09950 - Wallcoverings.doc

DOC document 41 KB Posted

Attached to
(IDIQ) Contracts for Base Wide Paint Projects at Robins AFB Federal contract opportunity
Solicitation number
FA8501-11-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

09950

View the file

Other files for this federal contract opportunity

Other files attached to (IDIQ) Contracts for Base Wide Paint Projects at Robins AFB, newest first.
File Type Posted
Questions Answers 04-22-2011.pdf PDF
MEMO FOR CLARIFICATION 14 Apr 2011.pdf PDF
Amendment 0002 —
Questions Answers 04-14-2011.pdf PDF
PAINT IDIQ 2010 BIDDERS ESTIMATE —
Pre-proposal Conference Sign-in.pdf PDF
Pre-proposal Conference Questions Answers.pdf PDF
Amendment 0001.pdf PDF
09900 - Painting.doc DOC document
01580 - Safety Requirements.docx DOCX document
01540 - Green Procurement.docx DOCX document
09960 - High-Performance Coatings.doc DOC document
01560 - Environmental Requirements rev 11-2009.docx DOCX document
PAINT IDIQ 2010 GOV ESTIMATE —
Solicitation 03-14-2011.pdf PDF
09930 - Painting Concrete Floors.doc DOC document
01572 - Construction and Demolition Waste Management.doc DOC document
Building Wage Desicion.docx DOCX document
02065 - Lead Based Paint Abatement.doc DOC document
0 - Index of Specifications.pdf PDF
01040 - Site Requirements.doc DOC document
01560 - Environmental Requirements.doc DOC document
07900 - Calking and Sealants.doc DOC document
UHHZ 100240W PAINT IDIQ.pdf PDF
01300 - Submittals Contractor-Furnished Items.doc DOC document
01005 - Statement of Work.doc DOC document
Residential Wage Desicion.docx DOCX document
01503 - Contract Administration.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 09950 - WALLCOVERINGS

UHHZ 100240W, Paint IDIQ

PART 1 - GENERAL

1.01

DESCRIPTION OF WORK:

Types of wallcovering required include the following:

Vinyl wallcovering.

1.02

SUBMITTALS:

Samples: Submit 2 ea. 6-inch long samples of each type and color of edge molding specified.

Submit 2 ea. 6-inch long samples of each type and color of rubber base specified.

Submit 2 ea. 1 ft. square samples of each color sisal wall covering specified.

1.03 TRANSPORTATION AND STORAGE: Receive materials in manufacturer's original unopened packaging. Store according to manufacturer's recommendations.

1.04.

JOB CONDITIONS:

A.

Maintain ambient temperature in areas of installation prior to, and after applications of materials, according to manufacturer's recommendations.

B.

Illuminate areas of installation using the building's permanent lighting system; temporary lighting alone will not be acceptable.

PART 2 – PRODUCTS

2.01

VINYL WALL COVERING:

Contractor shall provide wallcovering meeting requirements of Federal Specification CCC-W-408A, Type II and CFFA Spec CFFA-W-101-D, Type II. Design Basis is Koroseal Collage wallcovering as manufactured by the RJF International Corporation. Manufacturer's code for Koroseal Collage Wallcovering is K321-xx series and is available in 29 colorwways.

Requirements:

Weight

21.0 oz PLY

14.0 oz PSY

Gauge

22 mils

Width

53/55 inches

Tensile (minimum)

50 x 55 lbf

Tear (minimum)

25 x 25 lbf

Fire Testing (meet)

NFPA 101

NFPA 255

NFPA 288

Match Information

Random Match, Reverse Hang

2.02

ACCESSORY ITEMS:

Adhesives: Provide manufacturer's recommended adhesive and sealer, produced expressly for use with selected wallcovering on substrate. Provide materials that contain mildew inhibitors and are non-staining to wallcovering.

Primer: Provide a mildew-resistant primer, such as "Kilz," or an approved equal.

C.

Vinyl Edge Moldings: As recommended by manufacturer to complement wall covering provided.

Adhesive for molding: Provide contact adhesive recommended by molding manufacturer.

D.

Rubber Base: As recommended by manufacturer to match vinyl edge moldings provided. Outside corners shall be pre-molded units.

Adhesive for rubber base: Provide contact adhesive recommended by manufacturer.

PART 3 - EXECUTION

3.01

PREPARATION:

Acclimatize wallcovering materials by removing from packaging in area of installation not less than 24 hours before application.

Remove switch plates, wall plates, and surface-mounted fixtures in areas where wallcovering is to be applied.

C.

Clean walls to ensure proper bonding of adhesives.

D. Wall surfaces shall be free from defects and imperfections that could show through the finished covered surface.

E. Sand-finished plaster shall be smoothed, cinder or cement blocks shall be plastered, or otherwise rendered smooth, and old wall coverings shall be removed.

F. For drywall construction, manufacturer’s recommended primer should be used before application of wallcovering for ease of future removal.

G.

Repair holes and broken areas in gypsum board substrate with spackling compound and new gypsum board as required. Sand smooth.

H. Glossy surfaces shall either be sanded to dull surface, or a coat of manufacturer’s recommended primer applied prior to installation of wallcovering.

I. If there is any evidence of mildew, substrate shall be checked with a suitable “Moisture Meter”. Moisture shall not exceed 4%. Mildew must be removed and the wall surface treated to inhibit further mildew growth.

J. Primers must contain mildew inhibitors and be applied according to manufacturer's instructions.

K. All painted surfaces should be evaluated for the possibility of pigment bleed-through. If there is any possibility, a coat of sealer, recommended by the manufacturer, should be applied before application of the wallcovering.

L.

Do no install vinyl wallcovering over oil-based wood stains as a bleed-through may occur.

INSTALLATION:

A. Vinyl Wallcovering:

1. Wallcovering shall be installed by experienced workers and contractors in strict accordance with the manufacturer’s printed instructions using vinyl wallcovering adhesive recommended by the manufacturer (WHEAT PASTE SHALL NOT BE USED). It is absolutely imperative that the installer read the manufacturer’s instruction sheet in each roll before installing the vinyl wallcovering. Permanent building light shall be available for installation.

2. Installer, before cutting, shall examine pattern and color and determine that they are the correct pattern and color as specified.

3. Installer shall install each roll in sequence starting with largest roll number and each strip in same sequence as cut from roll. If necessary, trim to assure color uniformity.

4. Bring material six (6) inches around inside and outside corners being sure to fir into corners to avoid bridging or spanning.

5. Wallcovering shall be smoothed to the hanging surface with a stiff bristled sweep brush or a flexible broad-knife to eliminate ari bubbles.

6. Remove excess adhesive along finished seam immediately after each wallcovering strip is applied. Use of clean, warm water, a natural sponge and clean towels are recommended for this use.

7.

Where a suspended ceiling is to be installed (by others), install top of wall covering true and level 2" A.F.F or as directed by Government. Where a furred ceiling remains, install fabric flush against the ceiling with edge molding.

8.

Install rubber base in all areas from which vinyl or rubber base was removed.

3.02

ADJUST AND CLEAN:

Replace removed plates and fixtures; verify cut edges of wall-coverings are completely concealed.

Remove surplus materials, rubbish, and debris resulting from wall-covering installation upon completion of work, and leave areas of installation in neat, clean condition.

<< End of Section >>