Questions__2.docx

DOCX document 14 KB Posted

Attached to
Renovate Command Post B-418 Federal contract opportunity
Solicitation number
FA6712-15-R-0004
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Command Post B-418, newest first.
File Type Posted
Question__5.docx DOCX document
Second_Site_Visit_Notice.docx DOCX document
Addendum_2_JLSS_12-0010.docx DOCX document
Addendum_2_amendment.doc DOC document
27_15_00__Data_Cabling.docx DOCX document
Questions__4.docx DOCX document
Questions__3.docx DOCX document
A002CPPL_REVISION_1.pdf PDF
Addendum_1_JLSS_12-0010.docx DOCX document
Amendment_One.pdf PDF
Question__1.docx DOCX document
Sign-In_Sheet_Site_Visit.pdf PDF
Drawings.zip ZIP file
Drawings.zip ZIP file
Past Performance Questionnaire Command Post.docx DOCX document
FA6712-15-R-0004 Rpr Command Post.doc DOC document
911 B418 Construction Bid Specifications.pdf PDF
PA1 13 Feb 15 Mod 5.txt TXT text file
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Sheet A-5 Lists the chair rail as 4 ¼ but the specs list the chair rail as 2 ¼. Which is correct?

ALLEGHENY MILLWORK WEBSITE SHOWS 2 1/4" IS AVAILABLE UNDER BASIS OF DESIGN.

2. 08-31-13 is for access doors but we don’t see any on the print. Is there some that did not get on the drawing?

BASED ON SHOP DRAWINGS AND FIELD CONDITIONS, ANY ITEMS REQUIRING ACCESS WILL

NEED AN ACCESS DOOR, SUCH AS VALVES, FILTERS, ETC. SEE DRAWING NOTES, SUCH

AS GENERAL NOTE 7 ON DRAWING H-1, AND GENERAL NOTE 8 ON DRAWING P-1.

3. Will we need to provide testing to validate the STC rating of the rooms?

We did not see it in the closeout. NO.

4. There are no fire extinguishers on the plans. How many are required and what are their locations?

FIRE EXTINGUISHERS ARE SHOWN ON DRAWING A-3.

5. H-1 lists a symbol for an access door and spec 08-31-13 is listed. We could not locate any of either on the prints. Is there a requirement for these?

BASED ON SHOP DRAWINGS AND FIELD CONDITIONS, ANY ITEMS REQUIRING ACCESS WILL

NEED AN ACCESS DOOR, SUCH AS VALVES, FILTERS, ETC. SEE DRAWING NOTES, SUCH

AS GENERAL NOTE 7 ON DRAWING H-1, AND GENERAL NOTE 8 ON DRAWING P-1.

6. Are there any special requirements other than normal fire stopping for penetrations through the walls inside the command post area? NO.

7. Will the SIPRnet cabling be required to be a specific color? NO.

8. Is a lockbox over the faceplate for the SIPRnet required? NO.

9. Will any conduit connections for the SIPRnet be required to have epoxy applied along with a stripe to allow for easy identification of tampering?

NO.

10. Does the bonding/grounding system in the communication room required double attachment points at each location of bonding or grounding termination?

Follow the current NEC and BICSI standards on grounding/ bonding. The grounding/bonding should go back to the main building service grounding system. There should only be one grounding source within a room.