This solicitation requests proposals for a storage aids system at Truax Field in Wisconsin. The Air Force Materiel Command Lifecycle Management Center is seeking proposals for the design, fabrication, installation and testing of storage systems in Buildings 400, 409 and 510. Proposals are due by April 14th, 2023 and the contract completion is required within 210 days of award. Evaluation will be based on lowest price technically acceptable. The solicitation is fully set aside for small businesses with less than 500 employees. Offerors must be registered in SAM and proposals must be submitted electronically. Questions about the solicitation will be accepted until April 7th. The storage systems must be delivered to a central location at Building 510, which has loading docks, and then distributed between buildings using forklifts. Shelving must support a minimum of 400 pounds and pallet racks have an upright capacity requirement.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604‐23‐R‐B004
Truax Field, Wisconsin Questions/Answers Set 1 21 March 2023
Questions/Responses:
1. This is a sizable project across 3 different buildings. Is it possible to deliver to a central location and move material with a forklift between the buildings?
A. Yes. B510 is equipped with loading docks. See relative distance between each building on provided map.
2. Do you have a map you could provide to show how far apart they are?
A. Map provided.
3. Does each/any of the buildings have a dock for delivery of the LTL items that won’t come on a flat bed or will a ground drop or unloading from the back with a forklift be required?
A. B510 is equipped with docks.
4. There is no demo mentioned in this solicitation. If the material is going into a working warehouse will the area be free and clear prior to arrival to begin installation?
A. All Buildings are going through renovations/new additions and empty when beneficial occupancy is granted and equipment can be installed.
5. Appendix H – 3.5.1 Security Wire Shelving – Is there a capacity required for the shelves?
A. Shelves shall be minimum 400 pound capacity. Appendix H has been revised to update the Wire Mesh Security Unit requirements.
6. TPQ – Pallet Rack – Could you please clarify? 3.2.1 has shelf beam capacity listed as well as per bay capacity listed. Is the per bay capacity the total capacity of all the shelves between 2 uprights?
A. The question in the TPQ should read minimum UPRIGHT capacity. TPQ has been revised.