Attachment_7_DD_Form_254_-_Conversions.doc

DOC document 453 KB Posted

Attached to
Ground Control Station Conversion Federal contract opportunity
Solicitation number
FA4855-15-R-0007
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 7 DD Form 254

View the file

Other files for this federal contract opportunity

Other files attached to Ground Control Station Conversion, newest first.
File Type Posted
Attachment_8_Wage_Determination_8_July_15.doc DOC document
FA4855-15-R-0007_Amendment_0007_Conformed_Copy.pdf PDF
Attachment_4_GFM_8_July_15.doc DOC document
FA4855-15-R-0007_Amendment_0007.pdf PDF
Attachment_5_Performance_Reference_Form.doc DOC document
Attachment_10_Ground_Control_Station_Conversion_QA_Rev_Nov_24.doc DOC document
Attachment_6_Past_and_Present_Performance_Questionairre.rtf RTF text file
Attachment_2_GCS_Conversion_Proof_of_Concept_and_List_of_Materials_corrected.doc DOC document
Attachment_9_SOW.doc DOC document
Attachment_1_Gantt.pdf PDF
Attachment_3_GCS_Room_Layout.doc DOC document
FA4855-15-R-0007_Amendment_0006.pdf PDF
Attachment_4_GFM_8_July_15.doc DOC document
Attachment_9_SOW_(Revised_16_Jul_15).doc DOC document
Attachment_8_Wage_Determination_8_July_15.doc DOC document
FA4855-15-R-0007_Amendment_0006.pdf PDF
Attachment_1_Gantt_16_July_15.doc DOC document
FA4855-15-R-0007_Amendment_0005_Suspend_Contract.pdf PDF
Attachment_1_Gantt_Schedule_revised_9_Dec_14.doc DOC document
Attachment_9_Statement_of_Work_(Revised_2_Dec_14).doc DOC document
Amendment_0004_Update_PoP.pdf PDF
Amendment_0003_Q_and_A_and_updated_SOW.pdf PDF
Attachment_9_Statement_of_Work_(Revised_24_Nov_14).doc DOC document
Ground_Control_Station_Conversion_QA_Rev_Nov_24.doc DOC document
Amendment_0002_Extend_proposal_due_date.pdf PDF
Amendment_0001_Add_Q A_date.pdf PDF
Attachment_1_Gantt_Schedule.pdf PDF
Attachment_8_Wage_Determination.pdf PDF
Attachment_6_Past_and_Present_Performance_Questionnaire.pdf PDF
Attachment_9_Statement_of_Work.pdf PDF
Attachment_7_DD_Form_254_-_Conversions.pdf PDF
Attachment_5_Performance_Reference_Form.pdf PDF
Attachment_4_Government_Furnished_Materials.pdf PDF
Attachment_3_GCS_Room_Layout.pdf PDF
Attachment_2_GCS_Conversion_Proof_of_Concept_and_List_of_Materials.pdf PDF
FA4855-15-R-0007_GCS_Conversions.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF DEFENSE

CONTRACT SECURITY CLASSIFICATION SPECIFICATION

(The requirements of the DoD Industrial Security Manual apply to all security aspects of this effort.)

1. CLEARANCE AND SAFEGUARDING

a. FACILITY CLEARANCE REQUIRED

b. LEVEL OF SAFEGUARDING REQUIRED

TS/SCI

2. THIS SPECIFICATION IS FOR: (X and complete as applicable)

3. THIS SPECIFICATION IS: (X and complete as applicable)

a. PRIME CONTRACT NUMBER

a. ORIGINAL (Complete date in all cases)

DATE (YYYYMMDD)

b. SUBCONTRACT NUMBER

b. REVISED (Supersedes all previous specs)

REVISION NO.

DATE (YYYYMMDD)

c. SOLICITATION OR OTHER NUMBER

FA4855-15-R-0007

DUE DATE (YYYYMMDD)

20141201

c. FINAL (Complete Item 5 in all cases)

DATE (YYYYMMDD)

4. IS THIS A FOLLOW-ON CONTRACT?

YES

NO. If Yes, complete the following:

Classified material received or generated under (Preceding Contract Number) is transferred to this follow-on contract.

5. IS THIS A FINAL DD FORM 254?

YES

NO. If Yes, complete the following:

In response to the contractor's request dated , retention of the classified material is authorized for the period of

6. CONTRACTOR (Include Commercial and Government Entity (CAGE) Code)

a. NAME, ADDRESS, AND ZIP CODE

b. CAGE CODE

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)

7. SUBCONTRACTOR

a. NAME, ADDRESS, AND ZIP CODE

b. CAGE CODE

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)

8. ACTUAL PERFORMANCE

a. LOCATION RPA Operations Center 300 Air Commando Way Bldg 848 Cannon AFB, NM 88103

b. CAGE CODE N/A

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code) See Block/Item 15 of this form

9. GENERAL IDENTIFICATION OF THIS PROCUREMENT

The objective of this contract is to execute the conversion of MQ-1/9 mobile Ground Control Stations into Fixed Ground Control Station system(s) in the Remotely Piloted Aircraft Operations Center and perform related facility/infrastructure integration into the SCIF at Cannon AFB, NM.

10. CONTRACTOR WILL REQUIRE ACCESS TO:

YES

NO

11. IN PERFORMING THIS CONTRACT, THE CONTRACTOR WILL:

YES

NO

a. COMMUNICATIONS SECURITY (COMSEC) INFORMATION

a. HAVE ACCESS TO CLASSIFIED INFORMATION ONLY AT ANOTHER CONTRACTOR'S FACILITY OR A GOVERNMENT ACTIVITY

b. RESTRICTED DATA

b. RECEIVE CLASSIFIED DOCUMENTS ONLY

c. CRITICAL NUCLEAR WEAPON DESIGN INFORMATION

c. RECEIVE AND GENERATE CLASSIFIED MATERIAL

d. FORMERLY RESTRICTED DATA

d. FABRICATE, MODIFY, OR STORE CLASSIFIED HARDWARE

e. INTELLIGENCE INFORMATION

e. PERFORM SERVICES ONLY

(1) Sensitive Compartmented Information (SCI)

f. HAVE ACCESS TO U.S. CLASSIFIED INFORMATION OUTSIDE THE U.S., PUERTO RICO, U.S. POSSESSIONS AND TRUST TERRITORIES

(2) Non-SCI

g. BE AUTHORIZED TO USE THE SERVICES OF DEFENSE TECHNICAL INFORMATION CENTER (DTIC) OR OTHER SECONDARY DISTRIBUTION CENTER

f. SPECIAL ACCESS INFORMATION

h. REQUIRE A COMSEC ACCOUNT

g. NATO INFORMATION

i. HAVE TEMPEST REQUIREMENTS

h. FOREIGN GOVERNMENT INFORMATION

j. HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS

i. LIMITED DISSEMINATION INFORMATION

k. BE AUTHORIZED TO USE THE DEFENSE COURIER SERVICE

j. FOR OFFICIAL USE ONLY INFORMATION

l. OTHER (Specify)

k. OTHER (Specify)

ACCM

DD FORM 254, DEC 1999 PREVIOUS EDITION IS OBSOLETE. Adobe Professional X

12. PUBLIC RELEASE. Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination except as provided by the Industrial Security Manual or unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to releaseDirectThrough (Specify)
HQ AFSOC/PAHQ AFSOC/A2SAF/A2RS-CSA
229 C9D6, Suite 103100 Bartley Street, Suite 212 South1110 Luke Ave. SW, Suite 490 Hurlburt Field, FL 32544Hurlburt Field, FL 32544Joint Base Bolling AFB, DC 20032

to the Directorate for Freedom of Information and Security Review, Office of the Assistant Secretary of Defense (Public Affairs)* for review.

*In the case of non-DoD User Agencies, requests for disclosure shall be submitted to that agency.

SECURITY GUIDANCE. The security classification guidance needed for this classified effort is identified below. If any difficulty is encountered in applying this guidance or if any other contributing factor indicates a need for changes in this guidance, the contractor is authorized and encouraged to provide recommended changes; to challenge the guidance or the classification assigned to any information or material furnished or generated under this contract; and to submit any questions for interpretation of this guidance to the official identified below. Pending final decision, the information involved shall be handled and protected at the highest level of classification assigned or recommended. (Fill in as appropriate for the classified effort. Attach, or forward under separate correspondence, any documents/guides/extracts referenced herein. Add additional pages as needed to provide complete guidance.)

Supported USAF organizations will provide security classification guides and other classification guidance to the contractor as required for contract performance. Contractors will comply with all Cannon AFB, supported unit and special program requirements. Supported units will provide security requirements and instructions, and will include contractors in the unit Information Security program.
Classified markings on all working, draft, and final copies of deliverable material shall be in accordance with Executive Order 13526, The Controlled Access Program Coordination Office (CAPCO) guidelines, DOD 5220.22-M, DoDM 5200.01 vols 1-4 and applicable instructions contained in the respective security classification guides.
For on-base contractors, the NISPOM security standards can be satisfied by incorporating AFI 31-401, Information Security Program Management, AFI 31-601, Industrial Security Program Management, requirements into Visitor Group Security Agreement.
All classified material provided shall be returned by the contractor at contract completion. Individuals are responsible for safeguarding classified information entrusted to them.
Use only AF, USSOCOM, or AFSOC certified AIS for performance on base and will comply with all AF, USSOCOM, or AFSOC AIS procedures.

file_0.wmf file_1.wmf

GERRY L. MICHAELS, Civ, DAFMARK L. CROKE, Civ, DAF
Program ManagerIndustrial Security Manager
27 SOW/XP, Cannon AFB, NM27 SOW/IP, Cannon AFB, NM

14. ADDITIONAL SECURITY REQUIREMENTS. Requirements, in addition to ISM requirements, are established for this contract.

Yes

No (If Yes, identify the pertinent contractual clauses in the contract document itself, or provide an appropriate statement which identifies the additional requirements. Provide a copy of the requirements to the cognizant security office. Use Item 13 if additional space is needed.)

Provide the information in Notification of Government Security Activity clause and Visitor Group Security Agreements Clause, AFFARS 5352.204-9000, to the Servicing Security Activity indicated in Item 13 above. Refer to the contract document for these clauses. The visitor group will operate per DoDM 5200.01, AFI 31-401, AFI 31-601, supplements and unit security program operating instruction, plans and procedures.

15. INSPECTIONS. Elements of this contract are outside the inspection responsibility of the cognizant security office.

Yes

No (If Yes, explain and identify specific areas or elements carved out and the activity responsible for inspections. Use Item 13 if additional space is needed.)

Long term visitor groups will be inspected as part of the supported organizations annual Information Security Program Review, conducted by the SSA, while operating on an Air Force Installation. The contractor will comply with the visitor group security agreement provided by the USAF Program/Project Manager at the performance location. The above does not apply to intelligence, SCI and SAP. See attached addendum.

16. CERTIFICATION AND SIGNATURE. Security requirements stated herein are complete and adequate for safeguarding the classified information to be released or generated under this classified effort. All questions shall be referred to the official named below.

a. TYPED NAME OF CERTIFYING OFFICIAL

b. TITLE

Contracting Officer

c. TELEPHONE (Include Area Code)

d. ADDRESS (Include Zip Code)

17. REQUIRED DISTRIBUTION

CONTRACTOR
SUBCONTRACTOR
COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR
U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION
ADMINISTRATIVE CONTRACTING OFFICER
OTHERS AS NECESSARY

e. SIGNATURE

DD FORM 254 (BACK), DEC 1999

File details come from the government source that posted it. Updated .