C5AircraftStaircaseSOW_Aug2012.pdf

PDF 12 KB Posted

Attached to
Standard Staircase Trucks and C-5 Staircase Trucks
Solicitation number
FA8533-12-R-31169
Issued by

About this file

SOW C-5 Truck

View the file

Other files

File Type Posted
Q As_feb12013.pdf PDF
Q As_jan152013.pdf PDF
Q As_jan42013.pdf PDF
FA853312R31169______0004.pdf PDF
158revised-1.pdf PDF
FA853312R31169______0003.pdf PDF
StandardCDRLRequestforDeviationC002.pdf PDF
Q As_dec192012.pdf PDF
IUIDStandard.pdf PDF
Attachment2PastPresentPerformanceQuestionnaire.pdf PDF
Attachment5ConsentForm.pdf PDF
C5CDRLTestProcedureD001.pdf PDF
C5CID.pdf PDF
EDLC5.pdf PDF
DD1653.pdf PDF
SpecialPackagingInstructions.pdf PDF
CIDAmend1Standard.pdf PDF
C5CDRLTechReportServiceBullentinD003.pdf PDF
StandardCDRLTestInspectionReportA002.pdf PDF
C5CDRLTestInspectionReportD002.pdf PDF
C5CDRLTechReportWeldingD004.pdf PDF
CIDAA59888StandardTruckAmend2.pdf PDF
StandardCDRLTechReportServiceBullentinA003.pdf PDF
C5CDRLRequestforDeviationF002.pdf PDF
TMCRC5.pdf PDF
Q As_dec42012.pdf PDF
TMCRStandard.pdf PDF
C5CDRLECPF001.pdf PDF
Attachment1FACTSSheet.pdf PDF
158revised.pdf PDF
CDRLTMCRStandardB001.pdf PDF
CIDAA59889C5TruckAmend2.pdf PDF
StandardCDRLTechReportWeldingA004.pdf PDF
FA853312R31169superseding.pdf PDF
IUIDC5.pdf PDF
StandardCDRLTestProcedureA001.pdf PDF
CIDStandard.pdf PDF
PackagingInstructions_revised.pdf PDF
EDLStandard.pdf PDF
CIDAmend1C5.pdf PDF
FA853312R31169______0002.pdf PDF
CDRLTMCRC5E001.pdf PDF
GeneralEngineeringNotes.pdf PDF
Attachment4ClientAuthorizationLetter.pdf PDF
StandardCDRLECPC001.pdf PDF
Attachment3TransmittalLetter.pdf PDF
FA853312R31169______0001.pdf PDF
CIDA-A-59888Amend1.pdf PDF
Attachment4 —
C5AircraftStaircaseSOW_Aug2012.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

1 August 2012

Statement of Work (SOW) for

Staircase, Aircraft Boarding, C-5, Truck

Prepared by

SUPPORT EQUIPMENT AND VEHICLE ENGINEERING DIVISION

235 BYRON ST STE 19A

ROBINS AFB GA 31098-1813

DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.

THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

1.Scope.

This document defines the tasks associated with the procurement of C-5 Aircraft Staircase as described by Commercial Item Description (CID) A-A-59889 and is to be used in conjunction with A-A-59889.

2. APPLICABLE DOCUMENTS

The following documents are applicable to the SOW to the extent specified herein.

2.1 Government documents.

2.1.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks of the exact revision listed below form a part of this SOW to the extent specified herein.

DATA ITEM DESCRIPTIONS (DIDs)

DI-MISC-80508B Technical Report/Study Services

DI-NDTI-80809B Test/Inspection Report

(Unless otherwise indicated, copies of the above specifications, standards, and handbooks are available from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia PA 19111-5094.)

2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 Pre-production test.

3.1.1 Pre-production test procedures. The contractor shall develop detailed pre-production test procedures, which shall address all requirements identified in CID and this SOW. The test procedures shall include data record sheets, charts, graphs, identification of test instruments by manufacturer, model number, and serial number. The test procedures shall address modeling and simulation (M&S); if M&S is not applicable, the test procedures shall be so noted.

(DI-NDTI-80603, Test Procedure)

3.1.2 Pre-production testing. After Government approval of the pre-production test procedures, the contractor shall schedule the testing to be conducted. If shipping is required to move the item(s) to and from a test site away from the contractor’s facility, the contractor shall be responsible for all costs associated with the shipment. The contractor shall notify the Government of the date, time, and location of pre-production testing 30 days prior to the start of testing. The test will be witnessed by one or more Government representatives.

3.1.3 Compatibility testing. During the pre-production test, a test item shall be shipped to Travis AFB or Dover AFB (whichever is more geographically preferable to the manufacturer) for compatibility testing in accordance with 4.2.1 of the CID. Air Force personnel will perform the test; contractor personnel shall witness the test, provide maintenance, and advise the Air Force personnel. At the conclusion of the compatibility test, the test item shall be shipped to the contractor’s facility. The contractor shall be responsible for all costs associated with shipping the item to the compatibility test location and returning it to the contractor’s facility.

3.1.4 Pre-production test report. The contractor shall submit a pre-production test report upon completion of the pre-production test. The test report shall document all testing performed, including results of any unsuccessful test attempts. Failure reports generated as a result of the FRACAS process (see 4.5.4 of A-A-59889) shall be included with results of unsuccessful test attempts. (DI-NDTI-80809, Test/Inspection Report)

3.1.5 Restoration. After completion of pre-production and compatibility acceptance, the pre-production C-5 Aircraft Staircase shall be shipped, within 30 days, to the contractor’s facility for restoration; if necessary. The contractor shall be responsible for any repairs that may be necessary to restore the C-5 Staircase Truck to a serviceable, “like new” condition while retaining configuration integrity. The contractor shall be responsible for all costs associated with shipping of the pre-production C-5 Staircase Truck to the contractor's facility for restoration.

3.2 Disposition. The pre-production C-5 Aircraft Staircase shall be shipped to the location specified in the contract.