Section_J_Listing.docx

DOCX document 26 KB Posted

Attached to
Afghan Air Force (AAF) C-130H Contractor Logistics Services (CLS)
Solicitation number
FA8553-13-R-32288
Issued by

About this file

Section J list of Attachments

View the file

Other files

File Type Posted
Afghan_CLS_Questions_Answers_18_Aug_14.docx DOCX document
Attachment_7--Relevancy_Table_Rev_1.docx DOCX document
Section_J_Listing.docx DOCX document
Attachment_14--Site_Survey.docx DOCX document
PWS__1Jun_2014_Rev_2.docx DOCX document
CDRL_A003_-_Conference_Agenda.pdf PDF
CDRL_A004_-_Conference_Minutes.pdf PDF
Section_M_Final_6_Aug_14.docx DOCX document
CDRL_A006_-_Technical_Report-Study_Services.pdf PDF
Attachment_12--Consent_Form.docx DOCX document
Attachment_5--Transportation_DD_Form_1653.pdf PDF
Attachment_10--Client_Authorization_Letter.docx DOCX document
FA855313R32288______0005.pdf PDF
CDRL_A011_-_Enviro_Health_and_Safety_Plan_(HSP).pdf PDF
Attachment_3--Labor_Rates_Matrix.xlsx XLSX spreadsheet
Section_L__Final_10_Jul_14.docx DOCX document
Attachment_8--Past_Performance_Questionnaire.doc DOC document
CDRL_A008_-_Corrosion_Prevention_and_Control_Plan.pdf PDF
Attachment_13--Sample_Tasks.doc DOC document
Attachment_9--Cross_Reference_Matrix.docx DOCX document
CDRL_A002_-_Quality_Control_Plan.pdf PDF
Attachment_4--Electronic_Format_for_all_Proposal_Volumes.docx DOCX document
Attachment_15--PPI_Instructions_to_Offerors.docx DOCX document
CDRL_A005_-_Contractor_Stand_Operating_Procedures.pdf PDF
Attachment_6--Appendix_C.docx DOCX document
Attachment_11--Transmittal_Letter.docx DOCX document
Attachment_18_Contracting_with_APPF.pdf PDF
FD2060-13-32288_QASP_2_July_2014.pdf PDF
CDRL_A001_-_Monthly_Status_Report_(MSR).pdf PDF
Afghan_CLS_Questions_Answers_8_Aug_14.docx DOCX document
Section_M_Final_11_Jul_14.docx DOCX document
Section_L__Final_10_Jul_14.docx DOCX document
CDRL_A002_-_Quality_Control_Plan.pdf PDF
Attachment_10--Client_Authorization_Letter.docx DOCX document
Attachment_18_Contracting_with_APPF.pdf PDF
Attachment_7--Relevancy_Table_Rev_1.docx DOCX document
Attachment_11--Transmittal_Letter.docx DOCX document
Attachment_8--Past_Performance_Questionnaire.doc DOC document
Attachment_1_PWS__1Jun_2014_Rev_1.docx DOCX document
Attachment_6--Appendix_C.docx DOCX document
CDRL_A003_-_Conference_Agenda.pdf PDF
Attachment_14--Site_Survey.docx DOCX document
CDRL_A011_-_Enviro_Health_and_Safety_Plan_(HSP).pdf PDF
Attachment_12--Consent_Form.docx DOCX document
Attachment_17_QASP_2_July_2014.pdf PDF
Attachment_15--PPI_Instructions_to_Offerors.docx DOCX document
Attachment_13--Sample_Tasks_Drafts_4-17-14.doc DOC document
CDRL_A006_-_Technical_Report-Study_Services.pdf PDF
CDRL_A008_-_Corrosion_Prevention_and_Control_Plan.pdf PDF
Attachment_9--Cross_Reference_Matrix_Draft.docx DOCX document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

LIST OF ATTACHMENTS

Form Number
Description/File Name
Date
Number of Pages
Attachment 1--PWS
1 JUN 2014
49
DD FORM 1423
1423 Attachment 2:

CDRLS and DIDs

CDRL A001--Status Report, 10 Jun 14, 3 Pages; 1 CDRL A002--Quality Assurance Program Plan, 10 Jun 14, Pages;2

CDRL

A003--Conference Agenda, 10 Jun 14, Pages; 2 CDRL A004--Conference Minutes, 10 Jun 14, Pages;1 CDRL A005--Contractor's Standard Operating Procedures, 10 Jun 14, Pages;1 CDRL A006--Technical Report-Study/Services, 10 Jun 14, Pages;1 CDRL A007—Reserved CDRL A008--Corrosion Prevention and Control Plan, 10 Jun 14, Pages;1 CDRL A009—Reserved;

CDRL A010—Reserved;

CDRL A011-Environmental Health and Safety Plan, 10 Jun 14, Pages;1

Attachment 3--Labor Rates Matrix Excel Spreadsheet, 2 Tabs

NA

Attachment 4--Electronic Format for all Proposal Volumes

Attachment 5--Transportation DD Form 1653
02JUL2013
3
Attachment 6--Appendix C
01NOV2013
15

Attachment 7--Relevancy Table

Attachment 8--Past Performance Questionnaire

Attachment 9--Cross Reference Matrix

Attachment 10--Client Authorization Letter

Attachment 11--Transmittal Letter

Attachment 12--Consent Form

Attachment 13--Sample Tasks

Attachment 14--Site Survey

Attachment 15--PPI Instructions to Offerors

Attachment 16--PPI Tool Access Database File

Attachment 17--QASP
02DEC2013/Revised 9 June 2014
17

Attachment 18- Contracting with APPF

File details come from the government source that posted it. Updated .