Appendix N-Operational Requirements
105 KB Posted
- Attached to
- Remotely Piloted Aircraft (RPA) Federal contract opportunity
- Solicitation number
- FA4890-10-R-0009
About this file
PWS App N Operational Requirements
Text of this file
FA4890-10-R-0009
Appendix N
Operational Requirements
[N-1]
Operational requirements below reflect the maximum projected level of effort to support RPA requirements. Fiscal years are projections. Specific requirements and performance periods will be addressed in individual task order requirements.
1.0 CONUS Requirements:
1.1 FY13: Base Year
Location Supported
RPA
Average
Sorties/Day
ASD Hours/Month Aircraft GCS GDT
Creech AFB MQ-1/9 8 12 1584 14 6 6
Nellis AFB MQ-1/9 0 4 0
Grand Forks AFB MQ-1 2 12 528 6 2 3
Whiteman AFB MQ-1 0 6* 0
Ellsworth AFB MQ-1/9 0 6* 0
Base Z MQ-1/9 2 12 528 8 6* 3
Base A MQ-1/9 2 12 528 6 2
2*
Base B MQ-1/9 2 12 528 6 2
2*
Base C MQ-1/9 2 12 528 6 2
2*
Base D MQ-1/9 2 12 528 6 2
2*
GCS support is 16/5 unless asterisked (*), then GCS support is 24/7
ASD: Average Sortie Duration
The Average Sorties/Day, ASD, Hours/Month, Aircraft, GCS, and GDT represent maximum numbers the contractor is expected to support. Actual requirements may vary and are defined in the task orders.
1.2 FY14: Option Year 1
RPA
Average
Sorties/Day
AS
D
Hours/Month Aircraft GCS GDT
Creech AFB MQ-1/9 8 12 1584 14 6 6
Nellis AFB MQ-1/9 0 4 0
Grand Forks AFB MQ-1 2 12 528 6 2 3
Whiteman AFB MQ-1 0 6* 0
Ellsworth AFB MQ-1/9 0 6* 0
Base Z MQ-1/9 2 12 528 8 6* 3
Base D1 MQ-1/9 2 12 528 12 6* 3
Base D2 MQ-1/9 2 12 528 12 6* 3
Base A MQ-1/9 2 12 528 6 2
2*
Base B MQ-1/9 2 12 528 6 2
2*
Base C MQ-1/9 2 12 528 6 2
2*
Base D MQ-1/9 2 12 528 6 2 3
[N-2]
RPA
Average
Sorties/Day
AS
D
Hours/Month Aircraft GCS GDT
2*
Base E MQ-1/9 2 12 528 6 2
2*
Base F MQ-1/9 2 12 528 6 2
2*
GCS support is 16/5 unless asterisked (*), then GCS support is 24/7
ASD: Average Sortie Duration the contractor is expected to support. Actual requirements may vary and are defined in the task orders.
1.3 FY15: Option Year 2
RPA
Average
Sorties/Day
ASD Hrs/Month Aircraft GCS GDT
Creech AFB MQ-1/9 8 12 1584 14 6 6
Nellis AFB MQ-1/9 0 4 0
Grand Forks AFB MQ-1 2 12 528 6 2 3
Whiteman AFB MQ-1 0 6* 0
Ellsworth AFB MQ-1/9 0 6* 0
Base Z MQ-1/9 2 12 528 8 6* 3
Base D1 MQ-1/9 2 12 528 8 6* 3
Base D2 MQ-1/9 2 12 528 8 6* 3
Base D3 MQ-1/9 2 12 528 8 6* 3
Base A MQ-1/9 2 12 528 6 2
2*
Base B MQ-1/9 2 12 528 6 2
2*
Base C MQ-1/9 2 12 528 6 2
2*
Base D MQ-1/9 2 12 528 6 2
2*
Base E MQ-1/9 2 12 528 6 2
2*
Base F MQ-1/9 2 12 528 6 2
2*
GCS support is 16/5 unless asterisked (*), then GCS support is 24/7
ASD: Average Sortie Duration the contractor is expected to support. Actual requirements may vary and are defined in the task orders.
1.4 FY16: Option Year 3
RPA
Average
Sorties/Day
ASD Hrs/Month Aircraft GCS GDT
Creech AFB MQ-1/9 8 12 1584 14 6 6
Nellis AFB MQ-1/9 0 4 0
Grand Forks AFB MQ-1 2 12 528 6 2 3
[N-3]
Average
Sorties/Day
ASD Hrs/Month Aircraft GCS GDT
Whiteman AFB MQ-1 0 6* 0
Ellsworth AFB MQ-1/9 0 6* 0
Base Z MQ-1/9 2 12 528 8 6* 3
Base D1 MQ-1/9 2 12 528 8 6* 3
Base D2 MQ-1/9 2 12 528 8 6* 3
Base D3 MQ-1/9 2 12 528 8 6* 3
Base A MQ-1/9 2 12 528 6 2
2*
Base B MQ-1/9 2 12 528 6 2
2*
Base C MQ-1/9 2 12 528 6 2
2*
Base D MQ-1/9 2 12 528 6 2
2*
Base E MQ-1/9 2 12 528 6 2
2*
Base F MQ-1/9 2 12 528 6 2
2*
GCS support is 16/5 unless asterisked (*), then GCS support is 24/7
ASD: Average Sortie Duration the contractor is expected to support. Actual requirements may vary and are defined in the task orders.
1.5 FY17: Option Year 4
RPA
Average
Sorties/Day
ASD Hrs/Month Aircraft GCS GDT
Creech AFB MQ-1/9 8 12 1584 14 6 6
Nellis AFB MQ-1/9 0 4 0
Grand Forks AFB MQ-1 2 12 528 6 2 3
Whiteman AFB MQ-1 0 6* 0
Ellsworth AFB MQ-1/9 0 6* 0
Base Z MQ-1/9 2 12 528 8 6* 3
Base D1 MQ-1/9 2 12 528 8 6* 3
Base D2 MQ-1/9 2 12 528 8 6* 3
Base D3 MQ-1/9 2 12 528 8 6* 3
Base A MQ-1/9 2 12 528 6 2
2*
Base B MQ-1/9 2 12 528 6 2
2*
Base C MQ-1/9 2 12 528 6 2
2*
Base D MQ-1/9 2 12 528 6 2
2*
Base E MQ-1/9 2 12 528 6 2
2*
[N-4]
Average
Sorties/Day
ASD Hrs/Month Aircraft GCS GDT
Base F MQ-1/9 2 12 528 6 2
2*
GCS support is 16/5 unless asterisked (*), then GCS support is 24/7
ASD: Average Sortie Duration the contractor is expected to support. Actual requirements may vary and are defined in the task orders.
[N-5]
2.0 Deployed Requirements: The actual number of sites, CAPs per site, and total number of CAPs will vary as dictated by mission requirements but will not exceed maximum requirements identified below. Support at all locations shall provide 24 hour/7 day coverage.
2.1 FY13: Base Year
Supported RPA Up to # of Locations Maximum # CAPs
MQ-1/9 8 40
2.2 FY14: Option Year 1
MQ-1/9 8 40
2.3 FY15: Option Year 2
MQ-1/9 9 45
2.4 FY16: Option Year 3
MQ-1/9 9 45
2.5 FY17: Option Year 4
MQ-1/9 10 50
[N-6]
3.0 Communications Reachback Sites: Support shall include satellite terminals (Tactical Field
Terminals (TFT), Fixed Site SATCOM Terminal (FSST), and SATCOM Earth Terminal Sub-System
(SETSS), Ground Multi-band Terminals (GMT), and all related equipment at each site. Support shall provide 24 hour/7day coverage.
3.1 FY13-17
Location
Maximum
Number of
Satellite
Terminals
Current &
Max CAPs
Supported
Mission Areas
Supported
Estimated
Start Date Comments
EUR-1A
(Ramstein
AB,
Germany
Site A)
60-90
Satellite/RSO communications
FY13 through
FY14
Existing Site. EUR-1A stands down after EUR-
2 is operational.
EUR-1B
(Ramstein
AB,
Germany
Site B)
FY13
EUR-2
(Southern
Europe)
FY14
PAC-1
(Kadena
AB, Japan)
0-80
FY13
PAC-2
(PACOM
AOR)
0-80
FY15
Other files for this federal contract opportunity
Show all 50
Remotely Piloted Aircraft (RPA) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .