Attachment_4_-_SABER_Price_Evaluation_Worksheet.pdf

PDF 106 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ
Solicitation number
FA4897-16-R-0005
Issued by

About this file

Attachment 4 - SABER Price Evaluation Worksheet

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
ID2_(set_2).pdf PDF
ID2_(set_1).pdf PDF
ID2_(set_3).pdf PDF
ATTACHMENT_16.xlsx XLSX spreadsheet
AMENDMENT_0001.pdf PDF
Revised_Warehouse_Submittal_Register.xlsx XLSX spreadsheet
Pre-proposal_conf_slideshow.pdf PDF
Attachment_1_-_SABER_Statement_Of_Work_(SOW).pdf PDF
Attachment_9_-_WD_-_Elmore_-_ID160079_-_Highway.pdf PDF
Attachment_6_-_WD_-_Owyhee_-_ID160071_-_Heavy.pdf PDF
FA4897-16-R-0005_SABER_RFP.pdf PDF
Attachment_3_-_Past_Performance_Questionnaire.pdf PDF
Sample_Project_Attachment_4_-_Warehouse_Submittal_Register.pdf PDF
Attachment_11_-_WD_-_Elmore_-_ID160020_-_Building.pdf PDF
Attachment_5_-_WD_-_Owyhee_-_ID160099_-_Highway.pdf PDF
Sample_Project_Attachment_1_-_Warehouse_Assumptions.pdf PDF
Attachment_8_-_WD_-_Elmore___Owhyee_-_ID160001_-_RESIDENTIAL.pdf PDF
Attachment_7_-_WD_-_Owyhee_-_ID160033_-_Building.pdf PDF
Sample_Project_Attachment_2_-_Warehouse_Siting.pdf PDF
Attachment_10_-_WD_-_Elmore_-_ID160048_-_Heavy.pdf PDF
Attachment_12_-_SFS_FORM_30.pdf PDF
Attachment_13_-__Notification_of_Compliance.pdf PDF
Sample_Project_Attachment_3_-_Warehouse_FloorPlan.pdf PDF
Attachment_2_-_Warehouse_Sample_Project_SOW.pdf PDF
Attachment_14_-__Determination_of_Responsibility.pdf PDF
SABER_SOW_-_Draft.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4897-16-R-0005

ATTACHMENT 4

SABER Price Evaluation Worksheets

BASE CONTRACT PERIOD

0001 Simplified Acquisition of Base Engineering Requirements (SABER) Coefficients: Furnish all plant, labor, equipment, materials, personnel, and supervision necessary to plan, design, manage, and perform all work required by this Indefinite-Delivery/ Indefinite-Quantity (IDIQ) contract for Simplified Acquisition of Base Engineering Requirements (SABER) at Mountain Home AFB, ID. The performance period shall be for one calendar year from date of award. Projects will be in support of real property maintenance, repair, alteration, and/or new construction at Mountain Home AFB, ID, and associated sites.

DESCRIPTION

ESTIMATED

MAXIMUM*

DOLLAR

AMOUNT

PRICING

COEFFICIENT**

ESTIMATED

MAXIMUM

PRICE

Mountain Home AFB Coefficient - SABER

PROJECTS AT MOUNTAIN HOME AFB ID:

Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as required in individual delivery orders issued against this contract.

$2,876,856.00

Off Base Small Arms Range Coefficient -

SABER PROJECTS AT THE OFF- BASE

SMALL ARMS RANGE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as required in individual delivery orders issued against this contract.

$43,187.00

Range and Emitter Sites Coefficient - SABER

PROJECTS AT SAYLOR CREEK RANGE,

JUNIPER BUTTE RANGE, GRASMERE,

AND ASSOCIATED EMITTER SITES:

Offeror shall perform functions called for in the Request for Proposal as clarified in the

$104,562.00

Strike Dam Marina/Rattlesnake Radar Site Coefficient - SABER PROJECTS AT THE

STRIKE DAM MARINA AND

RATTLESNAKE RADAR SITE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as required in individual delivery orders issued against this contract.

$35,629.00

TOTAL ESTIMATED MAXIMUM PRICE

SABER PRICE EVALUATION WORKSHEET

(Continued)

TOTAL BASE CONTRACT PERIOD ____________

* The estimated dollar amounts, price, and estimated number of projects are for price evaluation purposes only (see Section M of this solicitation). The estimated price shall be based on the Estimated Maximum Dollar Amount multiplied by the coefficient for each location or Design Fee Magnitude for PRICE EVALUATION PURPOSES ONLY. The government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

** See Section B of this solicitation for more information on Coefficients.

*** The amounts under this CLIN shall be paid to the Contractor only if the project design/estimate is complete, accepted, and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the delivery order price for construction if/when awarded. Coefficients shall not be applied to this line item.

0002 Design/Estimating Magnitudes***

PROJECTS

PROJECT

DESIGN/ESTIMATING

FEES TOTAL

Micro Magnitude Micro Magnitude - $50,000 or Less Estimated Projects 4 Projects

Low Magnitude Low Magnitude - $50,001 to $150,000 Estimated 3 Projects

Medium Magnitude Medium Magnitude - $150,001 to $500,000 Estimated 2 Projects

High Magnitude High Magnitude - $500,001 or more Estimated 1 Projects

TOTAL DESIGN/ESTIMATING FEES

Saber Price Evaluation Worksheet

OPTION ONE CONTRACT PERIOD

1001 Simplified Acquisition of Base Engineering Requirements (SABER) Coefficients: Furnish all plant, labor, equipment, materials, personnel, and supervision necessary to plan, design, manage, and perform all work required by this Indefinite-Delivery/ Indefinite-Quantity (IDIQ) contract for Simplified Acquisition of Base Engineering Requirements (SABER) at Mountain Home AFB, ID. The performance period shall be for one calendar year from date of award. Projects will be in support of real property maintenance, repair, alteration, and/or new construction at Mountain Home AFB, ID, and

MAXIMUM*

DOLLAR

AMOUNT

PRICING

COEFFICIENT**

ESTIMATED

MAXIMUM

Offeror shall perform functions called for in the Request for Proposal as clarified in the

$2,876,856.00 _____________ ___________

SABER PROJECTS AT THE OFF- BASE

SMALL ARMS RANGE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as required in individual delivery orders issued against this contract.

$43,187.00 _____________ ___________

Range and Emitter Sites Coefficient - SABER

PROJECTS AT SAYLOR CREEK RANGE,

JUNIPER BUTTE RANGE, GRASMERE,

AND ASSOCIATED EMITTER SITES:

Offeror shall perform functions called for in the Request for Proposal as clarified in the

$104,562.00 _____________ ___________

Coefficient - SABER PROJECTS AT THE

STRIKE DAM MARINA AND

RATTLESNAKE RADAR SITE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work

$35,629.00 _____________ ___________

TOTAL OPTION ONE CONTRACT PERIOD _____________

* The estimated dollar amounts, price, and estimated number of projects are for price evaluation purposes only (see Section M of this solicitation). The estimated price shall be based on the Estimated Maximum Dollar Amount multiplied by the coefficient for each location or Design Fee Magnitude for PRICE EVALUATION PURPOSES ONLY. The government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

** See Section B of this solicitation for more information on Coefficients.

*** The amounts under this CLIN shall be paid to the Contractor only if the project design/estimate is complete, accepted, and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the delivery order price for construction if/when awarded. Coefficients shall not be applied to this line item.

1002 Design/Estimating Magnitudes***

PROJECTS

PROJECT

TOTAL DESIGN/ESTIMATING

FEES

Saber Price Evaluation Worksheet

OPTION TWO CONTRACT PERIOD

2001 Simplified Acquisition of Base Engineering Requirements (SABER) Coefficients: Furnish all plant, labor, equipment, materials, personnel, and supervision necessary to plan, design, manage, and perform all work required by this Indefinite-Delivery/ Indefinite-Quantity (IDIQ) contract for Simplified Acquisition of Base Engineering Requirements (SABER) at Mountain Home AFB, ID. The performance period shall be for one calendar year from date of award. Projects will be in support of

MAXIMUM*

DOLLAR

AMOUNT

PRICING

COEFFICIENT**

ESTIMATED

MAXIMUM

Offeror shall perform functions called for in the Request for Proposal as clarified in the

$2,876,856.00 ____________ ___________

SMALL ARMS RANGE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as

PROJECTS AT SAYLOR CREEK RANGE,

JUNIPER BUTTE RANGE, GRASMERE,

AND ASSOCIATED EMITTER SITES:

Offeror shall perform functions called for in the Request for Proposal as clarified in the

STRIKE DAM MARINA AND

RATTLESNAKE RADAR SITE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work

TOTAL OPTION TWO CONTRACT PERIOD _____________

* The estimated dollar amounts, price, and estimated number of projects are for price evaluation purposes only (see Section M of this solicitation). The estimated price shall be based on the Estimated Maximum Dollar Amount multiplied by the coefficient for each location or Design Fee Magnitude for PRICE EVALUATION PURPOSES ONLY. The government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

** See Section B of this solicitation for more information on Coefficients.

*** The amounts under this CLIN shall be paid to the Contractor only if the project design/estimate is complete, accepted, and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the delivery order price for construction if/when awarded. Coefficients shall not be applied to this line item.

2002 Design/Estimating Magnitudes***

PROJECTS

PROJECT

Saber Price Evaluation Worksheet

OPTION THREE CONTRACT PERIOD

3001 Simplified Acquisition of Base Engineering Requirements (SABER) Coefficients: Furnish all plant, labor, equipment, materials, personnel, and supervision necessary to plan, design, manage, and perform all work required by this Indefinite-Delivery/ Indefinite-Quantity (IDIQ) contract for Simplified Acquisition of Base Engineering Requirements (SABER) at Mountain Home AFB, ID. The performance period shall be for one calendar year from date of award. Projects will be in support of

MAXIMUM*

DOLLAR

AMOUNT

PRICING

COEFFICIENT**

ESTIMATED

MAXIMUM

Offeror shall perform functions called for in the Request for Proposal as clarified in the

SMALL ARMS RANGE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as

PROJECTS AT SAYLOR CREEK RANGE,

JUNIPER BUTTE RANGE, GRASMERE,

AND ASSOCIATED EMITTER SITES:

Offeror shall perform functions called for in the Request for Proposal as clarified in the

STRIKE DAM MARINA AND

RATTLESNAKE RADAR SITE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work

TOTAL OPTION THREE CONTRACT PERIOD ____________

* The estimated dollar amounts, price, and estimated number of projects are for price evaluation purposes only (see Section M of this solicitation). The estimated price shall be based on the Estimated Maximum Dollar Amount multiplied by the coefficient for each location or Design Fee Magnitude for PRICE EVALUATION PURPOSES ONLY. The government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

** See Section B of this solicitation for more information on Coefficients.

*** The amounts under this CLIN shall be paid to the Contractor only if the project design/estimate is complete, accepted, and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the delivery order price for construction if/when awarded. Coefficients shall not be applied to this line item.

3002 Design/Estimating Magnitudes***

PROJECTS

PROJECT

Saber Price Evaluation Worksheet

OPTION FOUR CONTRACT PERIOD

4001 Simplified Acquisition of Base Engineering Requirements (SABER) Coefficients: Furnish all plant, labor, equipment, materials, personnel, and supervision necessary to plan, design, manage, and perform all work required by this Indefinite-Delivery/ Indefinite-Quantity (IDIQ) contract for Simplified Acquisition of Base Engineering Requirements (SABER) at Mountain Home AFB, ID. The performance period shall be for one calendar year from date of award. Projects will be in support of

MAXIMUM*

DOLLAR

AMOUNT

PRICING

COEFFICIENT**

ESTIMATED

MAXIMUM

Offeror shall perform functions called for in the Request for Proposal as clarified in the

SMALL ARMS RANGE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work and as

PROJECTS AT SAYLOR CREEK RANGE,

JUNIPER BUTTE RANGE, GRASMERE,

AND ASSOCIATED EMITTER SITES:

Offeror shall perform functions called for in the Request for Proposal as clarified in the

STRIKE DAM MARINA AND

RATTLESNAKE RADAR SITE: Offeror shall perform functions called for in the Request for Proposal as clarified in the Statement of Work

TOTAL OPTION FOUR CONTRACT PERIOD ____________

* The estimated dollar amounts, price, and estimated number of projects are for price evaluation purposes only (see Section M of this solicitation). The estimated price shall be based on the Estimated Maximum Dollar Amount multiplied by the coefficient for each location or Design Fee Magnitude for PRICE EVALUATION PURPOSES ONLY. The government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

** See Section B of this solicitation for more information on Coefficients.

*** The amounts under this CLIN shall be paid to the Contractor only if the project design/estimate is complete, accepted, and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the delivery order price for construction if/when awarded. Coefficients shall not be applied to this line item.

4002 Design/Estimating Magnitudes***

PROJECTS

PROJECT

TOTAL DESIGN/ESTIMATING FEES
TOTAL DESIGN/ESTIMATING FEES
TOTAL DESIGN/ESTIMATING FEES
TOTAL DESIGN/ESTIMATING FEES
TOTAL DESIGN/ESTIMATING FEES

File details come from the government source that posted it. Updated .