Question__1.docx

DOCX document 14 KB Posted

Attached to
Renovate Command Post B-418 Federal contract opportunity
Solicitation number
FA6712-15-R-0004
Issued by
Department of the Air Force Reserve Command

About this file

Questions 1

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Command Post B-418, newest first.
File Type Posted
Question__5.docx DOCX document
Second_Site_Visit_Notice.docx DOCX document
Addendum_2_amendment.doc DOC document
27_15_00__Data_Cabling.docx DOCX document
Addendum_2_JLSS_12-0010.docx DOCX document
Questions__4.docx DOCX document
Questions__3.docx DOCX document
A002CPPL_REVISION_1.pdf PDF
Addendum_1_JLSS_12-0010.docx DOCX document
Amendment_One.pdf PDF
Questions__2.docx DOCX document
Sign-In_Sheet_Site_Visit.pdf PDF
Drawings.zip ZIP file
Drawings.zip ZIP file
Past Performance Questionnaire Command Post.docx DOCX document
FA6712-15-R-0004 Rpr Command Post.doc DOC document
911 B418 Construction Bid Specifications.pdf PDF
PA1 13 Feb 15 Mod 5.txt TXT text file
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) No elevation i.e. floor to structure has been denoted within solicitation, with walls scheduled to be framed and drywalled to underside of structure.

Please provide this information as it is very critical.

HEIGHT FROM FLOOR TO DECK ABOVE IS APPROXIMATELY 9' 10".

2)Drawing sheet 5 of 21 shows Vestibule A-100 to receive CT, and Corridor A-100 to receive LVT according to Floor Plan Legend as drawn. Drawing sheet 8 of 21 Finish Schedule calls for Vestibule A-100 to receive VCT, and Corridor A-100 to receive CT. Please clarify finishes for areas.

SHEET 5 IS CORRECT. CERAMIC TILE IN VESTIBULE AND LUXURY VINYL TILE IN THE

CORRIDOR.

3) Note to relocate Fence Gate A-2 there is no further information provided.

Per the observations made at today's site visit this is a wire mesh partition system with the gate integral the the panelized system. Is it the government's intention to move the entire wall to reconfigure this gate?

THIS WILL BE ADDRESSED IN AN ADDENDUM.

4) No raised floor system with handrails were noted within the solicitation.

Is it the government's intention to remove this system?

CORRECT. RAISED FLOOR WILL NEED TO BE REMOVED TO ALLOW INSTALLATION OF NEW

FLOORING AS SHOWN ON DRAWING A-4. THERE IS NO NEW RAISED FLOOR IN THIS

CONTRACT.

5) Sheet E-3 notes give direction on what electrical equipment is to be removed, however there are no quantities stated for any devices. No distances are given for sources of power or data where demolition is to be terminated.

SOURCE FOR LIGHTS AND OUTLETS IS FROM PANEL EMER-1. SOURCE FOR PANEL EMER-1

IS IN MECHANICAL ROOM ON EAST SIDE OF BUILDING. SOURCE FOR DATA CABLES IS ON

MEZZANINE ABOVE THE CORRIDOR.