Section_J_Attachment_1_PSSC_Performance_Work_Statement_20140714.docx

DOCX document 436 KB Posted

Attached to
Propulsion Subsystem Support Contract Federal contract opportunity
Solicitation number
FA8214-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Section J Attachment 1 PSSC Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Propulsion Subsystem Support Contract, newest first.
File Type Posted
PSSC_Questions_and_Answers_3.xlsx XLSX spreadsheet
PSSC_Questions_and_Answers_2.xlsx XLSX spreadsheet
Section_J_Attachment_3_PSSC_CDRL_Package.pdf PDF
Section_L_PSSC_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
FA821414R0003_______0003.pdf PDF
Section_J_Attachment_6_PSSC_Mapping_Worksheet.xlsx XLSX spreadsheet
FA821414R0003_______0002.pdf PDF
Section_L_Attachment_7_PSSC_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_1_PSSC_Performance_Work_Statement.pdf PDF
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_3_CDRL_Package_PSSC.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories.pdf PDF
PSSC_Questions_and_Answers_1.xlsx XLSX spreadsheet
Section_L_PSSC_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
FA821414R0003_______0001.pdf PDF
Section_J_Attachment_3_PSSC_CDRL_Package.pdf PDF
Section_J_Attachment_1_PSSC_Performance_Work_Statement.pdf PDF
Section_L_Attachment_2_PSSC_Questionnaire_Cover_Letter.pdf PDF
Section_L_PSSC_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories.pdf PDF
FA821414R0003.pdf PDF
Section_L_Attachment_12_Sample_BOE_Summary.xlsx XLSX spreadsheet
Section_L_Attachment_5_PSSC_Commercial_Client_Auth.pdf PDF
Section_L_Attachment_11_PSSC_Transition_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_7_PSSC_QASP.pdf PDF
PSSC_Bidders_Library_Instructions.docx DOCX document
Section_L_Attachment_6_PSSC_Roles_and_Responsibilities.xlsx XLSX spreadsheet
Section_M_PSSC_Evaluation_Factors_for_Award.pdf PDF
Section_L_Attachment_10_PSSC_CLIN_Pricing_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_6_PSSC_Mapping_Worksheet.xlsx XLSX spreadsheet
Section_L_Attachment_7_PSSC_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Section_L_Attachment_1_PSSC_PPI_Tool.pdf PDF
Section_L_Attachment_4_PSSC_Consent_Form.pdf PDF
Section_L_Attachment_9_PSSC_EZSource_Instructions.pdf PDF
Section_L_Attachment_8_PSSC_Encryption_Instructions.pdf PDF
PPITool.accdb —
Section_J_Attachment_8_PSSC_GFP_Listing.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories_20140717.docx DOCX document
Section_L_Attachment_10_PSSC_CLIN_Pricing_Matrix_20140717.xlsx XLSX spreadsheet
Section_L_PSSC_20140717.docx DOCX document
Section_J_Attachment_2_PSSC_Government_Rights_in_Data_(GRID)_20140718.docx DOCX document
Section_J_Attachment_3_PSSC_CDRL_Instructions_and_Master_Listing_16_Jul_14.pdf PDF
Section_M_PSSC_20140714.docx DOCX document
Draft_RFP_Release_Comment_and_Replies_20140717.xlsx XLSX spreadsheet
ICBM_PSSC_GFP_Listing_20140718_Location.docx DOCX document
FA821414R0003.pdf PDF
Section_L_Attachment_11_PSSC_Transition_Matrix_20140717.xlsx XLSX spreadsheet
Section_L_Attachment_12_Sample_BOE_Summary.xlsx XLSX spreadsheet
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix_20140717.xlsx XLSX spreadsheet
Show all 50

Propulsion Subsystem Support Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERCONTINENTAL BALLISTIC MISSILE (ICBM)

PROPULSION SUBSYSTEM SUPPORT CONTRACT (PSSC)

PERFORMANCE WORK STATEMENT (PWS)

FOR

AIR FORCE NUCLEAR WEAPONS CENTER (AFNWC)

ICBM SYSTEMS DIRECTORATE (ICBMSD)

Flight Systems Division (AFNWC/NIB) ICBM Propulsion Branch (AFNWC/NIBB)

14 July 2014

TABLE OF CONTENTS

SECTION I - DESCRIPTION OF SERVICES1
1.0SCOPE1
1.1PURPOSE1
1.2BACKGROUND1
1.3FUTURE ICBM SUSTAINMENT AND ACQUISITION CONSTRUCT (FISAC) DESCRIPTION2
1.4PROPULSION SUBSYSTEM DESCRIPTION5
1.4.1Stage 15
1.4.2Stage 26
1.4.3Stage 36
1.4.4Booster Integrating Hardware/Interstage Hardware6
1.4.5Propulsion System Rocket Engine (PSRE)6
1.4.6Flight Controls6
1.4.7Flight Batteries7
1.4.8Weapon System Ordnance Devices10
1.4.9Propulsion Flight Test Support Equipment13
1.4.10Depot Support Equipment14
1.4.11Modeling and Simulation Table16
1.5APPLICABLE DOCUMENTS17
1.6REQUIREMENTS18
1.6.1Basic Description18
1.6.2Integration18
1.6.3Projected Meetings and Estimated Frequencies19
1.6.4Contractor Manpower Reporting22
1.6.5Program Management Support22
1.6.5.1Risk Management22
1.6.5.2Commercial Small Business Involvement22
1.6.5.3Modification/Replacement/New Requirement Oversight22
1.6.5.4Program Task Management23
1.6.5.5Cost Reporting24
1.6.5.6Management Plan24
1.6.5.7Data Rights25
1.6.5.8Transition25
1.6.5.9Program Administration26
1.6.6Propulsion Subsystem Technical Services Required27
1.6.6.1Sustaining Engineering27
1.6.6.1.1Systems Engineering27
1.6.6.1.2Systems Requirements Determination28
1.6.6.1.3Nuclear Surety28
1.6.6.1.4Nuclear Control29
1.6.6.1.5Environmental Conditions30
1.6.6.1.6Trade Studies31
1.6.6.1.7Configuration Management (CM)31
1.6.6.1.8Software Support32
1.6.6.1.9Maintenance Support33
1.6.6.1.10Technical Order (TO) Support33
1.6.6.1.11Hardware Support34
1.6.6.1.12System Safety35
1.6.6.1.13Demilitarization and Disposal36
1.6.6.1.14Corrosion37
1.6.6.1.15Emergency Response Support37
1.6.6.1.16Weapon System Interface Control38
1.6.6.1.17Subsystem and End-Item Specifications38
1.6.6.1.18Electromagnetic Radiation38
1.6.6.1.19Nameplates and Product Marking39
1.6.6.1.20Diminishing Manufacturing Sources and Materiel Shortages (DMSMS)39
1.6.6.1.21Test and Evaluation (T&E)39
1.6.6.2Propulsion Subsystem Assessment41
1.6.6.2.1Technical Risk Assessment41
1.6.6.2.2Availability41
1.6.6.2.3Maintainability42
1.6.6.2.4Nuclear Hardness and Survivability42
1.6.6.2.5Reliability and Accuracy42
1.6.6.2.6Aging Surveillance (AS)43
1.6.6.2.6.1Solid Propulsion AS43
1.6.6.2.6.2Liquid Propulsion AS46
1.6.6.2.6.3Ordnance AS48
1.6.6.2.6.4Flight Controls Assessment50
1.6.6.2.6.5Flight Battery AS51
1.6.6.2.7Subsystem Component53
1.6.6.2.8Assessment Data53
1.6.6.2.9Anomaly Resolution53
1.6.6.2.10Modeling and Simulation53
1.6.7Associate Contractor Agreements (ACA)54
1.6.8Travel54
SECTION II – SERVICE SUMMARY55
2.0SUMMARY MATRIX55
SECTION III – PROPERTY MANAGEMENT63
3.0PROPERTY MANAGEMENT63
3.1GOVERNMENT-FURNISHED PROPERTY (GFP) AND SERVICES63
3.2NUCLEAR WEAPONS-RELATED MATERIEL (NWRM)63
SECTION IV – GENERAL INFORMATION68
4.0GENERAL INFORMATION68
4.1SECURITY REQUIREMENTS68
4.2QUALITY CONTROL69
4.3QUALITY ASSURANCE69
4.4PHYSICAL SECURITY70
4.5HOURS OF OPERATION71
4.6CONSERVATION OF UTILITIES72
4.7RECORDS72
4.8ENVIRONMENTAL CONTROLS72
4.9GOVERNMENT OBSERVATIONS72
4.10SAFETY REQUIREMENTS73
4.11QUALIFICATIONS74
4.12PARTNERING AGREEMENT (PA)74
4.13ANTITERRORISM CONSIDERATIONS75
4.14CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING CRISIS IAW Department of Defense Instruction (DoDI) 1100.2275
4.15PUBLICATIONS75
SECTION V - APPENDICES76
APPENDIX A: ACRONYMS AND ABBREVIATIONS LIST77
APPENDIX B: EXAMPLES OF FUTURE EFFORTS OR PROGRAMS88
APPENDIX C: SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION89
APPENDIX D: GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT (GFP/GFS/GFE)96
APPENDIX E: WORK BREAKDOWN STRUCTURE97
APPENDIX F: APPLICABLE DOCUMENTS98
APPENDIX G: CONTRACT DATA REQUIREMENTS LIST (CDRL)103

Page | 110

SECTION I - DESCRIPTION OF SERVICES

1.0 SCOPE

This contract is required to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Propulsion Subsystem to include solids, liquids, flight controls, system ordnance, and flight batteries for an estimated 5-year period in the areas of sustaining engineering, maintenance engineering, aging surveillance, modification of systems and equipment, software maintenance, developmental engineering, production engineering, and procurement. This subsystem contractor will be responsible for all elements of the Performance Work Statement (PWS) to include integration of these efforts with the Government and all ICBM contractors.

1.1 PURPOSE

The purpose of this document is to provide a description of the types of services the Propulsion Subsystem Support Contract (PSSC) contractor will perform, not to specify to the contractor how to perform required services. It is in no way intended to suppress innovative ideas or approaches for performing required services.

The Propulsion Mission Statement is to integrate and coordinate all activities necessary to assess, report, and sustain the operational capability and reliability of the ICBM Propulsion Subsystem through 2030 and disposal.

1.2 BACKGROUND

The MMIII is a mature weapon system that is in the Operations and Support Phase of its life cycle. The primary ICBM activity is the sustainment of the operational force in a state of readiness such that national defense strategies involving these systems can be successfully executed. Weapon system sustainment includes the following: incorporation of changes to ICBM weapon systems in response to requirements for performance improvements; to make appropriate use of advances in technology; correction of system deficiencies; determining the need for and executing life extension programs; implementation of policies mandated by Congress or directed by other higher authorities; and addressing threat or safety driven changes or other changes in the operational or support environment.

Requirements for changes or modifications to fielded systems are usually applicable at the subsystem or lower level. These changes will be performed primarily by the subsystem contractors although the Government reserves the right to compete these changes among a variety of vendors. Satisfying these requirements involves acquisition activities that can potentially impact system-level performance. The ICBM Systems Directorate (ICBMSD) will lead and coordinate efforts with the Integration Support Contract (ISC) contractor and the PSSC contractor to manage the contracts required to change, modify, and sustain ICBM weapon systems.

The PSSC contractor will assist the Government in its performance of tasks to maintain the weapon system. Contractor assessment operations will be required to conduct materials and subcomponent analysis and test, including aging surveillance test and evaluation. The primary focus will be to identify aging mechanism, anomalous behavior, and ensure any modifications or changes to the system will maintain and/or improve system-level performance.

1.3 FUTURE ICBM SUSTAINMENT AND ACQUISITION CONSTRUCT (FISAC) DESCRIPTION

1.3.1 FISAC Structure

The Government has prepared a sustainment concept to ensure a safe, secure, and reliable MMIII ICBM Weapon System through 2030 and disposal. This FISAC replaced the ICBM Prime Integration Contract (IPIC). The FISAC structure and its relationship to the Propulsion Subsystem are described in Figure 1:

Figure 1. FISAC Structure

1.3.1.1 PSSC Contractor/ICBMSD Relationship

The contractor shall perform the subsystem(s) functions shown in Figure 2 and described in this PWS. The contractor will provide the Government with technical expertise. The PSSC contractor will assist the Government in fulfilling its role as the Propulsion Subsystem manager by performing sustaining engineering, maintenance engineering, aging surveillance, modification of systems and equipment, software maintenance, developmental engineering, production engineering, and procurement of Propulsion Subsystem components and related support equipment. The PSSC contractor will provide breadth and depth of capabilities for the elements listed in the Work Breakdown Structure (WBS), Appendix E, across the Propulsion Subsystem. This contract will be flexible and allow for adjustments to the contractor workforce to gain efficiencies based on the changing requirements, policy, realities of the industrial base, and the Government’s capability to support MMIII.

ICBM Systems Directorate Function: Weapon System Integrator

Figure 2. FISAC Component Functions

1.3.1.2 ICBMSD/PSSC/ISC Contractor Relationship

While the PSSC contractor will provide the preponderance of sustaining engineering support to the Propulsion Subsystem, the ISC contractor will also provide subsystem expertise to validate subsystem contractor analyses and produce requirements and other documentation for subsystem acquisitions that would create an Organizational Conflict of Interest (OCI) if produced by the subsystem contractor.

In order to competently and conscientiously support the MMIII, the Air Force (AF) requires its contractors and their subcontractors to effectively share information concerning the status of programs and technical issues with the weapon system. This communication will need to occur with the Government and among other support contractors to the maximum extent consistent with proper protection of classified and/or other sensitive information. To achieve this, the PSSC contractor will have appropriate Non-Disclosure Agreements (NDA) with other contractors and subcontractors as applicable and demonstrate the ability and willingness to communicate openly. The ISC contractor will only provide contractual direction to its subcontractors. Likewise, the PSSC contractor shall only provide direction to its subcontractors. See Figure 1.

1.3.2 PSSC Contractor and Other Subsystem Contractors

Each subsystem support contract in the FISAC is designed to include sustaining engineering efforts for that subsystem and any relevant support tasks required to sustain the subsystem not accomplished on a different contract or by an organic entity. Test equipment programs and modifications may also be performed on the contract, as long as the dollar threshold for the contract is not exceeded. The intent of the AF is that major modification programs, such as Acquisition Category (ACAT) 1D programs, will be separately competed as these programs are likely to provide an opportunity for innovation from the larger industrial base to improve weapon system performance. However, subsystem integration support for major modifications to include ACAT 1D programs may be executed under the PSSC. ACAT II and ACAT III programs and non ACAT efforts may be executed by a subsystem contractor. Nuclear Safety Cross Check Analysis (NSCCA), Performance Analysis Technical Evaluation (PATE), and Independent Verification and Validation (IV&V) for software will be managed by the AF and performed by an independent contractor.

1.3.3 Technical Council

The PSSC contractor will be a key participant on the ICBM Technical Council. The ICBMSD will establish and chair this council which will meet at a minimum semi-annually and maximum quarterly, as determined by the Director, ICBMSD, and be comprised of contractor and ICBMSD representatives from each of the subsystems. The Technical Council will provide a forum where the ICBMSD and key suppliers at various levels can directly, and on an equal level, engage on issues important to ICBM systems.

1.3.3.1 Government Members

Director, ICBMSD (Chair); Director of Engineering (Alt Chair); Chief Engineer, ICBM Flight Systems; Chief Engineer, ICBM Ground Systems; Technical Director, ICBM Systems Engineering; and Senior Engineer, ICBM Future Systems. Representatives from the following organizations will also be included: 748th Supply Chain Management Group (SCMG); Air Force Global Strike Command (AFGSC) (HQ/OL-J); Air Force Nuclear Weapons Center (AFNWC)/Engineering and Technical Management Directorate (AFNWC/EN); AFNWC/Logistics Directorate (AFNWC/LG);AFNWC/Intelligence and Capabilities Integration Directorate (AFNWC/XR); AF Program Executive Officer, Strategic Systems (AFLCMC/SS); 309th Maintenance Wing; and others as determined appropriate by the ICBMSD.

1.3.3.2 Associate Government Members

Associate Government members are designated by the relevant Integrated Product Team (IPT) Chief or Director of Engineering.

1.3.3.3 Contractor Primary Members

Contractor primary members are System Engineering contractors, Guidance Subsystem contractors, Propulsion Subsystem contractors, Reentry Subsystem contractors, Ground Subsystems contractors, and Integration and Test contractors.

1.3.3.4 Associate Contractor Members

Associate contractor members are designated by the relevant Government IPT Chief or ICBMSD Director of Engineering from among the contractors or subcontractors currently on contract to perform ICBM support. Examples of expected members are inertial instrument designers and producers, solid propulsion provider, liquid propulsion provider, flight control provider, and Rapid Execution and Combat Targeting (REACT) console provider. If an associate contractor is also a subsystem contractor and primary Technical Council member, then additional membership is not required.

1.3.3.5 Ground Rules

Meetings of the ICBM Technical Council are expected to be a place of frank and open discussion of ICBM issues. Classified discussion at the SECRET level may occur, requiring proper visitor clearances be on file with the ICBMSD security office. The Technical Council is not intended to be a decision making body, nor does it provide contractual direction. The technical council shall be conducted in a non-attribution environment with clear attention paid to protection of property rights. Prior to each meeting a call for topics and agenda will go out to all participating members. Topics for discussion will be prioritized by the Director of Engineering. The Director of Engineering reserves the right to defer topics to another meeting to maintain focus on priority topics. Each meeting will allow time for review of all Action Items to ensure the proper personnel are assigned and aware.

1.4 PROPULSION SUBSYSTEM DESCRIPTION

The PSSC technical scope includes all Propulsion Subsystem components described in Section 1.4; all associated depot support equipment, including test stands and associated software; maintenance and test fixtures; and all associated technical data.

The MMIII Propulsion Subsystem is the aerospace vehicle less the Reentry System/Reentry Vehicle (RS/RV) and Guidance Subsystem. The Propulsion Subsystem consists of three solid rocket motors, the Propulsion System Rocket Engine (PSRE), two interstages, an aft skirt, and a raceway cable system, plus all the control equipment for the nozzles and safing devices; also includes weapon system ordnance devices and flight batteries.

Additional component descriptions are provided in subsequent paragraphs.

1.4.1 Stage 1

The MMIII Stage 1 is a cylindrically-shaped solid propellant rocket motor located at the aft end of the downstage. Stage 1 has four independent nozzles and flight control is provided via an electro-hydraulic nozzle control unit (NCU). The Stage 1 forward skirt attaches the Stage 1 motor to the 1-2 interstage. The motor and controls are operated by signals from the Missile Guidance and Control (G&C) system.

1.4.2 Stage 2

The MMIII Stage 2 is a cylindrically-shaped solid propellant rocket motor that is installed in the middle of the downstage. Stage 2 has a single, fixed submerged nozzle, an exit cone extension, a liquid injection thrust vector control (LITVC) system, and a roll control system (RCS). The forward skirt of the Stage 2 attaches the Stage 2 motor to the 2-3 interstage. The Stage 2 aft skirt attaches the Stage 2 motor to the 1-2 interstage.

1.4.3 Stage 3

The MMIII Stage 3 is a cylindrically-shaped solid propellant rocket motor that is located at the forward end of the downstage. Stage 3 has a single fixed exhaust nozzle, LITVC, RCS, and thrust termination system. The Stage 3 motor is attached to the 2-3 interstage at the aft skirt and the propulsion system rocket engine (PSRE) attached at the forward skirt.

1.4.4 Booster Integrating Hardware/Interstage Hardware

The MMIII booster interstage hardware consists of the interstage separation and skirt removal ordnance and the raceway interconnections.

1.4.5 Propulsion System Rocket Engine (PSRE)

The PSRE is a self-contained, prepackaged, liquid bipropellant rocket propulsion system that provides the thrust capability to deploy the MMIII RV. The PSRE is capable of providing precise, on command, vehicle velocity increments to the post-boost vehicle. The PSRE uses a hypergolic mixture of di-nitrogen tetroxide (N2O4) as the rocket oxidizer and monomethyl hydrazine (MMH) as the rocket fuel. The oxidizer and fuel are independently stored in two propellant storage assemblies.

The PSRE is contained in the CD2-4 shell, located between the Missile Guidance Set (MGS) and the Stage 3 motor. The PSRE attaches to the aft end of the MGS and the forward end of the Stage 3 motor.

1.4.6 Flight Controls

1.4.6.1 P89A1 Stage 1 Nozzle Control Unit (NCU)

The P89A1 Stage 1 NCU controls four moveable exhaust nozzles that, in turn, control thrust vector orientation, providing pitch, yaw, and roll control. The NCU is powered in flight by a SE13G squibactivated battery.

1.4.6.2 P90A1 Stage 2 Attitude Control Group

The P90A1 Stage 2 Attitude Control Group is used to change position of four pintle valves that control injection fluid flow to obtain LITVC of missile attitude in pitch and yaw. The unit, operating in conjunction with the missile guidance system, provides a closed loop position servo for positioning the Stage 2 pintle valves. The control group assembly consists of the following major components: two hydraulic auxiliary power supplies, four servo injectors, and one roll amplifier assembly.

1.4.6.3 P116A1 Stage 3 Liquid Injection Thrust Vector Control (LITVC) The P116A1 Stage 3 LITVC is an electromechanical system used to control liquid injection into the Stage 3 motor plume for maintaining missile control through thrust vectoring. The control group consists of a main structure containing the electronics assembly, four flexible cable arms, and four servo-injectors.

1.4.6.4 Raceway Conduit Support Set

The Raceway Conduit Support Set, CVK-103, is part of the LGM-30G (MMIII) “Dust Hardened” operational missile providing support and environmental protection for the G&C cables in Stages 1, 2 and 3. The conduit support set also provides means for G&C cable separation during missile staging.

The G&C cables carry the electrical signals from the MGS to and from the various stages and PSRE. Each stage and skirt contains an assembly to house the cables on the outer skin. Typical signals include guidance commands, destruct commands, and instrumentation.

1.4.7 Flight Batteries

The MMIII utilizes a number of batteries during flight and test operations. This list is not all inclusive, new batteries developed or deployed for use may become a part of the MMIII weapons system inventory.

1.4.7.1 Stage 1 Flight Control Unit (FCU) Battery (SE-13G)

The Stage 1 FCU battery provides the hydraulic power and has a nominal loaded output of 28 volts (V) and a capacity over 12 amperes hour. This battery consists of 20 silver-zinc cells. It is a non-rechargeable reserve design and activation is accomplished by a self-contained squib activation system. The battery assembly consists of two gas generators that provide activation redundancy.

1.4.7.2 Static Random Access Memory (SRAM) Battery

The NS-50A MGS uses SRAM to retain operational software, data and codes, and MGS maintenance data when an MGS is removed from ground power. The SRAM, a nonrechargeable, active battery located in the NS-50A MGS is used to provide the required power when the primary MGS power is removed from the missile. Two different battery designs are used for SRAM. One type is a battery with two, DD-sized lithium/sulfuryl chloride cells with a rated capacity of 30 amperes hour. The second type is made with two lithium/carbon monofluoride DDsized cells and has a capacity rated at 32 amperes hour.

1.4.7.3 Missile Guidance Set (MGS) Battery

The SE-437C battery provides power to the MGS, PSRE, Stage 1, Stage 2, and Stage 3 flight control units and the RS. The SE-437C battery connects to the NS50A power distribution unit with a 9W05Z adapter cable. The battery consists of 20 silver-zinc cells and has a nominal loaded output of 28V and a capacity of over 20 amperes hour.

1.4.7.4 Mark (Mk)21 Solid State Radar (SSR) Battery

The Mk21 SSR battery is a remotely activated lithium-aluminum/iron-disulfide thermal battery. It is located in the aft end of the Mk21 fuze and provides regulated directcurrent voltages to the central power conditioner (CPC), as well as various SSR functions during the final phase of the MMIII mission flight. The thermal battery has two independent activation circuits and six outputs, and is started by applying an activation pulse to one or both of the activation circuits. The six sections are a nominal 40V, 38V, 15V, 9V, -6V and -15V. The battery output remains active, as long as the temperature remains within a range to keep the electrolyte in a molten state and there is sufficient active material in the positive and negative electrodes.

1.4.7.5 Mk21 Arming and Fuzing Assembly (AFA) Battery

The Mk21 AFA battery is used to provide power for the RV arming and fuzing assembly and is located in the forward section of the RV. The Mk21 AFA battery has a nominal, loaded output of 35V and a capacity of over 650 ampere second. The battery consists of 24 silverzinc cells, is a nonrechargeable, reserve design, and activation is accomplished by a self-contained, single squib-activated, gas generator system.

1.4.7.6 Mk12A AFA Battery

The Mk12A AFA battery provides power to the RV arming and fuzing assembly and is activated following launch of the MMIII missile. The current force configuration consists of Mk12A RVs, containing an AFA battery that is known as the Mk12A battery. The battery consists of 22 silver zinc cells, is a nonrechargeable, reserve design, and activation is accomplished by a selfcontained, single squib-activated, gas generator system.

1.4.7.7 Operational Test Batteries

The AF conducts Operational Test Launches (OTL) from Vandenberg Air Force Base (VAFB) as part of ICBM Force Development Evaluation (FDE). The OTL batteries installed in the MOD 7 lightweight (LW) wafer and motor raceways are used to power equipment for telemetry, tracking, and command and destruct purposes for test flights only. The MOD 7LW wafer contains four batteries: one Sband telemetry subsystem battery, two command destruct (CD) subsystem batteries, and one global positioning system (GPS) battery. Each motor stage is equipped with ordnance to terminate motor thrust in the event of inadvertent separation of the missile motor stages. The mounting area of the premature stage separation (PSS) battery on each solid motor stage is in the missile cable raceway.

1.4.7.7.1 Premature Stage Separation (PSS) Battery

The PSS destruct system terminates motor thrust in the event of premature motor separation. If premature separation occurs, a squib in a Safe/Arm device is initiated, activating the explosive destruct package (linear shape charge) located on each stage. The first, second, and third stage cable raceways contain a Safe/Arm device and a PSS battery. Upon arming the Safe/Arm, the battery circuit completes, allowing the detonation sequence to occur. The PSS destruction of all downstage motors occurs if premature separation occurs between any of the first, second, or third stage or postboost vehicle interfaces.

The PSS battery is comprised of silver oxide positive plates and zinc negative plates. The battery monoblock contains two independent, 6V sections of four silver-zinc cells each for redundancy. Battery activation occurs when an electrical signal initiates a gas generator located in the rear of the coil reservoir containing approximately 27 milliliters of Potassium Hydroxide (KOH) electrolyte. The battery, activated during terminal countdown at approximately T-14 minutes, attains required voltage within 2 minutes. The battery must meet all performance requirements following a minimum 6hour wet stand in a lightly loaded condition of 60 microamperes in the event of a launch hold.

1.4.7.7.2 Telemetry Battery

The MOD 7LW telemetry battery is a non-rechargeable, silver-zinc battery. The battery has a nominal voltage output of 28V and a capacity greater than 160 amperes minute. Battery activation is complete within 2 minutes when voltage is above the specified minimum. The battery, activated during terminal countdown at T-14 minutes, is required to meet all performance requirements following a minimum 6-hour, no-load, wet stand in the event of a launch hold.

1.4.7.7.3 Global Positioning System (GPS) Battery

The GPS battery is a manually activated, secondary (rechargeable), silver-zinc battery that powers the GPS metric tracking system. The battery contains 18 cells and is activated manually by adding KOH electrolyte into the cells (gas generators are not used to inject electrolyte into the battery). The battery has a nominal voltage output of 28V and a design capacity of 1.2 ampere hour. The battery is capable of meeting performance requirements after a 60-day wet stand.

The GPS battery has also been qualified for use on the MOD 7LW as the CD battery.

1.4.7.7.4 Command Destruct (CD) Battery

The CD system used for MMIII OTLs consists of two independent systems that provide redundancy. Each OTL uses two CD batteries.

A remote-activated battery was used for many years; currently a manually-activated battery is being used for this application. The current configuration (manually activated battery) has also been designed and qualified for use in the GPS application.

1.4.8 Weapon System Ordnance Devices

The MMIII utilizes a number of ordnance devices during flight and test operations. These devices do not include the nuclear warhead managed through the Department of Energy (DOE).

1.4.8.1 Launch Facility Ordnance (LFO)

The current MMIII system employs 4 types of ordnance items within each Launch Facility. Those items are the Launcher Closure Ballistic Gas Generator, Umbilical Disconnect Cartridge, Umbilical Retract Actuator Cartridge, and the Suspension System Explosive Bolt.

1.4.8.1.1 Launcher Closure Ballistic Gas Generator (BGG)

The BGG provides pressure, in the form of hot gases, to drive an actuator that removes the launcher closure door from the silo before missile launch. The BGG detonator contains boron/potassium nitrate (BKNO3) with two redundant ES-003/Mk2 MOD 0 squibs for initiation of the ammonium nitrate-based propellant grain in the BGG cartridge. A replacement gas generator is projected in the near future.

1.4.8.1.2 Umbilical Disconnect Cartridge

The umbilical disconnect cartridge shears a pin to disconnect the upper umbilical cable from the missile just before launch. Only one cartridge is used per missile. The cartridge has three pins and two bridge-wires for redundancy. One pin is a common ground for the two bridge-wires. The cartridge contains a primer mix and main charge.

1.4.8.1.3 Umbilical Retract Actuator Cartridge

The umbilical retract actuator charge operates the ballistic rotary actuator to retract the G&C system umbilical cable from the missile to the launch tube wall before Stage 1 ignition. The cartridge contains two redundant Mk2 Mod 0 squibs, BKNO3, and two propellants.

1.4.8.1.4 Suspension System Explosive Bolt

The suspension system explosive bolt assembly disengages the missile restraining (or articulating) arms at the time of launch. The explosive bolt is 4.7 inches long with a diameter of 0.5 inch.

1.4.8.2 Reentry System Reentry Vehicle (RS/RV) Ordnance

The RS/RV Subsystems contain items for the Mk12A, Mk21, and RS components that include rocket motors, initiators, and other cartridge-actuated devices.

1.4.8.2.1 Mk12A Spin Gas Generator

The spin gas generator generates high-pressure gases for RV spin. The generator is five (5) inches in length and five (5) inches in diameter.

1.4.8.2.2 Mk12A Spin Gas Generator Initiator

The Mk12A Spin Gas Generator initiator ignites the Mk12A Spin Gas Generator to enable proper RV axial stabilization.

1.4.8.2.3 Mk21 Rear Cover Assembly

The Mk21 rear cover assembly is the aft end of the Mk21 RV which contains the Mk21 Spin Gas Generator. This assembly shall be controlled using Nuclear Weapons-Related Materiel (NWRM) processes.

1.4.8.2.3.1 Mk21 Spin Gas Generator

The Mk21 Spin Gas Generator is a subcomponent of the Rear Cover Assembly and by itself is also considered NWRM. This device provides high-pressure gases required for RV spin.

1.4.8.2.4 Mk21 Delay Initiator

The initiator/delay combination ignites the Mk21 Spin Gas Generator to enable proper RV axial stabilization.

1.4.8.2.5 Shroud Rocket Motor

The Shroud Rocket Motor is located in the forward end of the shroud and is used to pull the shroud away from the support payload bulkhead and RVs.

1.4.8.2.6 Shroud Rocket Motor Initiator

The Shroud Rocket Motor igniter ignites the Shroud Rocket Motor. The igniter is one (1) inch in length, 0.9 inches in diameter, and is an electrically-initiated hot-bridge wire device.

1.4.8.2.7 Thruster Bolt Impulse Cartridge

The Thruster Bolt Impulse Cartridge shears the thruster bolt in the v-band clamp to release the Shroud Assembly.

1.4.8.2.8 Ball Lock Impulse Cartridge

The Ball Lock Impulse Cartridge provides pressure to move a piston within the Ball Lock to release the RV. There are six cartridges for each RV.

1.4.8.3 Solid Rocket Motor Ordnance Components

These ordnance components serve a variety of functions, including stage separation, skirt jettison, stage ignition, roll control, LITVC pressurization, and thrust termination.

1.4.8.3.1 Igniter Safe/Arm Device

This electro-mechanical switch provides the energy to ignite the solid rocket motor stages and serves as a safety mechanism to prevent inadvertent initiation.

1.4.8.3.2 Circumferential and Longitudinal Detonation Cord

This 12.3 grain-per-foot lead sheath Royal Detonating Explosive (RDX) detonation cord helps provide proper stage separation and skirt jettison.

1.4.8.3.3 Detonators

Detonators consist of an electrical connection that mates to the 7300 Arm/Disarm (A-D) switch and includes all energetic materials to initiate the linear explosive assemblies.

1.4.8.3.4 H-Boosters

H-Boosters contain RDX explosives and provide redundancy to the ordnance firing train.

1.4.8.3.5 Time Delays

Stage 2 uses redundant time-delay boosters to delay skirt removal. The time delay is approximately 16 seconds from initiation by the linear explosive assembly.

Stage 3 uses redundant time-delay boosters for separation of the skirt. The time delay is one (1) second from initiation by the linear explosive assembly.

1.4.8.3.6 Mechanical Safe/Arm Devices

Mechanical safe/arm devices provide mechanical alignment of ordnance transfer charges upon stage separation via lanyard.

1.4.8.3.7 Arm/Disarm (A-D) Switch

The PSRE employs two A-D switches and each interstage within the booster employs one A-D switch. Although not an energetic device, the Government’s ordnance experts also manage A-D switches due to their integration within the ordnance systems and application throughout the flight vehicle.

1.4.8.4 Liquid Propulsion Ordnance Components

The ordnance components within the PSRE are responsible for propellant pressurization and separation from the third stage.

1.4.8.4.1 Pyrocartridge

Five Pyrocartridges located within the PSRE, each of which creates an impulse to drive an isovalve piston to allow proper gas or liquids propellant flow.

1.4.8.4.2 Ordnance Module

The Ordnance Module provides pressure to provide an electrical and mechanical disconnect between the Stage 3 and the PSRE.

1.4.8.5 Unique Operational Test Ordnance

This ordnance is unique to operational test and evaluation. It provides the means to destroy the missile in the event of a flight anomaly.

1.4.8.5.1 All Ordnance Destruct System (AODS)

The AODS is installed at the test range to provide a reliable method for in-flight missile destruction. This system consists of the CD Safe/Arm device, detonating cords, boosters, crossover assemblies, launch safety closures, PSS Safe/Arm devices, actuators, timers, acceleration switches, and batteries.

1.4.8.5.2 Modular Mechanical Ordnance Destruct System (MMODS) The MMODS is installed at the test range to provide a reliable method for in-flight missile destruction. The system is mainly a modular mechanical system, relying on lanyard actuated devices to sever the pressure vessels and render them non-propulsive. MMODS consists of linear shaped charges, a Pull Actuated Device System (PADS), and CD safe/arm devices.

1.4.9 Propulsion Flight Test Support Equipment

ICBM flight tests are scheduled three to four times each year and are conducted by the AF’s cognizant flight test authority at VAFB. Various flight and nonflight components are necessary to support this effort in addition to the AODS and MMODS ordnance systems described in Sections 1.4.8.5.1 and 1.4.8.5.2. Technical Order (TO) 21M-LGM30F-4-1-1 describes each of the parts listed below in additional detail (TO Figure reference in parenthesis). This table is intended for reference only, not intended to be inclusive of all flight test support equipment:

Components, Post-Boost Propulsion System (24)
Box Assembly, Protective Device, Inadvertent Ignition Ordnance (2-28)
Cable Assembly, Electrical Power (Explosive Bolt Cable), (2-81)
Rails, Missile Support (2-149)
Band, Retaining, Rocket Motor, Combat Training Launch Instrumentation (CTLI) (2150)
Work Platform, Missile Access (2-159)
Test Set, Electrical Cable (2-168)
Panel, Downstage Electrical System (2-169)
Lead Set, Test, Destruct Package Installation Facility (DPIF), CTLI Test Set, Explosive Set Circuitry (2-171)
Test Chamber, Safety, CTLI (2-172)
Lead Set, Test, Launcher, CTLI Test Set, Explosive Set Circuitry (2-173)
Test Set, Electrical, Cable, AN/GSM-144 (2174)
Cable Simulator, Self-Test (2-175)
Circuit Analyzer (2-176)
Power Supply Assembly (2-177)
Relay, Chassis Assembly (2-178)
Detector Assembly (2-179)
Tester, Safety and Arming Device Test Set (2180)
Test Set, Missile System Components (MSC) (2-202)
Test Unit, MSC, AN/GSM-349A (2-203)
Cable Assembly, Video Display Power (2-204)
Chassis Assembly, Peripheral Component Interface Extension for Information (PXI), 14slot (2-205)
Cable Assembly, CD Safe and Arm (S/A) (2206)
Support Fixture, Post-Boost Propulsion System (2-209)

Retainer, Electrical Connector (2-211)

Table 1. Parts List

1.4.10 Depot Support Equipment

The PSSC contractor will have the responsibility to assist the Government in ensuring continuing functionality of the following Government-owned and maintained (unless otherwise noted) support equipment and software. The PSSC contractor will provide engineering support to troubleshoot unless otherwise noted in the description. This table is intended for reference only, not intended to be inclusive of all depot support equipment and software.

EQUIPMENT
DESCRIPTION
Minuteman PSRE Test Set (MPTS)
Tests the electrical and pneumatic functions of the PSRE
Cablemaster
Test the electrical functions of the PSRE cables
P106 actuator console
P106 Actuator component level tests
Guided Missile Components Test Stand
Performs functional testing of assembled flight control units prior to NHA activities
Servocomponents Test Stands
Tests the electrical and physical functionality of the Servocomponents for the flight controls
Auxiliary Power Supply Test Stands (APS Test Stands)
Tests the functionality of APSs for the flight controls
Fill and Bleed Test Stands
Fills and bleeds the flight controls
Injector Cycling Test Station
Test P116A1 injectors
Pump Dynamic Test Stands (Dynamic)
Tests the functionality of pumps for the flight controls
Pump Static Test Stands (Static)
Tests the functionality of pumps for the flight controls
Static Leak Test Stand
Tests the static leak behavior of the flight controls
Large Motor Test Stand (Large Customizable Motor Test Stand (CMTS))
Tests the functionality of the dc motors for flight controls
Small Motor Test Stand (Small CMTS)
Tests the functionality of the dc motors for flight controls
Brush Run-in Stands
Runs in brushes for the flight control dc motors
Shaker
Physically shakes flight controls
Aqueous Motor Cleaner
Cleans flight control motors
Self-Test Calibration Adapters (Cal Carts)
Provides calibration capabilities for the test stands in the flight control shop
Spray Flush Booth
Cleans flight control components
Vapor Degreasers
Degreases flight control components
Explosive Set Circuitry Test Set (ESCTS)
- Performs electronic tests on cables and ordnance items at the weapon system level in the field

Note: Upgrades and Mods to software and or redesign efforts to support new assets, as well as technical support for failures and anomalies

Safety and Arming Test Set
Performs electrical check out of Ordnance Safe and Arm Devices

Note: Upgrades and Mods to software and or redesign efforts to support new assets, as well as technical support for failures and anomalies

Ordnance AS test fixtures
AS testing fixtures to include: Closed Bombs, Shock and Vibe Plates, Cables, Mounts

Note: Design changes, Fixture Surveys, Structural Analysis

Guided Missile Test Set
Performs tests the MM booster and rocket motors, including functional and final acceptance testing of all circuits and flight control functions
Electrical Cable Test Set
Performs continuity check on MM rocket motors
Raceway Cable Test Set
Performs cable checks to identify functionality and validate repairs
Pressure Transducer Test Set
Tests solid rocket motor pressure transducers
Roll Control Valve Test Set
Tests solid rocket motor roll control valve functionality
Motor Leak Test Set
Tests solid rocket motor chamber ability to hold static pressure

Table 2. Depot Support Equipment

1.4.11 Modeling and Simulation Table

The PSSC contractor will maintain the ability to develop, maintain, run, and update models in support of ICBM Propulsion systems sustainment. The following is a current list of models used for ICBM sustaining engineering and engineering assessment activities.

Model
Description
Propulsion Model
Contains equations and propulsion performance data for the boost and post-boost phases of flight. Derives system performance for software and simulation studies.
Mass Properties Model
Contains equations to compute center of gravity, instantaneous mass, and inertia tensors transformation relations. Derives sequential mass properties for system performance models - these models contain mass properties data for the various missile configurations.

Multiple Independently Targeted Reentry Vehicle

Single Reentry Vehicle

Propulsion Replacement Program (PRP)

PRP/Safety Enhanced Reentry Vehicle (SERV)

Propulsion System Rocket Engine (PSRE)

Boost Aerodynamics Model
Contains equations and data required to calculate MMIII aerodynamic forces acting on missile during flight.
Control System Model - GRP
Contains algorithms and data used for boost Thrust Vector Control (TVC) and roll control systems and post boost TVC system performance calculations for missile pitch, yaw, and roll.
Separation Model
Contains lateral impulse data for 1-2 and 2-3 staging events, axial separation velocity for stage 3/PBV separation, and skirt jettison timing for stages 2 and 3.
Structural Dynamics Model
Used to determine missile control bending data. Documents MMIII stiffness and mass properties and data sources. Also documents NASTRAN digital files on tape and disk of various substrates.
Thermal and Structural Models
Used to determine the thermal and/or structural condition of Propulsion items to include (but not limited to) solid propellant grain, motor cases (metal and composite), stage structural hardware, pressure vessels, inter-stage hardware, component mounting hardware, and nozzle components.
Internal Ballistics Models
Used to determine the internal operational characteristics of Propulsion components such as solid rocket motors, gas generators, igniters, and initiator assemblies.
Propellant Residual Model
Defines/Contains Stage 3 propellant reserve (for Stage 3, including the Management Reserve) and PSRE performance reserve to meet the targeting performance reliability of 97P/90C.
Boost Steering Model
Contains algorithms and data used to determine stages 1 and 2 steering coefficients and sequencing coefficients (K1, K2).
Pitch Steering and Staging Coefficients Model
Contains stages 1 and 2 steering coefficients K24 through K32 and K39. Classified.
Propulsion Parameter Perturbations Model
Contains the propulsion perturbation data required for Monte Carlo and off-nominal analyses.
Mass Properties Perturbation Model
Contains mass property perturbation data required for Monte Carlo and off-nominal analyses.
Aerodynamics Perturbation Model
Contains aerodynamic perturbation data required for Monte Carlo and off-nominal analyses.
Bending Mode Tolerances
Contains control bending mode data required for Monte Carlo and off-nominal analyses. Results in bending mode tolerances.
Thrust Misalignment and Offset Data
Contains thrust vector misalignment and offset data required for Monte Carlo and off-nominal analyses of booster and post boost propulsion systems.

Table 3. Model List

1.5 APPLICABLE DOCUMENTS

Compliance and reference documents related to specifications, standards, handbooks, regulations, instructions, and applicable to the work required in the performance of this contract are listed in APPENDIX F: APPLICABLE DOCUMENTS. The documents in Appendix F form a part of this PWS to the extent specified. In the event of conflict between the document referenced and contents of this PWS, the PWS shall be considered a superseding requirement. If vendors are knowledgeable of critical documents or requirements not listed in this draft PWS, it is expected they inform the Government to ensure adequate coverage.

The contractor shall comply with the current versions of compliance documents unless specifically exempted by the Government.

1.6 REQUIREMENTS

The requirements in this section are intended to describe the capabilities necessary to sustain the weapon system and encompass the scope of effort expected to be executed for this contract. Capabilities may be applied to future programs, technology insertion, major modifications, integration, or requirements definition for a follow-on system. Use of the PSSC capabilities for future Propulsion-related efforts would be incorporated as new Contract Line Item Numbers (CLIN) on the contract as the tasks and/or funds are identified and available.

1.6.1 Basic Description

1.6.1.1 The PSSC contractor shall support the Government in their effort to integrate and coordinate all activities necessary to assess, report, and sustain the operational capability and reliability of the ICBM Propulsion Subsystem through 2030 and disposal.

1.6.1.2 The PSSC contractor shall support the Propulsion IPT(s). The PSSC contractor will provide this support at the individual Propulsion IPT level and will support the Government who is responsible for weapon system-level engineering and program management support.

1.6.1.3 The PSSC contractor shall support the Government in the following functional areas: Program Management Support, Technical Services, assessment operations, and all corresponding AssessFixBuy activities required for the subsystem that are not accomplished on a different contract or by an organic entity outside the ICBMSD.

1.6.1.4 The PSSC contractor shall coordinate with the Government and Directorate Security Manager to ensure its personnel attain appropriate access levels to the applicable information systems. Access to Government information systems shall be restricted to PSSC contractor personnel requiring access to accomplish their PSSC responsibilities.

1.6.1.5 The PSSC contractor shall coordinate their activities for the purpose of integration with the 748 SCMG, Global Ammunition Control Point (GACP), the 309th Missile Maintenance Group (MMXG), the 75th Air Base Wing (ABW), Department of Defense (DoD) and Department of State (DOS) agencies, the Department of Transportation (DOT), the DOE, the National Aeronautics and Space Administration (NASA), Missile Defense Agency (MDA), and other Government agencies as required.

1.6.2 Integration

1.6.2.1 The PSSC contractor shall support and staff all subsystem integration efforts by performing the following activities: assessing and managing requirements changes; addressing and documenting internal and external interfaces; designing, testing, and integrating hardware and software, and accomplishing the associated documentation changes; accomplishing all associated verification and validation activities, as directed by the Government; and supporting integration working group meetings as defined elsewhere in the PWS.

1.6.2.2 The PSSC contractor shall collaborate with the Government, ISC contractor, Partial Bridge Contract (PBC) contractor, and all other subsystem contractors to include new start acquisition contractor(s), e.g., the ICBM Fuze Modernization Program contractor, in the process of ensuring full compatibility with the subsystem and the weapon system.

1.6.2.3 The PSSC contractor shall assess all modifications to include replacements, life extensions, and any changes proposed by the contractor or their subcontractors for any potential integration impact(s) on the subsystems and/or the weapon system as a whole.

1.6.2.3.1 The PSSC contractor shall ensure assessment and analysis of modifications are accomplished using Government integration processes as defined in the following ICBMSD documents as guidance: ICBMSD Operating Instruction (OI) 62-08, Requirements Validation Board, ICBMSD OI 6319, Data Management, and all other relevant systems integration guidance that may apply at a future date.

1.6.2.3.2 The PSSC contractor shall proactively engage with the Government, ISC contractor, other subsystem contractors, and those contractors awarded future modification efforts to ensure any proposed modifications will have no negative impact on the subsystem or the weapon system as a whole.

1.6.2.3.3 The PSSC contractor shall establish NDAs with the ISC contractor and the other subsystem and acquisition contractors, as required, to enable successful integration efforts.

1.6.3 Projected Meetings and Estimated Frequencies

The following are projected meetings (not all inclusive) and estimated frequencies:

MEETING
FREQUENCY
PWS REFERENCE
Technical Council
Minimum semi-annual and maximum quarterly
PWS 1.3.3
Program Management Reviews
Quarterly or as indicated in PWS Section II
PWS SECTION II – SERVICE SUMMARY
Reliability Scoring Panel
Semi-Annual
PWS 1.6.6.2.5
Technical Interchange Meetings
As required
PWS 1.6.6.1.1.5
Corrosion Prevention Advisory Board
As required
PWS 1.6.6.1.9
Launch Anomaly Group
As required
PWS 1.6.6.2.9
Task Log Review (Management Review)
Quarterly
PWS 1.6.5.4.3
Interface Control Working Group
As required
PWS 1.6.6.1.16.2
DMSMS Working Group
Monthly
PWS 1.6.6.1.20
Material Review Boards
As required
PWS 1.6.6.1.9

Configuration Control Board (CCB)

· Technical Evaluation Review Board (TERB) Preliminary meetings to support CCBs As required

· Weekly meetings, contractor would only be required on an as-requested basis

PWS 1.6.6.1.7.1.1

Product Improvement Working Groups
Twice annually
PWS 1.6.6.1.9
Subsystem IPT Meeting
Weekly
PWS 1.6.1.2, 1.6.5.4.1

Nuclear Surety:

ICBMSD System Engineering, Environment, Safety & Technical Data (NIEV) Safety IPTs

ICBM Nuclear Surety Working Group (NSWG)

Air Force Nuclear Weapon System Safety Groups (NWSSG)

ICBM Project Officers Working Group (POG)

Nuclear Security Working Groups

ICBM Codes Conference

Monthly

Quarterly

Minimum Once Every 3 Years, Program Could Trigger Additional Meetings

Annually

PWS 1.6.6.1.3

System safety support:

Program IPTs

Safety IPTs

ICBM POG

Weekly

Monthly

PWS 1.6.6.1.12.1

Risk Management Boards
Monthly
PWS 1.6.5.1

Table 4. Projected Meetings and Estimated Frequencies

1.6.4 Contractor Manpower Reporting

1.6.4.1 The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the PSSC via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

1.6.4.2 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.

1.6.5 Program Management Support

1.6.5.1 Risk Management

1.6.5.1.1 The PSSC contractor shall provide standardized risk assessment and management functions through the Government, utilizing techniques consistent with the Government’s most current risk management process, reference ICBMSD OI 62-10, Risk Management. [CDRL A021, DI-MISC-80508B/T, Risk Assessment Studies and/or Recommendations (subtitle)]

1.6.5.1.2 The PSSC contractor shall utilize the Government’s current risk management system as identified in ICBMSD OI 62-10, Risk Management. If the Government’s risk management system changes, the PSSC contractor shall comply with this change.

1.6.5.1.3 The contractor shall provide a Contractor’s Risk Management Plan. [CDRL A004, DIMGMT-81808, Contractor’s Risk Management Plan]

1.6.5.2 Commercial Small Business Involvement

The PSSC contractor shall be required to make a best effort to meet small business subcontracting goals to include Small Businesses (SB), Veteran-Owned Small Business (VOSB), Service Disabled Veteran-Owned Small Business (SDVOSB), HUBZone…