Question__1.docx
DOCX document 14 KB Posted
- Attached to
- Renovate Command Post B-418 Federal contract opportunity
- Solicitation number
- FA6712-15-R-0004
About this file
Questions 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question__5.docx | DOCX document | |
| Second_Site_Visit_Notice.docx | DOCX document | |
| Addendum_2_amendment.doc | DOC document | |
| 27_15_00__Data_Cabling.docx | DOCX document | |
| Addendum_2_JLSS_12-0010.docx | DOCX document | |
| Questions__4.docx | DOCX document | |
| Questions__3.docx | DOCX document | |
| A002CPPL_REVISION_1.pdf | ||
| Addendum_1_JLSS_12-0010.docx | DOCX document | |
| Amendment_One.pdf | ||
| Questions__2.docx | DOCX document | |
| Sign-In_Sheet_Site_Visit.pdf | ||
| Drawings.zip | ZIP file | |
| Drawings.zip | ZIP file | |
| Past Performance Questionnaire Command Post.docx | DOCX document | |
| FA6712-15-R-0004 Rpr Command Post.doc | DOC document | |
| 911 B418 Construction Bid Specifications.pdf | ||
| PA1 13 Feb 15 Mod 5.txt | TXT text file |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) No elevation i.e. floor to structure has been denoted within solicitation, with walls scheduled to be framed and drywalled to underside of structure.
Please provide this information as it is very critical.
HEIGHT FROM FLOOR TO DECK ABOVE IS APPROXIMATELY 9' 10".
2)Drawing sheet 5 of 21 shows Vestibule A-100 to receive CT, and Corridor A-100 to receive LVT according to Floor Plan Legend as drawn. Drawing sheet 8 of 21 Finish Schedule calls for Vestibule A-100 to receive VCT, and Corridor A-100 to receive CT. Please clarify finishes for areas.
SHEET 5 IS CORRECT. CERAMIC TILE IN VESTIBULE AND LUXURY VINYL TILE IN THE
CORRIDOR.
3) Note to relocate Fence Gate A-2 there is no further information provided.
Per the observations made at today's site visit this is a wire mesh partition system with the gate integral the the panelized system. Is it the government's intention to move the entire wall to reconfigure this gate?
THIS WILL BE ADDRESSED IN AN ADDENDUM.
4) No raised floor system with handrails were noted within the solicitation.
Is it the government's intention to remove this system?
CORRECT. RAISED FLOOR WILL NEED TO BE REMOVED TO ALLOW INSTALLATION OF NEW
FLOORING AS SHOWN ON DRAWING A-4. THERE IS NO NEW RAISED FLOOR IN THIS
CONTRACT.
5) Sheet E-3 notes give direction on what electrical equipment is to be removed, however there are no quantities stated for any devices. No distances are given for sources of power or data where demolition is to be terminated.
SOURCE FOR LIGHTS AND OUTLETS IS FROM PANEL EMER-1. SOURCE FOR PANEL EMER-1
IS IN MECHANICAL ROOM ON EAST SIDE OF BUILDING. SOURCE FOR DATA CABLES IS ON
MEZZANINE ABOVE THE CORRIDOR.