Truax Question set 2.docx
DOCX document 13 KB Posted
- Attached to
- FA8604, Storage Aids System, Truax Field, WI, MMHS Federal contract opportunity
- Solicitation number
- FA860423RB004
About this file
This solicitation requests proposals for a storage aids system at Truax Field in Wisconsin. The Air Force Materiel Command Lifecycle Management Center is seeking the design, fabrication, installation, and testing of storage aids for three buildings including 10K/463L forklifts and pallet jacks. Proposals are due by April 14, 2023 with an evaluation based on lowest price technically acceptable. The contractor must be registered in SAM and able to complete the project within 210 days of award. The NAICS code is 333922 and it is 100% set aside for small businesses with a size standard of 500 employees.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604-22-R-B004
Truax Field Question Set #2 10 April 23
1. Are the three buildings referenced under construction and if so will construction be completed so that Delivery Requirements can be met?
Bldg. 506 is under renovation and getting a new addition. Scheduled BOD is Nov 23 timeframe.
Bldg. 400 is under renovation and scheduled completion is Nov 23 timeframe Bldg. 409 is getting renovations but will not impact areas of installation.
2. Solicitation, Appendix A indicates there is an updated 3.21.2023 revision but when we open the 3.21.2023 document it appears to be the same as the original document. Please advise?
There was an error in the TPQ. The TPQ should read minimum upright capacity. TPQ has been revised. Revised Appendix A is attached.
3. In our market research, the 10K/463L fork truck has a delivery lead time of 48-52 weeks ARO. This is consistent with industry lead times we saw at the recent Promat trade show in Chicago after visiting several manufacturers. Solicitation requires 150 day delivery. Please advise.
We are aware of the potential lead time for the 463L Pallet Jack. Please identify in proposed schedule. If required, CLIN for 463L Pallet Jack will be revised accordingly.