Building Wage Desicion.docx

DOCX document 17 KB Posted

Attached to
(IDIQ) Contracts for Base Wide Paint Projects at Robins AFB Federal contract opportunity
Solicitation number
FA8501-11-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to (IDIQ) Contracts for Base Wide Paint Projects at Robins AFB, newest first.
File Type Posted
Questions Answers 04-22-2011.pdf PDF
MEMO FOR CLARIFICATION 14 Apr 2011.pdf PDF
Amendment 0002 —
Questions Answers 04-14-2011.pdf PDF
PAINT IDIQ 2010 BIDDERS ESTIMATE —
Amendment 0001.pdf PDF
Pre-proposal Conference Sign-in.pdf PDF
Pre-proposal Conference Questions Answers.pdf PDF
01005 - Statement of Work.doc DOC document
Residential Wage Desicion.docx DOCX document
01503 - Contract Administration.doc DOC document
09900 - Painting.doc DOC document
01580 - Safety Requirements.docx DOCX document
01540 - Green Procurement.docx DOCX document
09960 - High-Performance Coatings.doc DOC document
01560 - Environmental Requirements rev 11-2009.docx DOCX document
PAINT IDIQ 2010 GOV ESTIMATE —
Solicitation 03-14-2011.pdf PDF
09930 - Painting Concrete Floors.doc DOC document
01572 - Construction and Demolition Waste Management.doc DOC document
02065 - Lead Based Paint Abatement.doc DOC document
09950 - Wallcoverings.doc DOC document
0 - Index of Specifications.pdf PDF
01040 - Site Requirements.doc DOC document
01560 - Environmental Requirements.doc DOC document
07900 - Calking and Sealants.doc DOC document
UHHZ 100240W PAINT IDIQ.pdf PDF
01300 - Submittals Contractor-Furnished Items.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: GA100275 01/14/2011 GA275

Superseded General Decision Number: GA20080275

State: Georgia

Construction Type: Building

County: Houston County in Georgia.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010 1 04/02/2010 2 05/28/2010 3 07/09/2010 4 10/01/2010 5 10/22/2010 6 01/14/2011

ASBE0048-001 04/01/2010

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 25.07 12.41

* ELEC1316-009 01/01/2011

Rates Fringes

ELECTRICIAN......................$ 21.75 9.85

ENGI0474-021 07/01/2010

Rates Fringes

Operating Engineers:

Boom (over 15 tons), Crane (over 10 tons), Drill, Drill Rig Caissons, Forklift (15 tons and over), and Hoist (two drum).$ 23.30 11.60 Bulldozer, Boom (15 tons and under), Compactor, Excavator, Forklift (under 15 tons), Hoist (one drum), Loader, and Scraper..$ 21.47 11.60 Crane (over 120 tons).......$ 24.30 11.60 Crane (over 250 tons).......$ 25.30 11.60 Oiler.......................$ 19.13 11.60

IRON0387-001 08/01/2009

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 24.04 9.86

* PAIN0193-001 01/01/2011

Rates Fringes

PAINTER: Brush, Roller, Spray...$ 17.75 7.49

PLUM0072-003 08/01/2010

Rates Fringes

PIPEFITTER.......................$ 26.68 12.60

SUGA2008-187 08/21/2008

Rates Fringes

BRICKLAYER.......................$ 11.65 0.17

CARPENTER........................$ 14.33 0.00

CEMENT MASON/CONCRETE FINISHER...$ 10.09 0.21

IRONWORKER, REINFORCING..........$ 11.05 0.21

LABORER: Common or General......$ 10.00 0.00

LABORER: Pipelayer..............$ 8.00 0.00

OPERATOR: Backhoe...............$ 10.78 0.00

OPERATOR: Grader/Blade..........$ 9.00 0.24

OPERATOR: Mechanic..............$ 17.95 0.00

OPERATOR: Roller................$ 10.88 0.00

PLUMBER..........................$ 13.57 2.20

ROOFER (Excluding Metal Roof)....$ 10.00 0.00

SHEET METAL WORKER, Including Hvac Duct Installation and Metal Roofing....................$ 18.37 7.57

TILE SETTER......................$ 15.00 0.00

TRUCK DRIVER.....................$ 11.10 1.10

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .