Final_RFP_Q_and_A__(01_May_15).xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Unmanned Aircraft System Operations Center Support (UASOCS) Federal contract opportunity
- Solicitation number
- FA4890-14-R-0018
About this file
Updated Q A to Final RFP. Additional questions added from Ques 97 on. Some prior answers updated. Review entire Q A.
View the file
Other files for this federal contract opportunity
Show all 50
Unmanned Aircraft System Operations Center Support (UASOCS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final RFP
| Ques # | Reference | Question | Government Response | |
| 1 | L-8.1.4 | Is the one(1) page for each subcontractor's PPI or one(1) total for Vol II? | One (1) page for each sub's PPI | |
| 2 | PWS Appendices | Will Govt provide Appendix D? | The equipment in Appendix D is listed in CDRL A013, currently posted on FBO. Appendix D will be reviewed at Transition. | |
| 3 | PWS Appendices | Will Govt provide Appendix L? | This appendix is contractor provided with their proposal in response to the Government requirement in Appendix K. | |
| 4 | RFP p. 194 | DD254 not provided. | An updated DD254 will be posted the same day that these questions/answers are posted. | |
| 5 | Govt Q&A of 29 Jan 15 Ques 33. | Clarify which DoD 8570.01-M criteria will be required? | Refer to Appendix K for applicable requirements | |
| 6 | L-5.4.5 Copies and Page Limit, L-7.4.1.1.2, L-7.4.1.2.1, and L-7.4.1.4.1 | Would the Govt consider moving the Transition Plan outside the Volume's 60 page limit? | Yes. The Transition Plan can be outside the Volume's 60 page limit. The Transition Plan should be physically located in the Volume, tabbed as Transition Plan and has it's own 15 page limit. | |
| 7 | L-5.4.2 | Can a legal size fold out be 11x17? | Yes, size 11x17 can be used for flow charts and Processes and will be counted as 2 pages if it has folds. | |
| 8 | PWS Appendices | Will Govt provide appendix J? | There is no Appendix J at this time. If the Government decides to incorporate any portion of the awardee's proposal, it will be incorporated into Appendix J at the time of award. | |
| 9 | PWS 2.1 Appendix E | Will the Govt provide the size of the admin office space in Bldg 1000 that is allotted to UASOCS contract personnel? | No the square footage is not provided at this time. The Government will provide adequate office space. | |
| 10 | PWS 2.1, 2.2.2 CLIN item X0002 | Will the Govt provide the size of the admin office space in the 432nd OSS building that is allotted to UASOCS contract personnel? | No the square footage is not provided at this time. The Government will provide adequate office space. | |
| 11 | PWS 2.4.2 CLINs X028,X029, X030 | Will new ops centers require new staffing or can current staffing be used (moved)? | If it is a new ops center, and not a relocated center, then additional staffing should be required to fully supported the new center. | |
| 12 | PWS 2.4.2 CLINs X028,X029, X030 | Will the Govt provide equipment density for these facility(ies)? | A new facility will require the same equipment as a current functioning operations center at Creech. | |
| 13 | PWS 7.0 Contractor Support Services | Will the Govt name Contractor Support Services for Sigonella? | Same support as Ramstein is expected. | |
| 14 | Appendix H Workload Data | Will updated workload data be released? | Updated workload data was released just after the Final RFP. See FBO postings. | |
| 15 | Appendix H Workload Data | Will the Govt provide workload data for CAPs/missions for each SOC? | This information was previously made available in the Bidder's Library for viewing. | |
| 16 | Appendix E -GFF | Will office space be provided for dedicated 732nd staff for KTR Site Lead, Engineering team, Logistics Mgr and Security personnel? | Yes. | |
| 17 | Appendix E -GFF | Will Govt provide more info on Server Room Bldg 1005? Is this secure storage for KTR or live systems there? | The server room in bldg 1005 is for server rack use only. This is not a storage location. | |
| 18 | Appendix D- GFE and 12 Mar 15 Q and A Ques #6 | Will Govt provide number of databases and systems, classification of each and level of support for each required? | See CDRL A013. CDRL A010 was available when the bidder's library was open. | |
| 19 | PWS sec A 4.2.12.12 CTK | Will the Govt clarify if the CTK is GFP or CFP and what is the expected purpose of the toolkit? | CTK is GFP to support the RPA SATCOM Relay Sites. The CTK program is IAW AFI 21-101, Chapter 10. | |
| 20 | PWS sec A 4.2.12.12 CTK | Will the Govt provide secure storage area for the CTK and if so in which building? | Government will provide secure storage within the EURO2 site | |
| 21 | PWS D.1.2.1 and D.1.2.1.3 and CLIN 0099 | Is the transition period 45 or 60 days? | The transition period is 60 days. The 45 day reference is incorrect and will be changed with the upcoming Amendment 0001. | |
| 22 | PWS A.4.2.12.13 TMDE | Will the govt clarify does the KTR provide shipping and postage or is TMDE shipped at Govt expense? | The KTR provides shipping and postage then claims its costs on a CR CLIN for reimbursement. | |
| 23 | L-7.4.1.2.2 and L-7.4.1.3.1 | Will govt provide software tools to support Bandwidth Management, maintaining Video quality for the VDH? | Software is already posted on FBO. | |
| 24 | Q&A Ques #5 of 06 Mar 15 | The Govt stated AWOC is physically located in the 15RS. Will the Govt provide the number of times per year the AWOC is activated to estimate level of effort for Clin X012? | The AWOC has never been used for an operations mission. It is usually used for testing purposes 3 or 4 times a quarter for an annual total of 12-16 times per year. | |
| 25 | Q&A Ques #11 of 06 Mar 15 | Will the govt provide historical data so a reasonable Fixed Price for CLIN X027 can be submitted? | Support of the 556 TES is per PWS para 3.1.1. There is no additional historical workload data. | |
| 26 | RFP Appendix E (GFF) | Appendix E identifies the 432nd ACMS in Bldg 1109 as a performance location. Will the govt confirm KTR provide equip/facility support for Bldg 1109? | Yes. Support for Bldg 1109 is required. | |
| 27 | PWS D.4.1 - Facilities Appendix E GFF PWS Sec E1.1.1 - 732nd dedicated support | Will the Govt clarify level of support for the SCIF PEB (Bldg 1217)? | Level of support is 24/7/365. | |
| 28 | Final RFP documents 12 Mar 15 Help Desk Tickets 2012-2014. | Will the Govt provide insight into the significant increase in the number of 732 OG Help Desk tickets for Jan-Apr 2014 and/or provide May-Dec 2014 ticket totals? | Prior to Jun 2013, 732OG help desk tickets were not broken out as a separate report. They were included as part of other reporting areas. In June 2013, the 732OG was officially created and began separate reporting totals. Additional data for Sept-Dec 2014 was lost during an equipment failure and cannot be provided. | |
| 29 | Section L Attachment 1 Past Performance Information | Is this attachment exempt from the Section L font size requirement? | Yes the Past Performance Attachment is exempt from the font size requirement. | |
| 30 | Section L L-5.4 Proposal format. | Will the Govt allow font size smaller than 10 pt Times New Roman in headers and footers within the contents of the proposal. | Yes smaller font size may be used in headers and footers ONLY within the contents of the proposal. | |
| 31 | Section L Attachment 1 Past Performance Information | Please confirm instructions may be deleted on Attachment 1 Past Performance Information to utilize the maximum page allocation. | Yes, the instruction page may be deleted. | |
| 32 | PWS Para 2.2.1.1 Appendix L | Appendix L is not provided. | This appendix is contractor provided with their proposal in response to the Government requirement in Appendix K. | |
| 33 | PWS 2.4.1 and 2.4.2 | Will the Govt provide a "notional" location? | The "notional" location of Creech AFB, NV should be used. | |
| 34 | PWS 2.4.2, 2.4.2.1 and CLINs X0028, 29 and 30. | Will the Govt clarify new Ops center/ RPA SATCOM site location? | The "nominal" location for a new Ops center is Creech AFB, NV. A new RPA SATCOM site other than Ramstein, Kadena or Sigonella would be separately negotiated. | |
| 35 | DD254 | Is the DD254 available for review? Is there a single Govt security office that is responsible for all clearances on the contract? | An updated DD254 will be posted on the same day that these questions/answers are posted. Clearances are managed through ACC AMIC SSO office and forwarded to HQ ACC for final approval. Local processing and indoc is done by local base offices. | |
| 36 | Optional CLINs | Are the option CLINs (X028, X029 and X030 included in the total evaluated price (TEP)? | Yes, they are included in the total overall evaluated price (TOEP). | |
| 37 | CLIN 0029 | Confirm actual duration of CLIN 0029 is for a PoP starting at contract execution? | CLIN 0029 is an option CLIN. PoP would be the length up to 12 months if exercised. | |
| 38 | CLINs 0029, 0030 and 0031 | Do other items/services include any/all equipment and shipping expenses? Isn't the equipment different between squadrons for each Ops center? | "Other items" does not include equipment or shipping expenses these will be billed against a CR CLIN. Labor should be priced against notional 18 RS at Creech AFB NV. CLIN description will be modified. | |
| 39 | CLIN 0021 | Requirement is listed as temporary Operations of the 9th ATKS SOC. Can the start/end of PoP be given for length of support? | The word "temporary" is incorrect and will be deleted from the CLIN description with the upcoming Amendment 0001. CLIN will be operational for the full PoP and should be priced as such. | |
| 40 | CLIN 0031, 0032 and 0033 | Are these sites now operational and being supported by the current contract? Or are the sites in a "stand up" mode? | CLINs 0031 and 0032 are currently operational and supported by another contract. CLIN 0033 should be listed as an option and is not currently operational but should be priced. | |
| 41 | Q&A on RFP IRT App L (see Ques 3 above) | If App L is KTR provided in response to App K, there are no clear instructions as to the format of App L nor where App L should be provided in the proposal submission and what elements are required. Would the Govt clarify? | An Appendix L template will be provided. The contractor proposed Appendix L must be included in the Technical Volume. | |
| 42 | Question from PPC | |||
| RFP Sec M | With the decision to do an LPTA acquisition, are you still going to go through a down-select process? If so, please explain how you will do that and how that process will differ from the final selection process? | Yes, please refer to RFP Section M, paragraph M-1.4. | ||
| 43 | Question from PPC | |||
| PWS | To be clear, all expansion and facility build outs will require contractor to install cabling and conduit infrastructure along with network switching equipment? | Yes, the contractor will be responsible for all cabling, conduit, and network program for the mission systems. SIPR and NIPR will be based upon the privileges grant by each base. | ||
| 44 | Question from PPC | |||
| RFP para M-3.2, Factor 2, Past Performance | One of the highly relevant contracts we wish to cite as past performance ended in Apr 13, and was followed by 3 bridge contracts of 12 months, 7 months, and 2 months respectively (with separate contract numbers) until the re-award of a new contract in Jan 15. The work was performed for the same customer and has been essentially the same throughout all of the performance periods. Question: For purposes of relevance in the evaluation, can we cite the 21-month period of the 3 bridge contracts as part of a single overall past performance effort, even though they had different contract numbers? Or should these otherwise identical contracts be cited as separate contracts? | You may cite the 21-month period of the three bridge contracts as part of a single overall past performance effort for both recency and relevancy. | ||
| 45 | Question from PPC | |||
| RFP para L-7.4.1.2.2.c | This paragraph requires offerors to "Provide an analytic design for providing network administration and maintenance that meets requirements stated in the PWS…" Question: Please explain what the Government means by "analytic design", as no relevant verbiage is apparent anywhere in the PWS. | "Provide an analytic designed for..." will be changed with the upcoming Amendment 0001 to read, "Describe your approach for…" | ||
| 46 | Question from PPC | |||
| Can the Government confirm whether the units (other than the 39th Squadron), have Help Desk personnel assigned locally, or whether they are all supported from a central Helpdesk (Sys Ad support) and Network Operations Center (Comm & Network Support)? | The help desk is for tier 1. To meet PWS requirements of 24/7 operations, your tier 2 workers will be local. | |||
| 47 | Question from PPC | If the Gov decides to have Industry provide OCONUS travel estimates/costs, will the Gov provide the number of trips (estimate) per year and locations? | No, each offeror will propose their own OCONUS Travel CLIN (X036) cost estimates based on their technical approach and associated costs (relocation cost for employees/family members, etc., if applicable). This CLIN is not for Government Directed Travel which is CR CLIN X0008. | |
| 48 | Question from PPC | |||
| Appendix L | For Appendix L -- Where should this "tasle" be inserted in the technical response? Is it suggested to be part of the transition subfactor? | The 15 page transition should be part of the Transition subfactor. | ||
| 49 | Question from PPC | |||
| Appendix L | On Appendix L -- The Gov requires the certifications, qualifications, education… to be provided. Appendix K already provides the min requirements for key positions/ ___ categories. If Industry takes no exceptions, is it ok to state so (saves space)? | No, the government requires Industries' approach to fulfilling Appendix K requirements. | ||
| 50 | Question from PPC | |||
| PWS | PWS states that a potential exists for future Ops Center closure and realignment. However, the CLIN pricing sheet does not include a CLIN designated for SOC stand-down. Will the Gov clarify if the cost designated for SOC stand-down will be provided or if these costs should be included in CLIN X030 Relocate Existing Ops center. | The cost for standing down a SOC due to a relocation of that SOC should be included in CLIN X030, Relocate Existing SOC. If the need arises to stand-down a SOC that will not be relocated, the cost for that stand-down will be negotiated at that time. | ||
| 51 | Question from PPC | |||
| CLIN | When does the Gov plan to release CLIN updates including CLINs 36, 37, & 38? | We currently have the action to change CR CLIN X037 (DBA Insurance) to a FFP CLIN and to remove the pre-established government estimated costs for CR CLIN X036 (OCONUS Travel) & CR CLIN X038 (Overseas Allowances) and have each offeror propose its own costs, in review for approval. We will post the notice, if approved, as soon as we can. Depending on when approval is given, we may have to extend the proposal due date. | ||
| 52 | Question from PPC | |||
| PWS 2.1.5.1, Operations Tempo Increases | The PWS states: "The CO may add/subtract equipment or software that requires contractor support to units listed in this PWS or increase the level of contractor support required at any time." |
Question: Could the Gov please clarify how these additions/subtractions will be handled within the scope of this solicitation? Will they be treated as contract modifications?
| Rationale: Section B includes only FFP CLINs for O&M. It does not allow for additions/subtractions over the life of the contract. | The intend of this PWS section is to replace software/equipment as it becomes obsolete or if minor increases/decreases to the same occur. If the change is a major one requiring much more than the usual O&M, then a modification may be processed. | |||
| 53 | Question from PPC | |||
| PWS 4.2.13.1 | As part of the Q&A released by the Gov’t dated 27 Jan 15, the Government provided that there is no ITAR requirement for the UASOCS Program and that the PWS would be updated to remove such a requirement. The FINAL RFP still includes a requirement for obtaining a license 90 days from contract start. Will the Government provide a detailed list of equipment affected by ITAR? Will ITAR apply as provided in this PWS Section? | ITAR requirement has been removed. | ||
| 54 | Question from PPC | |||
| Section 508 | Respectfully request clarification from the Government that Section 508 does not apply to this effort pursuant to FAR 39.2 exception for National Security Systems. | It does not apply. | ||
| 55 | Question from PPC | |||
| Appendix G | Paragraph 4.a states “Draft Quality Manual and the six mandatory procedures are due to the Government 30 days after the start of the transition period. Only four procedures are identified in Appendix G (paragraphs 2.c.1-4). Would the Government please clarify/identify the “six mandatory procedures?” | The six mandatory procedures are those identified within ISO 9001-2008. | ||
| 56 | Question from PPC | |||
| Section L, Atch 3 | Would the Government please provide a Microsoft Word version of the Past Performance Questionnaire to facilitate its completion by the contract POC? | Yes, a word version of the PPQ will be posted the same day that these questions/answers are posted. | ||
| 57 | Question from PPC | Would the Government please provide industry with any technical manuals or training materials on the terminals and associated equipment that are installed and used at the relay/remote sites? Understand that these items were previously available during the reading room session last year; however, we ask for another opportunity to view this material no later than April 15. | The government will not reopen the Bidder's Library. The library was made available to all for a 2-week period with an option for a third consecutive week depending on requests. We only receive enough requests to fill 1.5 weeks of usage/visits. | |
| 58 | Question from PPC | |||
| Q&A_20Mar2015, Q32 | Please confirm that the Appendix L will be included as a separate attachment to the technical volume and not included in any page count limitation. | Appendix L will be included as part of the technical volume. As such, it will be part of the 60 page technical volume limitation. | ||
| 59 | Question from PPC | |||
| CDRL A013 432WG; posted on 12 Mar 2015 | This CDRL is dated 19 Dec 2013. Is this the most current list? If not, would the Government provide an updated CDRL for 432WG? | There was a CDRL A013 posted on 12 Mar 2015. A revised CDRL A013 will be posted the same day that these questions/answers are posted. | ||
| 60 | Question from PPC | |||
| CDRL A013 432 ATKS; posted on 12 Mar 2015 | This CDRL is dated 19 Dec 2013. Is this the most current list? If not, would the Government provide an updated CDRL for 432ATKS? | There was a CDRL A013 posted on 12 Mar 2015. A revised CDRL A013 will be posted the same day that these questions/answers are posted. | ||
| 61 | Question from PPC | |||
| Pricing, CLIN 0033 | CLIN 0033 states, “Period of Performance 1 Apr 2016…” Would the Government confirm if Sigonella will be operational by 1 Apr 2016 (prior to award)? | The government cannot confirm the exact operational date for Sigonella Operations, but it is unlikely that the site will be operational prior to 1 April 2016. | ||
| 62 | Question from PPC | |||
| Section A, PWS 2.4.2 | Section A-PWS 2.4.2 states, “The contractor shall plan and support the standup of new Operations Center(s) or RPA SATCOM Relay Site(s).” In reference to the Government’s response for question 34, would the Government confirm that CLINs will be added after award for any separately negotiated new RPA SATCOM Relay Sites? | Yes, should a new RPA SATCOM Relay site (other than the ones listed in the RFP) be added, the effort will be separately negotiated and a new CLIN added to the contract. | ||
| 63 | Question from PPC | Test measurement, diagnostic equipment (TMDE) is listed for Ramstein. Please confirm what the TMDE for Kadena, Sigonella, and the operations center locations are? | TMDE for Kadena is listed under PAC 1 GFE, dated 12 Mar 2015 in FedBizOpps. Sigonella is not operational and no TMDE equipment is required for all Squadron operation centers. | |
| 64 | Question from PPC | |||
| Question #2 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015) | Question: In the Government’s response to questions posted 12 March 2015, it was stated that CDRL A013 was updated to include 26 WPS equipment. We could not find the list of 26 WPS equipment in the CDRL that you provided. Could you please direct us to the location of this information in the CDRL? | |||
| Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location. | An updated CDRL 013 will be posted to FedBizOpps that includes the 26 WPS equipment on the same day that these questions/answers are posted. | |||
| 65 | Question from PPC |
FBO Posting Update Mar 12, 2015 files:
PAC_1_GFE_Update_12_Mar_2015 Ramstein_GFP_1 Ramstein_GFP
| Ramstein_additional_equipment_SRVT_GFE | Question: There is a wide range of equipment listed at Ramstein and Kadena in the files posted 12 March 2015 under the headings “Ramstein Equipment Update” and “Posting Updates” to include Hellfire components and coveralls. Will all equipment in these files be covered under O&M on this contract? If not, would the Government identify what equipment is within the O&M scope of this contract? | |
| Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location. | Yes, all listed GFE is O&M. | |
| 66 | Question from PPC | |
| PWS Section 3.3.6, Telephone Services | Question: Section 3.3.6, Telephone Services, identifies the requirement for telephone set and associated building communications cabling maintenance. However, telephone sets or PBXs are not included in CDRL A013 equipment lists other than the VoIP phones at 432 ATKS that were identified as out of scope in the Government’s response to questions 12 March 2015. Would the Government please provide the number and types of telephone sets, PBXs, and Call Managers at each location that are included in this requirement? | |
| Rationale: The inventory of equipment helps industry estimate workload and labor category skill sets to staff at each required Air Force location. | This contract is not responsible for PBXs and Call Managers. | |
| 67 | Question from PPC | |
| Section B | Question: If the customer adds scope during contract performance will the award fee be adjusted accordingly? | |
| Rationale: This information will aid in financial planning. | If a scope change is of a magnitude that warrants an increase and funds are available, the award fee may be increased. | |
| 68 | Question from PPC | |
| Section L-2, Access to Bidder’s Library | Question: Would the Government consider re-opening the bidder’s library? | |
| Rationale: The initial Bidder’s Library visit was to be made by 24 October 2014 before the final RFP was issued. Since the issuance of the final RFP, this offeror has additional information to gather related to the requirements in the final RFP. To ensure fair and adequate competition, this offeror requests a return visit to the Bidder’s Library. | The Government will not reopen the Bidder's Library. The library was made available to all for a 2-week period with an option for a third consecutive week depending on requests. We only receive enough requests to fill 1.5 weeks of usage/visits. | |
| 69 | Question from PPC | |
| Question #6 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015) | Question: In the Government’s response to questions posted 12 March 2015, it was stated that total storage capacity and utilization for each unit would be provided. When will this information be provided? |
Rationale: Storage capacity and utilization data for sites helps industry understand the size, complexity, and tempo of operations
| for the contract. This data creates a more accurate staffing solution. | The government will provide an updated CDRL 013 GFP on the same day that these questions/answers are posted. | |
| 70 | Question from PPC | |
| Question #14 for the UASOCS_FBO_posting_Ques_and_-_Govt_Answers_(6_Mar_2015) | Question: In the Government’s response to questions posted 12 March 2015, it was stated that the SATCOM Relay Sites Monitoring tool would be provided for each SATCOM Relay Site. Does the Government have a date as to when this information will be provided? | |
| Rationale: Understanding the system configurations will help industry develop better solutions to support the program. | Monix is the monitoring system for the SATCOM Relay Sites. | |
| 71 | Question from PPC | |
| PWS 4.2.13.1 and Question #57 issued on 6 March 2015 | Question: In Question #57 for the DRFP, the Government stated that there is no ITAR requirement for UASOCS. However, the final PWS still contains an ITAR requirement in Section 4.2.13.1. Is it the intent of the Government to remove this PWS requirement? | |
| Rationale: Removal of the ITAR requirement will clarify the RFP requirements. | The ITAR requirement has been removed. | |
| 72 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A001 | Question: The PWS reference in the matrix for CDRL A001 is Sec. A, Para 2.1.2.1. Para. 2.1.2.1, Technical Interchange, does not seem to be related to CDRL A001. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response and ease of evaluation. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A001 will be posted the same date as these questions/answers. | |
| 73 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A002 | Question: The PWS reference in the matrix for CDRL A002 is Sec. A, Para 4.1.1.5. The PWS does not contain Para. 4.1.1.5. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A002 will be posted the same date as these questions/answers. | |
| 74 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A004 | Question: The PWS reference in the matrix for CDRL A004 is Sec. A, Para 2.1.2.4. The PWS does not contain Para. 2.1.2.4. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A004 will be posted the same date as these questions/answers. | |
| 75 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A005 | Question: The PWS references in the matrix for CDRL A005 are Sec. A, Para 2.1.2.5, 2.4.4, and 4.3.6. The PWS does not contain these three paragraphs. Could the Government please clarify the PWS references for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A005 will be posted the same date as these questions/answers. | |
| 76 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A006 | Question: The PWS reference in the matrix for CDRL A006 is Sec. A, Para 3.4.8. The PWS does not contain Para. 3.4.8. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A006 will be posted the same date as these questions/answers. | |
| 77 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A008 | Question: The PWS reference in the matrix for CDRL A008 is Sec. A, Para 4.2.2.4. The PWS does not contain Para. 4.2.2.4. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A008 will be posted the same date as these questions/answers. | |
| 78 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A009 | Question: The PWS references in the matrix for CDRL A009 are Sec. A, Para 3.1.3.4 and 3.3.3.1. The PWS does not contain these two paragraphs. Could the Government please clarify the PWS references for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A009 will be posted the same date as these questions/answers. | |
| 79 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A010 | Question: The PWS reference in the matrix for CDRL A010 is Sec. A, Para 3.2.5.4.1. The PWS does not contain Para. 3.2.5.4.1. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A010 will be posted the same date as these questions/answers. | |
| 80 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A011 | Question: The PWS reference in the matrix for CDRL A011 is Sec. A, Para 3.4. Para. 3.4, Con tangency Action Plan, does not relate to CDRL A011, Contractor’s Configuration Management Plan. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A011 will be posted the same date as these questions/answers. | |
| 81 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A012 | Question: The PWS reference in the matrix for CDRL A012 is Sec. A, Para 4.1.2. Para. 4.1.2, Information Security, does not relate to CDRL A012. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A012 will be posted the same date as these questions/answers. | |
| 82 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A013 | Question: The PWS references in the matrix for CDRL A013 are Sec. A, Para. 4.1.3, Incident Reporting, and Sec. B, Para. 2.2, Evaluations, do not relate to CDRL A013. Could the Government please clarify the PWS references for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A013 will be posted the same date as these questions/answers. | |
| 83 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A014 | Question: The PWS reference in the matrix for CDRL A014 is Sec. A, Para 4.2.2.1. The PWS does not contain Para. 4.2.2.1. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A014 will be posted the same date as these questions/answers. | |
| 84 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A015 | Question: The PWS reference in the matrix for CDRL A015 is Sec. A, Para 4.7.1.1.1. The PWS does not contain Para. 4.7.1.1.1. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A015 will be posted the same date as these questions/answers. | |
| 85 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A016 | Question: The PWS reference in the matrix for CDRL A016 is Sec. A, Para 2.1.2.6. The PWS does not contain Para. 2.1.2.6. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A016 will be posted the same date as these questions/answers. | |
| 86 | Question from PPC | |
| Appendix B – Contract Data Requirements List (CDRL) Matrix: CDRL A017 | Question: The PWS reference in the matrix for CDRL A017 is Sec. A, Para 3.4.2. The PWS does not contain Para. 3.4.2. Could the Government please clarify the PWS reference for this CDRL? | |
| Rationale: Clarification of the PWS references for the CDRL will aid in correctly addressing each CDRL in our technical response. | A revised Appendix B, dated 8 Apr 15, containing a revised CDRL A017 will be posted the same date as these questions/answers. | |
| 87 | Question from PPC |
Appendix B: CDRL A008 Section L-7.4.1.2.1.d, Maintenance Support Plan CDRL A008, Maintenance Support Plan, states that the CDRL is not due until 90 days after contract award. In Section L-7.4.1.2.1, Aspect I – Maintenance Management, item d. states: “Provide a maintenance control plan that demonstrates effective scheduling of tasks and system of controls to provide quality/timely services or products that safely fulfill mission requirements.”
Question: We request that only a high-level summary of our Maintenance Control Plan be provided for Aspect I – Maintenance Management. Is submitting only a high-level summary of our Maintenance Control Plan with our proposal acceptable to the Government?
| Rationale: A complete Maintenance Control Plan would require a large portion of the 60 pages allowed for the technical response. CDRL A008 to be submitted 90 days DAC would contain the complete Maintenance Control Plan. | Provide a plan that can spell out the maintenance as a snap shot to prove competence. | |
| 88 | Question from PPC | |
| Section L-4.1 | Question: Page 204, Section L-4.1 states that hand delivered proposals require the submission of an e-mail to obtain a delivery schedule. How far in advance should this request be made? | |
| Rationale: We request this information for clarification of proposal delivery. | No less than two days will be sufficient. | |
| 89 | Question from PPC | |
| Section L-9.1.4,Supporting Price backup Data | Question: Page 214, Section L-9.1.4 states that “Certified cost or pricing data is not required” assuming that adequate competition is received. If this is the case, will the Government remove the following FAR clauses: |
• Page 163 FAR 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data and
• Page 163 FAR 52.215-12 Subcontractor Certified Cost or Pricing Data are only required when it is contemplated that cost or pricing data will be required?
| Rationale: This formation would clarify FAR clauses from RFP language. | Yes, FAR Clauses 52.215-10 and 52.215-12 will be removed. However, if circumstances should change during negotiations (if held) the Government may add the clauses back (and remove other related clauses as appropriate). | |
| 90 | Question from PPC | |
| Section L-9.1.4,Supporting Price backup Data | Question: If the Government will not remove the above two FAR clauses, will the Government remove the following clauses given that they are only required if FAR 52.215-10 and 12 are NOT included |
• Page 163 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data – Modifications and
• Page 163 FAR 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications
| Rationale: This formation would clarify FAR clauses from RFP language. | No longer applicable due to Government response to Question #89. | |
| 91 | Question from PPC | |
| Section I, Contract Clauses | Question: The Government has included FAR 52.232-20 and 52.232-22. Is the 75% notification required on the CR CLINs only? | |
| Rationale: This information would clarify the requirement between the firm-fixed-price and cost reimbursable CLINs. | Yes | |
| 92 | Question from PPC | |
| CLIN 28, 29, 30 | The Government states in the posted Q&A if it’s a new ops center and not a relocated center than new staffing will be required, and further defines the new SOC is at Creech (notional site per Q&A). | |
| Question: Can this “new” SOC share resources from the 432nd and/or 732nd support, or is it a completely new organization such as the Ellsworth or Whiteman. | Staffing for any new SOC will be part of your approach; however, each requirement of the PWS must be fully achieved. Also of note, the 732OG requires dedicated support, as outlined in the PWS. | |
| 93 | Question from PPC | |
| UASOCS CLINs Pricing Sheet Updated Rev 5 | Pricing Template |
CLIN Series XX06, the excel template UASOCS_CLINs_Pricing_Sheet_Updated_rev_5 (2) states the total each year is $400K, however the PDF document UASOCS_Final_RFP_Doc_-_5_Mar_15 states $800K.
Question: Which total is correct? The EXCEL pricing sheet showing the $400K is correct. The UASOCS_Final_RFP_Doc will be updated with the approval of Amendment 0001 to the RFP.
Note: The Estimated Cost for the Supplies/Services CLIN X006 was increased to $600K by Amendment 0001.
94 Question from PPC UASSOC_PWS_4_Mar_2015.doc
| para 4.2.13.1 | The need for ITAR procedures to ensure compliance was removed from sections L & M as part of the transition but remains in the PWS in section 4.2.13.1. | |
| Question: Should the PWS section 4.2.13.1 be removed as well? | ITAR requirement has been removed. | |
| 95 | Question from PPC | |
| Sample cover letter for Past Performance questionnaire | We were reviewing the Sample Cover Letter to be sent with Past Performance Questionnaires and noticed the due date noted there for the questionnaire was March 9th. Was that a sample date? |
Reading through Section L - I don't see a specific due date noted for the Questionnaire other than 05 May for the Past Performance volume.
Could you provide clarification? The Government mistakenly left an old date on the sample letter when we should have adjusted it due to a schedule slip. This date will be revised with the upcoming Amendment 0001 to reflect a no later than date of 5 May 2015 for the Past Performance Questionnaires. (Note: depending on when we receive approval for Amendment 0001, this date may be adjusted further.)
Note: The revised date noted in the Sample Cover Letter was changed to 15 May 2015 by Amendment 0001.
| 96 | SATCOM Relay sites equipment listing | Are all the items listed on the inventory equipment listing, to include the vehicles and scales, for the SATCOM Relay sites considered GFP? | Yes |
| 97 | Transition as part of total evaluated price. | Due to incumbent's advantage for a low cost phase-in, how does the Government plan to ensure fairness to all Offerors since evaluation of phase-in period is included in the total evaluated price? | The Government will not make any adjustments in regards to phase-in/transition costs. Due to the nature of the process, incumbents always have an advantage over competitors whether it be with phase-in/transition or otherwise. Unless an incumbent's competitive advantage is the result of preferred treatment or other unfair action by the Government, an agency issuing a solicitation need not take steps to equalize the advantage. How an offeror proposes its transition costs to be competitive is a business decision that it must decide. |
| 98 | Govt Q&A of 9 Apr 15 Ques 7, 8, 17 Apdx L | Govt answers seem to be conflicting. Will the Govt clarify requirements of Apdx L location and page limitations? | Apdx L should be included with the transition subfactor (Subfactor D) and must be within the overall page limitation of 60 pages for the Tech Vol as previously stated. |
| 99 | Govt Q&A of 9 Apr 15 Que 8 Apdx L | Govt responses at Pre-Proposal conference(Q 7,8 & 17) and in Q&A of 9 Apr 15 demand significant response. Due to amount of data required to meet requirements will the Govt increase page count of Vol I to 75 pages? | No, the Government will not increase the page limitation for the Technical Vol. |
| 100 | Govt Q&A 9 Apr 15, Ques 8, Apdx K and L. | Apdx L detailed response requires several 11x17 foldouts with detailed response to Apdx K. Will Govt remove apdx L from page count or provide Apdx L it's own 10 page limit? | No, the Government considers 60 pages for technical and 15 pages for transition to be sufficient. |
| 101 | Schedule B, CLINs 0028, 0029 and 0030 and X0XX options | Will the Govt provide additional information including: location for base year and each option year; complete equipment list and materials for each location per location and whether each location has required infrastructure (network, power, etc.) already in-place? If information is not available will the Govt provide a plug number for these CLINs or make them TBD? | Notional locations were noted in Section B of Amendment 1 under B-3 for each of the CLINs in question. For equipment/materials list, the 18 RS SOC on Creech (see answer to Ques 38 above) is to be used as the recommended notional. The power distribution and Government Point of Presence (PoP)/Network Nodes will be the responsibility of the Government. This will be further clarified with the posting of Official Amendment 0002. |
| 102 | Sec B, CLIN Pricing sheet Rev 5 and Sec F. | Is pricing IAW Section F or CLIN Pricing sheet? Section F and Pricing sheet show different Periods of Performance (PoP). | RFP Section F Period of Performance for CLIN 5003 is posted as N/A which is incorrect. The Period of Performance should be 01 Apr 21 through 31 Mar 22. The CLINs Pricing Sheet is correct. Contract Section F will be corrected for CLIN 5003 along with any other applicable CLINs with the posting of Official Amendment 0002. |
| 103 | CLINs X036, X037 and X038. | Request Govt reconsider removing plug numbers on X036 and X038. If Govt removes plug numbers, request removing X036, X037 and X038 from price evaluation criteria in order to ensure equitable evaluation of the price between offerors. | The Government will not insert plug numbers for CLINs X036 and X038. These CLINs have a manpower driven cost and thus varying technical approaches will result in varying costs. Using a "plug" number assumes all contractors will have the same costs and does not take into consideration the varying technical approaches and their associated costs. CLINs X036, X037, and X038 will not be removed from the price evaluation. |
| 104 | CLIN 0035 | Clarify statement "actual site standup date is unknown"? Offeror is still required to price a full 12 month period. | Under Amendment 1, the Summary of Changes description field was revised in error. Original description still applies to CLIN 0035, Network Operations Center (NOC) O&M. Official Amendment 0002 will correct the CLIN to read: "Provide O&M support for Network Operations Center (NOC) per PWS." |
| 105 | CLIN 0035 | PWS para 3.3.7 Help Desk and App E - Could the Govt confirm that the support is only within the scope of work as stated in para 3.0 or is typical blue-suit support provided for the NOC to be transferred to the UASOCS KTR? | Yes, the contractor shall be responsible for performing the requirements as stated in para 3.0 and para 3.3.7 and the contractor will also be required to process blue suit generated trouble tickets through resolution. |
| 106 | CLIN 0017, 0018, 0019, 0020, 0021 and 0030. | Extended description in the summary change pages does not match the CLIN change page, ex. 0017 "perform O&M of the…". | CLIN 0017 should have "perform O&M of the 42 ATKS SOC" at the end of the CLIN description. This will be corrected with the Official Amendment 0002. Other CLIN description fields are correct as noted. The word "temporary" was removed from CLINs 0018 through 0021 and CLIN 0030 only had, "Price IAW Contract Section B, Para B-3" added as the last sentence to the CLIN description. |
| 107 | CLIN 0028, 0029 and 0030 | Confirm location for each CLIN is Creech AFB. | Yes, Creech AFB is correct. This was stated in Section B of Amendment 0001. |
| 108 | CLIN 0028, 0029 and 0030 | These are listed as option CLINs but require pricing and are included in the TEP. Is it the Govt intention that UASOCS KTR should be prepared to install, operate and relocate a new SOC each year? If a new SOC is installed and begins operation what CLIN would we use to show O&M support for the follow on years? | Yes, the KTR should be prepared to possibly accomplish these tasks every year. If a new SOC is installed then a new CLIN will be added to provide O&M for that period and each follow on period. |
| 109 | CLIN 0028 and 0030 | Would the O&M support for installation and relocation require personnel to have required certifications, training and/or qualifications specifically TS or TS/SCI clearance to perform this work? | Yes, all certifications, training and qualifications must be in place with the personnel doing the installation or relocation from the beginning of the effort. |
| 110 | L-9.1.4 | The RFP requests indirect rate information which is not typical for a FFP response. Will the Govt consider removing referenced language given the FFP contract type? If not, will the Govt clarify what needs to be provided by offerors to comply with this section and how will this information be evaluated in accordance with Section M? | The Government will not remove this requirement. Since certified cost or pricing data (CCPD) is not being required, the Government is requiring supporting data other than CCPD in sufficient detail to evaluate offerors pricing. The documentation provided shall show a level of detail necessary to show how an offeror reached its price consistent with its estimating and accounting system. As noted in RFP Section L, L-9.1.4., the documentation provided shall provide support for all indirect labor rates proposed based on the offeror's accounting system and any applicable Forward Pricing Rate Agreements. |
| 111 | PPC | When will the Govt post a list of attendees at the PPC? | A list of companies attending was posted on 27 Apr 2015. Individual contact information will NOT be provided. |