Attachment 14 - Wage Determination-NM2.pdf

PDF 170 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4855-10-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 14 - Wage Determination-NM2 Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC Solicitation Questions Part II.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Attachment 62 - Bldg 206 Roof Plan.pdf PDF
MACC Conformed Solicitation per Amendment 2.doc DOC document
Attachment 39 - Bldg 206 Roof Location Plan.pdf PDF
Attachment 57 - Bldg 206 Layout Asbestos Removal.pdf PDF
Attachment 54 - Bldg 206 ADAL Base Warehouse Addition Mechanical Plumbing Plan.pdf PDF
Attachment 63 - ETL 07-4 Air Force Carpet Standard.pdf PDF
Attachment 58 - Bldg 206 Lead Based Paint Removal.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Attachment 1 - General Provisions - MACC new.doc DOC document
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
Attachment 18 - Cannon AFB Bldg 206 Areas 25 June 2010.pdf PDF
MACC solicitation.doc DOC document
Attachment 7 - Asbestos Documentation.pdf PDF
Attachment 30 - AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 26 - AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Attachment 3 - Cannon AFB Architectural Compatibility Plan for Draft Solicitation.pdf PDF
Attachment 37 - Past Performance Project Data.doc DOC document
Attachment 25 - AF Form 3064 Contract Progress Schedule.xls XLS spreadsheet
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc DOC document
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 16 - Seed Project Statement of Objective.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 14 FA4855-10-R-0006 12 March 2010

General Decision Number: NM100002 03/12/2010 NM2

Superseded General Decision Number: NM20080002

State: New Mexico

Construction Type: Highway

Counties: Catron, Chaves, Cibola, Colfax, Curry, De Baca, Eddy, Grant, Guadalupe, Harding, Hidalgo, Lea, Lincoln, Luna, McKinley, Mora, Otero, Quay, Rio Arriba, Roosevelt, San Juan, San Miguel, Sandoval, Sierra, Socorro, Taos, Torrance, Union and Valencia Counties in New Mexico.

STREETS, HIGHWAY, UTILITY AND LIGHT ENGINEERING: Construction shall include the construction, alteration, repair and demolition of roads, streets, highways, alleys, sidewalks, curbs, gutters, guard rails, fences, parkways, parking areas, airports (other than building thereon), bridle paths, athletic fields, highway bridges, median channel and grade separation involving highways; parks, golf courses, viaducts; uncovered reservoirs and uncovered sewage and water treatment facilities; canals, ditches and channels (including lining other than concrete linings); earth dams under one million (1,000,000) cubic yards; well drilling, telephone and electrical transmission lines and site preparations which are part of streets, highway, utility and light engineering projects; and shall include construction, alteration, repair, and demolition of utilities such as sanitary sewers, water lines, gas lines, including appurtenances thereto such as lift stations, inlets, manholes, sewer lagoons, septic tanks and service outlets (stubouts) providing such utility construction is outside the property line or five (5) feet from a building or heavy engineering structure, including the Navajo Indian Reservation.

Modification Number Publication Date 0 03/12/2010

* SUNM1992-001 10/21/1992

Rates Fringes

CARPENTER........................$ 8.11 .44

CEMENT MASON/CONCRETE FINISHER...$ 8.18 .26

ELECTRICIAN......................$ 17.00 2.35

IRONWORKER, REINFORCING..........$ 7.96 .50

IRONWORKER, STRUCTURAL...........$ 9.36 1.29

LABORER

GROUP 1

Common laborer; carpenter tender; concrete buggy

op. (hand); concrete workers....................$ 7.25 .35

GROUP 2

Air & power tool man;

asphalt heaterman;

asphalt jointman; asphalt raker; batching plant scaleman; tenders (to cement mason & plasterer); chain sawman;

concrete power buggyman;

concrete touchup man;

concrete sawman; curbing machine, asphalt or cement; cutting torchman;

metal form setter-road;

grade setter; hod carrier; mortar mixer & mason tender; powderman or blaster tender;

sandblaster; scaler;

Vibratorman (hand type);

vibrator compactor (hand type); wagon air tract, drill & diamond driller (outside) & tender.........$ 7.25 .35

GROUP 3

Gunite pumpcrete & nozzleman; multiplate setter; manhold builder;

pipelayer; powderman-blaster-make-up............$ 7.25 .35

LINE CONSTRUCTION: Cable Splicer

AREA A

Zone I.....................$ 19.47 2.70+3.75% Zone II....................$ 21.06 2.70+3.75% Zone III...................$ 22.13 2.70+3.75% Zone IV....................$ 24.07 2.70+3.75%

AREA B

Zone I.....................$ 15.49 1.80+3.75% Zone II....................$ 17.54 1.80+3.75%

AREA C

Zone I.....................$ 16.78 2.25+3.75%

Zone II....................$ 17.23 2.25+3.75% Zone III...................$ 17.38 2.25+3.75% Zone IV....................$ 17.63 2.25+3.75%

COMMERCIAL LINE WORK

LINE CONSTRUCTION: Equipment Operator (includes helicopter operator)

AREA A

Zone I.....................$ 16.81 2.70+3.75% Zone II....................$ 18.40 2.70+3.75% Zone III...................$ 19.47 2.70+3.75% Zone IV....................$ 21.41 2.70+3.75%

COMMERCIAL LINE WORK

LINE CONSTRUCTION: Groundman

AREA A

Zone I.....................$ 12.57 2.70+3.75% Zone II....................$ 14.16 2.70+3.75% Zone III...................$ 15.23 2.70+3.75% Zone IV....................$ 17.17 2.70+3.75%

AREA C

Zone I.....................$ 11.68 2.25+3.75% Zone II....................$ 12.13 2.25+3.75 Zone III...................$ 12.28 2.25+3.75% Zone IV....................$ 12.53 2.25+3.75%

COMMERCIAL LINE WORK

Line Construction: Equipment Mechanic (includes helicopter mechanic)

AREA A

Zone I.....................$ 16.81 2.70+3.75% Zone II....................$ 18.40 2.70+3.75% Zone III...................$ 19.47 2.70+3.75% Zone IV....................$ 21.41 2.70+3.75%

AREA B

Zone I.....................$ 12.83 1.80+3.75% Zone II....................$ 14.53 1.80+3.75%

COMMERCIAL LINE WORK

Line Construction: Equipment Operator and Mechanic (includes helicopter operator & mechanic)

AREA C

Zone I.....................$ 14.31 2.25+3.75% Zone II....................$ 14.76 2.25+3.75% Zone III...................$ 14.91 2.25+3.75% Zone IV....................$ 15.16 2.25+3.75%

COMMERCIAL LINE WORK

Line Construction:

Groundman-Jackhammer

AREA B

Zone I.....................$ 10.47 1.80+3.75% Zone II....................$ 11.86 1.80+3.75%

COMMERCIAL LINE WORK

Line Construction:

Lineman/Line Technician

AREA A

Zone I.....................$ 17.70 2.70+3.75% Zone II....................$ 19.29 2.70+3.75% Zone III...................$ 20.36 2.70+3.75% Zone IV....................$ 22.30 2.70+3.75%

AREA B

Zone I.....................$ 15.05 1.80+3.75% Zone II....................$ 17.03 1.80+3.75%

AREA C

Zone I.....................$ 16.45 2.25+3.75% Zone II....................$ 16.90 2.25+3.75% Zone III...................$ 17.05 2.25+3.75% Zone IV....................$ 17.30 2.25+3.75%

COMMERCIAL LINE WORK

Line Construction: Powderman

AREA A

Zone I.....................$ 15.40 2.70+3.75% Zone II....................$ 16.99 2.70+3.75% Zone III...................$ 18.06 2.70+3.75% Zone IV....................$ 20.00 2.70+3.75%

AREA B

Zone I.....................$ 12.39 1.80+3.75% Zone II....................$ 14.03 1.80+3.75%

AREA C

Zone I.....................$ 13.82 2.25+3.75% Zone II....................$ 14.27 2.25+3.75% Zone III...................$ 14.42 2.25+3.75% Zone IV....................$ 14.67 2.25+3.75%

COMMERCIAL LINE WORK

Line Construction

UTILITY FOR ELECTRIC &

TELEPHONE UTILITIES, REA

CO-OPS, RAILROADS &

MUNICIPALITIES

Cable Splicer..............$ 18.75 2.95+3.75% Equipment Operator & Mechanic (includes helicopter operator and mechanic)..................$ 15.24 2.95+3.75%

Groundman - Jackhammer.....$ 11.91 2.95+3.75% Lineman/Technician.........$ 17.52 2.95+3.75% Powderman..................$ 14.72 2.95+3.75%

PAINTER

Brush.......................$ 8.64 .91 Spray.......................$ 9.09 .20

Plumbers and Pipefitters All irrigation & lawn sprinkler work..............$ 7.80 3.09

AREA I......................$ 17.94 4.99

Specific Area...............$ 18.74 4.99

Power Equipment Operator

GROUP 1

Concrete paving curing machine....................$ 8.06 .26

GROUP 10

Pipemobile op., mole op....$ 10.51 .26

GROUP 2

Belt type conveyors (material & concrete);

broom (self-propelled);

fork lift; grease truck op.; head oiler; hydro life; tractor (under 50 drawbar HP with or without attachment);

industrial locomotive brakeman; front end loader (2 CY or less);

fireman; oiler;

screedman; roller (pull type); mulching machine;

roller (self-propelled)....$ 8.26 .26

GROUP 3

Concrete paving form grader; concrete paving gang vibrator; concrete paving joint or saw machine; concrete paving subgrader; tractor with backhoe attachment;

subgrade or base finisher; power plant (electric, general or welding machine)...........$ 8.84 .26

GROUP 4

Bulldozer (including self-propelled roller with dozer attachment; batch or continuous mix plant (concrete soil-cement or asphalt); roller (steel wheel) front end loader (2 CY through 10 cy);

scraper; motor grader......$ 8.86 .26

GROUP 5

Asphalt distributor;

asphalt paving or laydown machine; asphalt retort heater; mixer, heavy duty, asphalt or soil cement; trenching machine; clam-type shaftmucker; backhoe, clamshell, dragline, gradall, shovel (under 3/4 CY); elevating grader or belt loader; cranes (crawler or mobile) under 20 ton; air compressor (300 CFM 7 over);

crushing screening & washing plants; drilling machine (cable, core or rotary); mixer, concrete (1 CY & less); pump (6" intake or over); winch truck; hoist (1 drum);

industrial locomotive motorman, lumber stacker;

tractor (50 drawbar HP or over)......................$ 8.86 .26

GROUP 6

Concrete paver mixer;

hoist (2 drum & over);

side boom; traveling crane; piledriver;

backhoe, clamshell, dragline, gradall, shovel (3/4 CY to 3 CY); cranes (crawler or mobile) 20 ton to 40 ton; front end loader (over 10 CY);

mixer concrete (over 1 CY); mechanic and/or welder.....................$ 9.01 .26

GROUP 7

Concrete slip-form paving machine; concrete paving finishing machine;

concrete paving longitudinal float;

gunite machines;

refrigerator; jumbo form or drilling; stage;

slusher; concrete paving spreader; pumpcrete machine; grout pump op.....$ 9.06 .26

GROUP 8

Mine hoist; bulldozer (multiple units); scraper (multiple units); mucking machines; backhoe, clamshell, dragline, gradall, shovel (over 3 CY); cranes (crawler or mobile)....................$ 9.21 .26

GROUP 9

Belt loader (CMI type) op.; derrick cableway......$ 9.71 .26

TRUCK DRIVER

Diesel-powered transport;

lowboy heavy equipment......$ 7.35 .26 Distributor (asphalat;

transit-mix; lowboy, light equipment; off-high hauler; dump truck over 16 cubic yards; trailer semi-trailer dump................$ 7.25 .26 Dump truck, 8 to 16 cubic yards; flat bed over 1 1/2 ton.........................$ 7.25 .26 Pick-up truck 3/4 ton or under; warehouseman; dump truck under 8 cubic yards;

flat bed, 1 1/2 ton or under.......................$ 7.25 .26

AREA AND ZONE DEFINITIONS COMMERCIAL LINE WORK (excluding work done for electric & telephone utilities, REA co-ops, railroad & municipalities);

AREA A - Also applies to switching stations & substations adjacent to power plants. Catron, Chaves, Cibola, Colfax, Curry, Debaca, Grant, Guadalupe, Harding, Lincoln, Mckinley, Mora, Quay, Rio Arriba, Roosevelt, Sandoval, San Juan, San Miguel, Sierra, Socorro, Taos, Torrance, Union, Valencia, and those portions of White Sands Missile Range and Fort Bliss in Otero County, New Mexico

ZONE 1 - Cities & Towns Basing Points & Miles from Main Post Office Roswell - 12 miles Ruidoso - 12 miles Las Vegas - 8 miles Portales - 12 miles Farmington - 6 miles Carrizozo - 12 miles Raton - 6 miles Clovis - 12 miles Tucumcari - 6 miles Gallup - 10 miles

ZONE II - Extending up to 20 miles beyond Zone I, EXCEPT ALBUQUERQUE, rates per hour shall be increased by 9% of the journeyman rate of Zone I

ZONE III - Extending up to 30 miles beyond Zone I, EXCEPT ALBUQUERQUE rates per hour shall be increased by 15% of the journeyman rate of Zone I

ZONE IV - Anything beyond 30 miles from Zone I, EXCEPT ALBUQUERQUE rates per hour shall be increased by 26% of the journeyman rate for Zone I.

For establishing the outlying free zones from the Albuquerque free zone only, Zone II shall extend up to 10 miles beyond Zone I, Zone III shall extend up to 20 miles beyond Zone I and Zone IV anything beyond 20 miles from Zone I.

AREA B - Applies to switching stations & substations adjacent to power plants in Zone I & Zone II in Luna, Dona Ana, Otero & Hildalgo Counties, exclusive of those portions of White Sands Missile Range and Fort Bliss in Dona Ana County, New Mexico.

ZONE I - that area within 25 miles radius from the downtown Office of El Paso, Texas, Fort Bliss & Biggs Field; the area within a 5 mile radius of any city, town or municipality within which an employer establishes or maintains his place of business; the area within 10 mile radius from the Post Office in Alamogordo, New Mexico.

ZONE II - all other areas of the jurisdiction except those specified in Zone I.

AREA C - Applies to switching stations adjacent to power plants in Eddy & Lea Counies; the following zones listed shall be designated from the Main Post Office of Artesia, Carlsbad, Hobbs & Lovington:

Zone I - 0 to 12 miles Zone II - 12 to 22 miles Zone III - 22 to 40 miles Zone IV - 40 miles & beyond

PLUMBERS & PIPEFITTERS AREA DEFINITIONS:

AREA I: Alamogordo, Artesia, Belen, Bernalillo, Carlsbad, Clovis, Deming, Espanola, Estancio, Farmington, Gallup, Grant, Hobbs, Las Vegas, Lordsburg, Los Lunas, Lovington, Moriarty, Portales, Raton, Rio Rancho, Ruidoso, Silver City, Santa Rosa, Santa Teressa, Socorro, Taos, Tucumcari, Truth or Consequence, Artesia, Carlsbad, Hobbs, and Lovington.

AREA I - SHALL INCLUDE A DISTANCE OF ELEVEN (11) ROAD MILES

INCLUSIVE BEYOND THE CITY OR TOWN LIMITS FOR THE CITIES OR

TOWNS LISTED ABOVE AS BASING POINTS.

Specific Area: Los Alamos, White Rock, South Mesa, McGregor Range, White Sands Missile Range and/or Proving Grounds

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NM100002 03/12/2010 NM2
Superseded General Decision Number: NM20080002
State: New Mexico
Construction Type: Highway
Counties: Catron, Chaves, Cibola, Colfax, Curry, De Baca,
Eddy, Grant, Guadalupe, Harding, Hidalgo, Lea, Lincoln, Luna,
McKinley, Mora, Otero, Quay, Rio Arriba, Roosevelt, San Juan,
San Miguel, Sandoval, Sierra, Socorro, Taos, Torrance, Union
and Valencia Counties in New Mexico.
STREETS, HIGHWAY, UTILITY AND LIGHT ENGINEERING: Construction
shall include the construction, alteration, repair and
demolition of roads, streets, highways, alleys, sidewalks,
curbs, gutters, guard rails, fences, parkways, parking areas,
airports (other than building thereon), bridle paths, athletic
fields, highway bridges, median channel and grade separation
involving highways; parks, golf courses, viaducts; uncovered
reservoirs and uncovered sewage and water treatment
facilities; canals, ditches and channels (including lining
other than concrete linings); earth dams under one million
(1,000,000) cubic yards; well drilling, telephone and
electrical transmission lines and site preparations which are
part of streets, highway, utility and light engineering
projects; and shall include construction, alteration, repair,
and demolition of utilities such as sanitary sewers, water
lines, gas lines, including appurtenances thereto such as lift
stations, inlets, manholes, sewer lagoons, septic tanks and
service outlets (stubouts) providing such utility construction
is outside the property line or five (5) feet from a building
or heavy engineering structure, including the Navajo Indian
Reservation.
Modification Number Publication Date
0 03/12/2010
* SUNM1992-001 10/21/1992
Rates Fringes
CARPENTER........................$ 8.11 .44
CEMENT MASON/CONCRETE FINISHER...$ 8.18 .26
ELECTRICIAN......................$ 17.00 2.35
IRONWORKER, REINFORCING..........$ 7.96 .50
IRONWORKER, STRUCTURAL...........$ 9.36 1.29
LABORER
GROUP 1
Common laborer; carpenter
tender; concrete buggy
op. (hand); concrete
workers....................$ 7.25 .35
GROUP 2
Air & power tool man;
asphalt heaterman;
asphalt jointman; asphalt
raker; batching plant
scaleman; tenders (to
cement mason &
plasterer); chain sawman;
concrete power buggyman;
concrete touchup man;
concrete sawman; curbing
machine, asphalt or
cement; cutting torchman;
metal form setter-road;
grade setter; hod
carrier; mortar mixer &
mason tender; powderman
or blaster tender;
sandblaster; scaler;
Vibratorman (hand type);
vibrator compactor (hand
type); wagon air tract,
drill & diamond driller
(outside) & tender.........$ 7.25 .35
GROUP 3
Gunite pumpcrete &
nozzleman; multiplate
setter; manhold builder;
pipelayer; powderman-
blaster-make-up............$ 7.25 .35
LINE CONSTRUCTION: Cable
Splicer
AREA A
Zone I.....................$ 19.47 2.70+3.75%
Zone II....................$ 21.06 2.70+3.75%
Zone III...................$ 22.13 2.70+3.75%
Zone IV....................$ 24.07 2.70+3.75%
AREA B
Zone I.....................$ 15.49 1.80+3.75%
Zone II....................$ 17.54 1.80+3.75%
AREA C
Zone I.....................$ 16.78 2.25+3.75%
Zone II....................$ 17.23 2.25+3.75%
Zone III...................$ 17.38 2.25+3.75%
Zone IV....................$ 17.63 2.25+3.75%
COMMERCIAL LINE WORK
LINE CONSTRUCTION: Equipment
Operator (includes helicopter
operator)
AREA A
Zone I.....................$ 16.81 2.70+3.75%
Zone II....................$ 18.40 2.70+3.75%
Zone III...................$ 19.47 2.70+3.75%
Zone IV....................$ 21.41 2.70+3.75%
COMMERCIAL LINE WORK
LINE CONSTRUCTION: Groundman
AREA A
Zone I.....................$ 12.57 2.70+3.75%
Zone II....................$ 14.16 2.70+3.75%
Zone III...................$ 15.23 2.70+3.75%
Zone IV....................$ 17.17 2.70+3.75%
AREA C
Zone I.....................$ 11.68 2.25+3.75%
Zone II....................$ 12.13 2.25+3.75
Zone III...................$ 12.28 2.25+3.75%
Zone IV....................$ 12.53 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction: Equipment
Mechanic (includes helicopter
mechanic)
AREA A
Zone I.....................$ 16.81 2.70+3.75%
Zone II....................$ 18.40 2.70+3.75%
Zone III...................$ 19.47 2.70+3.75%
Zone IV....................$ 21.41 2.70+3.75%
AREA B
Zone I.....................$ 12.83 1.80+3.75%
Zone II....................$ 14.53 1.80+3.75%
COMMERCIAL LINE WORK
Line Construction: Equipment
Operator and Mechanic
(includes helicopter operator
& mechanic)
AREA C
Zone I.....................$ 14.31 2.25+3.75%
Zone II....................$ 14.76 2.25+3.75%
Zone III...................$ 14.91 2.25+3.75%
Zone IV....................$ 15.16 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction:
Groundman-Jackhammer
AREA B
Zone I.....................$ 10.47 1.80+3.75%
Zone II....................$ 11.86 1.80+3.75%
COMMERCIAL LINE WORK
Line Construction:
Lineman/Line Technician
AREA A
Zone I.....................$ 17.70 2.70+3.75%
Zone II....................$ 19.29 2.70+3.75%
Zone III...................$ 20.36 2.70+3.75%
Zone IV....................$ 22.30 2.70+3.75%
AREA B
Zone I.....................$ 15.05 1.80+3.75%
Zone II....................$ 17.03 1.80+3.75%
AREA C
Zone I.....................$ 16.45 2.25+3.75%
Zone II....................$ 16.90 2.25+3.75%
Zone III...................$ 17.05 2.25+3.75%
Zone IV....................$ 17.30 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction: Powderman
AREA A
Zone I.....................$ 15.40 2.70+3.75%
Zone II....................$ 16.99 2.70+3.75%
Zone III...................$ 18.06 2.70+3.75%
Zone IV....................$ 20.00 2.70+3.75%
AREA B
Zone I.....................$ 12.39 1.80+3.75%
Zone II....................$ 14.03 1.80+3.75%
AREA C
Zone I.....................$ 13.82 2.25+3.75%
Zone II....................$ 14.27 2.25+3.75%
Zone III...................$ 14.42 2.25+3.75%
Zone IV....................$ 14.67 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction
UTILITY FOR ELECTRIC &
TELEPHONE UTILITIES, REA
CO-OPS, RAILROADS &
MUNICIPALITIES
Cable Splicer..............$ 18.75 2.95+3.75%
Equipment Operator &
Mechanic (includes
helicopter operator and
mechanic)..................$ 15.24 2.95+3.75%
Groundman - Jackhammer.....$ 11.91 2.95+3.75%
Lineman/Technician.........$ 17.52 2.95+3.75%
Powderman..................$ 14.72 2.95+3.75%
PAINTER
Brush.......................$ 8.64 .91
Spray.......................$ 9.09 .20
Plumbers and Pipefitters
All irrigation & lawn
sprinkler work..............$ 7.80 3.09
AREA I......................$ 17.94 4.99
Specific Area...............$ 18.74 4.99
Power Equipment Operator
GROUP 1
Concrete paving curing
machine....................$ 8.06 .26
GROUP 10
Pipemobile op., mole op....$ 10.51 .26
GROUP 2
Belt type conveyors
(material & concrete);
broom (self-propelled);
fork lift; grease truck
op.; head oiler; hydro
life; tractor (under 50
drawbar HP with or
without attachment);
industrial locomotive
brakeman; front end
loader (2 CY or less);
fireman; oiler;
screedman; roller (pull
type); mulching machine;
roller (self-propelled)....$ 8.26 .26
GROUP 3
Concrete paving form
grader; concrete paving
gang vibrator; concrete
paving joint or saw
machine; concrete paving
subgrader; tractor with
backhoe attachment;
subgrade or base
finisher; power plant
(electric, general or
welding machine)...........$ 8.84 .26
GROUP 4
Bulldozer (including self-
propelled roller with
dozer attachment; batch
or continuous mix plant
(concrete soil-cement or
asphalt); roller (steel
wheel) front end loader
(2 CY through 10 cy);
scraper; motor grader......$ 8.86 .26
GROUP 5
Asphalt distributor;
asphalt paving or laydown
machine; asphalt retort
heater; mixer, heavy
duty, asphalt or soil
cement; trenching
machine; clam-type
shaftmucker; backhoe,
clamshell, dragline,
gradall, shovel (under
3/4 CY); elevating grader
or belt loader; cranes
(crawler or mobile) under
20 ton; air compressor
(300 CFM 7 over);
crushing screening &
washing plants; drilling
machine (cable, core or
rotary); mixer, concrete
(1 CY & less); pump (6"
intake or over); winch
truck; hoist (1 drum);
industrial locomotive
motorman, lumber stacker;
tractor (50 drawbar HP or
over)......................$ 8.86 .26
GROUP 6
Concrete paver mixer;
hoist (2 drum & over);
side boom; traveling
crane; piledriver;
backhoe, clamshell,
dragline, gradall, shovel
(3/4 CY to 3 CY); cranes
(crawler or mobile) 20
ton to 40 ton; front end
loader (over 10 CY);
mixer concrete (over 1
CY); mechanic and/or
welder.....................$ 9.01 .26
GROUP 7
Concrete slip-form paving
machine; concrete paving
finishing machine;
concrete paving
longitudinal float;
gunite machines;
refrigerator; jumbo form
or drilling; stage;
slusher; concrete paving
spreader; pumpcrete
machine; grout pump op.....$ 9.06 .26
GROUP 8
Mine hoist; bulldozer
(multiple units); scraper
(multiple units); mucking
machines; backhoe,
clamshell, dragline,
gradall, shovel (over 3
CY); cranes (crawler or
mobile)....................$ 9.21 .26
GROUP 9
Belt loader (CMI type)
op.; derrick cableway......$ 9.71 .26
TRUCK DRIVER
Diesel-powered transport;
lowboy heavy equipment......$ 7.35 .26
Distributor (asphalat;
transit-mix; lowboy, light
equipment; off-high
hauler; dump truck over 16
cubic yards; trailer semi-
trailer dump................$ 7.25 .26
Dump truck, 8 to 16 cubic
yards; flat bed over 1 1/2
ton.........................$ 7.25 .26
Pick-up truck 3/4 ton or
under; warehouseman; dump
truck under 8 cubic yards;
flat bed, 1 1/2 ton or
under.......................$ 7.25 .26
AREA AND ZONE DEFINITIONS COMMERCIAL LINE WORK (excluding
work done for electric & telephone utilities, REA co-ops,
railroad & municipalities);
AREA A - Also applies to switching stations & substations
adjacent to power plants. Catron, Chaves, Cibola, Colfax,
Curry, Debaca, Grant, Guadalupe, Harding, Lincoln,
Mckinley, Mora, Quay, Rio Arriba, Roosevelt, Sandoval, San
Juan, San Miguel, Sierra, Socorro, Taos, Torrance, Union,
Valencia, and those portions of White Sands Missile Range
and Fort Bliss in Otero County, New Mexico
ZONE 1 - Cities & Towns Basing Points & Miles from Main Post
Office
Roswell - 12 miles
Ruidoso - 12 miles
Las Vegas - 8 miles
Portales - 12 miles
Farmington - 6 miles
Carrizozo - 12 miles
Raton - 6 miles
Clovis - 12 miles
Tucumcari - 6 miles
Gallup - 10 miles
ZONE II - Extending up to 20 miles beyond Zone I, EXCEPT
ALBUQUERQUE, rates per hour shall be increased by 9% of the
journeyman rate of Zone I
ZONE III - Extending up to 30 miles beyond Zone I, EXCEPT
ALBUQUERQUE rates per hour shall be increased by 15% of the
journeyman rate of Zone I
ZONE IV - Anything beyond 30 miles from Zone I, EXCEPT
ALBUQUERQUE rates per hour shall be increased by 26% of the
journeyman rate for Zone I.
For establishing the outlying free zones from the Albuquerque
free zone only, Zone II shall extend up to 10 miles beyond
Zone I, Zone III shall extend up to 20 miles beyond Zone I
and Zone IV anything beyond 20 miles from Zone I.
AREA B - Applies to switching stations & substations adjacent
to power plants in Zone I & Zone II in Luna, Dona Ana,
Otero & Hildalgo Counties, exclusive of those portions of
White Sands Missile Range and Fort Bliss in Dona Ana
County, New Mexico.
ZONE I - that area within 25 miles radius from the downtown
Office of El Paso, Texas, Fort Bliss & Biggs Field; the
area within a 5 mile radius of any city, town or
municipality within which an employer establishes or
maintains his place of business; the area within 10 mile
radius from the Post Office in Alamogordo, New Mexico.
ZONE II - all other areas of the jurisdiction except those
specified in Zone I.
AREA C - Applies to switching stations adjacent to power
plants in Eddy & Lea Counies; the following zones listed
shall be designated from the Main Post Office of Artesia,
Carlsbad, Hobbs & Lovington:
Zone I - 0 to 12 miles
Zone II - 12 to 22 miles
Zone III - 22 to 40 miles
Zone IV - 40 miles & beyond
PLUMBERS & PIPEFITTERS AREA DEFINITIONS:
AREA I: Alamogordo, Artesia, Belen, Bernalillo, Carlsbad,
Clovis, Deming, Espanola, Estancio, Farmington, Gallup,
Grant, Hobbs, Las Vegas, Lordsburg, Los Lunas, Lovington,
Moriarty, Portales, Raton, Rio Rancho, Ruidoso, Silver
City, Santa Rosa, Santa Teressa, Socorro, Taos, Tucumcari,
Truth or Consequence, Artesia, Carlsbad, Hobbs, and
Lovington.
AREA I - SHALL INCLUDE A DISTANCE OF ELEVEN (11) ROAD MILES
INCLUSIVE BEYOND THE CITY OR TOWN LIMITS FOR THE CITIES OR
TOWNS LISTED ABOVE AS BASING POINTS.
Specific Area: Los Alamos, White Rock, South Mesa, McGregor
Range, White Sands Missile Range and/or Proving Grounds
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be
prevailing.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION

File details come from the government source that posted it. Updated .