Amendment_07.pdf
PDF 63 KB Posted
- Attached to
- Municipal Solid Waste Collection and Disposal Federal contract opportunity
- Solicitation number
- FA8501-15-R-0011
About this file
Amend 07
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3Q2AD5083A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
To incorporate changes in the PWS, Bid Sheet, and Schedule B to ensure all information is consistent. The Bid Spreadsheet w ill roll up to form the Schedule B. Proposals are hereby due Friday, 9 October 2015 by 3pm EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8501-15-R-0011
X 9B. DATED (SEE ITEM 11)
09-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2015
CODE
AFSC/PZIOC
INFRASTRUCTURE SUPPORT
375 PERRY STREET
BLDG 255
ROBINS AFB GA 31098-1672
FA8501 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8501-15-R-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2015 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 17 April 2015.This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0017) to Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 February 2016 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 27 August 2015.This CLIN is not separately priced;
the requirement of this CLIN applies to all subsequent CLINS (0002-0017).
CLIN 0002
The CLIN extended description has changed from Municipal Solid Waste and Food Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1, 1.1.1.2. and 1.1.1.5. to Municipal Solid Waste and Food Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.1..
CLIN 0003
The CLIN extended description has changed from Recyclable Cardboard Collection and Transportation in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.3. to Recyclable Cardboard Collection and Transportation in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.1.3..
CLIN 0005
The CLIN description has changed from Organic Waste Collection to RESERVED.
The CLIN extended description has changed from Yard and Wood (Organic) Waste collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.4. to .
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
The unit of issue Months has been deleted.
CLIN 0009
The CLIN description has changed from RESERVED to OPERATE COMPOSTING
FACILITY.
The CLIN extended description Operate composting facility in accordance with Performance Work Statement, dated 27 August 2015, paragraph 1.2. has been added.
The pricing detail quantity 12.00 has been added.
The unit of issue Months has been added.
CLIN 0010
The CLIN extended description has changed from Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.1. The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals. Provide the unit price for the following items:
30 CY compactors 12 EA $ 8 CY cardboard/waste 24 EA $ to Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.1.
The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals..
The pricing detail quantity 1.00 has been added.
The unit of issue Lot has been added.
CLIN 0011
The CLIN description has changed from Construction & Demolition Debris Pick-up to
RESERVED.
The CLIN extended description Construction and Demolition Debris Pick-up in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.2.
has been deleted.
CLIN 0012
The CLIN extended description has changed from Common Use Trash Receptacle Collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.3. to Common Use Trash Receptacle Collection in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.3..
CLIN 0013
The CLIN extended description has changed from Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.4. to Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.5..
The pricing detail quantity has decreased by 63.00 from 75.00 to 12.00.
The unit of issue has changed from Each to Months.
CLIN 0015
The CLIN extended description has changed from Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and 1.5.Note:
The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer. to Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.5.Note: The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer..
The pricing detail quantity has decreased by 5,741.00 from 5,742.00 to 1.00.
The unit of issue has changed from Actual Tons to Lot.
CLIN 0016
The CLIN extended description has changed from Contractor Transition in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraphs 4.11 – 4.11.8. This CLIN will be Not Separately Priced (NSP). to Contractor Transition in accordance with Performance Work Statement (PWS), dated 27 August 2015. This CLIN will be Not Separately Priced (NSP). .
CLIN 0017
The CLIN extended description has changed from Contract Data in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1, 1.3.1.,1.5., 4.1.,
4.10.1. and the DD form 1423, Contract Data Requirements List, attached hereto. to Contract Data in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AA
The CLIN extended description has changed from Vehicle Routes and Collection Schedule in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1. and the DD Form 1423, Contract Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AB
The CLIN extended description has changed from Disposal Facility Operating Permits in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.3.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Disposal Facility Operating Permits in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AC
The CLIN extended description has changed from Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AD
The CLIN extended description has changed from Quality Control Plan in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Quality Control Plan in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AE
The CLIN extended description has changed from Safety and Health Plan in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.10.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Safety and Health Plan in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
SUBCLIN 0017AF
Schedule in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1. and the DD Form 1423, Contract Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
CLIN 1001
equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2015 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 17 April 2015.This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0017) to Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2016 – 30 September 2017 in accordance with the
CLIN 1002
Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1, 1.1.1.2. and 1.1.1.5. to Municipal Solid Waste and Food Waste
CLIN 1003
and Transportation in accordance with Performance Work Statement (PWS), dated 17 April
CLIN 1005
The CLIN extended description has changed from Yard and Wood (Organic) Waste
CLIN 1009
FACILITY.
The CLIN extended description Operate composting facility in accordance with Performance Work Statement, dated 27 August 2015, paragraph 1.2. has been added.
CLIN 1010
Special Events in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.1. The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals. Provide the unit price for the following items:
30 CY compactors 12 EA $ 8 CY cardboard/waste 24 EA $ to Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.1.
The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals..
CLIN 1011
RESERVED.
The CLIN extended description Construction and Demolition Debris Pick-up in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.2.
has been deleted.
CLIN 1012
CLIN 1013
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.4. to Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.5..
CLIN 1015
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and 1.5.Note:
The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer. to Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.5.Note: The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer..
CLIN 1016
with Performance Work Statement (PWS), dated 17 April 2015, paragraphs 4.11 – 4.11.8. to Contractor Transition in accordance with Performance Work Statement (PWS), dated 27 August 2015. This CLIN will be Not Separately Priced (NSP). .
CLIN 1017
Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1, 1.3.1.,1.5., 4.1.,
4.10.1. and the DD form 1423, Contract Data Requirements List, attached hereto. to Contract
SUBCLIN 1017AA
paragraph 1.1.1.1. and the DD Form 1423, Contract Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
SUBCLIN 1017AB
in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.3.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Disposal Facility
SUBCLIN 1017AC
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with
SUBCLIN 1017AD
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Quality Control Plan in accordance
SUBCLIN 1017AE
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.10.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Safety and Health
SUBCLIN 1017AF
Schedule in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1. and the DD Form 1423, Contract Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
CLIN 2001
equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2015 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 17 April 2015.This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0017) to Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2017 – 30 September 2018 in accordance with the
CLIN 2002
Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1, 1.1.1.2. and 1.1.1.5. to Municipal Solid Waste and Food Waste
CLIN 2003
and Transportation in accordance with Performance Work Statement (PWS), dated 17 April
CLIN 2005
The CLIN extended description has changed from Yard and Wood (Organic) Waste
CLIN 2009
FACILITY.
The CLIN extended description Operate composting facility in accordance with Performance Work Statement, dated 27 August 2015, paragraph 1.2. has been added.
CLIN 2010
Special Events in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.1. The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals. Provide the unit price for the following items:
30 CY compactors 12 EA $ 8 CY cardboard/waste 24 EA $ to Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.1.
The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals..
CLIN 2011
RESERVED.
The CLIN extended description Construction and Demolition Debris Pick-up in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.2.
has been deleted.
CLIN 2012
CLIN 2013
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.4. to Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.5..
CLIN 2015
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and 1.5.Note:
The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer. to Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.5.Note: The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer..
CLIN 2016
with Performance Work Statement (PWS), dated 17 April 2015, paragraphs 4.11 – 4.11.8. to
CLIN 2017
Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1, 1.3.1.,1.5., 4.1.,
4.10.1. and the DD form 1423, Contract Data Requirements List, attached hereto. to Contract
SUBCLIN 2017AA
Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
SUBCLIN 2017AB
in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.3.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Disposal Facility
SUBCLIN 2017AC
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with
SUBCLIN 2017AD
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Quality Control Plan in accordance
SUBCLIN 2017AE
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.10.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Safety and Health
SUBCLIN 2017AF
paragraph 1.1.1.1. and the DD Form 1423, Contract Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
CLIN 3001
equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2015 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 17 April 2015.This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0017) to Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2018 – 30 September 2019 in accordance with the
CLIN 3002
Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1, 1.1.1.2. and 1.1.1.5. to Municipal Solid Waste and Food Waste
CLIN 3003
and Transportation in accordance with Performance Work Statement (PWS), dated 17 April
CLIN 3005
The CLIN extended description has changed from Yard and Wood (Organic) Waste collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, CLIN 3009
FACILITY.
The CLIN extended description Operate composting facility in accordance with Performance Work Statement, dated 27 August 2015, paragraph 1.2. has been added.
CLIN 3010
Special Events in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.1. The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals. Provide the unit price for the following items:
30 CY compactors 12 EA $ 8 CY cardboard/waste 24 EA $ to Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.1.
The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals..
CLIN 3011
RESERVED.
The CLIN extended description Construction and Demolition Debris Pick-up in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.2.
has been deleted.
CLIN 3012
Collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, CLIN 3013 accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.4. to Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.5..
CLIN 3015
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and 1.5.Note:
The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer. to Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.5.Note: The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer..
CLIN 3016
with Performance Work Statement (PWS), dated 17 April 2015, paragraphs 4.11 – 4.11.8. to
CLIN 3017
Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1, 1.3.1.,1.5., 4.1.,
4.10.1. and the DD form 1423, Contract Data Requirements List, attached hereto. to Contract
SUBCLIN 3017AA
SUBCLIN 3017AB
in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.3.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Disposal Facility
SUBCLIN 3017AC
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with
SUBCLIN 3017AD
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Quality Control Plan in accordance
SUBCLIN 3017AE
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.10.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Safety and Health
SUBCLIN 3017AF
Vehicle Routes and Collection Schedule in accordance with Performance Work Statement
CLIN 4001
equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2015 – 30 September 2016 in accordance with the Performance Work Statement (PWS), dated 17 April 2015.This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0017) to Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Municipal Solid Waste Management services at Robins AFB, GA for the period 1 October 2019 – 30 September 2020 in accordance with the
CLIN 4002
Waste Collection and Disposal in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1, 1.1.1.2. and 1.1.1.5. to Municipal Solid Waste and Food Waste
CLIN 4003
and Transportation in accordance with Performance Work Statement (PWS), dated 17 April
CLIN 4005
The CLIN extended description has changed from Yard and Wood (Organic) Waste collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.4. to .
CLIN 4009
FACILITY.
The CLIN extended description Operate composting facility in accordance with Performance Work Statement, dated 27 August 2015, paragraph 1.2. has been added.
CLIN 4010
Special Events in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.1. The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals. Provide the unit price for the following items:
30 CY compactors 12 EA $ 8 CY cardboard/waste 24 EA $ to Unscheduled Items Pick-up and Special Events in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.1.
The Contracting Officer may, from time to time during the contract period, require the contractor to make unscheduled collections and disposals..
CLIN 4011
RESERVED.
The CLIN extended description Construction and Demolition Debris Pick-up in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.2.
has been deleted.
CLIN 4012
Collection in accordance with Performance Work Statement (PWS), dated 17 April 2015, CLIN 4013 accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.3.4. to Tobacco Waste Can Service in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.1.3.5..
CLIN 4015
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and 1.5.Note:
The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer. to Landfill Tipping Fees in accordance with Performance Work Statement (PWS), dated 27 August 2015, paragraph 1.5.Note: The contractor will be paid the firm-fixed price for only those services authorized in advance by the Contracting Officer..
CLIN 4016
with Performance Work Statement (PWS), dated 17 April 2015, paragraphs 4.11 – 4.11.8. to
CLIN 4017
Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1, 1.3.1.,1.5., 4.1.,
4.10.1. and the DD form 1423, Contract Data Requirements List, attached hereto. to Contract
SUBCLIN 4017AA
Schedule in accordance with Performance Work Statement (PWS), dated 17 April 2015, SUBCLIN 4017AB in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.3.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Disposal Facility
SUBCLIN 4017AC
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.10 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Tonnage, Fees and Weight Tickets.
Monthly municipal waste tonnage, tipping fees, and weight tickets in accordance with
SUBCLIN 4017AD
with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Quality Control Plan in accordance
SUBCLIN 4017AE
accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 4.10.1 and the DD Form 1423, Contract Data Requirements List, attached hereto. to Safety and Health
SUBCLIN 4017AF
The CLIN extended description has changed from Vehicle Routes and Collection Schedule in accordance with Performance Work Statement (PWS), dated 17 April 2015, paragraph 1.1.1.1. and the DD Form 1423, Contract
Data Requirements List, attached hereto. to Vehicle Routes and Collection Schedule in accordance with Performance Work Statement (PWS), dated 27 August 2015 and the DD Form 1423, Contract Data Requirements List, attached hereto..
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0005 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
FOB: Destination
F3Q2AD
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
The following Delivery Schedule item for CLIN 0010 has been changed from:
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
The following Delivery Schedule item for CLIN 0011 has been changed from:
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
The following Delivery Schedule item for CLIN 0013 has been changed from:
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
The following Delivery Schedule item for CLIN 0015 has been changed from:
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
POP 01-OCT-2015 TO
30-SEP-2016
N/A SEE SCHEDULE - F3Q2AD
SEE SCHEDULE
78 CIVIL ENGINEERING GROUP
775 MACON STREET
BLDG 1555
ROBINS AFB GA 31098
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 TEP Spreadsheet - revised
21 July 2015
1 21-JUL-2015
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Bid Spreadsheet 1 Attachment 2 Performance Work
Statement (PWS)
20 27-AUG-2015
(End of Summary of Changes)
File details come from the government source that posted it. Updated .