This document is a solicitation for an indefinite delivery/indefinite quantity contract to provide antenna program services for the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base. The contractor will perform activities including program support, engineering, assessments, repairs, surveys, installations, demolitions, training, and noise surveys at various Air Force bases globally. The base period of performance is four years with options to extend up to an additional three years. Offerors should submit pricing for labor categories using the attached pricing matrix. The solicitation includes standard clauses for commercial contracts and provisions for small business participation.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 J
1. REQUISITION NUMBER Page 1
5. SOLICITATION NUMBER
FA8102-23-R-1000
b. TELEPHONE NUMBER (No collect calls) (405 ) 626 -1509 ext.
2. CONTRACT NO.
7. FOR SOLICITATION
INFORMATION CALL
3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
a. NAME Jocelyn K Johnson
8. OFFER DUE DATE/LOCAL
TIME
12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.
UNLESS BLOCK IS MARKED
SEE SCHEDULE
10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: 100 % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED
BUSINESS SMALL BUSINESS PROGRAM
NAICS CODE:
SERVICE-DISABLED EDWOSB 541330
VETERAN-OWNED SIZE STANDARD
SMALL BUSINESS 8 (A) $22.5 :
13a. THIS CONTRACT IS A
RATED ORDER
UNDER DPAS
(15 CFR 700)
13b. RATING
DO: A7 52.211-14, 52.211-15
14. METHOD OF SOLICITATION
RFQ IFB RFP
9. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFLCMC HBSK
3001 STAFF DR STE 2AH 86A
TINKER AFB OK 73145-3303
BUYER: Jocelyn K Johnson/AFLCMC/HBK jocelyn.johnson.2@us.af.mil Phone: (405) 626- 1509
15. DELIVER TO CODE
SEE LINE ITEM SCHEDULE
16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR FACILITY
CODE CODE
18a. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED. SEE ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, CLAUSE 252.232-7003.
FA8102
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
ISSUED PURSUANT TO SMALL BUSINESS COMPETITIVENESS DEMONSTRATION
PROGRAM
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 30 days.
Notice to Offerors/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
26. AWARD AMOUNT (For Gov’t use only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING
OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON
SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
X X
X
X X
X
25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE
X
SCD:B
EFT:T
Total
6. SOLICITATION ISSUE DATE
10 November 2022
STANDARD FORM 1449 (REV. 2/2012) BACK
COMPUTER GENERATED 11/9/2022, 2:40 PM
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
32c. DATE
41c. DATE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER36. PAYMENT
COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
FA8102-23-R-1000
SUPPLIES OR SERVICES AND PRICES/COSTS
Program Support (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Program Support The contractor will perform activities in accordance with (IAW) the PWS 1.1.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
12 MO
Program Engineering Support (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Program Engineering Support The contractor will perform activities IAW the PWS 1.1.5.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Assessment (PDM/UDLM) - Andrews (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
36 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
36 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
36 EA
Assessment (PDM/UDLM) - Ascension (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
22 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Beginning
Specified Date Specified Date Req No / Pri
Required Period of Performance
22 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
22 EA
Assessment (PDM/UDLM) - Croughton (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Diego Garcia (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
Assessment (PDM/UDLM) - Diego Garcia (Base Period - Year 1)
1 EA
Assessment (PDM/UDLM) - Elmendorf (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Guam (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of
Assessment (PDM/UDLM) - Guam (Base Period - Year 1)
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Hawaii (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Type / Ship To Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Delivery
1 EA 20 SEP 2023 19 SEP 2024
Proposed Delivery
1 EA
Assessment (PDM/UDLM) - Lajes (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Assessment (PDM/UDLM) - Lajes (Base Period - Year 1)
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Offutt (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Puerto Rico (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Assessment (PDM/UDLM) - Puerto Rico (Base Period - Year 1)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Sigonella (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
39 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
39 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
39 EA
Assessment (PDM/UDLM) - West Coast (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Assessment (PDM/UDLM) - West Coast (Base Period - Year 1)
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 EA
Assessment (PDM/UDLM) - Yokota (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
R425 Assessment (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.1.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 EA 20 SEP 2023 19 SEP 2024
Proposed Period of
1 EA
Repair (PDM/UDLM) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Assessment Repair (PDM/UDLM) The contractor will perform activities IAW the PWS 1.1.3.2. and 1.1.3.3. At the Government's discretion PWS Paragraph 4. Repair in Table 2-1 and PWS Paragraph 1.4. may be utilized.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Andrews (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Ascension (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Croughton (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Diego Garcia (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Surve - Elmendorf (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Guam (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Type / Ship To Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Delivery
1 LO 20 SEP 2023 19 SEP 2024
Proposed Delivery
1 LO
Antenna Site Survey - Hawaii (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
2 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
2 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
2 LO
Antenna Site Survey - Lajes (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) Sooner Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Offutt (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - Puerto Rico (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Sigonella (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Site Survey - West Coast (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Site Survey - Yokota (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Site Survey The contractor will perform activities IAW the PWS 1.1.2.1.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna Installation (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Installation The contractor will perform activities IAW the PWS 1.1.2. and 1.1.2.3.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Antenna Demolition and Disposal (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna Demolition and Disposal The contractor will perform activities IAW the PWS 1.1.4.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Antenna and Subsystem (Material) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Antenna and Subsystem (Material) The contractor will perform activities IAW the PWS 1.1.2.2.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Noise Survey (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Noise Survey The contractor will perform activities IAW the PWS 1.1.8.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of
Training (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Training The contractor will perform activities IAW the PWS 1.1.7.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Data (Base Period - Year 1)
Item No.
Not Separately Priced Quantity U/I Unit Price
NSP
R425 Data IAW the Contract Data Requirements List (CDRLs). The contractor will perform activities IAW the PWS 1.2.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: In accordance with DD Form 1423s.
Travel (Base Period - Year 1)
Item No.
Firm Fixed Price - To Be Determined Quantity U/I Unit Price Amount
LO To be Negotiated
R425 Travel
Travel (Base Period - Year 1)
The contractor will perform activities IAW the PWS 3.4. The contractor shall include expeditious movement of personnel, parts and/or equipment, if necessary, to perform all the requirements outlined in the PWS to any of the HFGCS sites located worldwide. Payment shall be inaccordance with FAR 31.205.46. The Contractor shall utilize the Joint Travel Regulations (JTR) as applicable.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) To be determined_ Req No / Pri
Required Period of Performance
LO TBD
Proposed Period of Performance
LO
Over and Above (O&A) - (Base Period - Year 1)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 Over and Above The work called for under this CLIN shall be accomplished ONLY when authorized by the PCO/ACO prior to performance of the work in accordance with DFARS 252.217-7028. The Contractor shall provide all services, parts, equipment, labor and materials to perform all unforeseen requirements which occur due to differing site conditions, environmental concerns, or extreme weather conditions.The contractor will perform activities IAW the PWS 1.16.5.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection Place of Perf Quantity (U/I) From Specified
Date Specified Date Req No / Pri
Required Period of Performance
1 LO 20 SEP 2023 19 SEP 2024
Proposed Period of Performance
1 LO
Phase-In
Item No.
Phase-In
Not Separately Priced Quantity U/I Unit Price
NSP
R425 Phase-In IAW PWS paragraph 1.16.6.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: In accordance with DD Form 1423s.
Period of Performance: 21 July 2023 20 September 2023
CONTRACT CLAUSES
252.2037000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) (IAW DFARS 203.1714(a), DFARS 212.301(f)(ii))
252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)
(IAW DFARS 204.2105(c))
252.204-7023 REPORTING REQUIREMENTS FOR CONTRACTED SERVICES-BASIC (JUL 2021)
(IAW DFARS 204.1705(a)(i) and (ii))
252.204-7023 REPORTING REQUIREMENTS FOR CONTRACTED SERVICES-ALTERNATE I
(JUL 2021)
(IAW DFARS 204.1705(a)(i) and (iii))
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)
(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS -- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(MAY 2022)
(IAW FAR 12.301(b)(4))
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19,Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L.
115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 89(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021)(41 U.S.C. 4704 and 10 U.S.C. 2402).
__X __ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41
U.S.C. 3509).
__X __ (3) 52.203-15, Whistleblower Protections Under the American Recovery and
Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).
(Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__X __ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) [Reserved] __X __ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L.
111-117, section 743 of Div. C).
__X __ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__X __ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (31 U.S.C. 6101 note).
__X __ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
____ (10) [Reserved} __ __ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021)(15
U.S.C. 657a).
__ __ (11) (ii) Alternate I (MAR 2020) of 52.219-3.
__ __ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
__ _ (12) (ii) Alternate I (MAR 2020) of 52.219-4.
(13) [Reserved]
__X __ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020)(15 U.S.C.
644).
__ __ (14) (ii) Alternate I (MAR 2020) OF 52.219-6.
__ __ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020)(15 U.S.C.
644).
__ __ (15) (ii) Alternate I (MAR 2020) of 52.219-7.
__X __ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.
637(d)(2) and (3)).
(17) (i) 52.219-9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C.
637(d)(4)).
__ __ (17) (ii) Alternate I (Nov 2016) of 52.219-9.
__ __ (17) (iii) Alternate II (Nov 2016) of 52.219-9.
__ __ (17) (iv) Alternate III (JUN 2020) of 52.219-9.
(17) (v) Alternate IV (SEP 2021) of 52.219-9.
__X (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
__X (18) (ii) Alternate I (MAR 2020) of 52.219-13.
__X (19) 52.219-14, Limitations on Subcontracting (SEP 2021)(15 U.S.C. 657s).
__ __ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.
637(d)(4)(F)(i)).
__X __ (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business
Set-Aside (SEP 2021) (15 U.S.C. 657f).
__X __ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP
2021) (15 U.S.C. 632(a)(2)).
(22) (ii) Alternate I (MAR 2020) of 52.219-28.
__X __ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).
__X __ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).
X (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
X (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
__X __ (27) 52.222-3, Convict Labor (June 2003)(E.O. 11755).
__ __ (28) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2022)
(E.O. 13126).
__X __ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
__X __ (30) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246 X (30) (ii) Alternate I (Feb 1999) of 52.222-26.
__X __ (31) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020)(38 U.S.C.
4212).
X (31) (ii) Alternate I (July 2014) of 52.222-35.
__X __ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN
2020) (29 U.S.C. 793).
(32) (ii) Alternate I (July 2014) of 52.222-36.
__X __ (33) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212).
__X __ (34) 52.222-40, Notification of Employee Rights Under the National Labor relations
Act (Dec 2010) E.O. 13496).
__X __ (35) (i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter
78 and E.O. 13627).
__ __ (35) (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ __ (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ __ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ _ (37) (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__X __ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June 2016) (E.O. 13693).
__ X __ (39) 52.223-12, Maintenance, Service, repair, or Disposal of Refrigeration Equipment and Air Conditioners (June 2016) (E.O.13693).
__ _ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
__ _ (40) (ii) Alternate I (Oct 2015) of 52.223-13.
__ _ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s
13423 and 13514).
__ _ (41) (ii) Alternate I (Jun 2014) of 52.223-14.
__ __ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020)
(42.U.S.C. 8259b).
__ __ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products
(Oct 2015) (E.O.s 13423 and 13514).
__ _ (43) (ii) Alternate I (Oct 2015) of 52.223-16.
__X __ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While
Driving (JUN 2020) (E.O.13513).
__X __ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) __X __ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).
__X __ (47) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
___ (47) (ii) Alternate I, (Jan 2017) of 52.244-3.
__ __ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
__ __ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV
2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
__ _ (49) (ii) Alternate I (JAN 2021) of 52.225-3.
__ _ (49) (iii) Alternate II (JAN 2021) of 52.225-3.
__ _ (49) (iv) Alternate III (JAN 2021) of 52.225-3.
__ __ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C.
3301 note).
__ X __ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign
Assets Control of the Department of Treasury).
__ __ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ __ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)(42 U.S.C.
5150).
__ __ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)(42 U.S.C. 5150).
__X __ (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).
__ __ (56) 52.232-29, Terms for financing of Purchases of Commercial Products and
Commercial Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ __ (57) 52.232-30, Installment Payments for Commercial Products and Commercial
Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__X __ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award
Management (Oct 2018) (31.U.S.C. 3332).
__ __ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for
Award Management (Jul 2013)(31.U.S.C. 3332).
__ __ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ __ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ __ (62) 52.242-5, Payment to Small Business Subcontractors (Jan 2017) (15 U.S.C.
637(d)(13)).
__ __ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels
(NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
__ _ (63) (ii) Alternate I (Apr 2003) of 52.247-64.
(63) (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
__X __ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29
U.S.C. 206 and 41 U.S.C. chapter 67).
__ X __ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor
Standards--Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ __ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__X __ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
__X __ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014)(41 U.S.C.
chapter 67).
__ __ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022).
__ __ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706. (Jan 2022) (E.O.
13706).
__ __ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (e)(1) of this paragraph in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L.
115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiii) X (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvi) 52.222-54, Employment Eligibility Verification (MAY 2022) (E. O. 12989).
(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii)52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES --
ALTERNATE II (MAY 2022)
(IAW FAR 12.301(b)(4))
Alternate II. As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows:
(d) (1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—
(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and
(ii) Interview any officer or employee regarding such transactions.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial products or commercial services, other than—
(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and
(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(A) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509).
(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).
(C) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(D) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L.
115-232).
(E) 52.219–8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219–8 in lower tier subcontracts that offer subcontracting opportunities.
(F) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(G) 52.222–26, Equal Opportunity (Sept 2016) (E.O. 11246).
(H) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(I) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(J) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(K) 52.222–41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(L) __X __ (1) 52.222–50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C.
chapter 78 and E.O. 13627).
__ __(2) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(M) 52.222–51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(N) 52.222–53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(O) 52.222–54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989).
(P…