Sample_Project_Attachment_1_-_Warehouse_Assumptions.pdf

PDF 43 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ
Solicitation number
FA4897-16-R-0005
Issued by

About this file

Sample Project Attachment 1 - Warehouse Assumptions

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
ID2_(set_2).pdf PDF
ID2_(set_1).pdf PDF
ID2_(set_3).pdf PDF
ATTACHMENT_16.xlsx XLSX spreadsheet
AMENDMENT_0001.pdf PDF
Revised_Warehouse_Submittal_Register.xlsx XLSX spreadsheet
Pre-proposal_conf_slideshow.pdf PDF
Attachment_1_-_SABER_Statement_Of_Work_(SOW).pdf PDF
Attachment_9_-_WD_-_Elmore_-_ID160079_-_Highway.pdf PDF
Attachment_6_-_WD_-_Owyhee_-_ID160071_-_Heavy.pdf PDF
FA4897-16-R-0005_SABER_RFP.pdf PDF
Attachment_3_-_Past_Performance_Questionnaire.pdf PDF
Sample_Project_Attachment_4_-_Warehouse_Submittal_Register.pdf PDF
Attachment_11_-_WD_-_Elmore_-_ID160020_-_Building.pdf PDF
Attachment_5_-_WD_-_Owyhee_-_ID160099_-_Highway.pdf PDF
Attachment_4_-_SABER_Price_Evaluation_Worksheet.pdf PDF
Attachment_8_-_WD_-_Elmore___Owhyee_-_ID160001_-_RESIDENTIAL.pdf PDF
Attachment_7_-_WD_-_Owyhee_-_ID160033_-_Building.pdf PDF
Sample_Project_Attachment_2_-_Warehouse_Siting.pdf PDF
Attachment_10_-_WD_-_Elmore_-_ID160048_-_Heavy.pdf PDF
Attachment_12_-_SFS_FORM_30.pdf PDF
Attachment_13_-__Notification_of_Compliance.pdf PDF
Sample_Project_Attachment_3_-_Warehouse_FloorPlan.pdf PDF
Attachment_2_-_Warehouse_Sample_Project_SOW.pdf PDF
Attachment_14_-__Determination_of_Responsibility.pdf PDF
SABER_SOW_-_Draft.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE

SABER Warehouse Project

Assumptions valid on this project only

• Frost depth will be 36”

• Ground snow load is 30 lbs.

• Maximum sustained wind speed is 115 mph

• Existing 10” cast iron water line has sufficient volume and pressure

• Existing primary electric has adequate capacity at nearest sectionalizer

• Existing 8” concrete sewer has adequate capacity

• Existing 4” polyethylene gas line has adequate capacity

• Curb cuts, driveway, and parking to be provided by others

• No rock will be encountered during excavation

• Nearest fire hydrant is approved for contractor use

• Native soil bearing strength is 2500 psf.

• Fiber optic for LAN and telephone to be provided to site by others

• Natural gas lateral and meter bar supplied by others

• All work to be ADA compliant

• Average occupant load to be under 20

• Ten personal computers will be in use

• All colors will be selected from manufacturers’ standard palettes

• Building drawing is notional and not to scale

• Floor design to be based on pneumatic tire 10K forklift

• 20-year, no dollar limit warranty required on roof

Sample Project ATTACHMENT 1

File details come from the government source that posted it. Updated .