Summary_of_Changes_Amendment_0002.docx DOCX document
Attachment_7a_-_RDIF_Live_Task_PWS.docx DOCX document
Questions_and_Answers_as_of_28_Aug_14.xlsx XLSX spreadsheet
Questions_and_Answers_as_of_26_Aug_14.xlsx XLSX spreadsheet
Questions_and_Answers_as_of_18_Aug_14.xlsx XLSX spreadsheet
SF_33_Request_for_Proposal_Amendment_0001.pdf PDF
Attachment_6a_-_RDIF_Sample_Task_PWS.docx DOCX document
Attachment_10_-_Instructions_to_Offerors_RFP_Section_L_Amendment_0001.docx DOCX document
Summary_of_Changes_Amendment_0001.docx DOCX document
Attachment_6b_-_JCO_Certification_Requirement.docx DOCX document
Attachment_7d_-_Live_Task_Drawing_5201902014-15.PDF PDF
Attachment_7b_-_Live_Task_Drawing_52001902014-10.PDF PDF
Attachment_3_-_RDIF_Price_Matrix_v3.xlsx XLSX spreadsheet
RDIF_Labor_Category_Qualifications.xlsx XLSX spreadsheet
Attachment_11_-_Evaluation_Criteria_Section_M.docx DOCX document
Attachment_4_-_RDIF_Past_Performance_Information_Tool.docx DOCX document
ppi_tool.accdb —
Performance_Work_Statement_Dated_7_Jul_14.doc DOC document
Attachment_8_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_2_-_Service_Contract_Act_Wage_Determination.pdf PDF
Attachment_10_-_Instructions_to_Offerors_RFP_Section_L.docx DOCX document
Attachment_7a_-_RDIF_Live_Task_PWS.docx DOCX document
SF_33_Request_for_Proposal.pdf PDF
Attachment_7c_-_Live_Task_Drawing_52001902014-13.PDF PDF
RDIF_Equipment_List.xlsx XLSX spreadsheet
Attachment_5_-_RDIF_Past_Performance_Questionnaire.docx DOCX document
Attachment_9_-_DD254.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

***THIS IS A SAMPLE TASK. THE GOVERNMENT WILL NOT AWARD A PROJECT BASED UPON THIS TASK ORDER.*** Attachment 6(a) – RDIF Sample Task PWS

Performance Work Statement (PWS) Rapid Development Integration Facility (RDIF) HC/MC-130 Hose Reel Limit Switch

1.0 Description of Services: The Contractor shall provide the manpower and materials to fabricate 30 ACC HC/MC-130 Hose Reel Limit Switches. These individuals will perform to the standards and specifications contained in the Performance Work Statement referenced in section C of this request for proposal.

2.0 Background: The RDIF has been tasked by AFLCMC/WISN/E to build-to-print, thirty (30) ACC HC/MC-130 Hose Reel Limit Switches.

3.0 Scope:

3.1 The Contractor shall provide the manpower and the required materials to fabricate thirty (30) ACC HC/MC-130 Hose Reel Limit Switches as detailed in the government provided drawings.

4.0 Program Management: The Contractor shall plan, organize, coordinate, and control all task order activities to ensure compliance with contract requirements, and the timely delivery of the required services. The Contractor shall designate a Program Manager who will be the primary point of contact for interface with the Government for all issues regarding this task order.

5.0 Specific Tasks/Objectives:

The contractor shall:

1) Provide the manpower expertise and the required materials to fabricate and perform the QA function on 30 HC/MC-130 Hose Reel Response Limit Switches. The QA function will provide a certificate of conformance stating it was manufactured IAW the attached drawings (CDRL A020).

2) Accomplish the fabrication according to the attached drawings. There is one change required by the customer and reflected in red within the drawings:

a. The text on the box will be etched versus using decals.

6.0 Principal Place of Performance / Hours of Operation: Work in support of this task order will be performed at Building 148, WPAFB, OH and the contractor facility as required. Normal work days are Monday through Friday, except United States (U.S.) Federal holidays. Workers normally work eight (8) hours per day, 40 hours per week, or as otherwise specified in the PWS.

7.0Overtime: N/A
8.0Security Requirements: No security requirements.
9.0Travel Requirements: N/A

10.0 Government Furnished Facilities, Information, Supplies, and Services: The Contractor will have access to and shall use the Government supplied facilities, supplies, and equipment required to accomplish the efforts described above (i.e., work space, test equipment, tools, machinery, office supplies, etc). The Government shall provide the HC/MC-130 Hose Reel Response Limit Switches drawings (as attachment to the PWS).

11.0 Required reports: Certificate of Conformance (CDRL A020)

12.0 Period of Performance: N/A (Sample Task not to be awarded)

13.0 Constraints: N/A

14.0 Performance Standards: The following Performance Objectives, Thresholds, and Surveillance Methods specified in the Quality Assurance Surveillance Plan (QASP) apply to this task order.

Performance Objective

PWS

Paragraph

Performance Threshold

Surveillance Method

Program Management

5.4.12 Keep customer informed.

Timely and accurate reporting.

100% Inspection

Sheet Metal Components and Assembly

5.2.5 Capability to perform these tasks IAW industry standards

100% Inspection

Purchasing material support
5.4.1
> Orders placed on time.

> On time deliveries of ordered products.

100% Inspection

Integration (Mechanical and Electrical subsystems

5.4.2 Able to perform electrical subsystem integration

Quality Assurance

5.4.5 > 100% detection of poor workmanship

15.0 Mission Essential Service: Contractor personnel are not considered mission essential.

16.0 Schedule: N/A (Sample Task not to be awarded)

17.0Attachments:
17.1 Hose Reel Limit Switch Drawing Package (5 Drawings)