Aerial_Targets_PWS_App_G_(Quality_Mgmt_System)_02_Sept_14_(Final).pdf

PDF 82 KB Posted

Attached to
Aerial Targets
Solicitation number
FA4890-14-R-0012
Issued by

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Final_RFP_Ques__Govt_Resp_(FBO_30Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).docx DOCX document
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_1Dec14).docx DOCX document
AT_Vehicles_List_(FBO_1Dec14).xlsx XLSX spreadsheet
Aerial_Targets_PWS_REV_App_A_(Definitions)_26Nov14_(Final).doc DOC document
AT_PPC_Safety_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
AT_PPC_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
CBA_Aerial_Tgts_Holloman_ _DS2_7May12-1May15.pdf PDF
CBA_Aerial_Tgts_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Govt_Responses_to_Industry_RFP_Ques__2_(FBO_17Nov14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_17Nov14).pdf PDF
Aerial_Targets_PWS_App_G_(Quality_Managment_System)_02_Sept_14_(Final)_Updated_14Nov14.pdf PDF
CDRL_A009_DD1423_Master_Library_Index.pdf PDF
CDRL_A019_DD1423_SW_Test_Report.pdf PDF
CDRL_A016_DD1423_Technical_Reports.pdf PDF
CDRL_A004_DD1423_Operating_Instructions.pdf PDF
CDRL_A002_DD1423_Cost_Performance_Report.pdf PDF
CDRL_A010_DD1423_GFE_Inventory.pdf PDF
CDRL_A005_DD1423_Environmental_Protection_Program.pdf PDF
CDRL_A011_TAB_Spill_Report_Form.doc DOC document
CDRL_A008_DID_DI-IPSC-81427A_Software_Development_Plan_(SDP).pdf PDF
CDRL_A014_DID_DI-IPSC-81488_Computer_Software_Product.pdf PDF
CDRL_A007_DD1423_Property_Control_Plan.pdf PDF
CDRL_A012_DD1423_Incident_Report.pdf PDF
CDRL_A020_DD1423_SW_Improvement_Report.pdf PDF
CDRL_A003_DD1423_Management_Plan.pdf PDF
CDRL_A013_DD1423_CSIR.pdf PDF
CDRL_A001_DD1423_Monthly_Summary_Report.pdf PDF
CDRL_A012_DID_DI-SAFT-81563_Accident-Incident_Report.pdf PDF
CDRL_A008_DD1423_Software_Development_Plan_(SDP).pdf PDF
CDRL_A005_DID_DI-ENVR-81378_Environ_Operation_ _Maint_(O M)_Plan.pdf PDF
CDRL_A014_DD1423_RIS_SW_Code_Doc.pdf PDF
CDRL_A007_DID_DI-MISC-81420_Property_Control_Report.pdf PDF
CDRL_A013_DID_DI-DRPR-80151A_Comm-Computer_Systems_Install_Records_(CSIRs).pdf PDF
CDRL_A015_DD1423_Recomp_Info_for_Bidder_Library.pdf PDF
CDRL_A011_DID_DI-SAFT-80494A_Pollution_Incident_Report.pdf PDF
CDRL_A010_DID_DI-ILSS-81251_Equip_Inventory_Records_(EIRs).pdf PDF
CDRL_A017_DID_DI-IPSC-81442A_Software_Version_Descrip_(SVD).pdf PDF
CDRL_A002_DID_DI-MGMT-80227_Contractor's_Progress-Status-Mgmt_Report.pdf PDF
CDRL_A009_DID_DI-MISC-80393A_Master_Document_List_(MDL).pdf PDF
CDRL_A001_DID_DI-ADMN-80447A_Contract_Summary_Report.pdf PDF
CDRL_A006_DD1423_Safety_ _Health_Program.pdf PDF
CDRL_A004_DID_DI-MISC-80392_Operating_Instructions.pdf PDF
CDRL_A001-01_TAB_FSAT_O M.docx DOCX document
CDRL_A018_DID_DI-IPSC-81439A_Software_Test_Descrip_(STD).pdf PDF
CDRL_A017_DD1423_Version_Desc_Report.pdf PDF
CDRL_A003_DID_DI-MGMT-80004A_Management_Plan.pdf PDF
CDRL_A006_DID_DI-ENVR-81375_Environ_Health_and_Safety_Plan_(HSP).pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0012

APPENDIX G

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

G-1 02 Sept 14

1. Registration

a. Registered to the most current version of the AS9100 and or AS9110 Quality

Management System standard, currently AS9110B, (current copy can be purchased at http://www.asq.org/quality-press or call 1-800-248-1946).

b. The contractor shall develop, document, implement, maintain and continuously improve a comprehensive higher-level Quality Management System (QMS) that assures compliance with all AS9100 and or AS9110 and all requirements of this PWS, (see Part I, Section E, Contract Clauses 52.246-2, 52.256-3, 52.246-4, 52.246-5, 52.246-11).

c. Where any requirement(s) of the AS 9100/AS 9110 standard cannot be applied, the requirement(s) can be considered for exclusion; however, any exclusion is limited to requirements within clause 7.3. Such exclusions cannot affect the organization’s ability, or responsibility, to provide product that meets customer and applicable regulatory requirements. Provide complete justification for any exclusion to the standard.

2. Quality Management System

a. The QMS shall document the organizations quality management structure, personnel authority and responsibility, identify personnel designated to perform QC functions, number of QC personnel (to include dedicated and additional duty personnel), and skill set for each QC representative.

b. The QMS shall incorporate a comprehensive risk management plan to include a risk matrix/table that identifies all high and moderate risks and how each will be monitored, measured and controlled. The plan shall be updated annually as a minimum.

c. The QMS shall describe the processes and procedures used to:

1. Enforce strict use of tech data. Strict use of tech data means ensuring all applicable TOs and directives are complete, current with applicable changes, available in the immediate work area, and open to applicable task/step/paragraph.

2. Ensure forms used to document any maintenance related action for aircraft or equipment are documented according to 00-20 series TOs, specific equipment TO requirements and applicable command directives and supplements.

http://www.asq.org/quality-press

AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0012

APPENDIX G

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

G-2 02 Sept 14

3. Establish and maintain proficiency of personnel.

4. Establish and maintain the training program.

3. Quality Management Representative Contractor’s Quality Management Representative shall be a Quality Certified Quality

Auditor or AS9110 Lead Auditor trained 3 months after contract start. Certified Quality

Auditor shall maintain the certification through the life of the contract.

4. Requirements

a. Draft Quality Manual and the six mandatory procedures are due to the Government 30 days after the start of the transition period. The final Quality Manual and procedures are due to the Government on the last day of the transition period. A desktop review will be accomplished by the Government.

b. The contractor’s comprehensive QMS shall be in place and performing NLT 30 days after contract start date, as identified in Section X and X of the contract (to include

Operating Instructions, Site Operating Procedures, Work Instructions, etc. required to meet contract requirements).

c. The contractor shall notify PMO of any changes to the QMS within two business days of implementation and provide the changed document(s) with references to the changes.

d. The contractor shall maintain and make available to the Government their measurement, analysis and improvement processes and supporting documentation.

e. The contractor shall be responsible for the quality of all products and/or services regardless of a validated QMS.

File details come from the government source that posted it. Updated .