Final_RFP_Q_and_A__(9_Apr_15).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Unmanned Aircraft System Operations Center Support (UASOCS) Federal contract opportunity
Solicitation number
FA4890-14-R-0018
Issued by
Department of the Air Force Air Combat Command

About this file

Final RFP Q A - 9 Apr 15

View the file

Other files for this federal contract opportunity

Other files attached to Unmanned Aircraft System Operations Center Support (UASOCS), newest first.
File Type Posted
Final_RFP_Q_and_A__(01_May_15).xlsx XLSX spreadsheet
UASOCS_PPC__companies_attending.docx DOCX document
UASOCS_PWS_20_Apr_2015.docx DOCX document
Draft_Appendix_F--Award_Fee_Plan-_20_Apr_15.docx DOCX document
UASOCS_CLINs_Pricing_Sheet_Updated_rev_6.xlsx XLSX spreadsheet
CDRL_A013_-_GFP_432_WG_(9_Apr_15).xls XLS spreadsheet
Appendix_B_UASOCS_9_Apr_15.pdf PDF
UASOCS_DD254_Continuation_Pages.rtf RTF text file
EUR2_GFP_Ramstein.XLSX XLSX spreadsheet
Appendix__L_UASOCS26Mar15.docx DOCX document
Final_RFP_Q_and_A_20_March_2015.xlsx XLSX spreadsheet
UASOCS_PreProposal_Conference_Agenda.docx DOCX document
Ramstein_additional_equipment_SRVT_GFE.xlsx XLSX spreadsheet
Ramstein_GFP.xlsx XLSX spreadsheet
UASOCS_Help_Desk_Tickets_2012-2014.xls XLS spreadsheet
CDRL_A013_-_Government_Furnished_Property_432_WG_(19_Dec_13).xlsx XLSX spreadsheet
Appendix_Q_UASOCS_12Feb15.docx DOCX document
Appendix_I-UASOCS_11Feb15.docx DOCX document
Appendix_S_UASOCS_12Feb15.docx DOCX document
UASOCS_CLINs_Pricing_Sheet_Updated_rev_5.xlsx XLSX spreadsheet
Appendix_M_UASOCS_12Feb15.docx DOCX document
WD_2005-2307_Rev_16.pdf PDF
WD_2005-2331_Rev_15.pdf PDF
Appendix_G_UASOCS_12Feb15.docx DOCX document
Appendix_H_UASOCS_5Mar15.docx DOCX document
UASOCS_Draft_RFP_Comment_Q A_Matrix__FBO_posting.xlsx XLSX spreadsheet
Draft_-_Appendix_M_UASOCS_Sep_14.docx DOCX document
Draft_Appendix_B_(Rev_X)_1_Oct_2014.pdf PDF
Draft_-_Appendix_H_UASOCS_9_Apr_2014.docx DOCX document
DRAFT_UASOCS_PWS_1_Oct__14.pdf PDF
Draft_-_Appendix_P_UASOCS_9_Apr_2014.docx DOCX document
Sections_L_and_M__Oct_2014.docx DOCX document
Creech_ _Nellis_WD_05-2331_Rev_13.pdf PDF
Section_K_Reps_and_Certs.doc DOC document
Ellsworth_WD_05-2485_Rev_12.pdf PDF
Draft_-_Appendix_O_UASOCS_Sep_14.docx DOCX document
Draft_RFP_FA4890-14-R-0018.doc DOC document
Draft_-_Appendix_C_UASOCS__Sep_14.docx DOCX document
Revised_(1)_Instructions_for_Bidder_Library_and_Site_Visits.docx DOCX document
EUR1_MUTE-UNMUTE_Log_MayJune2014_rev2.pdf PDF
UASOCS_Master_03B_Inventory.xlsx XLSX spreadsheet
UASOCS_OPS_Cell_inventory_(1).xls XLS spreadsheet
CDRL_A013_-_Government_Furnished_Property_432_ATKS_(19_Dec_13)(1).xlsx XLSX spreadsheet
Draft_-_Appendix_M_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_C_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_Q_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_S_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_G_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_E_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_O_UASOCS_9_Apr_2014.pdf PDF
Show all 50

Unmanned Aircraft System Operations Center Support (UASOCS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final RFP

Ques #ReferenceQuestionGovernment Response
1Question from PPC
RFP Sec MWith the decision to do an LPTA acquisition, are you still going to go through a down-select process? If so, please explain how you will do that and how that process will differ from the final selection process?Yes, please refer to RFP Section M, paragraph M-1.4.
2Question from PPC
PWSTo be clear, all expansion and facility build outs will require contractor to install cabling and conduit infrastructure along with network switching equipment?Yes, the contractor will be responsible for all cabling, conduit, and network program for the mission systems. SIPR and NIPR will be based upon the privileges grant by each base.
3Question from PPC
RFP para M-3.2, Factor 2, Past PerformanceOne of the highly relevant contracts we wish to cite as past performance ended in Apr 13, and was followed by 3 bridge contracts of 12 months, 7 months, and 2 months respectively (with separate contract numbers) until the re-award of a new contract in Jan 15. The work was performed for the same customer and has been essentially the same throughout all of the performance periods. Question: For purposes of relevance in the evaluation, can we cite the 21-month period of the 3 bridge contracts as part of a single overall past performance effort, even though they had different contract numbers? Or should these otherwise identical contracts be cited as separate contracts?You may cite the 21-month period of the three bridge contracts as part of a single overall past performance effort for both recency and relevancy.
4Question from PPC
RFP para L-7.4.1.2.2.cThis paragraph requires offerors to "Provide an analytic design for providing network administration and maintenance that meets requirements stated in the PWS…" Question: Please explain what the Government means by "analytic design", as no relevant verbiage is apparent anywhere in the PWS."Provide an analytic designed for..." will be changed with the upcoming Amendment 0001 to read, "Describe your approach for…"
5Question from PPC
Can the Government confirm whether the units (other than the 39th Squadron), have Help Desk personnel assigned locally, or whether they are all supported from a central Helpdesk (Sys Ad support) and Network Operations Center (Comm & Network Support)?The help desk is for tier 1. To meet PWS requirements of 24/7 operations, your tier 2 workers will be local.
6Question from PPCIf the Gov decides to have Industry provide OCONUS travel estimates/costs, will the Gov provide the number of trips (estimate) per year and locations?No, each offeror will propose their own OCONUS Travel CLIN (X036) cost estimates based on their technical approach and associated costs (relocation cost for employees/family members, etc., if applicable). This CLIN is not for Government Directed Travel which is CR CLIN X0008.
7Question from PPC
Appendix LFor Appendix L -- Where should this "tasle" be inserted in the technical response? Is it suggested to be part of the transition subfactor?The 15 page transition should be part of the Transition subfactor.
8Question from PPC
Appendix LOn Appendix L -- The Gov requires the certifications, qualifications, education… to be provided. Appendix K already provides the min requirements for key positions/ ___ categories. If Industry takes no exceptions, is it ok to state so (saves space)?The government requires Industries' approach to fulfilling Appendix K requirements.
9Question from PPC
PWSPWS states that a potential exists for future Ops Center closure and realignment. However, the CLIN pricing sheet does not include a CLIN designated for SOC stand-down. Will the Gov clarify if the cost designated for SOC stand-down will be provided or if these costs should be included in CLIN X030 Relocate Existing Ops center.The cost for standing down a SOC due to a relocation of that SOC should be included in CLIN X030, Relocate Existing SOC. If the need arises to stand-down a SOC that will not be relocated, the cost for that stand-down will be negotiated at that time.
10Question from PPC
CLINWhen does the Gov plan to release CLIN updates including CLINs 36, 37, & 38?We currently have the action to change CR CLIN X037 (DBA Insurance) to a FFP CLIN and to remove the pre-established government estimated costs for CR CLIN X036 (OCONUS Travel) & CR CLIN X038 (Overseas Allowances) and have each offeror propose its own costs, in review for approval. We will post the notice, if approved, as soon as we can. Depending on when approval is given, we may have to extend the proposal due date.
11Question from PPC
PWS 2.1.5.1, Operations Tempo IncreasesThe PWS states: "The CO may add/subtract equipment or software that requires contractor support to units listed in this PWS or increase the level of contractor support required at any time."

Question: Could the Gov please clarify how these additions/subtractions will be handled within the scope of this solicitation? Will they be treated as contract modifications?

Rationale: Section B includes only FFP CLINs for O&M. It does not allow for additions/subtractions over the life of the contract.The intend of this PWS section is to replace software/equipment as it becomes obsolete or if minor increases/decreases to the same occur. If the change is a major one requiring much more than the usual O&M, then a modification may be processed.
12Question from PPC
PWS 4.2.13.1As part of the Q&A released by the Gov’t dated 27 Jan 15, the Government provided that there is no ITAR requirement for the UASOCS Program and that the PWS would be updated to remove such a requirement. The FINAL RFP still includes a requirement for obtaining a license 90 days from contract start. Will the Government provide a detailed list of equipment affected by ITAR? Will ITAR apply as provided in this PWS Section?ITAR requirement has been removed.
13Question from PPC
Section 508Respectfully request clarification from the Government that Section 508 does not apply to this effort pursuant to FAR 39.2 exception for National Security Systems.It does not apply.
14Question from PPC
Appendix GParagraph 4.a states “Draft Quality Manual and the six mandatory procedures are due to the Government 30 days after the start of the transition period. Only four procedures are identified in Appendix G (paragraphs 2.c.1-4). Would the Government please clarify/identify the “six mandatory procedures?”The six mandatory procedures are those identified within ISO 9001-2008.
15Question from PPC
Section L, Atch 3Would the Government please provide a Microsoft Word version of the Past Performance Questionnaire to facilitate its completion by the contract POC?Yes, a word version of the PPQ will be posted the same day that these questions/answers are posted.
16Question from PPCWould the Government please provide industry with any technical manuals or training materials on the terminals and associated equipment that are installed and used at the relay/remote sites? Understand that these items were previously available during the reading room session last year; however, we ask for another opportunity to view this material no later than April 15.The government will not reopen the Bidder's Library. The library was made available to all for a 2-week period with an option for a third consecutive week depending on requests. We only receive enough requests to fill 1.5 weeks of usage/visits.
17Question from PPC
Q&A_20Mar2015, Q32Please confirm that the Appendix L will be included as a separate attachment to the technical volume and not included in any page count limitation.Appendix L will be included as part of the technical volume. As such, it will be part of the 60 page technical volume limitation.
18Question from PPC
CDRL A013 432WG; posted on 12 Mar 2015This CDRL is dated 19 Dec 2013. Is this the most current list? If not, would the Government provide an updated CDRL for 432WG?There was a CDRL A013 posted on 12 Mar 2015. A revised CDRL A013 will be posted the same day that these questions/answers are posted.
19Question from PPC
CDRL A013 432 ATKS; posted on 12 Mar 2015This CDRL is dated 19 Dec 2013. Is this the most current list? If not, would the Government provide an updated CDRL for 432ATKS?There was a CDRL A013 posted on 12 Mar 2015. A revised CDRL A013 will be posted the same day that these questions/answers are posted.
20Question from PPC
Pricing, CLIN 0033CLIN 0033 states, “Period of Performance 1 Apr 2016…” Would the Government confirm if Sigonella will be operational by 1 Apr 2016 (prior to award)?The government cannot confirm the exact operational date for Sigonella Operations, but it is unlikely that the site will be operational prior to 1 April 2016.
21Question from PPC
Section A, PWS 2.4.2Section A-PWS 2.4.2 states, “The contractor shall plan and support the standup of new Operations Center(s) or RPA SATCOM Relay Site(s).” In reference to the Government’s response for question 34, would the Government confirm that CLINs will be added after award for any separately negotiated new RPA SATCOM Relay Sites?Yes, should a new RPA SATCOM Relay site (other than the ones listed in the RFP) be added, the effort will be separately negotiated and a new CLIN added to the contract.
22Question from PPCTest measurement, diagnostic equipment (TMDE) is listed for Ramstein. Please confirm what the TMDE for Kadena, Sigonella, and the operations center locations are?TMDE for Kadena is listed under PAC 1 GFE, dated 12 Mar 2015 in FedBizOpps. Sigonella is not operational and no TMDE equipment is required for all Squadron operation centers.
23Question from PPC
Question #2 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015)Question: In the Government’s response to questions posted 12 March 2015, it was stated that CDRL A013 was updated to include 26 WPS equipment. We could not find the list of 26 WPS equipment in the CDRL that you provided. Could you please direct us to the location of this information in the CDRL?
Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location.An updated CDRL 013 will be posted to FedBizOpps that includes the 26 WPS equipment on the same day that these questions/answers are posted.
24Question from PPC

FBO Posting Update Mar 12, 2015 files:

PAC_1_GFE_Update_12_Mar_2015 Ramstein_GFP_1 Ramstein_GFP

Ramstein_additional_equipment_SRVT_GFEQuestion: There is a wide range of equipment listed at Ramstein and Kadena in the files posted 12 March 2015 under the headings “Ramstein Equipment Update” and “Posting Updates” to include Hellfire components and coveralls. Will all equipment in these files be covered under O&M on this contract? If not, would the Government identify what equipment is within the O&M scope of this contract?
Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location.Yes, all listed GFE is O&M.
25Question from PPC
PWS Section 3.3.6, Telephone ServicesQuestion: Section 3.3.6, Telephone Services, identifies the requirement for telephone set and associated building communications cabling maintenance. However, telephone sets or PBXs are not included in CDRL A013 equipment lists other than the VoIP phones at 432 ATKS that were identified as out of scope in the Government’s response to questions 12 March 2015. Would the Government please provide the number and types of telephone sets, PBXs, and Call Managers at each location that are included in this requirement?
Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location.This contract is not responsible for PBXs and Call Managers.
26Question from PPC
Section BQuestion: If the customer adds scope during contract performance will the award fee be adjusted accordingly?
Rationale: This information will aid in financial planning.If a scope change is of a magnitude that warrants an increase and funds are available, the award fee may be increased.
27Question from PPC
Section L-2, Access to Bidder’s LibraryQuestion: Would the Government consider re-opening the bidder’s library?
Rationale: The initial Bidder’s Library visit was to be made by 24 October 2014 before the final RFP was issued. Since the issuance of the final RFP, this offeror has additional information to gather related to the requirements in the final RFP. To ensure fair and adequate competition, this offeror requests a return visit to the Bidder’s Library.The Government will not reopen the Bidder's Library. The library was made available to all for a 2-week period with an option for a third consecutive week depending on requests. We only receive enough requests to fill 1.5 weeks of usage/visits.
28Question from PPC
Question #6 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015)Question: In the Government’s response to questions posted 12 March 2015, it was stated that total storage capacity and utilization for each unit would be provided. When will this information be provided?

Rationale: Storage capacity and utilization data for sites helps industry understand the size, complexity, and tempo of operations

for the contract. This data creates a more accurate staffing solution.The government will provide an updated CDRL 013 GFP on the same day that these questions/answers are posted.
29Question from PPC
Question #14 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015)Question: In the Government’s response to questions posted 12 March 2015, it was stated that the SATCOM Relay Sites Monitoring tool would be provided for each SATCOM Relay Site. Does the Government have a date as to when this information will be provided?
Rationale: Understanding the system configurations will help industry develop better solutions to support the program.Monix is the monitoring system for the SATCOM Relay Sites.
30Question from PPC
PWS 4.2.13.1 and Question #57 issued on 6 March 2015Question: In Question #57 for the DRFP, the Government stated that there is no ITAR requirement for UASOCS. However, the final PWS still contains an ITAR requirement in Section 4.2.13.1. Is it the intent of the Government to remove this PWS requirement?
Rationale: Removal of the ITAR requirement will clarify the RFP requirements.The ITAR requirement has been removed.
31Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A001Question: The PWS reference in the matrix for CDRL A001 is Sec. A, Para 2.1.2.1. Para. 2.1.2.1, Technical Interchange, does not seem to be related to CDRL A001. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response and ease of evaluation.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A001 will be posted the same date as these questions/answers.
32Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A002Question: The PWS reference in the matrix for CDRL A002 is Sec. A, Para 4.1.1.5. The PWS does not contain Para. 4.1.1.5. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A002 will be posted the same date as these questions/answers.
33Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A004Question: The PWS reference in the matrix for CDRL A004 is Sec. A, Para 2.1.2.4. The PWS does not contain Para. 2.1.2.4. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A004 will be posted the same date as these questions/answers.
34Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A005Question: The PWS references in the matrix for CDRL A005 are Sec. A, Para 2.1.2.5, 2.4.4, and 4.3.6. The PWS does not contain these three paragraphs. Could the Government please clarify the PWS references for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A005 will be posted the same date as these questions/answers.
35Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A006Question: The PWS reference in the matrix for CDRL A006 is Sec. A, Para 3.4.8. The PWS does not contain Para. 3.4.8. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A006 will be posted the same date as these questions/answers.
36Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A008Question: The PWS reference in the matrix for CDRL A008 is Sec. A, Para 4.2.2.4. The PWS does not contain Para. 4.2.2.4. Could the Government please clarify the PWS reference for this CDRL?
Rationale: CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A008 will be posted the same date as these questions/answers.
37Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A009Question: The PWS references in the matrix for CDRL A009 are Sec. A, Para 3.1.3.4 and 3.3.3.1. The PWS does not contain these two paragraphs. Could the Government please clarify the PWS references for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A009 will be posted the same date as these questions/answers.
38Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A010Question: The PWS reference in the matrix for CDRL A010 is Sec. A, Para 3.2.5.4.1. The PWS does not contain Para. 3.2.5.4.1. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A010 will be posted the same date as these questions/answers.
39Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A011Question: The PWS reference in the matrix for CDRL A011 is Sec. A, Para 3.4. Para. 3.4, Con tangency Action Plan, does not relate to CDRL A011, Contractor’s Configuration Management Plan. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A011 will be posted the same date as these questions/answers.
40Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A012Question: The PWS reference in the matrix for CDRL A012 is Sec. A, Para 4.1.2. Para. 4.1.2, Information Security, does not relate to CDRL A012. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A012 will be posted the same date as these questions/answers.
41Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A013Question: The PWS references in the matrix for CDRL A013 are Sec. A, Para. 4.1.3, Incident Reporting, and Sec. B, Para. 2.2, Evaluations, do not relate to CDRL A013. Could the Government please clarify the PWS references for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A013 will be posted the same date as these questions/answers.
42Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A014Question: The PWS reference in the matrix for CDRL A014 is Sec. A, Para 4.2.2.1. The PWS does not contain Para. 4.2.2.1. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A014 will be posted the same date as these questions/answers.
43Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A015Question: The PWS reference in the matrix for CDRL A015 is Sec. A, Para 4.7.1.1.1. The PWS does not contain Para. 4.7.1.1.1. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A015 will be posted the same date as these questions/answers.
44Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A016Question: The PWS reference in the matrix for CDRL A016 is Sec. A, Para 2.1.2.6. The PWS does not contain Para. 2.1.2.6. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A016 will be posted the same date as these questions/answers.
45Question from PPC
Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A017Question: The PWS reference in the matrix for CDRL A017 is Sec. A, Para 3.4.2. The PWS does not contain Para. 3.4.2. Could the Government please clarify the PWS reference for this CDRL?
Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response.A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A017 will be posted the same date as these questions/answers.
46Question from PPC

Appendix B: CDRL A008 Section L-7.4.1.2.1.d, Maintenance Support Plan CDRL A008, Maintenance Support Plan, states that the CDRL is not due until 90 days after contract award. In Section L-7.4.1.2.1, Aspect I – Maintenance Management, item d. states: “Provide a maintenance control plan that demonstrates effective scheduling of tasks and system of controls to provide quality/timely services or products that safely fulfill mission requirements.”

Question: We request that only a high-level summary of our Maintenance Control Plan be provided for Aspect I – Maintenance Management. Is submitting only a high-level summary of our Maintenance Control Plan with our proposal acceptable to the Government?

Rationale: A complete Maintenance Control Plan would require a large portion of the 60 pages allowed for the technical response. CDRL A008 to be submitted 90 days DAC would contain the complete Maintenance Control Plan.Provide a plan that can spell out the maintenance as a snap shot to prove competence.
47Question from PPC
Section L-4.1Question: Page 204, Section L-4.1 states that hand delivered proposals require the submission of an e-mail to obtain a delivery schedule. How far in advance should this request be made?
Rationale: We request this information for clarification of proposal delivery.No less than two days will be sufficient.
48Question from PPC
Section L-9.1.4,Supporting Price backup DataQuestion: Page 214, Section L-9.1.4 states that “Certified cost or pricing data is not required” assuming that adequate competition is received. If this is the case, will the Government remove the following FAR clauses:

• Page 163 FAR 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data and

• Page 163 FAR 52.215-12 Subcontractor Certified Cost or Pricing Data are only required when it is contemplated that cost or pricing data will be required?

Rationale: This formation would clarify FAR clauses from RFP language.Yes, FAR Clauses 52.215-10 and 52.215-12 will be removed. However, if circumstances should change during negotiations (if held) the Government may add the clauses back (and remove other related clauses as appropriate).
49Question from PPC
Section L-9.1.4,Supporting Price backup DataQuestion: If the Government will not remove the above two FAR clauses, will the Government remove the following clauses given that they are only required if FAR 52.215-10 and 12 are NOT included

• Page 163 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data – Modifications and

• Page 163 FAR 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications

Rationale: This formation would clarify FAR clauses from RFP language.No longer applicable due to Government response to Question #89.
50Question from PPC
Section I, Contract ClausesQuestion: The Government has included FAR 52.232-20 and 52.232-22. Is the 75% notification required on the CR CLINs only?
Rationale: This information would clarify the requirement between the firm-fixed-price and cost reimbursable CLINs.Yes
51Question from PPC
CLIN 28, 29, 30The Government states in the posted Q&A if it’s a new ops center and not a relocated center than new staffing will be required, and further defines the new SOC is at Creech (notional site per Q&A).
Question: Can this “new” SOC share resources from the 432nd and/or 732nd support, or is it a completely new organization such as the Ellsworth or Whiteman.Staffing for any new SOC will be part of your approach; however, each requirement of the PWS must be fully achieved. Also of note, the 732OG requires dedicated support, as outlined in the PWS.
52Question from PPC
UASOCS CLINs Pricing Sheet Updated Rev 5Pricing Template

CLIN Series XX06, the excel template UASOCS_CLINs_Pricing_Sheet_Updated_rev_5 (2) states the total each year is $400K, however the PDF document UASOCS_Final_RFP_Doc_-_5_Mar_15 states $800K.

Question: Which total is correct?The EXCEL pricing sheet showing the $400K is correct. The UASOCS_Final_RFP_Doc will be updated with the approval of Amendment 0001 to the RFP.
53Question from PPC

UASSOC_PWS_4_Mar_2015.doc

para 4.2.13.1The need for ITAR procedures to ensure compliance was removed from sections L & M as part of the transition but remains in the PWS in section 4.2.13.1.
Question: Should the PWS section 4.2.13.1 be removed as well?ITAR requirement has been removed.
54Question from PPC
Sample cover letter for Past Performance questionnaireWe were reviewing the Sample Cover Letter to be sent with Past Performance Questionnaires and noticed the due date noted there for the questionnaire was March 9th. Was that a sample date?

Reading through Section L - I don't see a specific due date noted for the Questionnaire other than 05 May for the Past Performance volume.

Could you provide clarification?The Government mistakenly left an old date on the sample letter when we should have adjusted it due to a schedule slip. This date will be revised with the upcoming Amendment 0001 to reflect a no later than date for of 5 May 2015 for the Past Performance Questionnaires. (Note: depending on when we receive approval for Amendment 0001, this date may be adjusted further.)
55SATCOM Relay sites equipment listingAre all the items listed on the inventory equipment listing, to include the vehicles and scales, for the SATCOM Relay sites considered GFP?Yes