A-33 Mountain Home AFB, Idaho : Installation Development and Design (ID2) pipes; design with passive insulation.
3. Recover heat from exhaust air if cost efficient. Minimum = 2.5. Ensure unrestricted airflow around radiators.
Recover heat from light fixtures if cost effective. Use evaporative coolers rather than mechanical coolers to maximum extent. Provide well-sealed dampers to close ducts during off-season.
4. Use a few large boilers/chillers rather than several small boilers/chillers. Use radiant heat in areas such as high bays. (Refer to File DE 335-85 for restrictions). Use electric ignition rather than pilot lights on oil/gas water heaters and furnaces. Use boilers with a minimum efficiency of 80% and furnaces with a minimum efficiency of 90%.
5. Where fans are used, put them on separate switches from lights when bathroom is for multi-users.
6. Compare use of air curtains vs. heating and cooling losses for facilities with high traffic between interior and exterior if no vestibules are used.
7. Use automatic setback thermostats or seven-day clocks where feasible. Also, consider using heating and cooling heat band thermostats.
8. Load calculations are required.
6.1.7 Additional Design Criteria for Heating/
Cooling Systems
1. Systems that may see freezing conditions shall be protected with a minimum of 30% propylene glycol in chilled water and heating water systems. Snowmelt systems shall use 50% propylene glycol.
2. Bladder or diaphragm type expansion tanks shall be used, not compression tanks.
Expansion tank connections to the main shall be off the side of the pipe; ceiling suspended tanks shall be furnished with an automatic air vent. The air vent is for filling the system, not everyday use. All expansion tanks shall be installed with isolation valves that are permanently labeled “leave open at all times” or with the handles removed.
3. Industrial air vents (high volume, cast iron bodies, stainless steel trim) shall be used off of air separators.
4. Circulating pumps in hot water heating systems shall be located to draw suction from the boiler and expansion tanks.
5. Each heating or chilled water coil shall have the following:
• Isolation valves on the supply and return, wafer type valves shall not be used for this application.
• Strainer prior to control valve or automatic flow control valve.
• Control valve.
• Automatic flow control valve (Griswald, Autoflow or similar) shall be used. Manual flow control valves (circuit setters) shall not be used for coil balancing unless the body size is greater than 64 mm (2 ½ inches). Split coils at air handlers only require one flow control device since some variation in flow between the coils will not appreciably affect coil performance.
• Manual air vent, 6.4 mm (¼ in) ball valve with candy cane outlet, coin operated air vents are not allowed.
• Pressure and temperature test plugs across the strainer and the coil.
• Drain plug on terminal coils or drain cock with hose connection on air handler unit coils
• Unions on the supply and return, unless the piping connections are grooved couplings or flanged.
A-34 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
6. Base mounted pumps shall be installed with suction diffusers unless 5 diameters of straight pipe can be provided to the inlet of the pump.
7. Liberally install pressure and temperature test plugs across chillers, boilers, pumps, coils, and straining devices.
8. All pumps shall have a single pressure gage (with snubber) ganged across the pump inlet, outlet and suction diffuser (if applicable). 6.4 mm (¼ in) black threaded ASTM A-53 pipe with 6.4 mm (¼ in) ball valves (not needle valves or petcocks) shall be used to make the manifold.
9. Dial type bimetallic thermometers in separable socket shall be used (not liquid filled “mercury” types).
10.Generally, pump away from boilers and heat exchangers. Generally, pump through chillers. Designs which vary from this concept shall include a justification.
11.Make-up shall be made as close to the “point of no pressure change” in the system as possible.
12.Chilled water systems shall not allow variable flow through the chiller, heating water system should not allow variable flow through the boiler if possible. Chillers shall be packaged, outdoor, air-cooled type.
Chillers shall be ground mounted. Chillers shall be sized for the sum of the peak loads.
13.Chilled water loops shall contain the volume recommended by the chiller manufacturer.
Generally, chilled water loops shall have 3 gallons per ton as a minimum system volume. Install storage tanks if the loop is too short to provide the minimum system volume.
14.Chilled water systems shall have relief valves at the point of no pressure change.
15.Size triple duty valves and manual calibrated balancing valves for a minimum of
1.5 meters (5 ft) pressure drop at design flow, do not line size these items unless
1.5 meters (5 ft) can be obtained.
16.Only provide one strainer in the mechanical room per system (i.e. strainers are often provided as standard equipment in suction diffusers and air separators.) If neither of these are used or feasible install one strainer in-line.
17.Provide a pot feeder assembly for each system.
18.Pumps shall be non-overloading over the entire pump curve. Primary/secondary pump systems are encouraged. Booster pump systems are strongly discouraged.
19.Boilers shall be installed with 102 mm (4 in) minimum house keeping pads.
20.Label ports on three-way control valves as to “normally closed”, “normally open” and “common”. Typically chilled water valves will fail to bypass and heating water coils will fail to heat.
21.Duct systems shall have the following features:
• Use of interior duct lining products shall be kept to a minimum.
• Factory fabricated 45 degree high efficiency take-off shall be used on duct systems, not spin-ins.
• Flexible duct shall be installed at ceiling diffuser connections;
maximum length of flexible duct shall be 1.8 meters (6 ft).
A-35 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
6.2 Plumbing
6.2.1 General
1. The Uniform Plumbing Code (latest edition) has been adopted by the USAF.
2. In buildings normally occupied by more than 15 persons, provide separate toilet rooms for each sex; position them together and use common wall for plumbing chase.
In buildings normally occupied by 1 to 15 employees, a single toilet room to serve both sexes may be provided. Furnish one water closet, one lavatory, and a room door that can be locked from the inside.
6.2.2 Pipe and Pipe Fittings
1. Water pipes shall be designed for a maximum velocity of 2.4 meters per second (8 fps), or manufacturer’s recommendation, whichever is less.
2. Velocity shall be limited to 1.2 meter per second (4 fps) in all copper and brass piping when transporting water above 66° C (150° F).
3. Where feasible, single, rather than multiple, stack venting should be provided.
4. Compressed air piping shall be black steel with malleable iron fittings.
5. Coordinate corrosion protection criteria with the 366 CES/CEE corrosion engineer.
Wherever possible, utilize plastic pipe for buried lines.
6. Drainage systems: Position manholes at every 45-degree and 90 degree, and a minimum of 91.4 meters (300 feet) apart.
Keep main building sewer at 102 mm (4 in) minimum for future add-ons.
7. Limit the use of overhead piping systems except for slab ongrade. Then ensure piping is within the heated space.
6.2.3 Valves
1. Utilize non-constricting ball valves instead of gate valves.
2. Building main water service needs “corporation stop” at main, shut off valve (with valve box, 102 mm (4 in) min) at nearest location (not in roadway), and exposed, hand-operated, labeled valve inside building.
6.2.4 Piping Specialties
1. Mechanical rooms with equipment requiring “blow down” will plumb low down through an exterior wall.
2. Use floor drain to capture leakage and condensation, if it occurs.
3. Use floor drains with concealed cleanouts.
Have cleanout at building exterior for building sewer system.
4. Utilize dielectric unions between all dissimilar metals.
6.3 Well/Pumps Control System
1. All water well/lift stations on Mt. Home AFB are fully automated.
2. The Base UMCS system is a Tano/Acquatyrol radio transmitted (SCADA) system installed at the central water plant which communicates with the central computer.
3. Tano/Acquatrol W1500 Remote Telemetry units are installed at each site to control and monitor all field points.
A-36 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
6.4 Energy Monitoring & Control System
1. Energy monitoring and control system
(EMCS) features will be required in the design of a facility. (See attached EMCS diagram at the end of the section.)
Coordinate with the 366 Civil Engineering EMCS Shop. EMCS design and facilities is to be in accordance with AFMAN(I) 32-1093.
Guide specification CEGS-13820 is to be utilized for building preparation for EMCS.
The HVAC system and associated EMCS will be designed using Direct Digital Control (DDC) technology. DDC may be described as the direct operation of Heating, Ventilation and Air Conditioning (HVAC) local loop control devices, such as valves, dampers, and actuators, by a digital computer. Control actions are determined by stored programs using inputs from real-time sensors. The digital computer and its associated software replace the local loop pneumatic (electric or electronic analog) sensors.
2. The DDC system is in compliance with Engineering Technical Letter (ETL) 86-16.
Future Military Construction Program (MPC) and O&M DDC designs must comply with ETL 86-16, as well as, ETL-83-1.
3. The DDC system at Mt. Home AFB is manufactured by Johnson Controls. All DDC equipment shall be compatible with the existing Johnson Controls infrastructure. The Johnson Controls system is a microprocessor-based network designed for maintenance management and the local automatic control of HVAC equipment in an energy efficient manner.
The system is comprised of a network of stand-alone units, each capable of DDC and supervisory control. The network control modules consist of a microcomputer that allows the base to perform manual operations, coordinate systems for demand reduction, view facilities status in real-time, and generate reports. In order to maintain coordinated system growth, future DDC procurements shall be compatible with the existing DDC network. Contact EMCS shop for the specific computer requirements required for each project.
4. The means of communication between buildings is by buried single-mode tube fiber optic cable. At a minimum, an eight fiber cable will be supplied for each EMCS installation. All fiber optic cables will be installed in 102-mm (4-in) PVC conduits with four way inner duct. Each four inch PVC will be installed from the building to a (BIDDS) communications manhole.
Coordinate with the EMCS shop on manhole locations. A maximum of two gradual ninety degree bends, vertically or horizontally is allowed without the installation of pull boxes in the conduit.
5. The following HVAC point schedule is an example of points that should be monitored or controlled in facilities at Mt. Home AFB:
• Outside Temperature (° C (° F))
• Air Flow Monitor (normal/low)
• Hot Deck (° C (° F))
• Return Air Temp (C ° (° F))
• Supply Temp to Each Zone (° C (°F))
• Humidity for Each Zone (%)
• Chilled Water Return (° C (° F))
• Tower Fan Status (on/off)
• Economizer Control
• BTUs Heating
• Tons Cooling
• Motor Run Time (elapsed)
• Filter Media
• Chiller Safeties
• Start/Stop Monitor (normal/low)
• Cold Deck (° C (° F))
• Mixed Air Temp (° C (° F))
• Room Air Temp for Each Zone (° C (° F))
• Chilled Water Supply (° C (° F))
• Chiller Start/Stop Control
• Chill Water Pump Status (on/off)
• Air Handler Safeties (Freezestats, Firestats)
• Hot Water Supply and Return Temps (° C (° F))
A-37 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
• Moisture Alarms in Raised Floor Areas
• Emergency Generator Status (off/ on/ready)
• Condenser Water Supply & Return Temps (° C (° F))
This is only an example and not meant to be binding or exhaustive.
6.5 Fire Protection Systems
1. All fire protection systems shall be coordinated with MHAFB Standard 12, “Fire Safety Systems”.
2. Fire hydrants shall have the following features:
• Hydrant valve seats shall be resilient plastic/rubber type. Metal-to-metal valves shall not be used.
• Hydrants shall be installed to provide a minimum clearance of 18” between grade level and the center of the 4½ inch (pumper) connection.
A-38 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
7.1 Seismic Design Criteria
7.1.1 Ground Motion
1. 0.2 second Spectral Response Acceleration (5% of Critical Damping, Site Class B), Maximum Considered Earthquake: SS=.30
2. 1.0 second Spectral Response Acceleration (5% of Critical Damping, Site Class B), Maximum Considered Earthquake: S1=.10
7.1.2 Site Classification
1. When soil properties are not otherwise determined by means of a site-specific geotechnical investigation, Site Class D shall be assumed.
7.2 Wind Loads
7.2.1 Basic Wind Speed
1. 40 meters/second (90 mph) 3 second gust.
Note: Specified wind speed per Figure 1 of U.S. Army Corps of Engineers (USACE) TI 809- 01, dated 3 August 1998.
7.3 Snow Loads
7.3.1 Ground Snow Load
1. 170 kg/m2 (35 psf)
Note: This ground snow load has been carried over from Army TM 5-809-01/Air Force AFM 88-3, Chapter 1, dated May 1992, as directed by ACC. This value exceeds the 75 kg/m2 (15 psf) value specified in TI 809-01, dated 3 August 1998.
7.4 Foundation Design Criteria
7.4.1 Frost Penetration
Minimum depth to bottom of foundation
1. Heated Structures: 940 mm (3 feet, 1 inch)
2. Unheated Structures: 1245 mm (4 feet, 1 inch)
Note: Specified footing depths based on Figure 1 of U.S. Army Corps of Engineers (USACE) TI 809-01, dated 3 August 1998, for a maximum frost penetration of 1625 mm (64 inches).
7.5 Soil Bearing Capacity
Maximum allowable design soil bearing pressure for foundations shall be determined for each site by means of a site-specific geotechnical investigation. In the absence of such, with the approval of the Base Civil Engineering Office, a value of 95 kPa (2000 psf) may be assumed. A one-third increase in allowable bearing pressure is permissible for short duration loads. All footings shall bear on a 300 mm (1 foot, 0 inch) layer of compacted select structural fill.
[SECTION 7] STRUCTURAL ENGINEERING STANDARDS
A-39 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
8.1 High Voltage Work Requirements
Before any power outages or distribution work will be authorized there must be a face to face meeting between the contractor in charge of the outage and the Exterior Electric Shop in order to coordinate the details and material to be used.
All contractors working with the base’s high voltage systems must comply with OSHA standard 1910.269(a) (1)(iii), 1910.269(I)(1), and must submit written proof that employees have been trained to work around high voltage lines or equipment. Contractors are required to submit current certifications for every individual involved with preparing High Voltages splices and elbows.
Any work on or near energized distribution lines or equipment requires a lockout/tagout and hot line hold before any work begins.
All distribution lines and equipment to be worked, which are de-energized for any reason, must be properly grounded out using proper grounding sets on both sides of the work area.
All distribution tools and equipment used for working on the distribution system such as; Bucket Trucks, Hot Sticks, Rubber Goods require dielectric testing.
Written certification of all tests must be made available to the Government upon request.
8.2 Transmission & Distribution
Existing transmission and distribution information is described in Section 1.0 - Regional Description.
New distribution is comprised of overhead and underground installations. As a general rule the overhead distribution system will be extended using class 2 wood poles to accommodate new facilities.
However, all distribution system installations in housing areas will be installed via underground duct banks without exception. Additionally when the proposed distribution system passes within 15 meters (50 feet) from the front of a new facility the installation will be underground.
8.3 General
All High voltage underground cable shall be Copper EPR with a 100% jacketed concentric neutral. No drain wire or shielding.
The use of full size underground manholes is not allowed. Use sector boxes where possible. Large two cover pull boxes are ok with no elbows.
All fused cutouts on primary DIP poles, or in-line will be load break type, rated for 200 amps. Fuse size will be determined by the actual requirement. The Exterior Electric Shop will determine fuse size for all transformers and in-line cutouts.
All underground primary cables will be marked with phase letter corresponding to the phase from which it originates, and markings to show where the cable feeds to and from.
All primary cables entering or leaving a sector box will be trained to allow easy removal and installation of the elbows.
All sector boxes will have ground sleeves or basements. Sector boxes should be sized to provide at least one spare take off point for future use.
Ground connections that are made in transformers, sector boxes, and on poles will be high compression crimp type, no mechanical connections are allowed.
No existing primary underground cable will be reused in conjunction with a new installation. If distribution work requires anything more than a disconnect/ reconnect situation, the entire cable shall be replaced with new. Any modifications to an existing cable run requires complete replacement of the cable.
8.4 Service Entrance
All primary voltage underground feeders, including installations under new roadways shall be in concrete-encased rigid conduit. Primary underground feeders under existing roadways will be bored or jacked. Use “stirrup” connectors to connect service feeders to overhead conductors.
[SECTION 8] ELECTRICAL STANDARDS
A-40 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
8.5 Grounding IAW ETL 90-6, AND AFI 32-1065
Provide separate grounding conductors and rods for surge (lightning) arrestors and service neutrals.
Provide insulated grounding conductors to all grounding type outlets. Metallic conduit shall not constitute a safety ground. Include in specifications:
Use three-point ground test and instrumentation in accordance with IEEE Std 81-1983 paragraph
8.2.1.2. Perform test in presence of the government
inspector. Submit results and indicate type of test performed.
Provide Cathodic Protection IAW ETL 91-6, and AFI 32-1045
When Lightning Protection has been identified as a requirement it shall be provided IAW ETL 90-6, AFI 32-1065, and NFPA 780. For buildings located within the Munitions area, a drawing of the system with test results must be submitted for approval prior to building acceptance.
All outdoor equipment shall be painted green in accordance with the standard colors identified in the BDS Architectural/Structural section.
8.6 Transformers
Provide service transformers with delta primary and wye secondary connections for three phase services. Base primary service is 12470/7200 V.
All service transformers shall have two 2-1.2% taps above and below rated voltage. Provide low percent Z transformers where short circuit currents permit. Screen all exterior transformers from major circulation routes or common areas. Load break switch, primary bayonet fusing, loop fed, load break bushings, 4 point counter poise grounding, lightning protection.
Pad-mount transformer enclosures shall be provided and the façade shall match with the adjacent facility.
Provide at least a 1.4-meter (4-ft) clearance around all distribution equipment located within an enclosure.
Pad mount distribution equipment not located in an enclosure shall have a minimum clearance of 3 meters (10 feet).
8.7 Panel Boards
Provide typed panel schedules. Provide manual bypass for all auto transfer generator panels. 25% spare capacity, provide load calculations in the design analysis.
8.8 Interior Lighting
Provide wire guards for all open fluorescent lamps.
Utilize energy saver 32-34 watt fluorescent lamps with energy saver ballast in administrative and similar areas. Use high-pressure sodium lights in bay areas where color rendition is not vital. Provide seismic zone 2 protection for all fixtures, especially ceiling grid mounted fluorescent fixtures. Provide Certified Ballast Manufacturer (CBM) listed ballast.
All ballasts shall have 0.90 power factor or greater.
LED Exit lights, Emergency Lighting IAW ETL 94-
5. Use Compact Fluorescent lights as opposed to incandescent lights.
8.9 Exterior Lighting
For parking lot lighting and roadway applications, use 250W HPS with photocell activation. Parking lot light poles shall be round and tapered, and have an anodized bronze finish.
The lamp wattage for street lighting varies between 250W and 400W, check with exterior electric shop for each application. All existing housing and new housing area street lighting shall be 100W metal halide, use 3-meter (9-foot 9-inch) Tapered fluted light poles, black color and 43-cm (17-in) diameter base (match existing poles in the Dunes housing area). For roadway lighting use anodized bronze finished, horizontal fixtures (Cobra Head Style), 10.5-meter (35-ft) high steel poles with 3.6-meter (12-ft) long single arm support. The poles shall be set back 1.5 meters (5 ft) from the curb. Each pole shall have a 15-cm (6-in) high concrete base for roads, and parking lot poles shall have a 60-cm (24-in) high concrete base.
Use 1000W or 400W Metal Halide for outdoor sports field lighting, with timers/photo cell activation.
A-41 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
Use 250W HPS with quartz backup, or fluorescent for security lighting.
Airfield Lighting IAW AFMAN 32-1076
8.10 Wiring Devices
Provide new devices and plates whenever an area is renovated. All devices shall be recessed except in mechanical rooms and utility areas. Provide devices rated at 20 amps where heavy use or electrical load dictates the need for 20 amp devices. All wiring shall be copper. No aluminum allowed.
8.11 Automatic Controllers
Provide battery backup for lawn sprinkler system controllers and automatic setback thermostats.
8.12 Generators
Automatic Transfer Switches: Provide a bypass switch to allow all power to be disconnected from the transfer switch while maintaining power to the facility. This will allow maintenance of the switch without causing an outage.
Emergency Generator Rooms: Provide generator rooms with automatic louvers and exhaust fans for ventilation. Provide overhead and side lighting to minimize shadows. Provide water outlet, bay or double doors to allow replacement of generator, minimum 800 mm (30 inches) working clearance all sides. Provide sound dampers. Auto-transfer switches and start panels shall be located in the generator room.
A monitoring system shall be installed on RPIE generators. The existing system is an Onan network control and monitoring system. The Monitoring and Control system shall include at least the following remote capabilities: generator status, fuel level, coolant temp, oil pressure, transfer status, phase availability to load, generator voltage level, battery voltage level, and start/stop capability.
Each RPI generator should have a phone line installed next to the transfer switch. Per AFI 32-1063/ACC Supplemental I, at least 72 hours of fuel storage in a double walled tank must be provided as part of each installation. All permanently installed generators must include a quick disconnect switch to allow for the rapid installation of a mobile unit during extended down time for the RPIE unit.
8.13 Over-Current Protective Devices
The minimum sized device for branch circuit over-current protection is 20 amps. Ensure proper coordination and withstand ratings for all over-current protection devices. Demonstrate coordination with first upstream existing protective device. Replace old circuit breakers with new when remodeling facilities. If replacement breakers are unavailable, consider replacement of entire panel board. Main fusing is acceptable for limiting short circuit currents;
however, place a box with one full set of spare fuses adjacent to main panel.
8.14 Electrical Identification
Provide plastic panel board and disconnect labels.
Labels shall be laminated (black with white core) engraved with 6.4-mm (1/4-in) high letters. Attach to front exterior of enclosures. Labels shall match plan designations. Provide non-ferrous phase and circuit identification labels in all enclosures for feeder circuit conductors. Provide underground marker tapes for all underground conductors. If underground conductors are not in metallic conduit, provide marker tape with foiled backing to facilitate detection.
8.15 Power Factor Correction
Add power factor (PF) capacitors to induction motors (10 HP or larger) to correct PF to 0.90 (+0.05, -0.00).
Switch PF capacitors in with the motor. Size capacitor IAW IEEE 141, NEMA MG2 and motor manufacturer recommendations.
A-42 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
8.16 Power Service
Power requirements for buildings shall be 480 or 208/120 depending on building function.
8.17 Electrical Related Work
Balance loads on phases within 10% at all panel boards. Conduct fault calculations to ensure proper withstand ratings for all protective devices. Ensure coordination for all protection devices, conductors, enclosures and equipment.
All electrical equipment shall be supported to meet seismic protection for zone 2. Use automatic setback thermostats in areas not normally occupied 24 hr/day, 7 day clock, battery backup. Emphasize maintainability in all designs
8.18 Raceways
Conduit run in concrete shall be PVC unless steel conduit is needed for a specific reason, i.e. to limit fault currents. Underground primary voltage feeders shall be in concrete encased conduit. All penetrations of fire resistance rated walls shall be fire stopped IAW NEC Article 300-21. Highlight compliance with NEC Articles 300-5(g) and 300-7(1) regarding moisture seals.
8.19 Conductors
Aluminum conductors smaller than No. 4 AWG may not be used IAW ETL 83-3. In mission critical facilities, housing, dormitories, and transient quarters, aluminum conductors may only be used for service entrances. The smallest branch circuit conductors acceptable are No. 12 AWG. Conductors No. 6 AWG and larger shall have heat resistant insulation.
8.20 Color Coding
Color coding for all three phase circuits shall be in accordance with the following:
480V 208V Phase A Yellow Black Phase B Brown Red Phase C Orange Blue Neutral White White Ground Green Green
8.21 Conduits Bored & Jacked Under Roadways
All new utility lines shall be run in 15-cm (6-in) PVC underground conduit and concrete encased under new roadways only, provide 1 spare conduit from transformer to building.
Underground lines shall have PVC to Schedule 80 Steel transition when going from underground to overhead.
8.22 Meters IAW ETL 94-2
Digital electrical meters shall be provided for all new facilities and all major remodels. The meter multiplier shall be clearly marked on the inside of the meter.
Calculations determining the meter multiplier shall be submitted to the Contracting Officer for approval.
Meters shall be generally located in rear of building or near service entrance. Each meter shall be wired to the EMCS system.
8.23 O&M Manuals
Provide one set of hard covered O&M manuals and four sets of O&M manuals on CD ROM.
8.24 As Built Drawings
All field changes shall be annotated on the As Built drawings prior to facility acceptance.
8.25 Intra-Building Wiring Policy
See Section 10, Telecommunication Standards.
A-43 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
The security system at Mt. Home AFB consists of a central computer located at Building 1013 – Law Enforcement Building. The computer communicates with all security panels located on base. This computer will only support security panels manufactured by Mycroft Technologies. Model number ACS-4400-X is of sufficient capacity to support most building security requirements. The prom chips in this panel must be compatible with the central computer software, which was developed by SMF Systems, San Francisco, Calif. In order to maintain coordinated system growth, security panels shall be compatible with the base IDS system.
All security panels will be located in a secure area of the building. Door contacts and motion detectors will be zoned separately. Under the floor or above the ceiling motion detectors or other sensors will be zoned separately. Duress alarm sensors and duct detectors will also be zoned separately. Every sensor shall be home run wired to the ACS-4400 security panel.
Electrical metal tubing (E.M.T.) will be used during security system installation. Install a 19-mm (¾-inch) conduit (E.M.T) from the security panel to the building’s main telephone backboard (home run panel). Route a 24 AWG four wire Cat 5 telephone cable in this conduit.
Magnetic card readers with keypads shall be installed to permit entry into a secure area. Mycroft Technologies card reader ASC/1150 is supported by our system. The keypad shall be mounted on the outside of the primary entrance into the classified area. If the keypad is mounted on an external wall exposed to the elements, a NEMA enclosure with hinged cover will be installed to protect the card reader. If at all possible the keypad should be mounted in a vestibule.
Style of card reader used at Mountain Home AFB is mandatory:
Mycroft Technologies ACS 1150 magnetic card reader / keypad. This style of card reader interfaces with the Mycroft 4400 DGP through an RS-485 serial communication port at the back of the reader. The annunciated lights produce red, green and amber colors for access. It has a 12-digit keypad arranged in two columns with short beeps to echo the keystrokes.
It is recommended the following hardware be used during installation:
Microwave Motion Detectors:
DUALTEC 450T this series of detector senses motion and passive infrared (body heat). When the PIR detector senses a change in infrared the microwave instantly becomes alert. If motion is detected within a specific time period the sensor will alarm. It takes motion as well as heat to send an alarm once the system is armed. Maximum range is 15.2 meters by
12.2 meters (50 feet by 40 feet) which is obtained at a mounting height of 2.3 cm (7 feet 6 inches).
Sensitivity is between 2 and 4 steps within field of view.
Magnetic Door Switch:
SENTROL 2507-A. The magnet closes a set of contacts sealed in the stationary portion of the two piece switch. The magnet is mounted to the door and the switched portion to the door jamb. When the security system is armed and the door opened, it also opens a normally closed circuit.
Duress Switch:
ADEMCO 269. Personnel activated switch with a keyed reset. Like operation to the magnetic switch, only difference being that it is manually operated and reset with a key.
Security Cable:
BELDON 9418. 18-gauge 4-conductor cable is used on all devices, except on card readers where the cable size must be 20-gauge 4 conductor according to the C.O.E
The Civil Engineering EMCS Shop will perform all software programming necessary for the central computer to communicate with the building ACS- 4400 security panel. 366TH CES/CEIOA (208) 828-
[SECTION 9] SECURITY SYSTEM STANDARDS
A-44 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
This section describes telephone, pre-wiring, computer support, and other communication requirements that must be addressed in the project design. These criteria are as follows:
10.1 CATV
Century Communications is the current base-wide cable TV contractor. All components of the on-base distribution system are owned and maintained by the base wide cable TV contractor. This includes cable, amplifiers, splitters, etc. installed within the building.
New construction and remodeling projects should make provisions for conduit, outlets, lockable enclosures, power and building entrance. However, in all cases the contractor is liable for a complete and functional system.
10.2 Phone Standard
Phone standard is Type A.
10.3 Intra-Building Wiring
INTRA Building Wiring Policy - Follow requirements of Engineering Technical Letter (ETL) 87-9.
10.4 General Communications - Computer
System Requirements
Computer System requirements (C-CS) are as follows:
A 3 meters by 3.5 meters (10 feet by 12 feet) Communication Equipment Room (CER) is required for a facility that has significant communications systems (C-CS) requirements. Unoccupied facilities and small facilities such as guardhouses, utility control buildings, storage bunkers, etc. will normally not require a CER. The CER normally serves as the entrance facility for all incoming C-CS ducts and service and as the main location for C-CS equipment such as PABXs, electronic key systems, main LAN hubs/routers/servers, etc. All CER spaces shall be environmentally controlled spaces, to be maintained at the same temperature conditions as occupied administrative areas.
10.4.1 Location
The CER should be located on the first floor with an exterior wall and be provided with double doors (recommended door size: 1.8 meters wide by 2.4 meters high (6 feet wide by 8 feet high)) without a center support to ensure that large equipment can be easily moved in the room. CERs and telecommunications closets (TC) must not be co-located with other building utility services such as HVAC, Generators/ Transformers, etc. due to the sensitivity of newer C-CS equipment to Electro-Magnetic Interference.
10.4.2 Power
The CER must have adequate power to support the C-CS equipment. In addition to normal power outlets, the CER requires 1 quad 20 amp dedicated branch circuit next to the backboard, and 1 quad 20 amp dedicated branch circuit next to the racks.
The designer should coordinate power requirements with the base C-CS personnel and/or the Designated Engineering and Installation (E&I) group. In addition, the room should also have normal convenience outlets on all walls in accordance with NEC and/or local code requirements.
10.4.3 Supporting Structures
As a minimum requirement, the CER should have ¾-inch plywood backboards on all walls, from no greater than one foot above the finished floor level to no less than 2.1 meters (7 feet) above the finished floor level.
Depending on the C-CS requirements, a floor mounted main distribution frame (MDF) may be required to support cable terminations.
[SECTION 10] TELECOMMUNICATION STANDARDS
A-45 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
Building Usable Square Meters (SF)
< 1,858 (20,000)
1,858 (20,000) to 9,290 (100,000)
9,290 (100,000) to 18,580 (200,000)
Every Add’l 18,580 (200,000)
CER Size Sq. Meters (SF)
37 (400)
46 (500)
84 (900)
+56 (+600) increment
# of Entrance Conduits
-1
10.4.4 Grounding
Grounding IAW ETL 90-6, must meet the appropriate NEC requirements and practices.
As a minimum, provide a single-point ground for all Communications-Electronics equipment for the building within the CER.
Provide a copper ground plate (bus bar with minimum 5 cm wide by 61 cm long (2 inches wide by 24 inches long) in the CER with 2.5 cm (1-inch) standoffs. The ground plate will be installed 2.1 meters (7 feet) above ground level on a wall (preferably an outside wall) within the CER. Provide a ground riser with a No. 1 or larger wire directly connected to the provided ground plate with no taps.
The resistance of the ground riser must be 5 ohms or less measured for the main ground point. All connections of wire-to-wire and/or wire-to-ground rod must be cadwelded. The designer should coordinate with the base Communications-Computer Systems Officer (CSO) for communications equipment that needs more specific grounding.
10.4.5 Size Requirements
See Table 1.
10.5 Telecommunications Closet (TC)
A telecommunications closet (TC) is required for each floor with 929 square meters (10,000 sq. ft.) of usable building footage in a facility. A TC serves as the interface from the CER to the individual voice/data outlets in the facility and as a location for enterprise hubs for data LAN equipment. Note the CER may also function as a TC for the area in the facility where it is located.
10.5.1 Location
The TC should usually be located close to the center of the area it serves. The critical item relative to the location is that the installed length of all distribution cables (horizontal cables) run from the TC to the outlets must be less than 90 meters (295 feet) to support LAN data requirements.
10.5.2 Power
Each TC should have a least two 20 amp dedicated branch circuits to support data hubs, but can be greater depending on the planned equipment for the room. The room should also have normal convenience outlets on all walls in accordance with NEC and/or local code requirements.
10.5.3 Supporting Structures
The TC should have ¾-inch plywood backboards on all walls, from no greater than one foot above the finished floor level to no less than 2.1 meters (7 feet) above the finished floor level.
10.5.4 Grounding
Grounding must meet the appropriate NEC requirements and practices. As a minimum, provide a No. 6 ground wire or larger connected with a direct home run to the ground plate in the CER. This grounding
Table 1. CER Size Requirements
(Not less than 2:1 ratio Length to Width)
A-46 Mountain Home AFB, Idaho : Installation Development and Design (ID2) must be 10 ohms or less measured at the grounding point.
10.5.5 Size
Minimum size for a TC is 3 meters by 3.5 meters (10 feet by 12 feet); however specific dimensions could vary depending on the type of facility. Contact Base Civil Engineering for any variances. The TC size should be provided in accordance with (IAW) EIA/TIA- 569, Chapter 7, Table 7.2-1.
10.6 Entrance Facilities
All facilities should have entrance conduit into the CER with the minimum number as indicated in Table
1. One of the ducts requires two 5 cm (2-inch) inner-ducts, and one of the ducts requires four 2.5 cm (1-inch) inner-ducts; the rest are spare. If the general area where the new facility will be located is served by a manhole (MH) and duct system, or if the impact of the new facility will greatly develop the area, then a new MH/duct system should be designed to connect the facility to the existing MH/duct system.
See the referenced USAF/LEE letter for additional guidance. For projects where an extensive new MH/ duct system will be required, it is critical that the appropriate E&I agency be consulted as soon as possible in the design definition process.
10.7 Wiring
10.7.1 Voice
All voice wiring should meet the minimum EIA/TIA Category 5 requirements.
Consult with the base CSO for outlet type requirements such as RJ-11 vs. RJ-45 jacks for voices and whether there are any special keying or wiring requirements. The voice riser cable from the CER to each TC should be sized at a minimum of 30% of the total pair distribution planned for the TC rounded up to the next 100 pair count. The riser conduit design should include spare capacity for a second riser cable of equal size.
10.7.2 Data
All copper data wiring should meet the minimum EIA/TIA Category 5 requirements.
All fiber cabling should meet the minimum ANSI/EIA/TIA/492AAA requirements.
Installed length of copper data cables must be less than 90 meters (295 feet). The minimum size fiber optic riser cable from the CER to each TC is 6 strands. Coordinate with the base CSO for additional requirements.
The riser conduit design should include spare capacity for a second fiber optic cable of equal size.
10.7.3 Outlets
The design should provide for an outlet box and wiring to support two voice, two data, and future fiber optic cable outlets every 9.3 square meters (100 square feet) of usable floor space. The designer should coordinate outlet requirements with the base CSO. In areas where conduits are used, the minimum size to serve a single outlet box should be 2.5 cm (1-inch) diameter to allow installation of copper and fiber optic cable. Pinouts for the voice and data jacks will conform to the EIA/ TIA 568A standard.
10.7.4 Secure Wiring
All secure communications requirements should be wired IAW AFSSI 30-30, and AFSSM 70-11.
The figure shown on this page, extracted from EIA/TIA-569 Figure 2.2-1 Intrabuilding Elements, illustrates the typical relationships between the major telecommunications pathway and elements within a building.
All Undergournd cable shall be installed in 51-mm (2-inch) conduit.
A-47 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
The following guidelines are intended to provide standardized guidance for environmental issues at Mountain Home AFB. These guidelines are then followed by a short guide specification (SECTION 01061) intended to be used only for smaller contracts.
For larger contracts, Project Managers should consider requiring the use of the Unified Federal Guide Specifications in lieu of the attached MHAFB Guide Specification 01061. Review of the unified guide specifications at “www CCB.org” is encouraged in all cases. Project Managers should consult with the Environmental Global Flight in selecting which guide specification(s) to use.
This document is provided in PDF and MS-WORD format.
Following the Guide Specification are several forms, checklists and samples to assist the designers and engineers as well as the contractor performing the work.
1) WASTE DISPOSAL AND RECYCLING PLAN:
This plan is required in the environmental specification section whenever applicable.
2) HAZARDOUS MATERIALS REPORTING FORM:
This form is required as an attachment to the environmental specification section whenever hazardous materials may be used in the contract.
An estimate of hazardous material quantities is required, as are manufacturer specific material data safety sheets.
3) HAZARDOUS MATERIALS MONTHLY USAGE LOG:
This form is required as an attachment to the environmental specification section whenever hazardous materials may be used in contracts ranging over an extended period of time.
4) PRECON CHECKLIST:
This checklist is used at all preconstruction conferences prior to the Contracting Officer’s issuance of the notice to proceed. Designers should use this checklist as additional guidance while writing the specifications. Project managers are requested to make this form available with the RFP and Design Packages.
5) PROJECT CHECKLIST:
This checklist should be used by all project managers and designers to assist them in addressing environmental concerns. Please use this while consulting or coordinating with the Environmental Global Flight.
11.1 Environmental Guidelines
11.1.1 Asbestos & Lead Based Paint Materials
Projects involving asbestos containing materials for renovation or removal can reference 366th Wing Plan 3206- 07 (or most current version) for project management procedures, policies, and required notifications. All asbestos/lead paint surveying and documentation will be the responsibility of the designer. MHAFB has an asbestos and lead database showing test results on some of the structures.
Contractor work involving asbestos and lead based paint removals shall comply with current regulations and including 40 CFR Part 61, 40 CFR Part 745, OSHA 1910, and
OSHA 1926.
The contractor shall dispose of all asbestos materials off-base in an approved landfill.
Lead containing materials will have to be tested in order to determine proper disposal procedures.
11.1.2 Waste Disposal
All waste disposal activities must be coordinated in advance with the Hazardous Waste Program Manager (208- 828- 6351). Non hazardous construction debris generated by the contractor must be disposed of off-base. Weight tickets and descriptions of debris must be provided to the Environmental Global Flight, building 1297.
[SECTION 11] ENVIRONMENTAL ENGINEERING STANDARDS
A-48 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
11.1.3 Recycling Center
MHAFB’s recycling center accepts all metals, cardboard, newspapers, and other mixed paper products. The recycling center can also assist with coordinating collection and pick up of recyclables. Contractors are encouraged to participate by recycling these products at the base recycling center. This list changes due to market fluctuations. Contact the recycling center for most current items (208-828-4212).
11.1.4 Soil Farm
A soil farm may be available on base, with prior authorization and coordination, for treatment of a small quantity of soils contaminated with hydrocarbons. Space is limited. Check with the Environmental Global Flight (208-828-6351) prior to developing plans to use this space.
11.1.5 Environmental Permits
Processing of required environmental permits (i.e., air emissions, storm and industrial water discharge, etc.) prior to releasing the contract for execution shall be the sole responsibility of the designer(s). Please inform the Environmental Global Flight of all environmental permit applications. These may vary on a case-by-case basis.
11.1.6 Sanitary Drains
Unless it is deemed necessary, it is preferred that oil/water separators are not used in draining areas where petroleum, oils and lubricants are encountered. If installing an oil/water separator, an above ground system is preferred.
11.1.7 Liquid Storage Tanks
Above ground storage tanks are required and shall meet all current regulations and code requirements. All tanks storing a hazardous liquid will either be of double walled construction, or secondary containment will be provided. Contact the Environmental GlobalFlight for more specific information.
11.1.8 Green Procurement
Whenever technically feasible and cost effective, products installed in the project will use as much recycled material as possible in accordance with 366th Wing Plan 3213-08 (or most current version).
A-49 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
This section describes the fire protection conditions and requirements that help the designer select appropriate fire protection equipment for the project. Each specific fire detection or suppression system selected should be explained in detail. The criteria shall be prepared and “signed off” by the base fire department (MIL HDBK-1008C and most current NFPA Standards as applicable).
12.1 Emergency Light & Power Systems
Provide lead calcium batteries rather than nickel cadmium batteries for backup systems.
All exit signs shall be white with red letters, with properly oriented arrows when applicable.
All internally illuminated signs must use low maintenance low energy consuming lighting. Light emitting diodes (LED) that actually spell out the word EXIT are required. Refer to Engineering Technical Letter (ETL) 91-5.
Emergency egress lighting shall be integral to overhead lights. Stand alone wall units are discouraged.
Alarm Panel, pull stations, and enunciators shall all be keyed the same. Simplex “B” key or Firelite 17003.
12.2 Fire Alarm & Detection Systems
Utilize lead calcium rather than nickel cadmium batteries for fire alarm panels.
Ensure disconnect breaker is inaccessible to the public.
Provide dedicated locked out breaker for alarm panel.
Provide an alphanumeric graphic enunciator with keyed silence switch at entrances to facilities.
When existing detectors are hidden by a new drop ceiling, a detector light should be installed below the new ceiling to allow visibility from space below. All heat and smoke detectors will have a latching LED alarm.
The fire alarm control panel shall have the capability, of reporting alarm and trouble by zone as directed by AHJ. The initiating devices shall be Style D (Class A) The fire alarm control panel must also have “walk-test” capability. Submittals shall provide for the layout of all fire alarm system components.
All panels will come complete with software and training necessary for performing any in-house reconfigurations of the installed system. Training shall be performed by a true factory representative.
The training of on site personnel should be the primary focus, with production of training videos and materials as a byproduct.
Provide a supervised override switch on all fire alarm panels where shut down of air handlers or electrical power is installed. This function will facilitate testing of the fire alarm system without shutting down equipment or power
12.2.1 Fire Alarm Reporting System, Radio Type
Provide a radio fire alarm system for all new facilities. The system will be compatible with the Monaco D-700 RF central receiving system. The transceivers will require the antenna package (VHF omni directional antenna). The required frequency will be
138.2875. The radio system reports alarms
to the central communication center. The system shall indicate the area of alarm and the radio link shall be supervised and operated using two way data transmission IAW NFPA 72 standards.
The contractor shall be certified by the Manufacturer.
The contractor shall have all the necessary equipment to install the Radio Transceiver i.e. Watt meter, Volt meter ,etc.
[SECTION 12] FIRE SAFETY STANDARDS
A-50 Mountain Home AFB, Idaho : Installation Development and Design (ID2)
12.3 Sprinkler Systems
Sprinkler systems layout shall not be included in contract drawings. Shop drawings shall be submitted by the Contractor before construction proceeds. The designer and installer must be certified by the State of Idaho’s Fire Marshal. Documents and specifications will be reviewed in accordance with MIL-HDBK- 1008C, NFPA 13, and NFPA 24. All mechanical penetrations of fire-rated walls, roofs, floors, etc shall have barrier of equal or superior protection. If penetrations require the application of a sealant, as a minimum, add a general reference on the drawings.
All fire related design and specifications must be closely coordinated with the base fire department or Technical Services Branch (contact the Fire Prevention Office).
Where wet pipe sprinkler systems are installed, ensure non-heated areas have dry pendant…