Questions__3.docx

DOCX document 15 KB Posted

Attached to
Renovate Command Post B-418 Federal contract opportunity
Solicitation number
FA6712-15-R-0004
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Command Post B-418, newest first.
File Type Posted
Question__5.docx DOCX document
Second_Site_Visit_Notice.docx DOCX document
Addendum_2_JLSS_12-0010.docx DOCX document
Addendum_2_amendment.doc DOC document
27_15_00__Data_Cabling.docx DOCX document
Questions__4.docx DOCX document
A002CPPL_REVISION_1.pdf PDF
Addendum_1_JLSS_12-0010.docx DOCX document
Amendment_One.pdf PDF
Questions__2.docx DOCX document
Question__1.docx DOCX document
Sign-In_Sheet_Site_Visit.pdf PDF
Drawings.zip ZIP file
Drawings.zip ZIP file
Past Performance Questionnaire Command Post.docx DOCX document
FA6712-15-R-0004 Rpr Command Post.doc DOC document
911 B418 Construction Bid Specifications.pdf PDF
PA1 13 Feb 15 Mod 5.txt TXT text file
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. There are some handwritten notes on the drawings. Are we to disregard them? YES. DISREGARD ANY HANDWRITTEN NOTES.

2. Are the bollards in front of the new condensing unit existing or new? NEW. SEE DWG A-7, DETAIL J FOR MORE INFORMATION.

3. Please provide thickness required for the pad that the new condensing unit sits on. MINIMUM SIX INCHES, OR WHATEVER STRENGTH IS NEEDED FOR THE WEIGHT OF THE EQUIPMENT, WHICHEVER IS GREATER.

4. It was indicated during the walkthrough that the occupants and furnishings will be relocated to the alternate command post prior to the contractor coming on site. THIS IS INCORRECT.

However section 01 01 00 of the specifications indicates that the contractor is to relocate furniture to the alternate command post in B125. Please clarify. CONTRACTOR TO RELOCATE FURNITURE TO LOCATIONS AS LISTED IN SPEC SECTION 01 01 00 PARA 1.07 (NOT ALL IN B125).

5. As this area was not reviewed during the walkthrough please advise what the access to B125 (double doors, ground floor, etc.) is if we are to move the furniture to B125. ACCESS IS AVAILABLE THROUGH A SINGLE WIDTH DOOR AT GROUND LEVEL.

6. We are assuming that the ‘Conex Box’ referenced in section 01 01 00 is the conditioned trailers that the contractor provides? CORRECT.

7. Also in specification section 01 01 00 it references that the conditioned storage trailers are to be placed on the RRR pad. Please advise where the RRR pad location is in proximity to the work area and if temporary power is available for the storage trailers.

RRR PAD IS LOCATED BEHIND THE WASH BAY, B324 AT THE SOUTHEAST PART OF THE BASE. TEMPORARY POWER IS AVAILABLE.

8. Can you provide a copy of the MIL-HB-232A criteria for the red power drops? AVAILABLE AT https://www.wbdg.org/ccb/FEDMIL/hdbk232a.pdf

9. Are the CCTV components and cabling part of this contract or are we only to provide pathways and 120V power? NO. CONTRACTOR TO PROVIDE CONDUIT AND POWER ONLY.

10. Drawing E-5 Note 1 calls for the EC to route an additional ¾” conduit from the video controller to each wall monitor. How many wall monitors are there and where are the located? MONITORS ARE SHOWN ON DRAWING A-4.