Attachment_7--Relevancy_Table_Rev_1.docx

DOCX document 30 KB Posted

Attached to
Afghan Air Force (AAF) C-130H Contractor Logistics Services (CLS)
Solicitation number
FA8553-13-R-32288
Issued by

About this file

Attachment 7 Relevancy Table

View the file

Other files

File Type Posted
Afghan_CLS_Questions_Answers_18_Aug_14.docx DOCX document
Attachment_7--Relevancy_Table_Rev_1.docx DOCX document
Section_J_Listing.docx DOCX document
Attachment_14--Site_Survey.docx DOCX document
PWS__1Jun_2014_Rev_2.docx DOCX document
CDRL_A003_-_Conference_Agenda.pdf PDF
CDRL_A004_-_Conference_Minutes.pdf PDF
Section_M_Final_6_Aug_14.docx DOCX document
CDRL_A006_-_Technical_Report-Study_Services.pdf PDF
Attachment_12--Consent_Form.docx DOCX document
Attachment_5--Transportation_DD_Form_1653.pdf PDF
Attachment_10--Client_Authorization_Letter.docx DOCX document
FA855313R32288______0005.pdf PDF
CDRL_A011_-_Enviro_Health_and_Safety_Plan_(HSP).pdf PDF
Attachment_3--Labor_Rates_Matrix.xlsx XLSX spreadsheet
Section_L__Final_10_Jul_14.docx DOCX document
Attachment_8--Past_Performance_Questionnaire.doc DOC document
CDRL_A008_-_Corrosion_Prevention_and_Control_Plan.pdf PDF
Attachment_13--Sample_Tasks.doc DOC document
Attachment_9--Cross_Reference_Matrix.docx DOCX document
CDRL_A002_-_Quality_Control_Plan.pdf PDF
Attachment_4--Electronic_Format_for_all_Proposal_Volumes.docx DOCX document
Attachment_15--PPI_Instructions_to_Offerors.docx DOCX document
CDRL_A005_-_Contractor_Stand_Operating_Procedures.pdf PDF
Attachment_6--Appendix_C.docx DOCX document
Attachment_11--Transmittal_Letter.docx DOCX document
Attachment_18_Contracting_with_APPF.pdf PDF
FD2060-13-32288_QASP_2_July_2014.pdf PDF
CDRL_A001_-_Monthly_Status_Report_(MSR).pdf PDF
Afghan_CLS_Questions_Answers_8_Aug_14.docx DOCX document
Section_M_Final_11_Jul_14.docx DOCX document
Section_L__Final_10_Jul_14.docx DOCX document
CDRL_A002_-_Quality_Control_Plan.pdf PDF
Attachment_10--Client_Authorization_Letter.docx DOCX document
Section_J_Listing.docx DOCX document
Attachment_18_Contracting_with_APPF.pdf PDF
Attachment_11--Transmittal_Letter.docx DOCX document
Attachment_8--Past_Performance_Questionnaire.doc DOC document
Attachment_1_PWS__1Jun_2014_Rev_1.docx DOCX document
Attachment_6--Appendix_C.docx DOCX document
CDRL_A003_-_Conference_Agenda.pdf PDF
Attachment_14--Site_Survey.docx DOCX document
CDRL_A011_-_Enviro_Health_and_Safety_Plan_(HSP).pdf PDF
Attachment_12--Consent_Form.docx DOCX document
Attachment_17_QASP_2_July_2014.pdf PDF
Attachment_15--PPI_Instructions_to_Offerors.docx DOCX document
Attachment_13--Sample_Tasks_Drafts_4-17-14.doc DOC document
CDRL_A006_-_Technical_Report-Study_Services.pdf PDF
CDRL_A008_-_Corrosion_Prevention_and_Control_Plan.pdf PDF
Attachment_9--Cross_Reference_Matrix_Draft.docx DOCX document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

RFP FA8553-13-R-32288

ATTACHMENT 7

Relevancy Table

Present/Past Performance “Relevancy Table” (TO BE COMPLETED BY OFFEROR, JOINT VENTURE MEMBER, AND IF APPLICABLE, CRITICAL SUBCONTRACTOR)

In addition to the information provided in the PPI tool, each offeror/joint venture member/critical subcontractor shall complete a separate Relevancy Table (RFP Attachment 7) for each effort/contract identified in the PPI tool for evaluation. See Clause L-900 of this RFP for detailed instructions and limits on number and recency of contracts.

A. OFFEROR:

(1) Name (Company/Division)

(2) Address

(3) CAGE Code

(Complete with each effort submitted for evaluation)

This table will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirement Afghan Air Force C-130H Contractor Logistics Services. Offeror/joint venture member/critical subcontractor, if applicable, shall only complete column three. Offeror’s/joint venture member’s/critical subcontractor’s answers are applicable only to the effort identified in the PPI Tool, not the offeror’s/joint venture member’s/critical subcontractor’s proposed solutions to the instant effort. If additional space is needed, please attach a separate sheet to your response (limited to two pages). Please be as specific as possible with the fill-in information provided.

This table should be tailored in such a manner that it will be easy for the performance evaluation team to make a relevancy determination based on the established relevancy definitions for a program.

Category
Fill-in for the Proposed Effort (GOVT has completed this column)

(DO NOT CHANGE)

Fill-in for the Effort Identified in PPI Tool

(Offeror/Joint Venture Member/Critical Subcontractor completes)

1. Nature of Business Area(s) Involved

Total C-130 system performance responsibility; CLS services to include operations support, maintenance, logistics, MIS, engineering services

2. Required Levels of Technology
State of the Art, COTS, Modified component
3. Materials and Production Processes
Procedures and processes modeled after AFI 21-101 and AFMAN 23-110
4. Performance Location
DoD designated AOR
5. Contract Type(s)
FFP, CRNF, LH
6. Quantities produced, # repaired or other quantitative data
50% of aircraft fleet FMC per day
7. Program Similarity
CLS for airlift aircraft
8. Program Phase
Sustainment
9. Extent of subcontractor involvement
≥ 30% Operations Services, Maintenance, Logistics, MIS, Engineering Services

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .