BOS_Bid_Schedule.pdf

PDF 29 KB Posted

Attached to
Base Operations Support (BOS) Federal contract opportunity
Solicitation number
FA4800-13-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

BOS Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support (BOS), newest first.
File Type Posted
Hand_delivering_BOS_proposal_Instructions.docx DOCX document
Part_2_633_CONS_List_of_FA4800-13-R-0004_Questions.docx DOCX document
Updated_BOS_SCA.pdf PDF
633_CONS_List_of_FA4800-13-R-0004_Questions.docx DOCX document
RFP_4-08-13_Final_v2.pdf PDF
633_CONS_List_of_FA4800-13-R-0004_Questions.docx DOCX document
BOS_Building_Rooms_and_GSF.pdf PDF
BOS_Final_Tech_Exhibit_4-19-13_v2.pdf PDF
BOS_Final_PWS-4-19-13_v2.pdf PDF
SCA.pdf PDF
BOS_Final_PWS-4-19-13.pdf PDF
BOS_Final_Tech_Exhibit_4-19-13.pdf PDF
BACKFLOW_PREVENTERS_at_FT_EUSTIS_2013.xlsx XLSX spreadsheet
BOS_Bid_Schedule.pdf PDF
633_CONS_List_of_FA4800-13-R-0004_Questions.docx DOCX document
Map_to_Officer-Club.pdf PDF
Past_Performance_Questionaire.pdf PDF
BOS_Site_Visit_instructions.docx DOCX document
FA4800-13-R-0004_Questions.docx DOCX document
RFP_4-08-13_Final.pdf PDF
Site_Visit__Registration_Form.pdf PDF
Past_Performance_Questionaire.pdf PDF
BOS_Final_PWS-4-05-13.pdf PDF
RFP_4-05-13_Final.pdf PDF
BOS_Final_Tech_Exhibit.pdf PDF
BOS_CBA.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNSCHEDULED TASKS (WORK ORDERS-EMER, PRIORITIES 1 thru

3) -Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform service order to include emergency, urgent, and routine. Assigned by Work Orders and shall not exceed Priority designation 1 thru 3 IAW PWS or take longer then 30 days to complete.

12 MO $0.00 $0.00

SCHEDULED TASKS (PREVENTIVE MAINTENANCE) -Section 5.1.1.1 Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform recurring basis preventive maintenance, scheduled tasks will be assigned by scheduled planning schedule IAW PWS

12 MO $0.00 $0.00

UNSCHEDULED/SCHEDULED FMO TASKS (Dedicated Barrack Personnel) Reference Functional Area 5.2.3.5 to 5.2.3.8 and Paragraph

5.2.4.8.9. The contractor will Provide a supervisor with vehicle and a support admin personnel to supervise unschedule/schedule FMO tasks for barracks and other dedicated group of facilities

12 MO $0.00 $0.00

WORK ORDERS - Work Orders will represent project-oriented work such as modifications, total replacements, and new work that are above the catastrophic replacements limitations and exceed Service Order thresholds.

58 EA $0.00 $0.00

0005 PHASE-IN (30 Day Phase-In) IAW PWS 1 Lot $0.00 $0.00

TOTAL COST

IDIQ

PRICE SCHEDULE - IDIQ

Base Operations Support (BOS)

CED JOINT BASE LANGLEY-EUSTIS, VIRGINIA

CLIN DESCRIPTION

QTY U/I UNIT PRICE TOTAL

PRICE

3) -Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform service order to include emergency, urgent, and routine. Assigned by Work Orders and shall not exceed Priority designation 1 thru 3 IAW PWS or take longer then 30 days to complete.

12 MO $0.00 $0.00

SCHEDULED TASKS (PREVENTIVE MAINTENANCE) -Section 5.1.1.1 Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform recurring basis preventive maintenance, scheduled tasks will be assigned by scheduled planning schedule IAW PWS

12 MO $0.00 $0.00

UNSCHEDULED/SCHEDULED FMO TASKS (Dedicated Barrack Personnel) Reference Functional Area 5.2.3.5 to 5.2.3.8 and Paragraph

5.2.4.8.9. The contractor will Provide a supervisor with vehicle and a support admin personnel to supervise unschedule/schedule FMO tasks for barracks and other dedicated group of facilities

12 MO $0.00 $0.00

WORK ORDERS - Work Orders will represent project-oriented work such as modifications, total replacements, and new work that are above the catastrophic replacements limitations and exceed Service Order thresholds.

58 EA $0.00 $0.00

TOTAL COST

CLIN DESCRIPTION

QTY U/I UNIT PRICE TOTAL

PRICE

IDIQ

PRICE SCHEDULE - IDIQ

Base Operations Support (BOS)

CED JOINT BASE LANGLEY-EUSTIS, VIRGINIA

3) -Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform service order to include emergency, urgent, and routine. Assigned by Work Orders and shall not exceed Priority designation 1 thru 3 IAW PWS or take longer then 30 days to complete.

12 MO $0.00 $0.00

SCHEDULED TASKS (PREVENTIVE MAINTENANCE) -Section 5.1.1.1 Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform recurring basis preventive maintenance, scheduled tasks will be assigned by scheduled planning schedule IAW PWS

12 MO $0.00 $0.00

UNSCHEDULED/SCHEDULED FMO TASKS (Dedicated Barrack Personnel) Reference Functional Area 5.2.3.5 to 5.2.3.8 and Paragraph

5.2.4.8.9. The contractor will Provide a supervisor with vehicle and a support admin personnel to supervise unschedule/schedule FMO tasks for barracks and other dedicated group of facilities

12 MO $0.00 $0.00

WORK ORDERS - Work Orders will represent project-oriented work such as modifications, total replacements, and new work that are above the catastrophic replacements limitations and exceed Service Order thresholds.

58 EA $0.00 $0.00

TOTAL COST

CLIN DESCRIPTION

QTY U/I UNIT PRICE TOTAL

PRICE

IDIQ

PRICE SCHEDULE - IDIQ

3) -Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform service order to include emergency, urgent, and routine. Assigned by Work Orders and shall not exceed Priority designation 1 thru 3 IAW PWS or take longer then 30 days to complete.

12 MO $0.00 $0.00

SCHEDULED TASKS (PREVENTIVE MAINTENANCE) -Section 5.1.1.1 Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform recurring basis preventive maintenance, scheduled tasks will be assigned by scheduled planning schedule IAW PWS

12 MO $0.00 $0.00

UNSCHEDULED/SCHEDULED FMO TASKS (Dedicated Barrack Personnel) Reference Functional Area 5.2.3.5 to 5.2.3.8 and Paragraph

5.2.4.8.9. The contractor will Provide a supervisor with vehicle and a support admin personnel to supervise unschedule/schedule FMO tasks for barracks and other dedicated group of facilities

12 MO $0.00 $0.00

WORK ORDERS - Work Orders will represent project-oriented work such as modifications, total replacements, and new work that are above the catastrophic replacements limitations and exceed Service Order thresholds.

58 EA $0.00 $0.00

TOTAL COST

CLIN DESCRIPTION

QTY U/I UNIT PRICE TOTAL

PRICE

IDIQ

PRICE SCHEDULE - IDIQ

3) -Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform service order to include emergency, urgent, and routine. Assigned by Work Orders and shall not exceed Priority designation 1 thru 3 IAW PWS or take longer then 30 days to complete.

12 MO $0.00 $0.00

SCHEDULED TASKS (PREVENTIVE MAINTENANCE) -Section 5.1.1.1 Provide all supervision, personnel, equipment, transportation, materials, and other services necessary to perform recurring basis preventive maintenance, scheduled tasks will be assigned by scheduled planning schedule IAW PWS

12 MO $0.00 $0.00

UNSCHEDULED/SCHEDULED FMO TASKS (Dedicated Barrack Personnel) Reference Functional Area 5.2.3.5 to 5.2.3.8 and Paragraph

5.2.4.8.9. The contractor will Provide a supervisor with vehicle and a support admin personnel to supervise unschedule/schedule FMO tasks for barracks and other dedicated group of facilities

12 MO $0.00 $0.00

WORK ORDERS - Work Orders will represent project-oriented work such as modifications, total replacements, and new work that are above the catastrophic replacements limitations and exceed Service Order thresholds.

58 EA $0.00 $0.00

0005 PHASE-OUT (60 Day Phase-In) IAW PWS 1 Lot $0.00 $0.00

TOTAL COST

CLIN DESCRIPTION

QTY U/I UNIT PRICE TOTAL

PRICE

IDIQ

PRICE SCHEDULE - IDIQ

Base Yr
Op Yr 1
Op Yr 2
Op Yr 3
Op Yr 4

File details come from the government source that posted it. Updated .