Draft RPA RFP Section H
242 KB Posted
- Attached to
- Remotely Piloted Aircraft (RPA) Federal contract opportunity
- Solicitation number
- FA4890-10-R-0009
About this file
Draft RPA RFP Section H Clauses
Text of this file
FA4890-10-R-0009
RPA DRAFT Section H – Special Contract Requirements
THEATER BUS CLEARNCE IRAQ/AFG
952.222-0001 – PROHIBITION AGAINST HUMAN TRAFFICKING, INHUMANE LIVING CONDITIONS, AND WITHHOLDING OF EMPLOYEE PASSPORTS (AUG 2011)
(a) All contractors (“contractors” refers to both prime contractors and all subcontractors at all tiers) are reminded of the prohibition contained in Title 18, United States Code, Section 1592, against knowingly destroying, concealing, removing, confiscating, or possessing any actual or purported passport or other immigration document, or any other actual or purported government identification document, of another person, to prevent or restrict or to attempt to prevent or restrict, without lawful authority, the person’s liberty to move or travel, in order to maintain the labor or services of that person.
(b) Contractors are also required to comply with the following provisions:
(1) Contractors shall only hold employee passports and other identification documents discussed above for the shortest period of time reasonable for administrative processing purposes.
(2) Contractors shall provide all employees with a signed copy of their employment contract, in English as well as the employee’s native language, that defines the terms of their employment/compensation.
(3) Contractors shall not utilize unlicensed recruiting firms or firms that charge illegal recruiting fees.
(4) Contractors shall be required to provide adequate living conditions (sanitation, health, safety, living space) for their employees. Fifty square feet is the minimum acceptable square footage of personal living space per employee. Upon contractor’s written request, Contracting Officers may grant a waiver in writing in cases where the existing square footage is within 20% of the minimum, and the overall conditions are determined by the Contracting Officer to be acceptable. A copy of the waiver approval shall be maintained at the respective life support area.
(5) Contractors shall incorporate checks of life support areas to ensure compliance with the requirements of this Trafficking in Persons Prohibition into their Quality Control program, which will be reviewed within the Government’s Quality Assurance process.
(6) Contractors shall comply with International and Host Nation laws regarding transit/exit/entry procedures and the requirements for visas and work permits.
(c) Contractors have an affirmative duty to advise the Contracting Officer if they learn of their employees violating the human trafficking and inhumane living conditions provisions contained herein. Contractors are advised that
Contracting Officers and/or their representatives will conduct random checks to ensure contractors and subcontractors at all tiers are adhering to the law on human trafficking, humane living conditions and withholding of passports.
(d) The contractor agrees to incorporate the substance of this clause, including this paragraph, in all subcontracts under his contract. (End of Clause)
952.223-0001 – REPORTING KIDNAPPINGS, SERIOUS INJURIES AND DEATHS (JUL 2010)
Contractors shall notify the Contracting Officer, as soon as practicable, whenever employee kidnappings, serious injuries or deaths occur.
Report the following information:
Contract Number
Contract Description & Location
Company Name
Reporting party:
Name
Phone number e-mail address
Victim:
Name
Gender (Male/Female)
Age
Nationality
Country of permanent residence
Incident:
Description
Location
Date and time
Other Pertinent Information
(End of Clause)
952.225-0003 – FITNESS FOR DUTY AND MEDICAL/DENTAL CARE LIMITATIONS (AUG 2011)
(a) The contractor shall perform the requirements of this contract notwithstanding the fitness for duty of deployed employees, the provisions for care offered under this section, and redeployment of individuals determined to be unfit. Contractor personnel who deploy for multiple tours, for more than 12 months total must be re-evaluated for fitness to deploy. An examination will remain valid for 15 months from the date of the physical. The contractor bears the responsibility for ensuring all employees are aware of the conditions and medical treatment available at the performance location. The contractor shall include this information and requirement in all subcontracts with performance in the theater of operations.
(b) The contractor shall not deploy an individual with any of the following conditions unless approved by the appropriate CENTCOM Service Component (i.e. ARCENT, AFCENT, etc.) Surgeon: Conditions which prevent the wear of personal protective equipment, including protective mask, ballistic helmet, body armor, and chemical/biological protective garments; conditions which prohibit required theater immunizations or medications; conditions or current medical treatment or medications that contraindicate or preclude the use of chemical and biological protective’s and antidotes; diabetes mellitus, Type I or II, on pharmacological therapy; symptomatic coronary artery disease, or with myocardial infarction within one year prior to deployment, or within six months of coronary artery bypass graft, coronary artery angioplasty, or stenting; morbid obesity (BMI >/= 40%); dysrhythmias or arrhythmias, either symptomatic or requiring medical or electrophysiological control; uncontrolled hypertension, current heart failure, or automatic implantable defibrillator; therapeutic anticoagulation; malignancy, newly diagnosed or under current treatment, or recently diagnosed/treated and requiring frequent subspecialist surveillance, examination, and/or laboratory testing; dental or oral conditions requiring or likely to require urgent dental care within six months’ time, active orthodontic care, conditions requiring prosthodontic care, conditions with immediate restorative dentistry needs, conditions with a current requirement for oral-maxillofacial surgery;
new onset (< 1 year) seizure disorder, or seizure within one year prior to deployment; history of heat stroke;
Meniere’s Disease or other vertiginous/motion sickness disorder, unless well controlled on medications available in theater; recurrent syncope, ataxias, new diagnosis (< 1 year) of mood disorder, thought disorder, anxiety, somatoform, or dissociative disorder, or personality disorder with mood or thought manifestations; unrepaired hernia; tracheostomy or aphonia; renalithiasis, current; active tuberculosis;
pregnancy; unclosed surgical defect, such as external fixeter placement; requirement for medical devices using AC power; HIV antibody positivity; psychotic and bipolar disorders. (Reference: Mod 10 to
USCENTCOM Individual Protection and Individual/Unit Deployment Policy, Tab A: Amplification of the
Minimal Standards of Fitness for Deployment to the CENTCOM AOR).
(c) In accordance with military directives (DoDI 3020.41, DoDI 6000.11, CFC FRAGO 09-1038, DoD Federal
Acquisition Regulation Supplement (DFARS) PGI 225.74), resuscitative care, stabilization, hospitalization at Level
III (emergency) military treatment facilities and assistance with patient movement in emergencies where loss of life, limb or eyesight could occur will be provided. Hospitalization will be limited to emergency stabilization and short-term medical treatment with an emphasis on return to duty or placement in the patient movement system. Subject to availability at the time of need, a medical treatment facility may provide reimbursable treatment for emergency medical or dental care such as broken bones, lacerations, broken teeth or lost fillings.
(d) Routine and primary medical care is not authorized. Pharmaceutical services are not authorized for routine or known, routine prescription drug needs of the individual. Routine dental care, examinations and cleanings are not authorized.
(e) Notwithstanding any other provision of the contract, the contractor shall be liable for any and all medically-related services or transportation rendered. To view reimbursement rates that will be charged for services at all DoD deployed medical facilities please got to the following website: http://comptroller.defense.gov/rates/fy2011.html
(change fiscal year as applicable). (End of Clause)
952.225-0004 – COMPLIANCE WITH LAWS AND REGULATIONS (JUL 2010)
(a) The Contractor shall comply with, and shall ensure that its employees and its subcontractors and their employees, at all tiers, are aware of and obey all U.S. and Host Nation laws, Federal or DoD regulations, and
Central Command orders and directives applicable to personnel in Iraq and Afghanistan, including but not limited to
USCENTCOM, Multi-National Force and Multi-National Corps operations and fragmentary orders, instructions, policies and directives.
(b) Contractor employees shall particularly note all laws, regulations, policies, and orders restricting authority to carry firearms, rules for the use of force, and prohibiting sexual or aggravated assault. Contractor employees are subject to General Orders Number 1, as modified from time to time, including without limitation, their prohibition on privately owned firearms, alcohol, drugs, war souvenirs, pornography and photographing detainees, human casualties or military security measures.
(c) Contractor employees may be ordered removed from secure military installations or the theater of operations by order of the senior military commander of the battle space for acts that disrupt good order and discipline or violate applicable laws, regulations, orders, instructions, policies, or directives. Contractors shall immediately comply with any such order to remove its contractor employee.
(d) Contractor employees performing in the USCENTCOM Area of Responsibility (AOR) may be subject to the jurisdiction of overlapping criminal codes, including, but not limited to, the Military Extraterritorial Jurisdiction Act
(18 U.S.C. Sec. 3261, et al) (MEJA), the Uniform Code of Military Justice (10 U.S.C. Sec. 801, et al)(UCMJ), and the laws of the Host Nation. Non-US citizens may also be subject to the laws of their home country while performing in the USCENTCOM AOR. Contractor employee status in these overlapping criminal jurisdictions may be modified from time to time by the United States, the Host Nation, or by applicable status of forces agreements.
(e) Under MEJA, a person who engages in felony misconduct outside the United States while employed by or accompanying the Armed Forces is subject to arrest, removal and prosecution in United States federal courts. Under the UCMJ, a person serving with or accompanying the Armed Forces in the field during a declared war or contingency operation may be disciplined for a criminal offense, including by referral of charges to a General Court
Martial. Contractor employees may be ordered into confinement or placed under conditions that restrict movement within the AOR or administratively attached to a military command pending resolution of a criminal investigation.
(f) Contractors shall immediately notify military law enforcement and the Contracting Officer if they suspect an employee has committed an offense. Contractors shall take any and all reasonable and necessary measures to secure the presence of an employee suspected of a serious felony offense.
http://comptroller.defense.gov/rates/fy2011.html
Contractors shall not knowingly facilitate the departure of an employee suspected of a serious felony offense or violating the Rules for the Use of Force to depart Iraq or Afghanistan without approval from the senior U.S. commander in the country. (End of Clause)
952.225-0005 – MONTHLY CONTRACTOR CENSUS REPORTING (AUG 2011)
Contractor shall provide monthly employee census information to the Contracting Officer, by province, for this contract. Information shall be submitted either electronically or by hard-copy. Information shall be current as of the th day of each month and received by the Contracting Officer no later than the first day of the following month.
The following information shall be provided for each province in which work was performed:
(1) The total number (prime and subcontractors at all tiers) employees.
(2) The total number (prime and subcontractors at all tiers) of U.S. citizens.
(3) The total number (prime and subcontractors at all tiers) of local nationals (LN).
(4) The total number (prime and subcontractors at all tiers) of third-country nationals (TCN).
(5) Name of province in which the work was performed.
(6) The names of all company employees who enter and update employee data in the Synchronized Pre-deployment & Operational Tracker (SPOT) IAW DFARS 252.225-7040 or DFARS DOD class deviation 2011-
O0004. (End of Clause)
952.225-0009 – MEDICAL SCREENING AND VACCINATION REQUIREMENTS FOR CONTRACTOR
EMPLOYEES OPERATING IN THE CENTCOM AREA OF RESPONSIBILITY (AOR) (AUG 2011)
(a) Contractors and subcontractors at any tier shall ensure and provide satisfactory evidence that all locally hired employees, including Local National (LN), Third Country National (TCN), and U.S. employees, working on bases have been screened for and do not currently have active tuberculosis (TB).
(1) Contractors may initially utilize a testing method of either a chest x-ray or TB skin test (TST), depending on the originating country of a contracted employee.
(i) Chest x-rays (CXR's), symptom survey, and Body Mass Index (BMI) shall be taken, and TSTs administered within 12 months prior to the start of deployment/employment. Contractors are required to bring in a physical copy of the pre-employment CXR film as it is the only way to verify interval changes should an active case of TB occur.
(A) Third Country Nationals (TCNs) and Local Nationals (LNs) cannot be screened with the TST.
They need the pre-employment screening with a quality CXR, BMI and symptom survey.
(B) Small-Risk Nationals (SRNs), those with less than 25 TB cases per 100,000 persons annually
(mostly expats from Europe and US), can be screened via the TST.
(ii) Annual re-screening for TCNs, and LNs will be performed with a CXR conducted by the Contractor’s medical provider or local economy provider who will look for interval changes from prior CXR’s and review any changes in the symptom survey.
(iii) SRN’s do not require annual TB re-screening. However, for a TB contact investigation, a TST or
Interferon Gamma Release Assay (IGRA) is required.
(iv) For a contact investigation, all personnel with a positive TST or IGRA will be evaluated for potential active TB with a symptom screen, exposure history, BMI, and CXR. All cases of suspected or confirmed active TB must be reported to the theater Preventive Medicine (PM) physician and/or TB Consultant as soon as possible. TB reporting is required within 24 hours to the PM POC. Contact tracing, and medical coding have specific requirements. All Small-Risk National (SRN) contract personnel are required to be
MEDEVAC’d out of theater, at the contractor’s expense, for treatment of active TB, after consultation with the Theater PM or TB Consultant. For SRN personnel, the contractor is responsible for management and compliance with all prescribed public health actions.
(v) Screening may be performed either by a licensed medical provider from the local economy or by the contractors’ licensed medical staffs. Contractors shall maintain medical screening documentation and make it available to the Contracting Officer upon request.
(2) TB screening and documentation is a requirement prior to receiving badges to work in the CENTCOM Area of Operations. A copy of the TB screening documentation shall be provided to the responsible Base Operations
Center prior to issuance of base access badges.
(b) Contractor employees, including subcontractors at any tier, who work in food service positions and/or water and ice production facilities, shall have current Typhoid and Hepatitis “A” (full series) immunizations in accordance with the Centers for Disease Control and Prevention guidelines (e.g. typhoid vaccination booster is required every 2 years), in addition to the required TB tests. The contractor medical provider must complete a pre-placement examination to include a stool sample test for ova and parasites, and annual medical screening form or equivalent for food service, ice and water production workers.
(c) Proof of individual employee vaccinations shall be provided to the Contracting Officer and COR showing that their employees and their subcontractor employees at any tier have received the above vaccinations. The contractor shall maintain their employees’ vaccination records for examination by the Contracting Officer. The contractor shall ensure that their subcontractors at any tier maintain their respective employees’ vaccination records for examination by the Contracting Officer.
(d) The contractor is responsible for management and compliance with all prescribed public health actions regarding TB in the contracted personnel. The contractor also bears the responsibility of ensuring that adequate health management for TB (screening/diagnosis/treatment/isolation) is available at the contractor’s chosen health care provider for their contracted and subcontracted personnel.
NOTE: Contractors are reminded of the requirement to comply with their contract and all regulatory guidance (DoD
Instructions/Regulations, Federal Acquisition Regulation as Supplemented, and FRAGO’s) as applicable regarding
Medical Screening and Vaccination Requirements. (End of Clause)
952.225-0011 – GOVERNMENT FURNISHED CONTRACTOR SUPPORT (AUG 2011)
The following is a summary of the type of support the Government will provide the contractor, on an “as-available” basis. In the event of any discrepancy between this summary and the description of services in the Statement of
Work, this clause will take precedence.
* CAAF means Contractors Authorized to Accompany Forces.
U.S. Citizens Accompanying the Force
APO/FPO/MPO/Postal Services DFACs Mil Issue Equip
Authorized Weapon Excess Baggage MILAIR
Billeting Fuel Authorized MWR
CAAF* Govt Furnished Meals Resuscitative Care
Controlled Access Card (CAC) Military Banking Transportation
Badge Military Clothing All
Commissary Military Exchange None
Dependents Authorized
Third-Country National (TCN) Employees
Billeting Fuel Authorized MWR
CAAF* Govt Furnished Meals Resuscitative Care
Controlled Access Card (CAC) Military Banking Transportation
Badge Military Clothing All
Commissary Military Exchange None
Local National (LN) Employees
Billeting Fuel Authorized MWR
CAAF* Govt Furnished Meals Resuscitative Care
Controlled Access Card (CAC) Military Banking Transportation
Badge Military Clothing All
Commissary Military Exchange None
(End of Clause)
952.225-0013 – CONTRACTOR HEALTH AND SAFETY (AUG 2011)
(a) Contractors shall comply with all National Electrical Code (NEC 2008), Specifications as outlined, and
MIL Standards and Regulations. All infrastructure to include, but not limited to, living quarters, showers, and restrooms shall be installed and maintained in compliance with these standards and must be properly supported and staffed to ensure perpetual Code compliance, prevent hazards and to quickly correct any hazards to maximize safety of those who use or work at the infrastructure. The government has the authority to enter and inspect contractor employee living quarters at any time to ensure the prime contractor is complying with safety compliance standards outlined in the 2008 National Electric Code (NEC).
(b) The contractor shall correct all deficiencies within a reasonable amount of time of contractor becoming aware of the deficiency either by notice from the government or a third party, or discovery by the contractor. Further guidance on mandatory compliance with NFPA 70: NEC 2008 can be found on the following link http://www.nfpa.org. (End of Clause)
952.225-0016 – CONTRACTOR DEMOBILIZATION (AFGHANISTAN) (AUG 2011)
(a) Full demobilization of contractors and subcontractor(s) in the Afghanistan Combined Joint Operations Area
(CJOA) is critical to responsible drawdown. The prime contractor is required to submit a demobilization plan to the
Contracting Officer a minimum of 120 days prior to the end of the contract performance period or when requested by the Contracting Officer. The demobilization plan shall address, as a minimum, the following procedures detailed below. The procedures outline specific guidance to ensure a timely and responsible exit from theater. Prime contractors are responsible and accountable to ensure their subcontractor(s) at all tiers comply with responsible and timely exit from theater immediately following contract performance completion or termination.
(1) Exit from Afghanistan: The prime contractor is responsible to remain cognizant of Afghan laws regarding exit from Afghanistan. Currently, all foreigners traveling out of Afghanistan airports via commercial air transportation must have exit visas. Department of Defense, U.S. Forces-Afghanistan, Letters of Authorization http://www.nfpa.org/
(LOAs), and/or Embassy Badges are not accepted means of exiting Afghanistan. All U.S. citizens and foreign national contractors exiting via commercial means must obtain an Afghanistan exit sticker before departing the country. The exit sticker may be obtained from Ministry of Interior (MOI) office. It is the prime contractor’s responsibility to ensure that the most recent exit procedures are followed and to ensure that subcontractor(s) at all tiers are in compliance with exit procedures. It is to the responsibility of the contractor to work with the Embassy of Afghanistan or Afghanistan MOI as required.
(2) Letter of Authorization (LOA): The prime contractor is responsible for demobilizing its workforce, including subcontractor employees at all tiers, and all contractor owned and subcontractor owned equipment out of theater as part of the prime contractor’s exit strategy. This exit strategy must include reasonable timeframes starting with the end of the contract performance period and not exceeding 30 days. The Contracting Officer has the authority to extend selected LOAs up to, but not exceeding 30 calendar days after the contract completion date to allow the prime contractor to complete demobilization of its workforce and contractor owned equipment, as well as subcontractor(s) workforce and owned equipment, out of the Afghanistan CJOA. The prime contractor shall notify the Contracting Officer a minimum of 30 days prior to the end of the contract period to request up to a 30-day extension of selected LOAs beyond the contract completion date to complete demobilization. The request shall include at a minimum:
(i) the name of each individual requiring a new LOA;
(ii) the number of days for the LOA (no more than 30 calendar days); and
(iii) justification for the request (e.g., what function the individual(s) will be performing during the demobilization period).
The Contracting Officer may request additional information for an LOA extension. Any LOA extension granted beyond the contract completion date shall not exceed 30 days and the contractor is not entitled to additional compensation for this period. If approved by the Contracting Officer, this is a no cost extension of an employee’s
LOA due to demobilization and in no way is an extension of the contract performance period.
(3) Badging: The prime contractor is responsible to ensure all employee badges, including subcontractor employees at all tiers, are returned to the local Access Control Badging Office for de-activation and destruction.
The prime contractor shall submit a Badge Termination Report to ensure each record is flagged and the badge is revoked. If a prime and/or subcontractor employee’s badge is not returned, the prime contractor shall submit a Lost, Stolen or Unrecovered Badge Report to the appropriate Access Control Badging Office. Contractor employees in possession of a Common Access Card (CAC) shall be responsible for turning in the CAC upon re-deployment through a CONUS Replacement Center in the U.S. Failure to return employee badges in a timely manner may result in delay of final payment.
(4) Contractor Controlled Facility Space: If the prime contractor has entered into a Memorandum of
Understanding with the Installation Mayor or Garrison for site space, buildings, facilities, and/or Containerized
Housing Units (CHU) to house prime and/or subcontractor employees (at all tiers), the prime contractor is responsible to notify the Installation Mayor or Garrison Commander of intent to vacate at least 90 calendar days prior to the end of the contract performance period. All United States Government (USG) provided property in the prime contractor’s possession must be returned to the USG in satisfactory condition. The prime contractor is responsible and liable for any and all damages to USG property caused by prime and/or subcontractor employees, and shall be further liable for all cleanup, clearing, and/or environmental remediation expenses incurred by the USG in returning prime contractor and/or subcontractor facilities including surrounding site to a satisfactory condition, including expenses incurred in physically moving property, trash, and refuse from such premises, removing/ remediating hazardous wastes on the premises, and repairing structures, buildings, and facilities used by the prime contractor and/or subcontractor. The prime contractor shall provide notification to the Installation Mayor or
Garrison Commander to perform an inspection of all facilities as soon as practicable, but no more than 30 days, after the end of the contract period. If damages are discovered, the prime contractor shall make the necessary repairs.
The prime contractor shall notify the Installation Mayor or Garrison Commander for re-inspection of the facilities upon completion of the repairs. If the Installation Mayor or Garrison Commander inspects the property, site space, buildings, facilities, and/or CHUs and finds they have not been properly cleaned, cleared, and/or environmentally remediated, or if the prime contractor fails to repair any damages within 30 calendar days after the end of the contract performance period, the final contract payment shall be reduced by the amount of the specified damages/repairs or the expenses incurred by the USG to properly clean, clear, and/or environmentally remediate the premises.
(5) Government Furnished Equipment/Materials: The prime contractor is responsible to return all USG furnished equipment, as defined in Federal Acquisition Regulation (FAR) Part 45, clauses 52.245-1, if included in the contract. Prime contractors who are not in compliance with the FAR, Defense Federal Acquisition Regulation
Supplement, Department of Defense Directives and Instructions, policies, or procedures will be responsible and liable for damages to the government property. The prime contractor may apply for a “relief of responsibility” from the Contracting Officer anytime during the contract performance period. A joint inventory shall be conducted of the equipment by the prime contractor, USG representative, and the Contracting Officer or their representative, within
10 calendar days after the end of the contract performance period. The prime contractor shall report lost, damaged or destroyed property immediately to the Contracting Officer, but no later than the joint inventory at the end of the contract period. If the prime contractor fails to report lost, damaged or destroyed equipment or materials during the contract performance period, the prime contractor shall be responsible for the replacement and/or repair of the equipment or materials. The replaced equipment shall be new, of the same quality, and shall perform at the same functional level as the missing piece of equipment. If the prime contractor fails to repair and/or replace damaged or missing equipment, the final payment shall be reduced by the appropriate amount of the specified damages or cost to replace missing equipment with new.
(6) Contractor Personal Property: The contractor is advised that all personal property left on the respective installation after the date of departure of said premises, shall be sold or otherwise disposed of in accordance with 10
U.S.C. § 2575.
(i) A request for the return of the property will be honored, if feasible, and if received before the expiration of the period of time allowed to vacate the installation.
(ii) If abandoned property is left on the respective installation, contractual remedies may be enforced against the contractor, (See paragraph (b) of this clause for potential contractual remedies). Additionally, even if the contractor waives its interest to all abandoned personal property, the contractor may still be liable for all costs incurred by the
USG to remove or dispose of the abandoned property.
(iii) The contractor hereby authorizes the USG authority to dispose of any and all abandoned personal property in any manner the USG may deem suitable and hereby releases and discharges the USG and its agents from any and all claims and demands whatsoever that could otherwise be asserted because of the disposition of said abandoned personal property.
(7) Synchronized Predeployment Operational Tracker (SPOT): The prime contractor is responsible to close out the deployment of personnel, including subcontractor employees at all tiers, at the end of the contract completion period and to release the personnel from the prime contractor’s company in the SPOT database. The release of employee information must be accomplished no more than 30 calendar days after the end of the contract completion date.
(8) Accountability of Prime and Subcontractor Personnel: Whether specifically written into the contract or not, it is the expectation of the USG that for any persons brought into the Afghanistan CJOA for the sole purposes of performing work on USG contracts, contract employers will return employees to their point of origin/home country once the contract is completed or their employment is terminated for any reason. If the prime contractor fails to re-deploy an employee, or subcontractor employee at any tier, the USG shall notify the applicable U.S. Embassy to take appropriate action. Failure by the prime contractor to re-deploy its personnel, including subcontractor personnel at any tier, at the end of the contract completion date, could result in the contractor being placed on the
Excluded Parties List System (EPLS) and not be allowed to propose on future U.S. contracts anywhere in the world.
(9) Personnel Recovery: Any DoD contractor with unaccounted for employees shall follow the instructions in the “Contractor Accountability and Personnel Recovery” Clause 952.225-20. The contractor may use the
Contracting Fusion Cell as a resource to track or research employees last known location and/or to view LOA’s.
(b) CENTCOM - Joint Theater Support Contracting Command (C-JTSCC) and external agencies will utilize all available contracting remedies to guarantee compliance with demobilization requirements. Such actions include, but are not limited to withholding payment, issuing a cure notice, issuing a negative Contractor Performance
Assessment Reporting System (CPARS) evaluation, reduction of award fee, debarment, reimbursement of U.S.
Government expenses, and/or any other legal remedy available to a contracting officer. The USG reserves the right to withhold payment from the prime contractor not in compliance with the above procedures included herein.
Additionally, the Contracting Officer shall document all unresolved contractor compliance issues in CPARS, which shall have an adverse past performance affect on future contracts with the USG, anywhere in the world. (End of
Clause)
952.225-0017 CONTRACTOR DEMOBILIZATION (IRAQ) (AUG 2011)
(a) Full demobilization of contractors and subcontractor(s) in the Iraq Combined Joint Operations Area (CJOA) is critical to Responsible Drawdown. The prime contractor is required to submit a demobilization plan to the
Contracting Officer a minimum of 120 days prior to the end of the contract performance period or when requested by the Contracting Officer. The demobilization plan shall address, as a minimum, the following procedures detailed below. The procedures outline specific guidance to ensure a timely and responsible exit from theater. Prime contractors are responsible and accountable to ensure their subcontractor(s) at all tiers comply with responsible and timely exit from theater immediately following contract performance completion or termination.
(1) Exit from Iraq: The prime contractor shall follow the exit guidance issued by the United States (U.S.)
Embassy Baghdad and shall ensure subcontractor(s) at all tiers also follow the exit procedures. The prime contractor is responsible to remain cognizant of Iraqi laws regarding exit from Iraq. Currently, all foreigners traveling out of Iraqi airports via commercial air transportation must have exit visas. Department of Defense, U.S.
Forces-Iraq, Letters of Authorization (LOAs), and/or Embassy Badges are no longer the accepted means of exiting
Iraq. All U.S. citizens and foreign national contractors must obtain an Iraqi exit sticker before departing the country.
The exit sticker may be obtained from selected police stations or Ministry of Interior (MOI) offices. It is the prime contractor’s responsibility to ensure that the most recent exit procedures are followed and to ensure that subcontractor(s) at all tiers are in compliance with exit procedures. Assistance for this procedure may be obtained by e-mailing baghdadregmgt@state.gov or phone 240-553-0581, ext 2782 or ext 2092.
(2) Letter of Authorization (LOA): The prime contractor is responsible for demobilizing its workforce, including subcontractor employees at all tiers, and all contractor owned and subcontractor owned equipment out of theater as part of the prime contractor’s exit strategy. This exit strategy must include reasonable timeframes starting with the end of the contract performance period and not exceeding 30 days. The Contracting Officer has the authority to extend selected LOAs up to, but not exceeding 30 calendar days after the contract completion date to allow the prime contractor to complete demobilization of its workforce and contractor owned equipment, as well as subcontractor(s) workforce and owned equipment, out of the Iraq CJOA. The prime contractor shall notify the
Contracting Officer a minimum of 30 days prior to the end of the contract period to request up to a 30-day extension of selected LOAs beyond the contract completion date to complete demobilization. The request shall include at a minimum:
(i) the name of each individual requiring a new LOA;
(ii) the number of days for the LOA (no more than 30 calendar days); and
(iii) justification for the request (e.g., what function the individual(s) will be performing during the demobilization period).
The Contracting Officer may request additional information for an LOA extension. Any LOA extension granted beyond the contract completion date shall not exceed 30 days and the contractor is not entitled to additional compensation for this period. If approved by the contracting officer, this is a no cost extension of an employee’s
LOA due to demobilization and in no way is an extension of the contract performance period.
mailto:baghdadregmgt@state.gov
(3) Badging: The prime contractor is responsible to ensure all employee badges, including subcontractor employees at all tiers, are returned to the local Access Control Badging Office for de-activation and destruction. The prime contractor shall submit a Badge Termination Report to ensure each record is flagged and the badge is revoked. If a prime and/or subcontractor employee’s badge is not returned, the prime contractor shall submit a Lost, Stolen or
Unrecovered Badge Report to the appropriate Access Control Badging Office. Contractor employees in possession of a Common Access Card (CAC) shall be responsible for turning in the CAC upon re-deployment through a
CONUS Replacement Center in the U.S. Failure to return employee badges in a timely manner may result in delay of final payment.
(4) Contractor Controlled Facility Space: If the prime contractor has entered into a Memorandum of
Understanding with the Installation Mayor or Garrison for site space, buildings, facilities, and/or Containerized
Housing Units (CHU) to house prime and/or subcontractor employees (at all tiers), the prime contractor is responsible to notify the Installation Mayor or Garrison Commander of intent to vacate at least 90 calendar days prior to the end of the contract performance period. All United States Government (USG) provided property in the prime contractor’s possession must be returned to the USG in satisfactory condition. The prime contractor is responsible and liable for any and all damages to USG property caused by prime and/or subcontractor employees, and shall be further liable for all cleanup, clearing, and/or environmental remediation expenses incurred by the USG in returning prime contractor and/or subcontractor facilities including surrounding site to a satisfactory condition, including expenses incurred in physically moving property, trash, and refuse from such premises, removing/remediating hazardous wastes on the premises, and repairing structures, buildings, and facilities used by the prime contractor and/or subcontractor. The prime contractor shall provide notification to the Installation Mayor or Garrison Commander to perform an inspection of all facilities as soon as practicable, but no more than 30 days, after the end of the contract period. If damages are discovered, the prime contractor shall make the necessary repairs. The prime contractor shall notify the Installation Mayor or Garrison Commander for re-inspection of the facilities upon completion of the repairs. If the Installation Mayor or Garrison Commander inspects the property, site space, buildings, facilities, and/or CHUs and finds they have not been properly cleaned, cleared, and/or environmentally remediated, or if the prime contractor fails to repair any damages within 30 calendar days after the end of the contract performance period, the final contract payment shall be reduced by the amount of the specified damages/repairs or the expenses incurred by the USG to properly clean, clear, and/or environmentally remediate the premises.
(5) Government Furnished Equipment/Materials: The prime contractor is responsible to return all USG furnished equipment, as defined in Federal Acquisition Regulation (FAR) Part if included in the contract. Prime contractors who are not in compliance with the FAR, Defense Federal Acquisition Regulation Supplement, Department of Defense Directives and Instructions, United States Forces-Iraq (USF-I) FRAGOs, policies, or procedures will be responsible and liable for damages to the government property. The prime contractor may apply for a “relief of responsibility” from the Contracting Officer anytime during the contract performance period. A joint inventory shall be conducted of the equipment by the prime contractor, USG representative, and the Contracting
Officer or their representative, within 10 calendar days after the end of the contract performance period. The prime contractor shall report lost, damaged or destroyed property immediately to the Contracting Officer, but no later than the joint inventory at the end of the contract period. If the prime contractor fails to report lost, damaged or destroyed equipment or materials during the contract performance period, the prime contractor shall be responsible for the replacement and/or repair of the equipment or materials. The replaced equipment shall be new, of the same quality, and shall perform at the same functional level as the missing piece of equipment. If the prime contractor fails to repair and/or replace damaged or missing equipment, the final payment shall be reduced by the appropriate amount of the specified damages or cost to replace missing equipment with new.
(6) Contractor Personal Property: The contractor is advised that all personal property left on the respective installation after the date of departure of said premises, shall be sold or otherwise disposed of in accordance with 10
U.S.C. § 2575.
(i) A request for the return of the property will be honored, if feasible, and if received before the expiration of the period of time allowed to vacate the installation.
(ii) If abandoned property is left on the respective installation, contractual remedies may be enforced against the contractor, (See paragraph (b) of this clause for potential contractual remedies). Additionally, even if the contractor waives its interest to all abandoned personal property, the contractor may still be liable for all costs incurred by the USG to remove or dispose of the abandoned property.
(iii) The contractor hereby authorizes the USG authority to dispose of any and all abandoned personal property in any manner the USG may deem suitable and hereby releases and discharges the USG and its agents from any and all claims and demands whatsoever that could otherwise be asserted because of the disposition of said abandoned personal property.
(7) Synchronized Pre-deployment Operational Tracker (SPOT): The prime contractor is responsible to close out the deployment of personnel, including subcontractor employees at all tiers, at the end of the person’s employment or at the end of the contract completion period and to release the personnel from the prime contractor’s company information as loaded in the SPOT database. The release of employee information must be accomplished no more than 30 calendar days after the termination of their employment or the end of the contract completion date, whichever occurs sooner.
(8) Accountability of Prime and Subcontractor Personnel: Whether specifically written into the contract or not, it is the expectation of the USG that for any persons brought into the Iraq CJOA for the sole purposes of performing work on USG contracts, contract employers will return employees to their point of origin/home country once the contract is completed or their employment is terminated for any reason. On a case-by-case basis, contracting officers may approve a contract employee’s request to transfer from an existing contract (as a USG prime or working as a subcontractor on an USG contract) to another USG prime contractor a USG subcontractor. In the instance of an employee leaving their current contract to be employed under another USG contract (either as a prime or subcontractor employee), the contractor losing the employee must terminate the LOA immediately, confiscate all badging, and notify MOI of the change in visa status within 24 hours of the employees termination. The receiving contractor is fully responsible for ensuring the employee has the appropriate passport and visas, badging, DD Form
93 Record of Emergency Data, and LOA in place in order for the new employee to begin work. If the prime contractor fails to re-deploy an employee (or subcontractor employee) at any tier, or fails to confiscate badging, terminate an LOA, or visa after an employee departs to another employer, the USG shall notify the applicable U.S.
Embassy to take appropriate action. If the employee has sought employment under another contract, the gaining employer will be responsible for repatriation upon termination. Failure by the prime contractor to re-deploy its’ personnel, including subcontractor personnel at any tier, at the end of the contract completion date, could result in the contractor being placed on the Excluded Parties List System (EPLS) and not be allowed to propose on future
USG contracts anywhere in the world.
(9) Personnel Recovery: Any DoD contractor with unaccounted for employees shall follow the instructions in the “Contractor Accountability and Personnel Recovery” Clause 952.225-18. The contractor may use the
Contracting Fusion Cell as a resource to track or research employees last known location and/or to view LOA’s.
(b) CENTCOM - Joint Theater Support Contracting Command (C-JTSCC) and external agencies will utilize all available contracting remedies to guarantee compliance with demobilization requirements. Such actions include, but are not limited to withholding payment, issuing a cure notice, issuing a negative Contractor Performance
Assessment Reporting System (CPARS) evaluation, reduction of award fee, debarment, reimbursement of USG expenses, and/or any other legal remedy available to a contracting officer. The USG reserves the right to withhold payment from the prime contractor not in compliance with the above procedures included herein. Additionally, the
Contracting Officer shall document all unresolved contractor compliance issues in CPARS, which shall have an adverse past performance affect on future contracts with the USG, anywhere in the world. (End of Clause)
952.225-0018 CONTRACTOR ACCOUNTABILITY AND PERSONNEL RECOVERY (IRAQ) (AUG 2011)
(a) Contract performance may require work in dangerous or austere conditions. Except as otherwise provided in the contract, the contractor accepts the risks associated with required contract performance in such operations.
(1) Unaccounted Personnel: It is the expectation of the USG that any contractor brought into Iraq for the sole purposes of performance of work on a USG contract must be accounted for at all times by their respective employers. Additionally, contractors who maintain living quarters on a USG base shall verify the location of each of its employees’ living quarters a minimum of once a month. If a DoD contracted employee becomes missing and evidence does not indicate foul play, a Personnel Recovery (PR) event is NOT automatically triggered. Such an event will be treated as an accountability battle drill by the employer’s chain of command or civilian equivalent.
(2) Contractor Responsibilities: The contractor is responsible to take all necessary steps to locate and investigate the unaccounted for employee(s) whereabouts to the maximum extent practicable. To assist in this process, contractors may use the Contracting Fusion Cell as a resource to track or research employee’s last known location and/or to view LOA’s. All missing personnel will be immediately reported to the installation division Personnel
Recovery Officer (PRO), Mayor’s cell, Military Police Station and/or the Criminal Investigative Division, and the
Base Defense Operations Center (BDOC).
(3) Contractor Provided Information: If it is determined that a potential criminal act has occurred, the USD PRO
(or USF-I Personnel Recovery Division (PRD) with prior coordination) will attempt to validate the missing person’s identity through the employer. The contractor shall provide the information to PRD within 12 hours of request. The required information the contractor should keep on file includes but is not limited to: copy of the individuals Letter of Authorization generated by the Synchronized Pre-deployment and Operational Tracker System (SPOT), copy of passport and visas, housing information of where the individual resides such as room number and location, DD
Form 93, Record of Emergency Data, copy of badging, and contact information for known friends or associates.
(b) If USF-I PRD determines through investigation that the unaccounted personnel have voluntarily left the installation either seeking employment with another contractor or other non-mission related reasons, PRD will notify the contractor. The contractor shall ensure that all government-related documents such as LOA’s, visas, etc. are terminated/reconciled appropriately within 24 hours of notification by PRD in accordance with subparagraph (a)(8) of C-JTSCC Clause 952.225-0017 entitled “Contractor Demobilization (Iraq)”. Contractors who fail to account for their personnel or whose employees create PR events will be held in breach of their contract and face all remedies available to the contracting officer. (End of Clause)
952.225-0020 CONTRACTOR ACCOUNTABILITY AND PERSONNEL RECOVERY (AFGHANISTAN)
(AUG 2011)
(a) Contract performance may require work in dangerous or austere conditions. Except as otherwise provided in the contract, the contractor accepts the risks associated with required contract performance in such operations.
(1) Unaccounted Personnel: It is the expectation of the USG that any contractor brought into Afghanistan for the sole purposes of performance of work on a USG contract must be accounted for at all times by their respective employers. Additionally, contractors who maintain living quarters on a USG base shall verify the location of each of its employees’ living quarters a minimum of once a month. If a DoD contracted employee becomes missing and evidence does not indicate foul play, a Personnel Recovery (PR) event is NOT automatically triggered. Such an event will be treated as an accountability battle drill by the employer’s chain of command or civilian equivalent.
(2) Contractor Responsibilities: The contractor is responsible to take all necessary steps to locate and investigate the unaccounted for employee(s) whereabouts to the maximum extent practicable. To assist in this process, contractors may use the Contracting Fusion Cell as a resource to track or research employee’s last known location and/or to view LOA’s. All missing personnel will be immediately reported to the installation division Personnel
Recovery Officer (PRO), Mayor’s cell, Military Police Station and/or the Criminal Investigative Division, and the
Base Defense Operations Center (BDOC).
(3) Contractor Provided Information: If it is determined that a potential criminal act has occurred, the USD PRO
(or USFOR-A Personnel Recovery Division (PRD) with prior coordination) will attempt to validate the missing person’s identity through the employer. The contractor shall provide the information to PRD within 12 hours of request. The required information the contractor should keep on file includes but is not limited to: copy of the individuals Letter of Authorization generated by the Synchronized Pre-deployment and Operational Tracker System
(SPOT), copy of passport and…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 50
Remotely Piloted Aircraft (RPA) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .