Amended_RFP_FA810223R1000-0002_15Dec2022.pdf
PDF 515 KB Posted
- Attached to
- Antenna Program Services (APS) III Federal contract opportunity
- Solicitation number
- FA810223R1000
About this file
This is a solicitation for an indefinite delivery/indefinite quantity contract to provide antenna program services for the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base. The contractor will perform activities including program support, program engineering support, equipment assessments, antenna site surveys, installations, demolitions and material provision across multiple U.S. and international locations over a potential seven-year ordering period. The contract will have a minimum one-year base period with three one-year option periods exercisable after the base period. Pricing will be on a firm-fixed-price basis for CLINs established under the contract.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8102-23-R-1000-0002
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
FA810223R1000
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFLCMC HBSK
3001 STAFF DR STE 2AH 86A
TINKER AFB OK 73145-3303
BUYER: Jocelyn K Johnson/AFLCMC/HBK jocelyn.johnson.2@us.af.mil Phone: (405) 626- 1509
7. ADMINISTERED BY (If other than item 6) CODEFA8102
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA810223R1000
9B. DATED (SEE ITEM 11)
3-OCT-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ISSUED PURSUANT TO SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM
Notice to Offerors/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8102-23-R-1000-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
Amendment to add SCLS and Wage Rate Determinations as attachments
SUPPLIES OR SERVICES AND PRICES/COSTS
Program Support (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Program Support The contractor will perform activities in accordance with (IAW) the PWS 1.1.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
12 MO
Program Engineering Support (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Program Engineering Support The contractor will perform activities IAW the PWS 1.1.5.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Assessment (PDM/UDLM) - Andrews (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
36 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
36 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
36 EA
Assessment (PDM/UDLM) - Ascension (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
22 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Beginning
Specified Date Specified Date Req No / Pri
Required Period of Performance
22 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
22 EA
Assessment (PDM/UDLM) - Croughton (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Diego Garcia (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
Assessment (PDM/UDLM) - Diego Garcia (Base Period - Year 1)
1 EA
Assessment (PDM/UDLM) - Elmendorf (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Guam (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of
Assessment (PDM/UDLM) - Guam (Base Period - Year 1)
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Hawaii (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Type / Ship To Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Delivery
1 EA 20 SEP 2023 19 SEP 2024
Proposed Delivery
1 EA
Assessment (PDM/UDLM) - Lajes (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Assessment (PDM/UDLM) - Lajes (Base Period - Year 1)
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Offutt (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Puerto Rico (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Assessment (PDM/UDLM) - Puerto Rico (Base Period - Year 1)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Sigonella (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
39 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
39 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
39 EA
Assessment (PDM/UDLM) - West Coast (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Assessment (PDM/UDLM) - West Coast (Base Period - Year 1)
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Yokota (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
1 EA
Repair (PDM/UDLM) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Assessment Repair (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.2. and 1.1.3.3. At the Government's discretion PWS Paragraph
4. Repair in Table 2-1 and PWS Paragraph 1.4. may be utilized.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Andrews (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Ascension (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Croughton (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Diego Garcia (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Surve - Elmendorf (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Guam (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Type / Ship To Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Delivery
1 LO 20 SEP 2023 19 SEP 2024
Proposed Delivery
1 LO
Antenna Site Survey - Hawaii (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
2 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
2 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
2 LO
Antenna Site Survey - Lajes (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Sooner Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Offutt (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Puerto Rico (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Sigonella (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - West Coast (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Yokota (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Installation (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Installation The contractor will perform activities IAW the PWS 1.1.2. and 1.1.2.3.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Demolition and Disposal (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Demolition and Disposal The contractor will perform activities IAW the PWS 1.1.4.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna and Subsystem (Material) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna and Subsystem (Material) The contractor will perform activities IAW the PWS 1.1.2.2.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Noise Survey (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Noise Survey The contractor will perform activities IAW the PWS 1.1.8.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Training (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Training The contractor will perform activities IAW the PWS 1.1.7.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Data (Base Period - Year 1)
Item No.
Not Separately Priced Quantity U/I Unit Price
NSP
R425 Data IAW the Contract Data Requirements List (CDRLs). The contractor will perform activities IAW the PWS 1.2.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: In accordance with DD Form 1423s.
Travel (Base Period - Year 1)
Item No.
Firm Fixed Price - To Be Determined Quantity U/I Unit Price Amount
LO To be Negotiated
R425 Travel
Travel (Base Period - Year 1)
The contractor will perform activities IAW the PWS 3.4. The contractor shall include expeditious movement of personnel, parts and/or equipment, if necessary, to perform all the requirements outlined in the PWS to any of the HFGCS sites located worldwide. Payment shall be inaccordance with FAR 31.205.46. The Contractor shall utilize the Joint Travel Regulations (JTR) as applicable.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
LO TBD
Proposed Period of Performance
LO
Over and Above (O&A) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Over and Above The work called for under this CLIN shall be accomplished ONLY when authorized by the PCO/ACO prior to performance of the work in accordance with DFARS 252.217-7028. The Contractor shall provide all services, parts, equipment, labor and materials to perform all unforeseen requirements which occur due to differing site conditions, environmental concerns, or extreme weather conditions.The contractor will perform activities IAW the PWS 1.16.5.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Phase-In
Item No.
Phase-In
Not Separately Priced Quantity U/I Unit Price
NSP
R425 Phase-In IAW PWS paragraph 1.16.6.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: In accordance with DD Form 1423s.
Period of Performance: 21 July 2023 20 September 2023
CONTRACT CLAUSES
252.2037000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) (IAW DFARS 203.1714(a), DFARS 212.301(f)(ii))
252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)
(IAW DFARS 204.2105(c))
252.204-7023 REPORTING REQUIREMENTS FOR CONTRACTED SERVICES-BASIC (JUL 2021)
(IAW DFARS 204.1705(a)(i) and (ii))
252.204-7023 REPORTING REQUIREMENTS FOR CONTRACTED SERVICES-ALTERNATE I
(JUL 2021)
(IAW DFARS 204.1705(a)(i) and (iii))
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)
(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used.
The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS -- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(MAY 2022)
(IAW FAR 12.301(b)(4))
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19,Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L.
115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 89(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021)(41 U.S.C. 4704 and 10 U.S.C. 2402).
__X __ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41
U.S.C. 3509).
__X __ (3) 52.203-15, Whistleblower Protections Under the American Recovery and
Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).
(Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__X __ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) [Reserved] __X __ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L.
111-117, section 743 of Div. C).
__X __ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__X __ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (31 U.S.C. 6101 note).
__X __ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
____ (10) [Reserved} __ __ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022)(15
U.S.C. 657a).
__ __ (11) (ii) Alternate I (MAR 2020) of 52.219-3.
__ __ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
__ _ (12) (ii) Alternate I (MAR 2020) of 52.219-4.
(13) [Reserved]
__X __ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020)(15 U.S.C.
644).
__ __ (14) (ii) Alternate I (MAR 2020) OF 52.219-6.
__ __ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020)(15 U.S.C.
644).
__ __ (15) (ii) Alternate I (MAR 2020) of 52.219-7.
__X __ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)).
(17) (i) 52.219-9, Small Business Subcontracting Plan (OCT 2022) (15 U.S.C. 637(d)(4)).
__ __ (17) (ii) Alternate I (Nov 2016) of 52.219-9.
__ __ (17) (iii) Alternate II (Nov 2016) of 52.219-9.
__ __ (17) (iv) Alternate III (JUN 2020) of 52.219-9.
(17) (v) Alternate IV (SEP 2021) of 52.219-9.
__X (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
__X (18) (ii) Alternate I (MAR 2020) of 52.219-13.
__X (19) 52.219-14, Limitations on Subcontracting (OCT 2022)(15 U.S.C. 657s).
__ __ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.
637(d)(4)(F)(i)).
__X __ (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
(OCT 2022) (15 U.S.C. 657f).
__X __ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (OCT 2022)
(15 U.S.C. 632(a)(2)).
(22) (ii) Alternate I (MAR 2020) of 52.219-28.
__X __ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
__X __ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
X (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
X (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
__X __ (27) 52.222-3, Convict Labor (June 2003)(E.O. 11755).
__ __ (28) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2022)
(E.O. 13126).
__X __ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
__X __ (30) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246 X (30) (ii) Alternate I (Feb 1999) of 52.222-26.
__X __ (31) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020)(38 U.S.C. 4212).
X (31) (ii) Alternate I (July 2014) of 52.222-35.
__X __ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(32) (ii) Alternate I (July 2014) of 52.222-36.
__X __ (33) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212).
__X __ (34) 52.222-40, Notification of Employee Rights Under the National Labor relations Act
(Dec 2010) E.O. 13496).
__X __ (35) (i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
__ __ (35) (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ __ (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ __ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ _ (37) (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__X __ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June 2016) (E.O. 13693).
__X __ (39) 52.223-12, Maintenance, Service, repair, or Disposal of Refrigeration Equipment and Air Conditioners (June 2016) (E.O.13693).
__ _ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
__ _ (40) (ii) Alternate I (Oct 2015) of 52.223-13.
__ _ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s
13423 and 13514).
__ _ (41) (ii) Alternate I (Jun 2014) of 52.223-14.
__ __ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020)
(42.U.S.C. 8259b).
__ __ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products
(Oct 2015) (E.O.s 13423 and 13514).
__ _ (43) (ii) Alternate I (Oct 2015) of 52.223-16.
__X __ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving
(JUN 2020) (E.O.13513).
__X __ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) __X __ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).
__X __ (47) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
___ (47) (ii) Alternate I, (Jan 2017) of 52.244-3.
__ __ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
__ __ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV
2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
__ _ (49) (ii) Alternate I (JAN 2021) of 52.225-3.
__ _ (49) (iii) Alternate II (JAN 2021) of 52.225-3.
__ _ (49) (iv) Alternate III (JAN 2021) of 52.225-3.
__ __ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C.
3301 note).
__ X __ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of Treasury).
__ __ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ __ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)(42 U.S.C.
5150).
__ __ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)(42 U.S.C. 5150).
__X __ (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).
__ __ (56) 52.232-29, Terms for financing of Purchases of Commercial Products and
Commercial Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ __ (57) 52.232-30, Installment Payments for Commercial Products and Commercial
Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__X __ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award
Management (Oct 2018) (31.U.S.C. 3332).
__ __ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award
Management (Jul 2013)(31.U.S.C. 3332).
__ __ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ __ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ __ (62) 52.242-5, Payment to Small Business Subcontractors (Jan 2017) (15 U.S.C.
637(d)(13)).
__ __ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels
(NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
__ _ (63) (ii) Alternate I (Apr 2003) of 52.247-64.
(63) (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
__X __ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C.
206 and 41 U.S.C. chapter 67).
__ X __ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price
Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C.
206 and 41 U.S.C. chapter 67).
__ __ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__X __ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
__X __ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014)(41 U.S.C.
chapter 67).
__ __ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022).
__X __ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706. (Jan 2022) (E.O.
13706).
__ __ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (e)(1) of this paragraph in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiii) X (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O.
13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvi) 52.222-54, Employment Eligibility Verification (MAY 2022) (E. O. 12989).
(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii)52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES --
ALTERNATE II (MAY 2022)
(IAW FAR 12.301(b)(4))
Alternate II. As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows:
(d) (1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—
(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and
(ii) Interview any officer or employee regarding such transactions.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial products or commercial services, other than—
(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and
(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(A) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509).
(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).
(C) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(D) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(E) 52.219–8, Utilization of Small Business Concerns (OCT 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219–8 in lower tier subcontracts that offer subcontracting opportunities.
(F) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(G) 52.222–26, Equal Opportunity (Sept 2016) (E.O. 11246).
(H) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(I) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(J) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(K) 52.222–41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(L) __X __ (1) 52.222–50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
__ __(2) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(M) 52.222–51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(N) 52.222–53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(O) 52.222–54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989).
(P) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).
(Q) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
(R) (1) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(2) Alternate I (Jan 2017) of 52.224-3.
(S) 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(T)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .