OKLAHOMA CITY
AIR LOGISTICS CENTER
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
TEAM TINKER
Pre-Solicitation Conference Tinker Air Force Base Oklahoma City Air Logistics Complex Material Support Integrator (MSI) Program
5 March 2014
Agenda Opening Remarks Oklahoma Small Business Development Center Program History/Background Milestones Pricing Briefing Source Selection Procedures/Plans Discussions/Q&As
Opening Remarks Welcome Introduction: Government Team Members Contracting Officer: Jill Graham Cost/Price Analyst: Janice Cessna Program Manager: Scott Minnick Source Selection Advisor: Van Garmon Program Office: James Hudson
TAFB Small Business Office – OC-ALC/SB Joanne Davis, Director 405-739-2601
Rose State College Oklahoma Small Business Development Center Jeanna McManus Voice: 405-733-7348 Fax: 405-733-7586 E-mail: jmcmanus@rose.edu Web Site: www.rose.edu/small-business-development-center
OC-ALC Material Support Integrator (MSI) Point of Use History
PROGRAM BACKGROUND
PROGRAM BACKGROUND
Material Support Integration is a means to vend, control and improve accountability of Common use Items/Material at the Shop Floor 24/7
Equipment/Software supports a wide range of Material Control/Accountability solutions
Maintenance Support Group (MXSG) began installing Point of Use (POU) equipment in Nov 03
Maintenance Production Shops followed suit in Feb 05
MXSG Guidance Sep 06 MXSG to Centrally Manage the MSI Program for the OC-ALC Provide a Complex Wide Solution for POU & Common Use Items/Material Develop an Integrated Supply Contract to procure and distribute common use items to the POU locations To Date: 361 POU pieces of equipment on site, 221 POU Locations, 31 Buildings
Program Growth February 2007 140 POU devices on site, 15 buildings and purchasing approximately 5300 items Current Follow-on Effort 361 POU devices on site, 221 POU locations, 31 buildings and purchasing approximately 5664 items
REQUIREMENTS DESCRIPTION
Material Support Integrator Services Obtain Material and Supply Agreements with Vendors to provide all the Common Use Items
Sustainment of over 221 different locations Sustainment of over 350 Automated Point-of-Use (POU) devices Sustainment of 17 Non-Automated Cribs Sustainment of approximately 80 Production Support Centers Purchasing for approximately 5,700 Items Management and Process Improvement for entire Common Use Item List (CUIL)
Acquisition Strategy OC-ALC Material Support Integrator
Competitive procurement
Small Business Set Aside, NAICS Code 561210
J&A for Brand Name Items 282 Common Use Items Sultzer Metco, Praxair, Buehler, Struers
FAR Part 12 Contract , Utilizing FAR Part 15 Procedures Firm Fixed Price (FFP) Contract 1 month phase-in, 11 month Basic, four 1-year options Approximately 5,700 Items, 221 Locations, 361 Automated, 17 Non-Automated, 80 PSCs
OC-ALC Material Support Integrator
Contract Line Item Numbers (CLINs)
CLIN 0001, FFP, Common Use Items Brand Name or Equal Brand Name provisions for Sulzer Metco, Praxair, Buehler and Struers items
CLIN 0002, FFP, Inventory Management Service Portion of Effort
CLIN 0003, NSP, Data Contractor Format CDRL A004 Inventory Management Improvement Report
0004, FFP, Phase-In
OC-ALC Material Support Integrator
Special Contract Provisions Funding for CLIN 0001 POU Common Use Items Changes in POU Common Use Item List
Performance Based Acquisition
AFI 63-138
Service Contract Act Applies
OC-ALC Material Support Integrator
Government Furnished Property 4 Laptop computers, 4 docking stations Industrial storage space in Building 9001
Source Selection Procedures Tradeoff Source Selection Procedures
Acquisition Center of Excellence involvement
OC-ALC Material Support Integrator Milestones
Notional Milestones
| EVENT | MILESTONE | ACTUAL |
| Draft PWS/RFP to Industry | 6 Feb 14 | 5 Feb 14 |
| Pre-Solicitation Conference | 20 March 14 | 5 March 14 |
| Release Formal RFP | 3 April 14 | |
| Receipt of Proposals | 19 May 14 | |
| Discussions (if necessary) | 13 Aug 14 | |
| Award | 17 Nov 14 |
Pricing Briefing MSI Pricing Briefing Ms. Janice Cessna Solicitation # FA8125-14-R-0001 5 March 2014
FACTOR 3: Price Government shall assess all technically acceptable offers for price reasonableness, completeness, and balance Evaluation will include Phase-In, Basic Period, all option year prices and the potential six-month extension Evaluation of options does not obligate the Government to exercise such options or extensions
FACTOR 3: Price (continued) The Total Evaluated Price (TEP) will be calculated as the sum of the Offeror’s proposed pricing multiplied by the BEQs The TEP will be used for evaluation purposes only
FACTOR 3: Price (continued) Reasonableness Proposed prices will be evaluated for reasonableness Pricing will also be evaluated for completeness Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404 in order to determine price reasonableness Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business Burden of Proof for credibility of proposed prices rests with the Offeror
FACTOR 3: Price (continued) Unbalanced Pricing Proposals will be reviewed for unbalanced pricing The Government may also determine a proposal unacceptable should the proposed prices be materially unbalanced Offerors may provide supporting explanation in the initial proposal of variance in pricing that suggests lack of balance Information Other than Cost or Pricing Data
FACTOR 3: Price (continued)
Pricing Information Cost assumptions Price reduction per Management Decision
Rounding CLIN pricing shall be rounded to four decimal places Government will apply specified format to determine the extended pricing and the TEP
FACTOR 3: Price (continued) Total Evaluated Price (TEP) The TEP will be calculated as the sum of the Offeror proposed unit prices in Exhibit 1, Common Use Item List (CUIL), and Exhibit 2, MSI Inventory Management, and CLIN 0004, Phase-In.
The TEP will be calculated as the sum of the Offeror proposed prices for the Phase-In, the Basic Period, the four Option Periods, and the six-month Extension Period
FACTOR 3: Price (continued) The six-month extension unit prices will be based on the proposed unit prices for Option Period 4 Also, the overall evaluated proposal price of each CLIN total will be calculated
FACTOR 3: Price (continued) Total Evaluated Price The Best Estimated Quantities (BEQ) in Exhibit 1 and Exhibit 2, provide information to be utilized as a basis for proposing prices by contract periods Evaluation quantities in the Exhibits are for evaluation purposes only and do not obligate the Government Extended pricing per CLIN will be based on proposed unit prices multiplied by the government provided estimated quantities
TEP Calculation CLIN X001 total + CLIN X002 total + CLIN 1004 = TEP
CLIN X001 total = Sum of extended amounts for all items, all yrs.
(Extended $ = Offeror proposed unit price X Est. Qty.)
CLIN X002 total = Sum of annual TEP for each period
| (Annual TEP = Sum of Offeror proposed unit price [monthly | |
| price] for 4 categories X 3) |
CLIN 0004 = Proposed unit price
Source Selection Procedures/Plans
Source Selection Training
AIR FORCE
SUSTAINMENT CENTER
Van Garmon
AFMC AFSC/PZCAB
734-3815 van.garmon@tinker.af.mil I n t e g r i t y - S e r v i c e - E x c e l l e n c e
SOURCE SELECTION
What Is It Best Value Main Members Exchanges with Offerors
EVALUATION FACTORS AND RATINGS
Technical Past Performance Price
AWARD DECISION
CONCLUSION
Topics
Best Value award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technically acceptable proposal, and superior past performance of the higher priced offeror outweighs the price difference with lower priced offerors.
The Government reserves the right to….
Trade-off possibilities Past Performance Price Technical Proposals Acceptable or Unacceptable
PERFORMANCE – PRICE TRADE-OFF SOURCE SELECTION
Source Selection Authority (SSA) Makes the award decision Selects which proposal or proposals represent the best value to the Government
Procurement Contracting Officer (PCO) Directs the evaluation of proposals Source of all direct communication between the Government and offerors
Source Selection Evaluation Board (SSEB) Evaluate Proposals Assign ratings Present evaluation results to the SSA
Source Selection Team Main Members
Source Selection Evaluation
Offeror A OfferorB Offeror C
A Offeror B
EVALUATION
CRITERIA
SSEB does not compare proposals against each other SSEB evaluates each proposal against the stated evaluation criteria
Source Selection Decision Offeror A OfferorB
SSA does compare proposals against each other SSA offeror comparison is based on the following considerations
Technical acceptability for each offeror Past Performance ratings and total evaluated price for each offeror Factor order of importance as stated in the RFP
FACTORS FOR
AWARD
EVALUATION CRITERIA
Criteria for award selection Evaluation factors and subfactors, and order of importance in relation to each other Factor rating definitions Proposals will be evaluated against stated criteria
INSTRUCTIONS
TO
OFFERORS
INSTRUCTIONS REGARDING PROPOSAL
CONTENT AND FORMAT
Includes format requirements, accepted document types, page limitations, etc Proposal separated into volumes, such as Technical, Past Performance, Price, etc Past Performance Package
ADDENDUM
TO
52.212-1
ADDENDUM
TO
52.212-2 Request for Proposal
FACTOR 1
TECHNICAL
FACTOR 2
PAST PERFORMANCE
FACTOR 3
PRICE
1 Resource Management 2 Program Management 3 Common Use Item List Subfactors Evaluation Factors For all technically acceptable proposals, Factor 2 (Past Performance) will be evaluated on a basis significantly more important than Factor 3 (Price).
Order of Importance
TECHNICAL
SUBFACTOR
LEVEL RATING
ACCEPTABLE
UNACCEPTABLE
PAST
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
UNKNOWN
FACTOR 2
PRICE
TOTAL
EVALUATED
PRICE
COMPLETENESS
REASONABLE
FACTOR 3
TRADEOFF
Evaluation Factors and Ratings for Trade-Off Process
The Government will evaluate all factors concurrently for all proposals.
Initial ratings and evaluated price will be established for each offeror.
Technical will be evaluated IAW para 2.2
Past Performance will be evaluated IAW para 2.3
Price will be evaluated IAW para 2.4
The SSA will assess the price and past performance ratings for all technically acceptable offers and make an integrated assessment for a best value award decision.
Evaluation Methodology As Described in the RFP
Exchanges with offerors are conducted through Evaluation Notices (ENs)
Three types of ENs Clarifications – limited exchanges when award without discussions is contemplated Communications – exchanges leading to the establishment of a competitive range Discussions – formal negotiations conducted after the establishment of a competitive range Conducted with every offeror within the competitive range Each offeror is given the opportunity to revise their proposal Exchanges with Offerors During Source Selection
TECHNICAL
SUBFACTOR
LEVEL RATING
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
EVALUATED
PRICE
ACCEPTABLE
Proposal clearly meets the minimum requirements of the solicitation.
Technical Rating Definition
Proposal does not clearly meet the minimum requirements of the solicitation.
Technical Rating Definitions
Technical Evaluation Each subfactor includes a list of criteria which defines the minimum requirements for that subfactor 1- Resource Management – 1 element (a) 2- Program Management – 5 elements (a – e) 3- Common Use Item List – 2 elements (a – b)
In order to be rated “Acceptable” for the Technical Factor, the offeror must meet all criteria in each element within each subfactor.
Failure to meet any element criteria will result in an “Unacceptable” rating for the corresponding subfactor.
An “Unacceptable” subfactor rating will result in an overall “Unacceptable” rating for the Technical Factor.
Technical Evaluation
RESOURCE
MANAGEMENT
PROGRAM
MANAGEMENT
COMMON USE
ITEM LIST
a)
TECHNICAL FACTOR
RATED AS
ACCEPTABLE, UNACCEPTABLE
a) b) a) b) c) d) e)
TECHNICAL
SUBFACTOR
LEVEL RATING
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
EVALUATED
PRICE
Performance Confidence Assessment Rating Measures the level of confidence the Government has in the offeror’s likelihood of successfully performing the proposed effort.
Rating is established through a review and analysis of the offeror’s recent, relevant, and past performance.
Performance evaluation focuses on portion of effort the offeror accomplished on previous/current contracts compared to the portion to be performed on the proposed effort.
Emphasis is on demonstrated performance
LIMITED
CONFIDENCE
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
SUBSTANTIAL
CONFIDENCE
SATISFACTORY
CONFIDENCE
NO
CONFIDENCE
UNKNOWN
CONFIDENCE
(Neutral)
Confidence Definitions DoD Source Selection Procedures, Table 5
Recency Recency, as stated in the RFP The effort must have been performed during the past three (3) years from the date of issuance of the current RFP
If any part of the performance falls within the recency timeframe, the contract in its entirety may be evaluated for past performance
For example, if a contract was completed within the recency timeframe, the Government may also consider the Phase-In portion of that contract, which may have occurred seven years ago.
Relevancy Evaluation determines how closely the offeror’s past and current performance relates to the Technical subfactors and Price for this requirement
Relevancy considerations Similar service Breadth and depth of skills
Similar… Scope Magnitude Complexity Contract Type
PAST PERFORMANCE
RELEVANCY
Reflects how relevant the contractor’s previous work is to the proposed acquisition Describes how well the contractor performed the previous work
BLUE -- EXCEPTIONAL
PURPLE -- VERY GOOD
GREEN -- SATISFACTORY
Past Performance Evaluation
YELLOW -- MARGINAL
RED -- UNSATISFACTORY
CONFIDENCE RATING
RECENCY
VERY RELEVANT
RELEVANT
SOMEWHAT RELEVANT
NOT RELEVANT
Past Performance Evaluation
VR
VG
SUB 3
CUIL
SUB 2
PM
SUB 1
RM
R
VG
R
VG
SR
Y $100M (10 yr) Government Program
F34601-99-C-9932 FFP/CR
R E
VR
S R S $55M (8 yr) Company A Excel Project FFP
SR
S
SR
S $25M (5yr) Company B Order 58CP FFP/T & M
ALPHA, INC.
DOLLAR
AMOUNT
PROGRAM
CONTRACT #
ALPHA, INC
N/A $10M (10 yr) Company C N/A (G) FFP with Incentive $30M (9 yr) Government Program
F09603-98-C-9950 CPFF
N/A
ZETA CORP
VR
E R P S
R
VG
SR
S
PRIME
SUBCONTRACTOR
PRICE
R S R S
SR
S N/A N/A
Past Performance Data Sources Past Performance volume of the offeror’s proposal
Contract Information Sheets (Prime and Subcontractors) Provided by contractor as part of proposal
Questionnaires Included as part of the RFP package Completed by contractor references Submitted directly to Past Performance Evaluation Team
Contractor Performance Assessment Reporting System (CPARS) Government database of contractor performance records on government contracts
Past Performance Additional Notes Offerors should describe, in detail, the work performed on previous or current contracts as it relates to the criteria in the Technical subfactors.
Offerors should provide the portion of effort to be performed by each member of the team (Prime and subcontractors) as it relates to the criteria in the Technical Subfactors Instructions to Offerors (ITO) Attachment 2.0, Proposed Team List Be specific when describing which companies will be performing each criteria.
Past Performance evaluation is based on rating each member of the offeror’s team for relevancy and performance for the portion of effort they are proposed to perform.
TECHNICAL
SUBFACTOR
LEVEL RATING
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
EVALUATED
PRICE
Completeness Did the offeror complete the Bid Schedule as required by the RFP Does the offeror’s proposal include all supporting price information as required by the RFP
Reasonableness Price proposal should address all RFP requirements Competitive market should establish price reasonableness PCO makes the determination of price reasonableness
Price Evaluation
Three Phases of Source Selection Evaluation
Initial Evaluation offeror’s proposal ENs prepared and finalized Evaluation of EN responses Follow-up ENs
Initial Ratings established Ratings adjusted Based on EN responses Release ENs to offerors Request for Final Proposal Revisions (FPR) Receive FPRs from offerors Final evaluation of proposals Final ratings established SSA Best Value Decision
INITIAL
EVALUATION
DISCUSSIONS
FINAL
SOURCE SELECTION
AWARD
Total Evaluated Price Past Performance Confidence Level
Technical Evaluation Summary SSA’s Best Value Decision is based on comparison of all remaining offerors
ACCEPTABLE
Offeror A
$80.0M
SUBSTANTIAL
CONFIDENCE
Source Selection is a Subjective process
Source Selection Evaluation Team (SSET) strives for consistency with each offeror
SSET evaluation is based on stated factors and written criteria listed in the RFP, not a comparison of offeror proposals
SSA determines which offeror represents the best value to the Government based on a comparison of offerors against the evaluation criteria
Summary
QUESTIONS
Discussions/Q&A Note: All final answers will be posted on FedBizOpps.
Submitted Questions Q1. The icon for the hyperlink to file "SGFPMod091012AppBProperty070213.xlsx" is not active. Will the GFP list be provided prior to RFP release (even in draft form)?
A1. The hyperlink will be replaced with the actual GFP listing. GFP includes:
| 1. | 4 Laptop computers |
| 2. | 4 Docking Stations |
Also note PWS para 3.2, Shared Property, for amount of office space provided.
Q2. In Addendum 52.212-1, The outline references ITO paragraph 3.2.4 (e) as "Phase In Plan (Subfactor 5)." However, there are only 3 Subfactors identified for the Technical Volume in both Attachment 1 (Instructions) and Attachment 2 (Evaluation Facotrs). Please clarify the reference to "Subfactor 5.“
A2 “Subfactor 5” should have been “Subfactor 2, Element e”. However, Table 2.3 will be changed to mirror para. 3.2.2 and the changes will be reflected in the RFP.
Q3. In Addendum 52.212-1, The outline for Volume 1 (Technical) is not consistent with the "Volume Organization" as identified in paragraph 3.2.2 on page 7. Please clarify.
A3. Table 2.3 will be changed to mirror para. 3.3.2 and the changes will be reflected in the RFP.
Q4. In Addendum 52.212-1, It is assumed that the guidance provided regarding past performance reference "up to 4" supersedes the guidance in Attachment 1.1, Past and Present Performance Information Sheet (first paragraph)… "offeror submit between 6 and 10 PPIS forms." Please confirm.
A4. “Up to 4” is the correct guidance. Attachment 1.1 changed to reflect accordingly.
Q5. What is the current method of delivery to the POU location for large, heavy material such as 25 ft long tubing or 4 ft x 12 ft sheet rock?
A5. Currently these items are drop shipped to a warehouse that has the capabilities to unload large bulky items. The warehouse is the only POU location that orders these types of items.
Q6. We would like to understand the current manpower and wage requirements for the mission, recognizing we need to align with the wage determination rates you have provided within the RFP. Please provide a numeric breakdown of the current team members supporting the mission with corresponding occupation codes. Thank you”
A6. We cannot provide a numeric breakdown of the current team members as it is considered proprietary data.