This request for proposal solicits offers for a storage aids system at Truax Field in Wisconsin. The Air Force Materiel Command Lifecycle Management Center is seeking proposals for the design, fabrication, installation and testing of storage racks and partitions for aircraft parts in three buildings on base. Offerors must provide two panel parts racks along with a relocatable partition as specified in Appendix I. Proposals are due by April 14th, 2023 and will be evaluated based on lowest price technically acceptable. The contract is set aside for small businesses with a NAICS code of 333922 and size standard of 500 employees. The solicitation includes 13 line items and work must be completed within 210 days of award.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX I
FOR
AIRCRAFT PANEL PARTS RACKS
AT
TRUAX FIELD, WISCONSIN
BUILDING 400
CSN: NWS912
DATE: 15 FEBRUARY 2023
PREPARED BY:
_Andrew J Huser_
ANDREW J HUSER
PROJECT ENGINEER
AFLCMC/EZPAE
_Brad Thompson___
BRAD THOMPSON
REVIEWER
AFLCMC/EZPAE
CSN: NWS912 Attachment 10 1
THIS PAGE LEFT BLANK INTENTIONALLY
CSN: NWS912 Attachment 10 2
TRUAX FIELD – APP I - Page i
TABLE OF CONTENTS
1. SCOPE
2. REQUIREMENTS
2.1. SYSTEM DEFINITION
2.2. CHARACTERISTICS
2.2.1. RACK DIMENSIONS
2.2.2. PANEL PARTS RACK DESIGN
3. QUALITY ASSURANCE PROVISIONS
3.1. INSPECTIONS
3.2. TEST
CSN: NWS912 Attachment 10 3
TRUAX FIELD – APP I - Page 1
1. SCOPE
This appendix establishes the minimum performance, design, fabrication, delivery, and assembly for two (2) Aircraft Panel
Parts Racks, for Building 400, at Truax Field Wisconsin. The work shall be completed in accordance with this appendix, the Cover
Purchase Description (PD), and Figure 1 of this PD. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.
2. REQUIREMENTS
2.1. SYSTEM DEFINITION
The two (2) aircraft panel parts rack shall be used to store and stage aircraft parts and components while awaiting assembly back onto the aircraft. The aircraft panel parts racks shall be Spika
Mfg. (www.spikamfg.com), SWM-Cowling Rack CWL62X120X86, or
Government approved equivalent. The aircraft panel parts racks shall provide safe separation of parts and be equipped with casters for movement within the maintenance hangar bay.
2.2. CHARACTERISTICS
2.2.1. RACK DIMENSIONS
Racks shall be nominal 120” long x 62” deep x 86” high.
2.2.2. PANEL PARTS RACK DESIGN
The aircraft panel parts racks shall be constructed of lightweight, corrosion resistant aluminum or powder coated steel. Plywood shelves shall be ¾” thick and covered in carpet or equivalent to protect the parts placed on and removed from the storage levels.
Each shelf shall have a minimum capacity of 225 pounds. Upright framing members shall also be protected by carpet, foam or equivalent to protect the parts. A relocatable partition shall be provided in a bay as shown in Figure 1. The panel parts racks shall be equipped with casters for smooth movement within the maintenance hangar. All four casters shall swivel and be provided with an anti-movement lock.
CSN: NWS912 Attachment 10 4
TRUAX FIELD – APP I - Page 2
120"
86"
62"
RELOCATABLE PARTITION
CASTERS
FIGURE 1
CSN: NWS912 Attachment 10 5
TRUAX FIELD – APP I - Page 3
3. QUALITY ASSURANCE PROVISIONS
3.1. INSPECTIONS
The system shall be inspected to verify that it meets all the requirements of sections 1 and 2 of this Purchase Description.
These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.
3.2. TEST
The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.
No. Description
1. A variety of parts shall be placed onto and removed from the panel parts racks. If the parts are susceptible to damage, the racks shall fail the test.
Shelf shall be loaded with a 225 pound object to test capability and measure any deflection.
2. Capabilities of the relocatable divider shall be demonstrated and locked into place in a minimum of three locations within the bay.
3 The panel parts racks shall be loaded and moved to test ease and ability of the casters. If the panel parts racks do not move freely in all direction, the racks shall fail the test.
CSN: NWS912 Attachment 10 6
TECHNICAL PROPOSAL QUESTIONNAIRE
FOR
TRUAX FIELD – APP I - TPQ Page 1 of 2
AIRCRAFT PANEL PARTS RACKS
Solicitation Number:
FA8604-
-R-
Project Title: Storage Aids System
Base: Truax Field WI CSN: NWS912
Appendix I, Aircraft Panel Parts Rack, 15 FEBRUARY 2023
This questionnaire shall be completed by the Offeror. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment. Please attach product literature/cut sheets for all equipment detailed in this questionnaire and attach any exceptions to the Purchase Description Appendix.
Characteristics
Number of Aircraft panel parts racks provided: _____
Manufacturer: _____________________
Panel Parts Rack Construction: _____________________
Panel Parts Rack dimensions:
Width: _________ inches
Depth: _________ inches
Height: _________ inches
Number of levels: __________
Total Number of shelves per unit: _________________
Is relocatable divider provided? YES NO
Are casters provided as specified? YES NO
What protective material is provided on Plywood?
CSN: NWS912 Attachment 10 7
Solicitation Number: FA8604- -R-
TRUAX FIELD – APP I - TPQ Page 2 of 2
EXCEPTIONS
Please outline each exception taken to the Purchase
Description Appendix in detail. All exceptions will be reviewed to determine acceptability.
Are exceptions taken? YES NO
EXCEPTIONS: