Section_M_(Draft_Industry).pdf

PDF 70 KB Posted

Attached to
Paint Booth Inserts for Hill AFB Federal contract opportunity
Solicitation number
FA8224-14-R-PAINT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attached is the draft section M for the Three Paint Booth Inserts for Hill AFB UT. Please provide questions or comments by 10 00 am MDT Monday April 7 2014 to kristin.stoker us.af.mil and esteban.bedoya_hernandez.1. us.af.mil

View the file

Other files for this federal contract opportunity

Other files attached to Paint Booth Inserts for Hill AFB, newest first.
File Type Posted
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_10_Jun_2012.pdf PDF
FA8224-14-R-3001-0001.pdf PDF
Paint_Booth_SOW-_REV_1.pdf PDF
Questions_and_Answers_Part_2.pdf PDF
IMG_9739.JPG JPG image
IMG_9725.JPG JPG image
IMG_9747.JPG JPG image
IMG_9727.JPG JPG image
IMG_9756.JPG JPG image
IMG_9734.JPG JPG image
IMG_9745.JPG JPG image
IMG_9723.JPG JPG image
IMG_9726.JPG JPG image
IMG_9754.JPG JPG image
IMG_9750.JPG JPG image
IMG_9751.JPG JPG image
IMG_9729.JPG JPG image
IMG_9735.JPG JPG image
IMG_9736.JPG JPG image
IMG_9755.JPG JPG image
IMG_9722.JPG JPG image
IMG_9744.JPG JPG image
IMG_9731.JPG JPG image
IMG_9748.JPG JPG image
IMG_9733.JPG JPG image
IMG_9752.JPG JPG image
IMG_9730.JPG JPG image
Site_Visit_Attendees.pdf PDF
IMG_9746.JPG JPG image
IMG_9737.JPG JPG image
Questions_and_Answers_Part_1.pdf PDF
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_v1.pdf PDF
Section_M_(B674_3Paint_Booth_Inserts).pdf PDF
Wage_Determinations_UT140007.pdf PDF
Paint_Booth_SOW.pdf PDF
Attachment_3_(As-Built_Drawings_B674_Phase_1).pdf PDF
FA8224-14-R-3001.pdf PDF
Attachment_11_(Asbestos_and_LBP_Survey).pdf PDF
Attachment_4_(General_Conditions_Specifications).pdf PDF
Attachment_10_(Hydrant_Flow_Test).pdf PDF
Attachment_1_(As-Built_Drawings_1).pdf PDF
Attachment_9_(DoD_Manual_5200.01_Vol3).pdf PDF
Attachment_7_(AF_ETLs).pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Attachment_6_(Base_Architectural_Compatibility_Standard).pdf PDF
Official_Paint_Booth_Inserts_Synopsis_of_Proposed_Contract_Action.pdf PDF
Section_L_(Draft_Industry).pdf PDF
RFI_-_2_Paint_Booth.doc DOC document
Registration_Form.xlsx XLSX spreadsheet
Paint_Booth_SOW_(Sources_Sought).docx DOCX document
Show all 50

Paint Booth Inserts for Hill AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION M

EVALUATION FACTORS FOR AWARD

BUILDING 674

THREE PAINT BOOTH INSERTS

SOURCE SELECTION

1. BASIS FOR AWARDS

1.1. This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated price, that is deemed responsible IAW the FAR and whose proposal conforms to the solicitation requirements. Offerors are required to meet all solicitation requirements, including all stated terms, conditions, representations, certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors and all other information required by Section L - Instructions to Offerors (ITO) of this solicitation.

1.2. Number of Contracts to be Awarded - The Government intends to award one contract for the

Building 674, Three Paint Booth Inserts project. However, the Government reserves the right to award one or no contract at all, if the Source Selection Authority (SSA) determines it is in the Government’s best interest. The Government intends and reserves the right to award without discussions.

1.3. Proposal Revisions - If a proposal receives an “Unacceptable” rating after initial evaluation and will require major revisions in order to meet the technical requirement, the Government reserves the right to exclude the offeror from the competitive range and/or contract award.

EVALUATION CRITERIA

2. EVALUATION FACTORS AND SUB-FACTORS

The Government will evaluate the factors and sub-factors described below:

Factor One – Price

Factor Two – Technical

Sub-factor One: Technical Approach Sub-factor Two: Company Experience Sub-factor Three: Key Positions

Factor Three – Past Performance

2.1. EVALUATION METHODOLOGY

2.1.1. An initial price evaluation will be performed for all offerors IAW this section and proposals will be ranked from lowest to highest price based on a Total Evaluated Price (TEP).

2.1.2. Next, a technical and past performance evaluation will be performed beginning with the lowest priced offeror.

2.1.2.1. If the lowest price offeror is technically acceptable, has acceptable past performance and meets all other requirements of this solicitation, award will be made to that offeror.

2.1.2.2. If the lowest price offeror is not technically acceptable or does not have acceptable past performance, then evaluations may continue and the SSA may:

2.1.2.2.1. Award to the first technically acceptable offeror with acceptable past performance; or

2.1.2.2.2. Set a competitive range that may include some or all of the offerors

2.1.2.2.3. Continue evaluating additional offerors

2.1.2.3. Under the scenarios described above, it is possible that higher priced offers will not be evaluated for technical and past performance acceptability.

2.1.2.4. Technical and past performance evaluation of an offeror does not ensure inclusion in a competitive range, if one is set.

2.2. FACTOR ONE PRICE (Volume I)

2.2.1. The pricing criteria used for evaluation are: (1) Completeness, (2) Reasonableness, (3) Balance, and (4) TEP.

2.2.1.1. Completeness - The Government will review the pricing submissions for completeness and compliance with Section L ITO of the Request for Proposal (RFP).

Incomplete price submissions may not be evaluated and the proposal may be eliminated from the competition.

2.2.1.2. Reasonableness - The existence of adequate price competition is expected to support a determination of reasonableness. Price analysis techniques may be used to further validate price reasonableness of the proposed direct labor rates and add-on factors (labor overhead, general and administrative expense and cost of money when applicable). If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government-obtained information, additional information IAW FAR Subpart 15.4 will be required to support the proposed price.

2.2.1.3. Balance - Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing exists when, despite an acceptable TEP, the price of one or more price elements is significantly overstated or understated as indicated by the application of analysis techniques such as those defined by FAR Subpart 15.404-1.

The Government shall analyze offers to determine whether there is unbalanced pricing within the proposals. IAW FAR Subpart 15.404-1, offers that are determined to be unbalanced may be rejected if the lack of balance poses an unacceptable risk to the Air Force.

2.2.1.4. Total Evaluated Price (TEP) - The TEP is the sum of all CLIN totals. The TEP will be calculated for evaluation of offers and will be a consideration in the award decision.

2.3. FACTOR TWO TECHNICAL (Volume II)

2.3.1. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability - The proposals must demonstrate a thorough understanding of the requirements as listed and offer complete technical solutions to the Statement of Work (SOW) sections required in Section L ITO. The proposals will be evaluated for acceptability IAW the criteria set forth in this section. The technical proposal must convey to the Government that the offeror possesses adequate technical expertise and experience, sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion to meet the needs of the Government. The Government may make a final determination as to the offeror’s capability to perform based on the proposal as submitted without requesting further information from the offeror. The offeror’s proposal shall not simply copy and paste, rephrase or restate SOW language for the technical volume.

2.3.2. Technical Acceptability - The Government technical evaluation team shall evaluate the technical proposals by assigning ratings of technically “Acceptable” or technically “Unacceptable.” Any “Unacceptable” sub-factor rating criteria below shall result in a proposal being rated technically “Unacceptable”.

2.3.3. Only those proposals determined to be technically acceptable either initially, or as a result of discussions, will be considered for award. The technical factor as a whole will be rated “Unacceptable” if any single element or sub-factor is rated “Unacceptable.” The offeror is reminded that the Government intends to award this effort based on the initial proposal, as received, without discussions. However, the Government may hold discussions if necessary. Proposals shall be evaluated against the following Sub-factors:

One - Technical Approach, Two – Company Experience, and Three - Key Positions.

2.3.4. Sub-Factor One: Technical Approach

Technical approach is acceptable when the offeror provides in detail an approach that is reasonable, realistic, achievable, and demonstrates the following:

2.3.4.1. Design Build Narrative - Offeror meets minimum criteria when it demonstrates in a written narrative the design build approach that minimizes disruption of existing building 674 aircraft production activities during construction activities; protects government personnel, aircraft, equipment, and existing buildings; secures and

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

protects construction materials and equipment IAW SOW Paragraphs 3.3, 3.4, 3.5, 3.8, 3.16, 16.1, 19.1.7, 19.1.9.

2.3.4.2. Floor Plan and Cross Section - Offeror meets minimum criteria when it provides a preliminary floor plan and a cross section showing the three paint booth inserts dimensions, egress circulation spaces, and distances between paint booth insert structures and existing walls IAW SOW Paragraphs 5.2.1 and 5.2.2.

2.3.4.3. Schedule - Offeror meets the minimum criteria when it provides a project schedule that identifies a critical path that meets the schedule events and does not exceed the time requirements IAW SOW Paragraph 2.

2.3.5. Sub-Factor Two: Company Experience

Company experience is acceptable when the offeror demonstrates expertise and capability by providing one example project for each of the following six categories: a) Prime Contractor; b) Architectural/Engineering (A/E) Design Contractor; c) General Contractor;

d) Paint Booth Insert Contractor; e) Fire Suppression Contractor; and f) Central Vacuum System Contractor.

The Government reserves the right to contact Owner Representatives (e.g. Paint Booth Customer), and/or make a site visit, with the Owner’s permission, to evaluate the offeror’s example projects.

a) Prime Contractor - Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.1, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in business for a minimum of ten consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror);

vi. Demonstrated design build experience;

vii. Demonstrated experience working on a military installation; and

viii. Demonstrated management of subcontractors including: designers, two or more equipment manufacturers of similar cost, size, and complexity

(e.g. paint booth insert or central vacuum system), structural steel, roofing, fire suppression, mechanical, plumbing and electrical.

b) Architectural/Engineering (A/E) Design Contractor - Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.2, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in A/E design business for a minimum of ten consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror);

vi. Demonstrated design build experience; and

vii. Demonstrated integrating a new large complex piece of equipment into a new or existing facility similar in size and complexity as the new paint booth inserts IAW SOW Paragraph 5.

c) General Contractor – Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.3, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in the general contracting business for a minimum of ten consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror);

vi. Demonstrated design build experience and coordination with A/E designer;

vii. Demonstrated management of subcontractors including: designers, two or more equipment manufacturers of similar cost, size, and complexity (e.g. paint booth insert or central vacuum system), structural steel, roofing, fire suppression, mechanical, plumbing and electrical; and

viii. Demonstrated integrating a new large complex piece of equipment into a new or existing facility similar in size and complexity as the new paint booth inserts IAW SOW Paragraph 5.

d) Paint Booth Insert Contractor – Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.4, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in the paint booth manufacturing business for a minimum of ten consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror);

vi. Demonstrated design, manufacture, installation, and commissioning of full military aircraft cross draft paint booth insert that was installed in new or existing building and at a minimum met the paint booth inserts dimensions of the current requirement IAW SOW Paragraph 5.2.2;

vii. Demonstrated cross draft paint booth insert had a minimum average cross sectional airflow of 75 Feet per Minute (FPM) IAW SOW Paragraph 5.5.;

viii. Demonstrated a paint booth insert that had automatic control of temperature and humidity with sensors and set points ranges IAW SOW Paragraphs 5.5.1.1. and 5.5.2.; and

ix. Demonstrated a paint booth insert with programmable logic controller (PLC) control and human-machine interface (HMI) display IAW SOW Paragraph 5.6.

e) Fire Suppression Contractor – Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.5, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in the fire suppression business for a minimum of 10 consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror); and

vi. Demonstrated design, installation, and commissioning of fire sprinkling and high expansion foam systems in an aircraft hangar and/or paint facility of similar size, scope, and complexity as required by the SOW Paragraph 19.

f) Central Vacuum System Contractor - Offeror meets the minimum criteria when it provides an example using the Example Project Template IAW Section L – ITO, Attachment 1 and Paragraph 5.3.2.2.2.6, which includes the following:

i. Includes all information required in the Example Project Template IAW Section L – ITO, Attachment 1;

ii. Demonstrated that all the work was accomplished under the same contract or task/delivery order for indefinite delivery contracts;

iii. Evidence the offeror has been in the central vacuum business for a minimum of 10 consecutive years from date of issuance of this solicitation;

iv. Evidence the Beneficial Occupancy Date (BOD) was given within five years prior to the date of issuance of this solicitation;

v. Evidence the offeror accomplished the project listed (i.e. offeror shall be the one who performed the work not an individual now working for the offeror); and

vi. Demonstrated design, installation, and commissioning of a central vacuum system of at least 100 vacuum outlets with at least one of the ports requiring a 200 foot run or longer to the port in an aircraft paint facility of similar size, scope, and complexity as required by the SOW Paragraph 8.

2.3.6. Sub-factor Three: Key Positions

Key positions are acceptable when the offeror has demonstrated experience and qualifications when it provides one key position resume for each of the following three positions: a) Overall Project Manager; b) A/E Design Manager; and c) Paint Booth Commissioning Agent.

The proposed individuals experience shall have been accomplished while in the same capacity as the key position (i.e. Overall Project Manager served as Overall Project Manager and not in a different capacity in the provided example projects).

a) Overall Project Manager - Offeror meets the minimum criteria when it provides an example using the Key Positions Resume Template IAW Section L – ITO, Attachment 2 and Paragraph 5.3.3.1.1., which includes the following:

i. Includes all information required in the Key Positions Resume Template IAW Section L – ITO, Attachment 2;

ii. A minimum of three years of experience as an Overall Project Manager on projects that:

1) Incorporated a new large complex piece of equipment into a new or existing building; and

2) Involved management of subcontractors including: designers, two or more equipment manufacturers of similar cost, size, and complexity (such as a paint booth insert or central vacuum system), structural steel, roofing, fire suppression, mechanical, plumbing and electrical.

b) A/E Design Manager - Offeror meets the minimum criteria when it provides an example using the Key Positions Resume Template IAW Section L – ITO, Attachment 2 and Paragraph 5.3.3.1.2., which includes the following:

ii. Is a registered licensed architect or professional engineer

iii. A minimum of three years of experience as an A/E Design Manager on projects that:

1) Incorporated a new large complex piece of equipment into a new or existing building; and

2) Involved management of subcontractors including: designers, two or more equipment manufacturers of similar cost, size, and complexity (such as a paint booth insert or central vacuum system), structural steel, roofing, fire suppression, mechanical, plumbing and electrical.

c) Paint Booth Insert Independent Commissioning Agent - Offeror meets the minimum criteria when it provides an example using the Key Positions Resume Template IAW Section L – ITO, Attachment 2 and Paragraph 5.3.3.1.3., which includes the following:

ii. A minimum of five years of experience as an Independent Commissioning Agent on projects that include PLC control systems, start-up, test and air balancing of building HVAC, and electrical systems.

2.4. FACTOR THREE PAST PERFORMANCE (Volume III)

2.4.1. Past performance information will be gathered from offeror submissions and Government databases (e.g. Past Performance Information Retrieval System (PPIRS), customer interviews, etc.). Only recent and relevant past performance information will be considered.

2.4.1.1. Recency is defined as performance less than three years old. The Government will not consider performance on contracts/task orders where performance was concluded more than three years prior to this solicitation’s issue date.

2.4.1.2. Relevancy is defined as work that involves similar types and complexities of services described in the RFP. For Government contracts, any relevant Government contract, where the offeror was the Prime Contractor will be considered and reviewed to determine past performance history.

2.4.2. Past performance will be rated on an “Acceptable” or “Unacceptable” basis using the following ratings.

Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below).

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “Acceptable.”

2.5. CONTRACT DOCUMENTATION (Volume IV)

2.5.1. This volume will be reviewed for completeness. The offeror’s proposal shall include a signed copy of the Model Contract, Sections A through K, signed amendments to the solicitation (if any), and all other information required by Section L , Paragraph 7 “Contract Documentation.” An incomplete package may be excluded from the competitive range and/or award.

2.5.1.1. The proposal shall contain evidence of adequate financial resources. Acceptable evidence normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award, to acquire the needed materials, equipment, personnel and other resources necessary to sustain operations.

2.5.1.2. Total Case Incident Rate (TCIR) and Days Away, Restricted and/or Transferred

(DART) rates, or, injury and illness rates should be equal to or lower than the most recently published Bureau of Labor Statistics (BLS) national average for North American Industry Classification System (NAICS) 336413. For offerors that do not possess three years of consecutive recording data, submit this information for the time period you do possess. Other comparable data from a recognized agency, such as workers compensation, insurance rates, etc, for the same time period is also acceptable.

2.5.1.3. Safety and Health Plan will be reviewed for compliance with applicable clauses, regulations and SOW requirements.

3. DISCUSSIONS

It is the Government’s intent to award without discussions; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions (FPRs) will be considered in making the source selection decision.

4. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

File details come from the government source that posted it. Updated .