Truax Solicitation FA860423RB004 QAs 3-21-23.pdf

PDF 118 KB Posted

Attached to
FA8604, Storage Aids System, Truax Field, WI, MMHS Federal contract opportunity
Solicitation number
FA860423RB004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This solicitation requests proposals for a storage aids system at Truax Field in Wisconsin. The Air Force Materiel Command Lifecycle Management Center is seeking proposals for the design, fabrication, installation and testing of storage systems in Buildings 400, 409 and 510. Proposals are due by April 14th, 2023 and the contract completion is required within 210 days of award. Evaluation will be based on lowest price technically acceptable. The solicitation is fully set aside for small businesses with less than 500 employees. Offerors must be registered in SAM and proposals must be submitted electronically. Questions about the solicitation will be accepted until April 7th. The storage systems must be delivered to a central location at Building 510, which has loading docks, and then distributed between buildings using forklifts. Shelving must support a minimum of 400 pounds and pallet racks have an upright capacity requirement.

View the file

Other files for this federal contract opportunity

Other files attached to FA8604, Storage Aids System, Truax Field, WI, MMHS, newest first.
File Type Posted
Attch 11 NWS912-01 REV 1 0416.pdf PDF
Attch 3 APP B MODULAR CABINETS REV 1 0416.pdf PDF
Solicitation Amendment FA860423RB0040002 SF 30.pdf PDF
Truax Question Set 3.docx DOCX document
Truax Question set 2.docx DOCX document
APP A - PALLET RACK REV 1 0321.pdf PDF
Attch 2 APP A - PALLET RACK - REV 1 0321.pdf PDF
Solicitation Amendment FA860423RB0040001 SF 30.pdf PDF
Attch 9 APP H -STORAGE AIDS - REV 1 0321.pdf PDF
Attch 20 Map.pdf PDF
MAP.pdf PDF
APP A - PALLET RACK - REV 1 0321.pdf PDF
APP H -STORAGE AIDS - REV 1 0321.pdf PDF
Attch 19 Notification of Compliance with Contract Insurance Requirements.pdf PDF
Attch 3 APP B MODULAR CABINETS 0215.pdf PDF
Attch 5 APP D BIN SHELVING 0215.pdf PDF
Attch 1 Cover PD 0215.pdf PDF
Attch 10 APP I AIRCRAFT PANEL RACKS 0215.pdf PDF
Attch 18 Checklist Summary Pricing Sheet.pdf PDF
Attch 17 Addendums.pdf PDF
Attch 13 NWS91203 0215.pdf PDF
Attch 2 APP A PALLET RACK 0215.pdf PDF
Attch 9 APP H STORAGE AIDS 0215.pdf PDF
Attch 4 APP C MOBILE AISLE 0215.pdf PDF
Attch 16 Acknowledgment of Compliance.pdf PDF
Attch 7 APP F Tire Carousel 0215.pdf PDF
Attch 6 APP E STOCK ASSIST VEHICLE 0215.pdf PDF
Solicitation - FA860423RB004.pdf PDF
Attch 11 NWS91201 0215.pdf PDF
Attch 12 NWS91202 0215.pdf PDF
Attch 8 APP G CANTILEVER RACK 0215.pdf PDF
Attch 14 CONTRACTOR INFORMATION 0215.pdf PDF
Attch 15 ODS Certification 0215.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604‐23‐R‐B004

Truax Field, Wisconsin Questions/Answers Set 1 21 March 2023

Questions/Responses:

1. This is a sizable project across 3 different buildings. Is it possible to deliver to a central location and move material with a forklift between the buildings?

A. Yes. B510 is equipped with loading docks. See relative distance between each building on provided map.

2. Do you have a map you could provide to show how far apart they are?

A. Map provided.

3. Does each/any of the buildings have a dock for delivery of the LTL items that won’t come on a flat bed or will a ground drop or unloading from the back with a forklift be required?

A. B510 is equipped with docks.

4. There is no demo mentioned in this solicitation. If the material is going into a working warehouse will the area be free and clear prior to arrival to begin installation?

A. All Buildings are going through renovations/new additions and empty when beneficial occupancy is granted and equipment can be installed.

5. Appendix H – 3.5.1 Security Wire Shelving – Is there a capacity required for the shelves?

A. Shelves shall be minimum 400 pound capacity. Appendix H has been revised to update the Wire Mesh Security Unit requirements.

6. TPQ – Pallet Rack – Could you please clarify? 3.2.1 has shelf beam capacity listed as well as per bay capacity listed. Is the per bay capacity the total capacity of all the shelves between 2 uprights?

A. The question in the TPQ should read minimum UPRIGHT capacity. TPQ has been revised.

File details come from the government source that posted it. Updated .