Attachment_11_(Asbestos_and_LBP_Survey).pdf

PDF 137 KB Posted

Attached to
Paint Booth Inserts for Hill AFB Federal contract opportunity
Solicitation number
FA8224-14-R-PAINT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 11 (Asbestos and LBP Survey)

View the file

Other files for this federal contract opportunity

Other files attached to Paint Booth Inserts for Hill AFB, newest first.
File Type Posted
Paint_Booth_Inserts_BLDG_674_Brand_Name_Justification_Redacted.pdf PDF
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_10_Jun_2012.pdf PDF
FA8224-14-R-3001-0001.pdf PDF
Paint_Booth_SOW-_REV_1.pdf PDF
Questions_and_Answers_Part_2.pdf PDF
IMG_9739.JPG JPG image
IMG_9725.JPG JPG image
IMG_9747.JPG JPG image
IMG_9727.JPG JPG image
IMG_9756.JPG JPG image
IMG_9734.JPG JPG image
IMG_9745.JPG JPG image
IMG_9723.JPG JPG image
IMG_9733.JPG JPG image
IMG_9752.JPG JPG image
IMG_9730.JPG JPG image
Site_Visit_Attendees.pdf PDF
IMG_9746.JPG JPG image
IMG_9737.JPG JPG image
IMG_9741.JPG JPG image
IMG_9724.JPG JPG image
IMG_9749.JPG JPG image
IMG_9721.JPG JPG image
IMG_9742.JPG JPG image
IMG_9732.JPG JPG image
IMG_9740.JPG JPG image
IMG_9758.JPG JPG image
IMG_9738.JPG JPG image
Questions_and_Answers_Part_1.pdf PDF
Section_M_(B674_3Paint_Booth_Inserts).pdf PDF
Wage_Determinations_UT140007.pdf PDF
Paint_Booth_SOW.pdf PDF
Attachment_3_(As-Built_Drawings_B674_Phase_1).pdf PDF
FA8224-14-R-3001.pdf PDF
Attachment_4_(General_Conditions_Specifications).pdf PDF
Attachment_10_(Hydrant_Flow_Test).pdf PDF
Attachment_1_(As-Built_Drawings_1).pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Attachment_6_(Base_Architectural_Compatibility_Standard).pdf PDF
Attachment_12_(CDRL).pdf PDF
Attachment_2_(As-Built_Drawings_2).pdf PDF
Attachment_5_(Base_Facility_Design_Standard).pdf PDF
Section_L_(Draft_Industry).pdf PDF
Section_M_(Draft_Industry).pdf PDF
Three_Paint_Booth_Inserts_-_Industry_Day_24_Feb_14.docx DOCX document
RFI_-_2_Paint_Booth.doc DOC document
Industry_Day_Agenda.docx DOCX document
Hill_Aerospace_Museum_Directions.pdf PDF
Notice_of_Industry_Day_Paint_Booth_Inserts.pdf PDF
Paint_Booth_SOW_(Sources_Sought).docx DOCX document
Show all 50

Paint Booth Inserts for Hill AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B674, THREE PAINT BOOTH INSERTS

Attachment 11 Asbestos Inspection Report and

Lead Based Paint Survey

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

ASBESTOS INSPECTION REPORT FOR BUILDING 674

NEW PAINT BOOTHS

During March, Terry Hess, with 309 MXSS requested an asbestos inspection of Building 674 to new paint booth install. The scope of this project is as follows:

Work Location: Building 674 Work Order #:56906

Statement of Work:

New paint booth inserts.

This inspection report is project specific and is not a valid report for any other project(s) associated with Building 674.

The information provided for this inspection report is based on samples collected by Neldon Anderson (Utah Certified Asbestos Inspector ASB-#0054). Samples for this survey were collected on 24 March 2014. The Science and Engineering laboratory, utilizing EPA Method 600R-93-116, analyzed all samples, which is PLM similar to NIOSH Manual of Analytical Methods 9002. Civil Engineering personnel also reviewed all available asbestos inspection reports databases of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

Footages are based upon the scope of work provided by the requestor.

Grey gravel/Black tar duct (100ln’) was sampled from the northeast corner of paint booths L02 and L03, the south side of paint booth L03, and the south side of paint booth L04. These sampled were analyzed as non-asbestos containing material (GM140846, GM140847, and

GM140848).

Roof flashing black (50ln’) was sampled from the north side of the blower on the north side of paint booth L01 roof, the south side of paint booth L03, and the northeast side of L02 and L03.

These samples were analyzed as non-asbestos containing material (GM140849, GM140850, and

GM140851).

Pipe insulation white/foil/yellow (500ln’) was sampled from the west side of paint booth L01, the west side of the boiler for paint booth L04, the east side boiler for paint booth L02, and the center of the west side of mechanical room 163. These samples were analyzed as non-asbestos containing material (GM140852, GM140853, and GM140854).

Pipe fitting insulation (100 ct.) was sampled from the south side of boiler for paint booth L03, the west side of paint booth L04, the northeast corner of the boiler for paint booth L04, the south

Bldg. 674 Install New Paint Booths

WO # 56906

17 April 2014 09:20 Hours side of paint booth L03, and the southwest corner of Bay M7 eyewash. These samples were analyzed as non-asbestos containing material (GM140856, GM140857, GM140858, GM140859, and GM140560).

Duct adhesive red (10ln’) was sampled from the roof duct on the south side of paint booth L04, the roof duct on the north side of paint booth L04, and the roof duct on the south side of paint booth L04. These samples were analyzed as non-asbestos containing materials (GM140861, GM140862, and GM863).

Block filler paint white (25sq’) was sampled from the exterior southeast corner of room 131, the southwest corner of room 162 phase II, and the west side of Bay 6 phase II. These samples were analyzed as non-asbestos containing material (GM140864, GM140865, and GM140866).

All Hard Thermal System Insulation encountered above ceilings, behind walls, in wall chases, in attic spaces, and in mechanical rooms is assumed to be asbestos. This includes all insulation on pipe runs, pipe saddles, tanks, and pipe fittings.

All suspect ACM not identified in the body of this report must be sampled to determine asbestos content. If materials are encountered which have not been previously identified/sampled, stop work and contact Nickolas King at 586-7094.

Remember that the locations of these building materials (homogenous areas) indicate where these materials were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project. When any new suspect ACM is encountered, stop work immediately and contact 75 CES/CEOHA to identify any new suspect building materials. As per state and federal regulations, if the scope of work or the work location changes, then a new asbestos inspection and asbestos inspection report will be required.

DO NOT DISTURB ANY BUILDING MATERIALS THAT ARE SUSPECTED ACM.

CONTACT NICKOLAS KING AT 586-7094 TO ARRANGE REMOVAL OF THESE

MATERIALS IF THERE IS ANY POTENTIAL FOR THEM TO BE DISTURBED

DURING THIS PROJECT.

The project manager must post a copy of this inspection report at the project before this project begins, and must remain posted until the project is completed. Please contact Nickolas King at 586-7094 with any questions regarding this inspection report.

Neldon Anderson 75th CES/CEOHA Certified Asbestos Inspector

UDAQ #ASB-0054

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

17 April 2014

MEMORANDUM FOR: 309 MXSS (Terry Hess)

FROM: 75th CES/CEOHA

SUBJECT: Lead Based Paint (LBP) Survey, Building 674 (WO #56906). New paint booth install.

1. On 24 March 2014, Neldon Anderson (Utah Certified Lead Inspector #PB-1072) tested the painted surfaces found in Building 674 that would be impacted by installing new paint booths. This building was constructed in N/A. A Niton XL3t 300 (Serial #30660) was used to test the painted surfaces of these components. Lead based paint was non-detected. Please refer to specific results of our survey; see attachment 1.

2. Limited lead-based paint identification has been completed for Building 674.

It is possible that lead based paint could be encountered during any renovation project.

Additional identification for lead based paint on other building components may be required. The facility manager should ensure that these components are surveyed for lead as well, to meet OSHA Standard 29 CFR 1926.62 construction requirements for lead.

3. The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, vanish, stain, or other applied coating that has 1mg/cm2 as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000ug/g by dry weight) by laboratory analysis, or more of lead. All other components tested were less than 1 mg/cm2.

4. Any effort to disturb lead paint can create lead dust. Please ensure that appropriate abatement, cleanup, and disposal will be accomplished and that the appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Nickolas King at 586-7094.

//original signed//

Neldon Anderson 75th CES/CEOHA Certified LBP Inspector Utah Certification #PB-1072

Attach:

Survey Results

Building: 674 Inspector:

Neldon Anderson

Date: 24‐March‐2014 PB # : PB‐1072 Time:

Work Order:

PbL (+/‐) Cal. Standard

1.00 1.00 1.20

1.07 1.04 +/‐ 0.06 1.00

XL Number Side Structure Condition NEG/POS 773 East Wall Good NEG 774 East Wall Good NEG 775 South Jamb Good NEG 776 South Door Good NEG 777 South Structural Steel Good NEG 778 South Floor Good NEG 779 South Floor Good NEG 780 South Tank Good NEG 781 South Structural Steel Good NEG 782 North Structural Steel Good NEG 783 South Wall Good NEG 784 South Hangar Door Good NEG 785 West Sire Suppression Pipe Good NEG

1.04 +/‐ 0.06

Cal. Standard PbL (+/‐)

Niton XL3t 300 30660

Post Calibration

PbL(mg/cm2)

Serial #Model#0900 56906

Pre Calibration

Average:

PbL(mg/cm2)

Room

L02

Bay M6 L04

Booth Boiler Booth Boiler Booth Boiler

Bay M5 Bay M6 Bay M6 White

White White Red Grey

Metal

0.00 0.00 0.00

Block Block

Substrate

Grey White

Metal

Average:

White

Off White

White Color

1.00 1.00 1.00

PbL(mg/cm2)

White White

Metal Metal Metal

Metal Metal Metal Metal Metal Metal Off White

0.20

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

Attach 11
Asbestos inspection
LBP Inspection
LBP Table

File details come from the government source that posted it. Updated .