Appendix H-RPA Service Summary

67 KB Posted

Attached to
Remotely Piloted Aircraft (RPA) Federal contract opportunity
Solicitation number
FA4890-10-R-0009
Issued by
Department of the Air Force Air Combat Command

About this file

PWS App H RPA Service Summary

Text of this file

FA4890-10-R-0009

APPENDIX H – RPA SERVICE SUMMARY

H-1

1.0 All metrics in this appendix shall be measured and evaluated on a calendar month basis and on a site by site basis. Standards are set by HQ ACC or the Government Program Office as applicable and are subject to annual adjustments by the government. The contractor shall meet or exceed these established metrics. Metrics/Standards are defined in PWS Section B, Services Summary & Appendix H.

2.0 C4ISR Equipment/System Operational Readiness Rate (OR)

OR Shall be calculated as follows for each month:

OR = (Active hours – NMCU hours) x 100

Active hours

Tactical = Operating in deployed wartime environment

OR Standards

2.1 System: Fixed Tactical

GCS (includes GDT) 99.50% 98.50%

TFT 99.50% N/A

FSST 99.50% N/A

SETSS 99.50% N/A

Reachback Circuits 99.80% N/A

2.2 Active hours: 24 hours a day, 7 days a week, unless otherwise specified by the government.

2.3 NMCU hours: Not Mission Capable Unscheduled System hours includes all time when system(s) are not mission capable because of unscheduled maintenance, associated delays, or downtime not approved by the government.

2.4 Non-chargeable Down Time:

2.4.1 Preventive Maintenance Inspections (PMI): Time periods approved by the government where equipment, system(s), or channel(s) is/are not active in its assigned mission due to the performance of scheduled preventive inspection(s). When a deficiency is discovered as a result of the PMI and prevents its completion, the PMI shall be deferred and a new maintenance action shall be opened to document corrective maintenance. The downtime shall be rescheduled and the PMI shall be completed after the deficiency is corrected (See Note).

2.4.2 Training: Government approved time period(s) when equipment, system(s), or channel(s) cannot perform its assigned mission due to training (See Note).

H-2

Note: When the sum of total system downtime per calendar quarter for preventive maintenance and training reaches 24 hours, any additional time for training or preventive maintenance shall be chargeable unless approved in advance by the government.

2.4.3 Government Authorized: Time period when contractor is directed or authorized by the government to shut down equipment or delay work due to personnel safety, interference with other equipment, parts delay, or higher headquarters requirements. A comment explaining the cause of the shutdown (e.g., personnel safety hazard, document, and directive) is required.

2.4.4 Awaiting Parts: Time period between documented item on order status and documented receipt of item shall be considered non-chargeable.

2.4.5 Commercial Power Failures: Time that equipment, system(s), or channel(s) is/are not capable of performing its assigned mission due to loss or instability of commercial/prime power..

Sites where back-up generators are available and contractor maintained, outage time shall be considered chargeable in the event of prime power loss and generator failure.

2.4.6 Modification or Relocation: Time period when an active equipment item is removed from its assigned mission to comply with Government-approved modification or relocation.

2.4.7 Depot Maintenance: Time period when the equipment, system, or channel is not operational due to scheduled depot maintenance. This includes jobs accomplished by

Engineering and Installation (E&I), Central Repair Authority (CRA), or Mobile Depot

Maintenance (MDM) teams.

2.4.8 Electromagnetic Interference: Time period when a communications facility is experiencing interfering electrical signals which prevents the equipment from performing its assigned mission.

2.4.9 Damage or Deterioration: Those time periods that the equipment is not performing its assigned mission due to uncontrollable equipment damage, which is not the result of equipment malfunction and is beyond the contractor maintenance activity’s control (e.g., natural disasters, vandalism, or riot).

2.4.10 Documented Software Error: Those time periods that equipment is not performing its assigned mission due to the occurrence of a documented software problem.

2.4.11 Atmospheric Disturbance or Weather: Time periods when equipment cannot perform its assigned mission due to severe weather or atmospheric conditions, such as anomalous propagation, high wind, hurricanes.

2.5 Aircraft Equipment/System:

MQ-1 MQ-9

MC Rate: > 86% > 86%

H-3

TNMCM Rate: < 10% < 10%

12-Hour Fix Rate: > 79% > 69%

Aircraft Availability Rate: > 73% > 82.4%

Flying Scheduling Effectiveness: > 87% > 84%

Total Abort Rate: < 9% < 5%

Break Rate: < 12% < 7%

Cannibalization (CANN) Rate: < 3% < 4%

Repeat/Recur: < 7% < 8%

AGE In-Commission Rate: > 90% > 90%

IMDS Accuracy Rate: > 85% (Pre-Correction; Correctable to 100%)

2.6 Parts/Equipment:

Due in From Maintenance (DIFM)

Turn in times = 24 hours for 2-level components and five calendar days for all others.

2.7 Inventory Accuracy Rates:

Nonexpendable Equipment: > 99%

Repairable: 100%

Consumables: > 97%

Other files for this federal contract opportunity

Other files attached to Remotely Piloted Aircraft (RPA), newest first.
File Type Posted
WD 2005-2331 rev 12 - Creech.Nellis.pdf PDF
RPA RFP - Amendment 0004 —
Section L Atch 6 Tech TO Rqmts —
WD 2005-2307 Rev 13 - Whiteman.pdf PDF
SF30 - Amendment 0003 —
Notice to Potential Offerors —
RPA Government Responses to Industry Questions —
RPA PWS —
App O-PWS Matrix —
Appendix E-Government Furnished Property —
L Atch 2 Subktr Consent Letter —
L Atch 6 Tech TO Rqmts —
Pre-Award DD254 —
L Atch 3 PPQ —
RPA Pre-Proposal Conference Ltr —
WD CBA-2011-4478.pdf PDF
CDRL A006 —
Notice to Potential Offerors - CBA H W Costs —
CDRL A005 —
WD 2005-2485 Rev 10 - Ellsworth.pdf PDF
Final Synopsis - posted 7Feb12.docx DOCX document
Draft RPA Sections L and M —
Draft RPA PWS —
Draft RPA RFP Section H —
Notice to Potential Offerors —
Corrrected Notice to Potential Offerors - 27 Oct 11.pdf PDF
Notice to Potential Offerors - 27 Oct 11.pdf PDF
DRAFT RPA PWS.pdf PDF
RPA Creech Site Visit Brief —
Potential Offerors.docx DOCX document
DRAFT - Appendix D -Publications Forms and Websites.pdf PDF
DRAFT - CDRL A004- Spill Report-RPA.pdf PDF
DRAFT - Appendix A - Definitions Abbreviations Acronyms.pdf PDF
DRAFT - Appendix G - Incentive Plan.pdf PDF
DRAFT - Appendix E Govt Furnished Property —
DRAFT - CDRL A006 - Safety Mishap Report-RPA.pdf PDF
RPA Site Visit Registration Correction 12 July 2011.docx DOCX document
DRAFT - RPA Incentive Plan.pdf PDF
RPA Site Visit Announcement - Updated 29 Jun 11.docx DOCX document
RPA DRAFT PWS —
RPA Industry Day Attendance Roster.pdf PDF
FINAL - RPA Industry Day Brief —
RPA Market Research Questionnaire.pdf PDF
RPA Industry Day Announcement.docx DOCX document
DRAFT - Appendix D - Publications and Forms —
DRAFT - CDRL A002 - Goverment Furnished Property-RPA —
DRAFT - RPA DRAFT PWS —
DRAFT - CDRL A004- Spill Report-RPA —
DRAFT - Appendix A - Definitions Abbreviations Acronyms —
DRAFT - Appendix H - RPA Service Summary —
Show all 50

Remotely Piloted Aircraft (RPA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .