Questions__2.docx
DOCX document 14 KB Posted
- Attached to
- Renovate Command Post B-418 Federal contract opportunity
- Solicitation number
- FA6712-15-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question__5.docx | DOCX document | |
| Second_Site_Visit_Notice.docx | DOCX document | |
| Addendum_2_JLSS_12-0010.docx | DOCX document | |
| Addendum_2_amendment.doc | DOC document | |
| 27_15_00__Data_Cabling.docx | DOCX document | |
| Questions__4.docx | DOCX document | |
| Questions__3.docx | DOCX document | |
| A002CPPL_REVISION_1.pdf | ||
| Addendum_1_JLSS_12-0010.docx | DOCX document | |
| Amendment_One.pdf | ||
| Question__1.docx | DOCX document | |
| Sign-In_Sheet_Site_Visit.pdf | ||
| Drawings.zip | ZIP file | |
| Drawings.zip | ZIP file | |
| Past Performance Questionnaire Command Post.docx | DOCX document | |
| FA6712-15-R-0004 Rpr Command Post.doc | DOC document | |
| 911 B418 Construction Bid Specifications.pdf | ||
| PA1 13 Feb 15 Mod 5.txt | TXT text file |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Sheet A-5 Lists the chair rail as 4 ¼ but the specs list the chair rail as 2 ¼. Which is correct?
ALLEGHENY MILLWORK WEBSITE SHOWS 2 1/4" IS AVAILABLE UNDER BASIS OF DESIGN.
2. 08-31-13 is for access doors but we don’t see any on the print. Is there some that did not get on the drawing?
BASED ON SHOP DRAWINGS AND FIELD CONDITIONS, ANY ITEMS REQUIRING ACCESS WILL
NEED AN ACCESS DOOR, SUCH AS VALVES, FILTERS, ETC. SEE DRAWING NOTES, SUCH
AS GENERAL NOTE 7 ON DRAWING H-1, AND GENERAL NOTE 8 ON DRAWING P-1.
3. Will we need to provide testing to validate the STC rating of the rooms?
We did not see it in the closeout. NO.
4. There are no fire extinguishers on the plans. How many are required and what are their locations?
FIRE EXTINGUISHERS ARE SHOWN ON DRAWING A-3.
5. H-1 lists a symbol for an access door and spec 08-31-13 is listed. We could not locate any of either on the prints. Is there a requirement for these?
BASED ON SHOP DRAWINGS AND FIELD CONDITIONS, ANY ITEMS REQUIRING ACCESS WILL
NEED AN ACCESS DOOR, SUCH AS VALVES, FILTERS, ETC. SEE DRAWING NOTES, SUCH
AS GENERAL NOTE 7 ON DRAWING H-1, AND GENERAL NOTE 8 ON DRAWING P-1.
6. Are there any special requirements other than normal fire stopping for penetrations through the walls inside the command post area? NO.
7. Will the SIPRnet cabling be required to be a specific color? NO.
8. Is a lockbox over the faceplate for the SIPRnet required? NO.
9. Will any conduit connections for the SIPRnet be required to have epoxy applied along with a stripe to allow for easy identification of tampering?
NO.
10. Does the bonding/grounding system in the communication room required double attachment points at each location of bonding or grounding termination?
Follow the current NEC and BICSI standards on grounding/ bonding. The grounding/bonding should go back to the main building service grounding system. There should only be one grounding source within a room.