9._T-6A_ADS_B_Out_Base_Support_Agreement_Final_24_Jun_16.pdf

PDF 401 KB Posted

Attached to
JPATS ADS-B (Out) Program Solicitation Federal contract opportunity
Solicitation number
FA8617-16-R-6207
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This amended BSA supersedes any previous version(s) of the BSA.

View the file

Other files for this federal contract opportunity

Other files attached to JPATS ADS-B (Out) Program Solicitation, newest first.
File Type Posted
5._T-6A_ADS_B_Out_Pricing_Matrix_Final_with_ACE_edits_7_Jul_16.xlsx XLSX spreadsheet
4._T-6A_ADS_B_Out_Section_M_Final_1_Jul_16.docx DOCX document
3._T-6A_ADS_B_Out_Section_L_Final_1_Jul_16.doc DOC document
3._T-6A_ADS_B_Out_Section_L_Final_1_Jul_16.doc DOC document
4._T-6A_ADS_B_Out_Section_M_Final_1_Jul_16.docx DOCX document
Gov_Responses_to_Industry_RFP_Questions_5th_Batch_30_Jun_16.pdf PDF
4._T-6A_ADS_B_Out_Section_M_Final_24_Jun_16.pdf PDF
13._Exhibit_A_T-6A_ADS-B_Out_CDRL_Final_24_June_16.pdf PDF
11._T-6A_ADS-B_(Out)_RFP_Final_24_June_16.pdf PDF
1._T-6A_ADS_B_Out_SOW_Final_24_Jun_16.pdf PDF
3._T-6A_ADS_B_Out_Section_L_Final_24_Jun_16.pdf PDF
2._T-6A_ADS_B_Out_SRD_Final_24_June_16.pdf PDF
Gov_Responses_to_Industry_RFP_Questions_4th_Batch_24_Jun_16.pdf PDF
Gov_Responses_to_Industry_RFP_Questions_3rd_Batch_20_Jun_16.pdf PDF
Gov_Responses_to_Industry_RFP_Questions_2nd_Batch_17_Jun_16.pdf PDF
Gov_Responses_to_Industry_RFP_Questions_9_Jun_16.pdf PDF
12._T-6A_ADB_Out_Notional_Execution_Schedule.pdf PDF
14._T-6A_ADS-B_Certification_Basis_Final.pdf PDF
A._T-6A_ADS-B_Out_CDRL_Package_Final.pdf PDF
6._T-6A_ADS-B_Out_Program_WBS_Final.pdf PDF
11._DD_Form_1653.pdf PDF
13.__T-6A_ADSB_Out_Draft_TEMP.pdf PDF
9._T-6A_ADS_B_Out_Base_Support_Agreement_Final.pdf PDF
7._T-6A_ADS-B_Out_Program_WBS_Dictionary_Final.pdf PDF
1._T-6A_ADS_B_Out_SOW_Final.pdf PDF
3._T-6A_ADS_B_Out_Section_L.pdf PDF
2._T-6A_ADS_B_Out_SRD_Final.pdf PDF
8._SGFP_Data_Input_Spreadsheet_Final.pdf PDF
RFP__11_May_2016.pdf PDF
10._AFMC_Form_158.pdf PDF
15._QASP_T_6A_ADS-B_Out_24_Mar_16.pdf PDF
5._T-6A_ADS_B_Out_Pricing_Matrix_Final.xlsx XLSX spreadsheet
4._T-6A_ADS_B_Out_Section_M.pdf PDF
ppi_tool.accdb —
12._T-6A_ADB_Out_notional_execution_schedule_final.pdf PDF
T-6A_ADS_B_Out_RFP_Cover_Letter_Final.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE SUPPORT AGREEMENT

JOINT PRIMARY AIRCRAFT TRAINING

SYSTEM (JPATS) AUTOMATIC DEPENDENT

SURVEILLANCE – BROADCAST (ADS-B)

(OUT)

Solicitation # FA8617-16-R-6207

Air Force Life Cycle Management Center (AFLCMC), Mobility Directorate

Training Aircraft Division, JPATS Branch

Wright-Patterson Air Force Base

Ohio 45433-7148

24 June 2016

Table of Contents

JPATS ADS-B (OUT) BASE SUPPORT AGREEMENT

Government Support

1. Base Access

2. Fire Protection

3. Furnishings and Equipment

3.1. Maintenance of Facilities and Operation of Utilities

4. USG Facilities

4.1. Design & Development Phase

4.1.1. United States Air Force Base

JBSA-Randolph, TX:

4.2. Retrofit Phase

4.2.1. United States Air Force & Navy Bases

JBSA-Randolph, TX, Laughlin AFB, TX, Vance AFB, OK, Columbus AFB, MS, Sheppard

AFB, TX, NAS Pensacola, FL (CSO)

4.2.2. United States Navy Base

NAS Pensacola, FL (NFO)

5. USG Services

5.1. Aircraft Maintenance

5.2. Egress Shop

5.3. Inspection/DCMA/COR

FA8617-16-R-6207

Attachment 9, Base Support Agreement

JPATS ADS-B (OUT) BASE SUPPORT AGREEMENT

Base support will be provided by the US Government (USG) to the contractor in accordance with the provisions of this agreement. Failure by the contractor to comply with the provisions of this agreement will release the USG, without prejudice, from its obligation to provide base support by the date(s) required. If warranted, and if the contractor has complied with the provisions of this agreement, an equitable adjustment will be made if the USG fails to provide base support by the date(s) required.

Base support includes USG-controlled working space or other support (including use of the

Defense Switched Network [DSN]) which the USG determines can be made available at, or through, any USG installation where this contract will be performed.

Unless otherwise stipulated in the contract schedule, support will be provided on a no-charge-for-use basis and the value will be a part of the USG's contract consideration.

The contractor agrees to immediately report to the USG Contracting Officer (with a copy to the cognizant Administrative Contracting Officer) inadequacies, defective Government Furnished

Property (GFP), or non-availability of support stipulated by the contract schedule, and recommend a plan for obtaining the required support. The USG agrees to determine (within 10 workdays) the validity and extent of the involved requirement and the method by which it will be fulfilled (e.g., purchase, rental, lease, GFP, etc.). Facilities will not be purchased under this agreement. Additionally, the contractor (or authorized representative) will not purchase, or otherwise furnish any base support requirement provided by the agreement (or authorize others to do so), without prior written approval of the USG Contracting Officer regarding the price, terms, and conditions of the proposed purchase or approval of other arrangements.

Following are installations where base support will be provided: JBSA-Randolph, TX; Laughlin

AFB, TX; Vance AFB, OK; Columbus AFB, MS; Sheppard AFB, TX; Naval Air Station (NAS)

Pensacola (CSO), FL, and NAS Pensacola (NFO), FL.

Government Support

The USG support to be furnished under this contract is as follows:

1. Base Access

The contractor shall identify all members of the design and development team and each contractor field team when requested by the USG Contracting Officer. Team personnel information will be provided to the base security office. The host base will provide base access upon successful completion of the base security office processes and procedures.

2. Fire Protection

The host base will:

a. Provide and operate structural firefighting, equipment, and vehicles when required

b. Accomplish appropriate fire hazard inspections and fire preventative measures

c. Provide and maintain fire extinguishers at the facilities occupied by the contractor in accordance with local procedures

3. Furnishings and Equipment

The host base will provide USG GFP furnishings for use by Contractor personnel to perform duties under this contract. These furnishings include, by way of example:

a. Desk, table, and chairs

b. Work benches with accessories and stools as required

c. 1 each stand to access the cockpit per aircraft

d. 1 each ladder (NAS Pensacola, FL NFO only) per aircraft

e. Shop Air

f. Barfield 1811D 405 pitot static test set

3.1. Maintenance of Facilities and Operation of Utilities

a. The host base will provide access to trash containers (dumpster bulk-type or equivalent)

4. USG Facilities

The USG will provide the following secured facilities for contractor use:

4.1. Design & Development Phase

4.1.1. United States Air Force Base

JBSA-Randolph, TX:

a. Office space

b. Hangar space for one aircraft

4.2. Retrofit Phase

4.2.1. United States Air Force & Navy Bases

JBSA-Randolph, TX, Laughlin AFB, TX, Vance AFB, OK, Columbus AFB, MS, Sheppard AFB, TX, NAS Pensacola, FL (CSO)

a. Hangar space for two aircraft

4.2.2. United States Navy Base

NAS Pensacola, FL (NFO)

a. Hangar space for two aircraft

5. USG Services

The USG shall provide aircraft maintenance support for the ADS-B (Out) modification

5.1. Aircraft Maintenance

a. Prep aircraft for ADS-B (Out) modification

b. Return aircraft to flight airworthiness status after ADS-B (Out) modification is completed

c. During the development phase, to prepare the aircraft for modification, the

Government will:

1. Provide the contractor with a Mission Capable (MC) aircraft capable of receiving external electrical power.

2. Tow the aircraft to the designated hangar space, chock the aircraft, ground the aircraft, make it safe for maintenance, and open basic access panels to allow access to avionics systems.

3. Safe, remove, and stow the aircraft’s egress equipment (i.e. ejection seats).

4. Provide external power when requested.

5. When requested, remove aircraft panels/components/equipment identified by the contractor as needing removal for installation of the developmental kit.

d. During the development phase, after the aircraft modification is complete, the

Government will:

1. Reinstall those aircraft panels/components/equipment removed at the contractor’s request during development.

2. Perform a post-system checks to ensure the aircraft is mission capable. Note:

The contractor will be responsible for performing a post-systems check on the installed ADS-B (Out) system prior to the Government’s effort for the entire aircraft.

e. During the validation and verification of the retrofit kit, to prepare the aircraft for modification, the Government will:

1. Provide the contractor with a Mission Capable (MC) aircraft capable of receiving external electrical power.

2. Tow the aircraft to the designated hangar space, chock the aircraft, ground the aircraft, make it safe for maintenance, and open basic access panels to allow access to avionics systems.

3. Safe, remove, and stow the aircraft’s egress equipment (i.e. ejection seats).

4. While writing the draft Time Compliant Technical Order (TCTO)/Technical

Directive (TD), work with the contractor to define respective contractor and

Government actions needed to execute the kit installation. Responsibility for removal of aircraft panels/components/equipment will be addressed in the

TCTO/TD.

f. After the validation and verification of the aircraft retrofit kit, the Government will:

1. Reinstall those aircraft panels/components/equipment identified in the draft

TCTO/TD as the responsibility of the Government to reinstall.

2. Perform a post-system checks to ensure the aircraft is mission capable. Note:

The contractor will be responsible for performing a post-systems check on the installed ADS-B (Out) system prior to the Government’s effort for the entire aircraft.

g. During kit retrofit execution of the T-6A fleet, to prepare each aircraft for modification, the Government will:

1. Provide the contractor with a Mission Capable (MC) aircraft capable of receiving external electrical power.

2. Tow the aircraft to the designated hangar space, chock the aircraft, ground the aircraft, make it safe for maintenance, and open basic access panels to allow access to avionics systems.

3. Safe, remove, and stow the aircraft’s egress equipment (i.e. ejection seats).

4. Provide external power when requested.

5. Remove those aircraft panels/components/equipment designated as a

Government responsibility in the final approved TCTO/TD.

h. During kit retrofit execution of the T-6A fleet, after each aircraft is modified, the

Government will:

1. Reinstall those aircraft panels/components/equipment identified in the final approved TCTO/TD as the responsibility of the Government to reinstall.

2. Perform a post-system checks to ensure the aircraft is mission capable. Note:

The contractor will be responsible for performing a post-systems check on the installed ADS-B (Out) system prior to the Government’s effort for the entire aircraft.

5.2. Egress Shop

a. Remove/store/install egress equipment from aircraft as required to support aircraft for ADS-B (Out) modification

5.3. Inspection/Defense Contract Management Agency/Contracting Office Representative

a. Provide contract oversight

b. Preform final government aircraft acceptance upon completion of each ADS-B (Out) modification

The contractor shall not incur any cost resulting from nonsupport prior to Contracting Officer concurrence in accordance with this agreement.

This is a firm fixed price contract and the contractor agrees that, in the performance of this contract or any major subcontract, no direct or indirect costs for property or services will be incurred if the USG determines that property or service is available at or through any USG installation where this contract shall be performed. Only prior written approval of the USG

Contracting Officer can relieve the contractor from this restriction.